This document is an Emergency Purchase Statement from the Illinois Department of Natural Resources Office of Realty & Capital Planning. The existing 30-ton chiller at the Vandalia State House State Historic Site has failed, and Culberston Heating & Cooling has been selected as the vendor to remove the failed chiller and purchase and install a new 30-ton unit. This is an emergency procurement to prevent further loss or damage to state property, as the historic building requires proper environmental controls to protect and preserve the artifacts and building components. The expected start date is August 13, 2019 and the expected end date is November 8, 2019, with a total estimated cost of $62,085.
Culberston Heating & Cooling is a local contractor and registered small business that has performed repair work at the Vandalia site previously, and is familiar with the existing piping and electrical connections layout for quick and efficient installation. This emergency procurement is necessary as the existing chiller can no longer be economically repaired, and the lack of proper cooling and humidity control poses risks of mold growth and damage to the historic building and artifacts. The procurement will be funded through state appropriated funds.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Alpha Final Cost EPS Signed.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Please wait...
If this message is not eventually replaced by the proper contents of the document, your PDF viewer may not be able to display this type of document.
You can upgrade to the latest version of Adobe Reader for Windows®, Mac, or Linux® by visiting http://www.adobe.com/go/reader_download.
For more assistance with Adobe Reader visit http://www.adobe.com/go/acrreader.
Windows is either a registered trademark or a trademark of Microsoft Corporation in the United States and/or other countries. Mac is a trademark of Apple Inc., registered in the United States and other countries. Linux is the registered trademark of Linus Torvalds in the U.S. and other countries.
Page of
EMERGENCY PURCHASE STATEMENT
State of Illinois Chief Procurement Office Emergency Purchase Statement Version 18.1
EMERGENCY PURCHASE STATEMENT
Statement Page of State of Illinois Chief Procurement Office Emergency Purchase Statement Version 18.1 Emergency Purchase Details Emergency Category (select the appropriate option from the drop-down menu below):
Reason for selection of this particular vendor:
Description of supplies or services to be provided:
Is there an existing State contract available for the required supplies or services?
If Yes is checked above, explain why the existing contract does not meet the need:
Actual or Estimated*:
*Actual end date and cost will be reported later.
Select the type of funding to be used:
Signatures I am making this statement and providing it to the CPO Office, the Auditor General, and the Procurement Policy Board in compliance with the Illinois Procurement Code and within 10 days after award of the contract.
I have authorized the emergency procurement in accordance with the requirements of the Illinois Procurement Code (30 ILCS 500) and the applicable administrative rule. I know and understand the contents of this statement and all statements herein are true and correct to the best of my knowledge.
EMERGENCY PURCHASE EXTENSION
Extension Page of State of Illinois Chief Procurement Office Emergency Purchase Statement Version 18.1 Extension Justification Actual or Estimated*:
Actual or Estimated*:
Select the type of funding to be used:
Describe the scope of the original emergency (supply, service, etc.):
Describe the scope of the extension (supply, service, etc.). Show justification for extending the original emergency contract, and explain why the extension need cannot be met through a competitive process:
Was authorization to proceed verbally given?
Term of emergency procurement shall not exceed 90 days. Contract may be extended beyond 90 days if CPO determines additional time is necessary; however, prior to execution of extension, CPO must hold a public hearing and provide written determination *Actual end date and cost will be reported later.
Signatures I am requesting an extension of the requested emergency contract. I know and understand the contents of this statement and all statements herein are true and correct to the best of my knowledge.
EMERGENCY PURCHASE FINAL COST AND TERM
Final Cost and Term Page of State of Illinois Chief Procurement Office Emergency Purchase Statement Version 18.1 Final Costs and Term I am reporting the final costs and term for the referenced emergency contract to the CPO and the Auditor General.
11.0.0.20130303.1.892433.887364
| PageCount: |
| ReferenceNumber: 20-422DNR-REALT-B-9815 |
| CurrentPage: |
| VendorZip: 62471 |
| VendorState: IL |
| VendorCity: Vandalia |
| VendorAddress: 1001 W Randolph Street |
| Vendor: Culberston Heating & Cooling |
| AgencyZip: 62702 |
| AgencyState: IL |
| AgencyCity: Springfield |
| AgencyAddress: One Natural Resources Way |
| AgencyDivision: Office of Realty & Capital Planning |
| AgencyUniversity: Illinois Department of Natural Resources |
| CurrentMasterPage: |
| MasterPageCount: |
| DropDownListQuickPurchase: To prevent or minimize serious disruption in critical State services that affect health, safety, or collection of substantial State revenues |
| CheckBox1ProtectingHealth: 0 |
| CheckBox2DiscountedPrice: 0 |
| CheckBox3RareItems: 0 |
| CheckBox4Entertainment: 0 |
| CheckBox5AvoidLapsing: 0 |
| ExplanationForSelectingVendor: Culberston Heating & Cooling is a local contractor and registered small business. They have performed repair work on at the Vandalia site on multiple occasions and are familiar with the existing piping and electrical connections layout for quick and efficient installation. |
| ExplanationSuppliesServices: The existing 30-ton chiller at Vandalia State House State Historic Site has failed. The unit has been repaired multiple times, but it is no longer economically feasible to make further repairs. |
To Protect against further loss or damage to State property:
The Vandalia State House is listed on the National Register of Historic Places. The chiller provides the proper environmentally controlled temperature and humidity levels within the building to protect and preserve historic artifacts and building components. The longer the building envelope is without proper cooling and humidity control, the greater the possibility for damages to occur. Additionally, without proper air conditioning, the potential for mold growth escalates posing other problems and increased expenses.
Threat to public health or safety:
The State house is open to the public and is staffed. Lack of proper temperature control/humidity controls could also have a detrimental impact to the well-being of visitors and employees.
Culberston Heating & Cooling will remove the failed chiller and purchase and install a new 30-ton unit.
| CheckBoxYes: 0 |
| CheckBoxYes: 0 |
| CheckBoxNo: 1 |
| CheckBoxNo: 0 |
| ExplanationDoesNotMeetNeed: |
| TextFieldExpectedStartDate: 2019-08-13 |
| TextFieldExpectedEndDate: 2019-11-08 |
| TextFieldAmountExpenditure: $62,085.00 |
| ActualOrEstimated1: Estimated * |
| CheckboxFederalFunds: 0 |
| CheckboxFederalFunds: 0 |
| CheckboxStateAppFunds: 1 |
| CheckboxStateAppFunds: 0 |
| CheckBoxStateGrantFunds: 0 |
| CheckBoxStateGrantFunds: 0 |
| CheckBoxOther: 0 |
| IfOtherExplainTextField: Revenue Generating Contract |
| AuthorizedSignature: |
| TitleField: Assistant Agency Procurement Officer |
| TitleField: APO |
| PrintedNameField: Clara M. Orrill |
| AuthorizedDateField: 2019-08-15 |
| Start: |
| End: |
| AmountOfOriginal: |
| ActualOrEstimated2: |
| ExpectedExtensionStartDate: |
| ExpectedExtensionEnd: |
| AmtExtensionExpenditure: |
| ActualOrEstimated3: |
| CheckBoxOther22: 0 |
| IfOtherExplainTextField22: |
| TextField1: |
| TextField2: |
| CheckBoxNA: 0 |
| WhoAuthorizedWork: |
| FinalTotalCost: $62,085.00 |
| FinalTotalTerm: 8/13/19-9/9/19 |
| PrintedName: Craig R. Foxall |