Critical Power PWS (Draft).pdf
PDF 247 KB Posted
- Attached to
- Critical Power Follow On
- Solicitation number
- N39430CriticalPower
About this file
This Performance Work Statement (PWS) outlines a comprehensive contract for critical power system services for the Navy at various worldwide locations. The contract covers a wide range of services including design, procurement, installation, renovation, integration, replacement, maintenance, and repair of critical power systems and supporting facilities. Key work categories include equipment procurement (such as engine generators, transfer switches, UPS systems), design, installation, troubleshooting, assessments, arc flash studies, maintenance, systems integration, and training.
The contract is an Indefinite Delivery, Indefinite Quantity (IDIQ) type, with task orders issued for specific projects at locations including Japan, Hawaii, Guam, Alaska, Europe, Africa, Middle East, and Diego Garcia. The contractor must comply with numerous military, federal, and commercial standards, and use Original Equipment Manufacturer (OEM) certified technicians. Critical requirements include ensuring system reliability, maintaining existing functionality, integrating with current infrastructure, and meeting cybersecurity standards. Each task order will include a specific Performance Work Statement, quality assurance plan, and detailed project requirements.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sources Sought.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PERFORMANCE WORK STATEMENT
CRITICAL POWER SYSTEM SERVICES
AT VARIOUS LOCATIONS WORLDWIDE
C.1.0 INTRODUCTION
The Navy relies on reliable electric power for its facilities, typically sourced from commercial utilities and government self-generation. Backup power is commonly provided by engine generators and battery-based uninterruptible power supplies (UPSs), which are generally three-phase units ranging in size from kilowatts (kW) to megawatts (MW). Critical utilities supported by this power include environmental/mechanical systems such as heating, ventilation, and air-conditioning (HVAC), and fire suppression.
To meet the Navy's evolving mission requirements, continuous acquisition, installation, upgrades, maintenance, and replacement of facilities and equipment are essential. The Naval Facilities Engineering and Expeditionary Warfare Center (NAVFAC EXWC), located in Port Hueneme, CA, supports these demands by providing critical power solutions for the Navy and other US government agencies worldwide.
The purpose of this contract is to acquire worldwide services for critical power systems and loads, encompassing design, procurement, installation, renovation, integration, replacement, alteration, technology refresh, troubleshooting, assessments/inspections, testing, technical documentation, maintenance, and repair to support facilities globally. Services may cover all project phases, from inception, design, system installation, and training to removal and disposal. Incidental construction activities may be required at the task order level.
Work will fall under one or more of the following categories:
I. Procurement II. Design III. Installation IV. Troubleshooting, Assessment, Analysis, and Inspection V. Arc Flash, Load Flow, and Coordination Studies VI. Maintenance, Repair, and Upgrades VII Systems integration VIII. Training
The Contractor shall comply with all applicable Military, Federal, Commercial, and local national standards, as well as relevant NAVFAC publications and other standards identified in Section C.3.0 of this contract. Furthermore, the Contractor shall ensure that Original Equipment Manufacturer (OEM) certified technicians perform work on corresponding equipment (e.g., Caterpillar-certified technicians for Caterpillar equipment). Task Orders (TOs) will be awarded under this contract.
Each TO will include:
I. Performance Work Statement (PWS) stating work to be done, site specific information, testing, submittals, deliverables, references, and performance period.
II. Quality Assurance Surveillance Plan (QASP). The Government will use it as a basis to monitor the contractor’s performance.
C.2.0 CONTRACT NATURE AND TASKS
The following examples illustrate the type of work possible under this contract and the work previously performed.
However, the list is not exhaustive.
