CRW SysOps Remodel ITB Bid Tab Results 10-31-23.pdf

PDF 151 KB Posted

Attached to
#23-2329 Clackamas River Water Invitation to Bid - SYSOPS Shop Remodel
Solicitation number
S-R02045-00008255
Issued by
Clackamas County, Cheshire CDP, Oregon

About this file

The document provided is a bid tally sheet for the CRW SysOps Remodel ITB (Invitation to Bid) Project #23-2329 in Clackamas, Oregon. Clackamas River Water (CRW), a public water provider, invited sealed bids from qualified contractors for the remodel of its System Operations Shop Building Interior, Crew Support Portion, located at 9100 SE Mangan Dr., Clackamas, Oregon 97015. The project is subject to the State of Oregon Prevailing Wage Requirement. The bid opening was held on 10/25/23 at 4:00 PM, and the bid tally sheet shows the bid prices from six different contractors across various line items such as Mobilization, Framing, Flooring, Electrical, Plumbing, Accessories, Doors, and Optional Items.

The total bid amounts from the six contractors range from $239,995 to $353,650, with the average bid being $295,733.75 and the median bid being $295,826.50. The bid tally sheet provides a detailed breakdown of the pricing for each line item, allowing for a comprehensive comparison of the bids. This information will be used by CRW to evaluate the proposals and award the contract to the most qualified and responsive bidder.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CLACKAMAS RIVER WATER

SysOps Remodel

COP 23-2329

BID TALLY

Bid opening 10/25/23, 4:00 PM

DESCRIPTION QTY UNITS PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT

1 Mobilization, Site Prep General and Demo 1 L.S. 21,525.00$ 21,525.00$ 54,340.00$ 54,340.00$ 22,000.00$ 22,000.00$ 89,595.00$ 89,595.00$ 46,865.00$ 46,865.00$ 38,170.00$ 38,170.00$

2 Framing, Drywall, and Carpentry 1 L.S. 22,956.00$ 22,956.00$ 39,353.00$ 39,353.00$ 63,500.00$ 63,500.00$ 54,230.00$ 54,230.00$ 45,009.75$ 45,009.75$ 46,791.50$ 46,791.50$

3 Flooring 1 L.S. 12,772.00$ 12,772.00$ 9,955.00$ 9,955.00$ 18,900.00$ 18,900.00$ 23,870.00$ 23,870.00$ 16,374.25$ 16,374.25$ 15,836.00$ 15,836.00$

4 Electrical 1 L.S. 32,139.00$ 32,139.00$ 26,234.00$ 26,234.00$ 28,750.00$ 28,750.00$ 24,200.00$ 24,200.00$ 27,830.75$ 27,830.75$ 27,492.00$ 27,492.00$

5 Plumbing 1 L.S. 20,661.00$ 20,661.00$ 22,789.00$ 22,789.00$ 43,250.00$ 43,250.00$ 28,265.00$ 28,265.00$ 28,741.25$ 28,741.25$ 25,527.00$ 25,527.00$

6 Accessories, Finishes, and HVAC 1 L.S. 94,120.00$ 94,120.00$ 35,596.00$ 35,596.00$ 103,400.00$ 103,400.00$ 93,990.00$ 93,990.00$ 81,776.50$ 81,776.50$ 94,055.00$ 94,055.00$

7 Doors, Windows, and Siding 1 L.S. 9,182.00$ 9,182.00$ 11,728.00$ 11,728.00$ 27,000.00$ 27,000.00$ 4,500.00$ 4,500.00$ 13,102.50$ 13,102.50$ 10,455.00$ 10,455.00$

8 Optional Item 1 L.S. 12,915.00$ 12,915.00$ 25,000.00$ 25,000.00$ 26,220.00$ 26,220.00$ 20,000.00$ 20,000.00$ 21,033.75$ 21,033.75$ 22,500.00$ 22,500.00$

9 Extra Work as Authorized 1 L.S. 15,000.00$ 15,000.00$ 15,000.00$ 15,000.00$ 15,000.00$ 15,000.00$ 15,000.00$ 15,000.00$ 15,000.00$ 15,000.00$ 15,000.00$ 15,000.00$

TOTAL 241,270.00$ 239,995.00$ 348,020.00$ 353,650.00$ 295,733.75$ 295,826.50$

*Corrected from bid submitted

Average MedianCedar Mill Cons. GR Smith Cons.ATK Cons. BnK Cons.

File details come from the government source that posted it. Updated .