CTSS-III_Industry_Day_Slides_-_AFCENT.pdf

PDF 76 KB Posted

Attached to
Communications Technical Support Services (CTSS)-III Federal contract opportunity
Solicitation number
Not on record
Issued by
Defense Information Systems Agency

About this file

Program Overview

View the file

Other files for this federal contract opportunity

Other files attached to Communications Technical Support Services (CTSS)-III, newest first.
File Type Posted
CTSS-III_Industry_Day_Slides_-_Contracting.pdf PDF
CTSS-III_Contractor_Package_-_FINAL.pdf PDF
CTSS-III_Contractor_Package_5_Feb_2014.pdf PDF
CTSS-III_Industry_Day_Announcement_16_JAN_14.pdf PDF
CTSS_III_Task_order_breakdown.docx DOCX document
CTSS_III_-_Draft_SOW_6-27-2013.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

UNCLASSIFIED

CTSSCTSS III I d t DIII I d t DCTSSCTSS--III Industry DayIII Industry Day

Opening CommentsOpening Comments

Lt Col Leernest RuffinLt Col Leernest Ruffin D t Di t f C i ti USAFCENTD t Di t f C i ti USAFCENT

UNCLASSIFIED

February 11, 2014February 11, 2014

1111 FEB 2014 11 FEB 2014 ---- 10001000

Deputy Director of Communication, USAFCENTDeputy Director of Communication, USAFCENT

CTSS BackgroundCTSS BackgroundCTSS BackgroundCTSS Background

Mr. John DeBerryMr. John DeBerry

USAFCENT A6USAFCENT A6

Chief of Plans and Resources DivisionChief of Plans and Resources Division

UNCLASSIFIED

February 11, 2014February 11, 2014

2211 FEB 2014 11 FEB 2014 ---- 10001000

CTSS BackgroundCTSS Background

• CTSS I Awarded January 2003

• Developed prior to Sep 11, 2001

• Support for 5 steady state bases “Operation Southern Watch”

• Requirements expand: Operations “Enduring & Iraqi Freedom

• CTSS II Awarded March 2007

• Supporting Operations Enduring & Iraqi Freedom

I t d Af h i t t d• Iraq retrograde, Afghanistan retrograde

UNCLASSIFIED 3311 FEB 2014 11 FEB 2014 ---- 10001000

CTSS Scope of WorkCTSS Scope of Work Task Groups Average FTE's

Large Base Small Base Knowledge Operations 1 1g p Cyber Systems Operations 5 1 Cyber Surety 2 1 Client Systems 7 6Client Systems 7 6 Cyber Transport 19 7 RF Transmissions 10 6 Spectrum Operations 1 0 Cable and Antenna Systems 8 6 Communication Engineering 2 1

UNCLASSIFIED 4411 FEB 2014 11 FEB 2014 ---- 10001000

Communication Engineering 2 1 Communication Planning and Management 3 2

CTSS Scope of WorkCTSS Scope of Work

• Primary Country/Locations Supported

Q t (1) U A E (1) K it (2) O (2) Af h i t (3)• Qatar (1), U.A.E. (1), Kuwait (2), Oman (2), Afghanistan (3), Pakistan (1), Saudi Arabia (1), Kyrgyzstan (1)

• CTSS II currently employs 237 FTE’s at 11 different locations in the CENTCOM AOR

• Projected scope in 2 years (BEST ESTIMATE):

• Qatar (1), U.A.E. (1), Kuwait (1.5), Oman (1), Afghanistan (1), UNCLASSIFIED

Qatar (1), U.A.E. (1), Kuwait (1.5), Oman (1), Afghanistan (1), Pakistan (1)

5511 FEB 2014 11 FEB 2014 ---- 10001000

CTSS FutureCTSS Future

CTSS III• CTSS III

• Support for “Enduring Bases”

• 3-6 locations

• Responding to “Emerging Requirements”Responding to Emerging Requirements

Examples of events that drive unplanned requirements:

• CTSS-1: 9/11/2001 drove a great number of unplanned requirements

• Iraq Troop Surge

UNCLASSIFIED

• AFG Troop Increase

6611 FEB 2014 11 FEB 2014 ---- 10001000

Q i ?Questions?

UNCLASSIFIED 7711 FEB 2014 11 FEB 2014 ---- 10001000

File details come from the government source that posted it. Updated .