C.2.1 Equipment Procurement Including:
Engine Generator Sets
Automatic Transfer Switch (ATS) Manual Transfer Switch (MTS) Uninterrupted Power Supply (UPS) Battery Systems and Battery Monitoring Systems Frequency Converters Distribution Systems Switchgear Substations Grounding systems Switchboards Electrical Panels Circuit Breakers Switches, relays, metering Cables and transmission lines Computer Room Air Conditioners (CRAC) Heating Ventilation Air Conditioning (HVAC) Systems Fuel/oil systems including storage, pumps, filters, strainers, etc Air systems Critical Power Control and/or Monitoring Systems Motor Control Centers (MCC) Power Distribution Unit (PDU) Transformers Industrial Control Systems including Supervisory Control and Data Acquisition (SCADA) Programmable Logic Controllers (PLC) Human Machine Interface (HMI) Custom Cabinets and Enclosures Generator Control Systems including Regulators, Governors, Synchronizers and Load Sharing Modules Mechanical Ancillary Equipment including Exhaust/Intake Air, Cooling and Fuel Systems Data Server Racks Life Safety Equipment Building Equipment, Building Structure Modifications, Concrete Pads/Foundation Supports, and Excavations Fire Alarm and Suppression Systems Electromagnetic Pulse (EMP)/High Altitude Electromagnetic Pulse (HEMP) Closed-Circuit Television (CCTV) Systems
C.2.2 Design of Critical Power Systems Including:
35%, 65%, 95%, IFC (issued for construction) and as-built design drawings Methods-of-Procedures (MOP) or Work Execution Plan (WEP) Equipment Submittals Project Schedules Material Submittals
C.2.3 Installation of Equipment Including:
Engine Generator Sets Automatic Transfer Switch (ATS) Manual Transfer Switch (MTS) Uninterrupted Power Supply (UPS) Battery Systems and Battery Monitoring Systems Frequency Converters Distribution Systems Switchgear Substations Grounding systems Switchboards
Electrical Panels Circuit Breakers Switches, relays, metering Cables and transmission lines Computer Room Air Conditioners (CRAC) Heating Ventilation Air Conditioning (HVAC) Systems Fuel/oil systems including storage, pumps, filters, strainers, etc.
Air systems Critical Power Control and/or Monitoring Systems Motor Control Centers (MCC) Power Distribution Unit (PDU) Transformers Industrial Control Systems including Supervisory Control and Data Acquisition (SCADA) Programmable Logic Controllers (PLC) Human Machine Interface (HMI) Custom Cabinets and Enclosures Generator Control Systems including Regulators, Governors, Synchronizers and Load Sharing Modules Mechanical Ancillary Equipment including Exhaust/Intake Air, Cooling and Fuel Systems Data Server Racks Life Safety Equipment Building Equipment, Building Structure Modifications, Concrete Pads/Foundation Supports, and Excavations Fire Alarm and Suppression Systems Electromagnetic Pulse (EMP)/High Altitude Electromagnetic Pulse (HEMP) Closed-Circuit Television (CCTV) Systems
C.2.4 Arc Flash, Load Flow, and Coordination Studies Including:
Arc Flash studies with report and equipment labeling Load Flow studies with diagrams Coordination studies with diagrams and settings for protective devices
C.2.5 Maintenance, Repair, and Modernization Including:
Engine Generator Sets Automatic Transfer Switch (ATS) Manual Transfer Switch (MTS) Uninterrupted Power Supply (UPS) Battery Systems and Battery Monitoring Systems Frequency Converters Distribution Systems Switchgear Substations Grounding systems Switchboards Electrical Panels Circuit Breakers Switches, relays, metering Cables and transmission lines Computer Room Air Conditioners (CRAC) Heating Ventilation Air Conditioning (HVAC) Systems Fuel/oil systems including storage, pumps, filters, strainers, etc.
Air systems Critical Power Control and/or Monitoring Systems Motor Control Centers (MCC) Power Distribution Unit (PDU) Transformers
Industrial Control Systems including Supervisory Control and Data Acquisition (SCADA) Programmable Logic Controllers (PLC) Human Machine Interface (HMI) Custom Cabinets and Enclosures Generator Control Systems including Regulators, Governors, Synchronizers and Load Sharing Modules Mechanical Ancillary Equipment including Exhaust / Intake Air, Cooling and Fuel Systems Data Server Racks Life Safety Equipment Building Equipment, Building Structure Modifications, Concrete Pads/Foundation Supports, and Excavations Fire Alarm and Suppression Systems Electromagnetic Pulse (EMP)/High Altitude Electromagnetic Pulse (HEMP) Closed-Circuit Television (CCTV) Systems
C.2.6 Systems Integration:
Integrate critical power components with existing infrastructure.
Meet cybersecurity and Risk Management Framework (RMF) requirements, ensuring compliance with all applicable DOD, SECNAV, NIST, and IA/Cybersecurity standards.
Contractors shall have appropriate certification(s).
C.2.7 Training:
The Contractor shall provide training as detailed in each task order, which includes orientation, operations, and specialized training on components, equipment, and systems. In-kind replacements require minimal training due to existing site familiarity, while new equipment installations require comprehensive orientation and O&M training.
All training methods are subject to Government approval and include in-class, online, and/or hands-on instruction.
