AMMENDMENT #3 October 12, 2023~2.pdf
PDF 117 KB Posted
- Solicitation number
- S-R02045-00008255
- Issued by
- Clackamas County, Cheshire CDP, Oregon
About this file
This document is Amendment #3 to the Clackamas River Water (CRW) Invitation to Bid for the SYSOPS Remodel Project #23-2329. The amendment revises the project specifications, indicating that the completed toilet stall is to be ADA compliant, the built-in garbage can will be replaced with a similar stainless steel style, and the tiled flooring will be removed and the floor prepared as a concrete surface with a clear epoxy coating.
The project is for the remodel of the System Operations Shop Building Interior, Crew Support Portion, located in Clackamas, Oregon. The project is subject to the State of Oregon Prevailing Wage Requirement and is open to qualified contractors submitting bids in accordance with the instructions and specifications contained in the CRW SYSOPS Shop Remodel Project Contract / Bid Package.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMMENDMENT #3 October 12, 2023 Clackamas River Water Invitation to Bid – SYSOPS Remodel Project #23-2329
• As stated in the Project Plans and Specifications, CRW intends the completed toilet stall to be ADA compliant.
• In Revision of Project Plans and Specifications, the built-in garbage can will be replaced with a similar style stainless steel built-in garbage can.
• It is the intent of the Project Plans and Specifications that the tiled flooring be removed and the floor be prepared as a concrete floor surface with a clear epoxy coating of the entire concrete floor.
File details come from the government source that posted it. Updated .