CTSS-III_Industry_Day_Slides_-_AFCENT.pdf
PDF 76 KB Posted
- Attached to
- Communications Technical Support Services (CTSS)-III Federal contract opportunity
- Solicitation number
- Not on record
- Issued by
- Defense Information Systems Agency
About this file
Program Overview
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| CTSS-III_Industry_Day_Slides_-_Contracting.pdf | ||
| CTSS-III_Contractor_Package_-_FINAL.pdf | ||
| CTSS-III_Contractor_Package_5_Feb_2014.pdf | ||
| CTSS-III_Industry_Day_Announcement_16_JAN_14.pdf | ||
| CTSS_III_Task_order_breakdown.docx | DOCX document | |
| CTSS_III_-_Draft_SOW_6-27-2013.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
UNCLASSIFIED
CTSSCTSS III I d t DIII I d t DCTSSCTSS--III Industry DayIII Industry Day
Opening CommentsOpening Comments
Lt Col Leernest RuffinLt Col Leernest Ruffin D t Di t f C i ti USAFCENTD t Di t f C i ti USAFCENT
UNCLASSIFIED
February 11, 2014February 11, 2014
1111 FEB 2014 11 FEB 2014 ---- 10001000
Deputy Director of Communication, USAFCENTDeputy Director of Communication, USAFCENT
CTSS BackgroundCTSS BackgroundCTSS BackgroundCTSS Background
Mr. John DeBerryMr. John DeBerry
USAFCENT A6USAFCENT A6
Chief of Plans and Resources DivisionChief of Plans and Resources Division
UNCLASSIFIED
February 11, 2014February 11, 2014
2211 FEB 2014 11 FEB 2014 ---- 10001000
CTSS BackgroundCTSS Background
• CTSS I Awarded January 2003
• Developed prior to Sep 11, 2001
• Support for 5 steady state bases “Operation Southern Watch”
• Requirements expand: Operations “Enduring & Iraqi Freedom
• CTSS II Awarded March 2007
• Supporting Operations Enduring & Iraqi Freedom
I t d Af h i t t d• Iraq retrograde, Afghanistan retrograde
UNCLASSIFIED 3311 FEB 2014 11 FEB 2014 ---- 10001000
CTSS Scope of WorkCTSS Scope of Work Task Groups Average FTE's
Large Base Small Base Knowledge Operations 1 1g p Cyber Systems Operations 5 1 Cyber Surety 2 1 Client Systems 7 6Client Systems 7 6 Cyber Transport 19 7 RF Transmissions 10 6 Spectrum Operations 1 0 Cable and Antenna Systems 8 6 Communication Engineering 2 1
UNCLASSIFIED 4411 FEB 2014 11 FEB 2014 ---- 10001000
Communication Engineering 2 1 Communication Planning and Management 3 2
CTSS Scope of WorkCTSS Scope of Work
• Primary Country/Locations Supported
Q t (1) U A E (1) K it (2) O (2) Af h i t (3)• Qatar (1), U.A.E. (1), Kuwait (2), Oman (2), Afghanistan (3), Pakistan (1), Saudi Arabia (1), Kyrgyzstan (1)
• CTSS II currently employs 237 FTE’s at 11 different locations in the CENTCOM AOR
• Projected scope in 2 years (BEST ESTIMATE):
• Qatar (1), U.A.E. (1), Kuwait (1.5), Oman (1), Afghanistan (1), UNCLASSIFIED
Qatar (1), U.A.E. (1), Kuwait (1.5), Oman (1), Afghanistan (1), Pakistan (1)
5511 FEB 2014 11 FEB 2014 ---- 10001000
CTSS FutureCTSS Future
CTSS III• CTSS III
• Support for “Enduring Bases”
• 3-6 locations
• Responding to “Emerging Requirements”Responding to Emerging Requirements
Examples of events that drive unplanned requirements:
• CTSS-1: 9/11/2001 drove a great number of unplanned requirements
• Iraq Troop Surge
UNCLASSIFIED
• AFG Troop Increase
6611 FEB 2014 11 FEB 2014 ---- 10001000
Q i ?Questions?
UNCLASSIFIED 7711 FEB 2014 11 FEB 2014 ---- 10001000
File details come from the government source that posted it. Updated .