C.3.0 MANDATORY COMPLIANCE REFERENCE
Unless specified in the task order, the Contractor shall adhere to the criteria outlined below. All criteria are effective as of the dates referenced in the Defense Index of Specifications and Standards (DODISS) or the current applicable commercial criteria in effect during solicitation. Individual task orders may modify, add, or subtract references as required.
MIL-STD-3037 – Inspection criteria for International Organization for Standardization (ISO) containers and Department of Defense (DoD) standard family of ISO shelters.
Defense Transportation Regulation (DTR), Department of Defense (DOD) Regulation 4500.9-R, Part VI.
FC 1-300-09N – Navy and Marine Corps Design Procedures, with Change 1 ANSI/NETA ATS (Acceptance Testing Specifications) for new systems ANSI/NETA MTS (Maintenance Testing Specifications) for existing systems ANSI/NETA ECS (Electrical Commissioning Specifications) 49 CFR Part 658 – Truck Size and Weight, Route Designations – Length, Width and Weight Limitations Department of Transportation Occupational Safety and Health Administration (OSHA) EM 385-1-1 US Army Corps of Engineers Safety and Health Requirements Manual
NAVFAC
P-300 Management of Civil Engineering Support Equipment P-307 Management of Weight Handling Equipment P-604 Electrical Safe Acts for Employees (E-SAFE)
UFC
1-200-01 DoD Building Code, with Change 4 3-410-01 Heating, Ventilating, and Air Conditioning Systems
3-410-04 Industrial Ventilation 3-501-01 Electrical Engineering 3-510-01 Foreign Voltages and Frequencies Guide, with Change 2 3-520-01 Interior Electrical Systems 3-520-05 Stationary and Mission Batteries, with Change 2 3-530-01 Interior and Exterior Lighting Systems, with Change 1 3-540-01 Engine-Driven Generator Systems for Prime and Standby Power Applications, with Change 3 3-540-07 Operation and Maintenance (O&M): Generators, with Change 1 3-550-01 Exterior Electrical Power Distribution, with Change 3 3-550-07 Operation and Maintenance (O&M): Exterior Power Distribution Systems 3-560-01 Operation and Maintenance: Electrical Safety, with Change 3 3-580-01 Information and Communications Technology Infrastructure Planning and Design 3-600-01 Fire Protection Engineering for Facilities, with Change 6 3-810-01 Environmental Engineering for Facility Construction
American National Standard Institute (ANSI) C37.90 Relays and Relay Systems Associated with Electric Power Apparatus C39.1 Requirements for Electrical Analog Indicating Instruments C57.13 Requirements for Instrument Transformers
American Welding Society (AWS) D1.1 Structural Welding Code – Steel D1.2 Structural Welding Code – Aluminum D1.6 Structural Welding Code – Stainless
Institute of Electrical and Electronic Engineers (IEEE) C2 National Electrical Safety Code C37 Circuit Breakers, Switchgear, Substations, and Fuses C39.1 Electrical Analog Indicating Instruments C57.13.1 Field Testing of Instrument Transformers C62 Surge Protection Devices 446 Recommended Practice for Emergency and Standby Power Systems for Industrial and Commercial Applications 1 General Principles for Temperature Limits in the Rating of Electric Equipment and for the Evaluation of Electrical Insulation 43 Recommended Practice for Testing Insulation Resistance of Rotating Machinery 48 Standard Test Procedures and Requirements for High-Voltage Alternating-Current Cable Terminations 81 Measuring Earth Resistivity, Ground Impedance, and Earth Surface Potentials of a Ground System (Part 1) Normal Measurements 100 Standard Dictionary of Electrical and Electronics Terms 115 Test Procedures for Synchronous Machines 120 Master Test Guide for Electrical Isolation in Wire and Cable
The Society for Protective Coatings (SSPC) AB 2 Cleanliness of Recycled Ferrous Metallic Abrasives AB 3 Ferrous Metallic Abrasives 12 Surface Preparation and Cleaning of Steel and Other Hard Materials by High- and Ultrahigh-Pressure Water Jetting Prior to Recoating VIS 1 Guide and Reference Photographs for Steel Surfaces Prepared by Dry Abrasive Blast Cleaning PA 1 Shop, Field, and Maintenance Coating of Metals PA 2 Procedure for Determining Conformance to Dry Coating Thickness Requirements QP 3 Shop Application of Complex Protective Coating Systems SP 10 Near-White Blast Cleaning SP COM Surface Preparation Commentary for Steel and Concrete Substrates
National Fire Protection Association (NFPA) 30 Flammable and Combustible Liquids Code
37 Standard for the Installation and Use of Stationary Combustion Engines and Gas Turbines 70 National Electrical Code 75 Standard for the Fire Protection of Information Technology Equipment 99 Health Care Facilities Code 110 Standard for Emergency and Standby Power Systems.
111 Standard on Stored Electrical Energy Emergency and Standby Power Systems
National Electrical Manufacturers Association (NEMA) SG-5 Power Switchgear Assemblies MG-1 Motors and Generators
International Organization for Standardization (ISO) ISO 668 Series 1 Freight Containers ISO 830 Freight Container terminology ISO 1161 Series 1 Freight Containers - corner fittings specification ISO 1496-1 Series 1 Freight Containers - specification and testing.
ISO 6346 Freight Containers - coding, identification and marking ISO 8528-1 Application, ratings, and performance
American Society for Testing and Materials International (ASTM) D 975 Diesel Fuel Oils D 1200 Standard test method for Viscosity D 3276 Painting Inspectors (Metal Substrates) D 3925 Sampling Liquid Paints and Related Pigmented Coatings D 4417 Field Measurement of Surface Profile of Blast Cleaned Steel
Underwriters Laboratories (UL) 508 Industrial Control Equipment. The entire control system of the generator set shall meet this standard.
891 Dead Front Switchboards (600V and below) 1066 Low Voltage AC and DC Power Circuit Breakers used in enclosures 1236 Battery Chargers for Engine Starter Batteries 1558 Standard for Metal Enclosed Low Voltage Switchgear 2200 Stationary Engine Generator Assemblies 142 Aboveground Flammable Liquid Tanks 2085 Protected Aboveground Tanks for Flammable and Combustible Liquids
Manufacturers Standardization Society of the Valve and Fittings Industry (MSS) SP-58 Pipe Hangers and Supports – Materials, Design, and Manufacture SP-69 Pipe Hangers and Supports – Selection and Application SP-80 Bronze Gate, Globe, Angle and Check Valves
National Institute of Standards and Technology (NIST) NIST SP 800-39 Managing Information Security Risk NIST SP 800-37 Applying the Risk Management Framework to Federal Information Systems NIST SP 800-82r3 Operational Technology (OT) Security NIST SP 800-125 Security for Full Virtualization Technologies NIST SP 800-123 General Server Security NIST SP 800-94 Intrusion Detection and Prevention Systems (IDPS) NIST SP 800-83r1 Malware Incident Prevention and Handling for Desktops and Laptops NIST SP 800-41r1 Firewalls and Firewall Policy NIST SP 800-40r2 Creating a Patch and Vulnerability Management Program NIST SP 800-153 Securing Wireless Local Area Networks (WLANs) NIST SP 800-55r1 Performance Measure Guide for Information Security NIST SP 800-61r2 Computer Security Incident Handling Guide NIST SP 800-88r1 Media Sanitization NIST SP 800-86 Integrating Forensic Techniques into Incident Response
NIST SP 800-115 Information Security Testing and Assessment
The following publications are incorporated into this specification by reference. They are cited throughout the document by their basic designation.
CSA Z282 Emergency Electrical Power Supply for Buildings CSA C22.2 No. 14 Industrial Control Equipment EN 50082-2 Electromagnetic Compatibility – Generic Immunity Standards, Part 2: Industrial EN 55011 Industrial, Scientific and Medical Equipment – Radio-frequency disturbance characteristics – Limits and methods of measurement FCC Part 15 Subpart B IEC 608528-4 Reciprocating Internal Combustion Engine Driven Alternating Current Generating Sets – Part 4:
Control gear and switchgear IEC 61000-4-2 Testing and Measurement Techniques – Electrostatic Discharge Immunity Test IEC 61000-4-3 Testing and Measurement Techniques – Radiated, Radiofrequency, Electromagnetic Field Immunity Test IEC 61000-4-5 Testing and Measurement Techniques – Surge Immunity Test
C.4.0 SCOPE
This procurement is for an Indefinite Delivery, Indefinite Quantity (IDIQ) contract for supplies and services including design, equipment purchase, installation, renovation, integration, replacement, alteration, technology refresh, troubleshooting, assessments, inspections, testing, technical documentation, maintenance and repair of critical power systems, loads, and supporting facilities at various worldwide locations.
The Government will issue Request for Proposals (RFPs) for individual Task Orders for the Contractor to provide critical power system services. The Contractor shall submit a technical schedule and cost proposal addressing all Task Order RFP requirements. Each Task Order RFP will include information necessary for developing and implementing a technical solution, such as integration requirements, site-specific details, and security protocols, where applicable.
C.4.1 Procurement of Equipment
Equipment may include:
Engine Generators: Diesel engine generator sets; alternative fuel sources are acceptable. Turbine engine generators may be specified or accepted on a case-by-case basis. Engines must be modern, safe, efficient, and comply with local emissions regulations. Generators are typically three-phase. Commercial generator set packages are preferred.
Packages shall include interfaces for remote controlled starting, shutdown, and voltage adjustment. Generator sets must be appropriately sized to operate with UPS and/or existing and planned loads. They must be suitable for extreme environments, where applicable
Static Transfer Switch (STS), Automatic Transfer Switch (ATS) or Manual Transfer Switch (MTS) is usually included in an engine-generator set. STS, ATS or MTS shall be modern and field-programmable with a user-friendly interface for facilities personnel to monitor and adjust essential functions. Remote monitoring and maintenance bypass may also be specified.
Uninterruptible Power Supply (UPS) system, consisting of a solid-state rectifier, battery, and inverter, is required.
UPS units are typically three-phase, double-conversion, and online full-time. Dual-redundant UPS configurations may be specified. UPS units include internal automatic static switches, external maintenance bypass switches, a maintenance bypass cabinet, and batteries. The specific configuration will be detailed in each task order. Batteries are typically sealed lead-acid type and include racks, cabling, disconnect switches, and safety devices. Battery monitoring systems may be specified. Removal and disposal of existing batteries and associated equipment is expected during replacement.
Remote Monitoring and Control (Generator, STS/ATS, and UPS) may be specified in each task order. Other functions include interface with existing monitoring and industrial control systems, energy monitoring, Supervisory Control and Data Acquisition (SCADA) systems, visual and audio alarms, and other automated building control systems.
Cables and transmission lines: Underground, surface mounted, or overhead. Voltage may vary but usually rated 20 kV or less. Underground cables shall be shielded with ground. Cables may be installed in conduit, duct banks, cable trays or directly buried per UFC and/or applicable codes. Removing existing cables (some lead sheathed) may be required. Overhead cable may be installed on existing poles. Provide and install new poles as necessary.
Transformers: Either oil-cooled or dry type. Distribution voltages range from 20 kV to 480/208V. Low voltages range from 480 to 208/120V. Higher voltages (i.e. 35 kV) may be required.
Switchgear: Medium voltage distribution equipment such as switches, fuses, and reclosers. Low voltage distribution equipment such as motor control centers and panelboards.
Grounding systems: Lightning protection grounding, Electromagnetic Pulse (EMP) protection, and equipment grounding conductors.
Ancillary equipment: Environmental support systems; Heating, Ventilation & Air-Conditioning (HVAC), Computer Room Air Conditioners (CRAC), Liquid cooled computer equipment racks; Petroleum, Oil, and Lubricants (POL), and fire suppression.
C.4.2 Installation of Equipment and Pre/Post-Installation Requirements
The contractor shall provide all design, labor, equipment, materials and facilities as described in individual task orders.
Critical Power Requirements may include:
Design, procurement, installation, renovation, alterations, assessments, training, troubleshooting, and repair of supporting facilities. Work may include preparing as-built drawings, removing equipment, and disposal.
Prior to performing any installation work, the Contractor may be required to submit various items outlined in each task order such as Quality Control Plan, Health & Safety Plan, Activity Hazard Analysis (AHA), Environmental Plan, Work Plan/Schedule/MOP/WEP, and drawings. The Work Plan/Schedule/MOP/WEP shall state the procedures, testing requirements, material, equipment, personnel and contingency conditions needed to complete the project.
Gathering data, identifying significant issues, developing appropriate inspection methods, identifying required retrofits, and preparing procedures for the installation, modification or upgrade of complex critical power systems and supporting facilities.
Preparing schedules and submittals.
Inspection, Assessment, and Troubleshooting Reports.
Daily Production and Quality Control Reports.
Preparing maintenance plans.
Developing as-built shop drawings with drawing formats specified in the task order.
Repairs, upgrades, retrofits, installation, and modifications to critical power systems and loads as well as supporting facilities, structures, and utilities.
Quality control of critical power systems and loads as well as supporting facilities and structures. Provide appropriate documentation of processes and procedures.
Provide training on installed and existing critical power equipment.
C.4.3 Manufacturer’s Operation and Maintenance Manuals/Commercial Manuals and Training Manuals.
Provide Manufacturer’s Operation and Maintenance Manual (O&MM), Commercial Manuals, or a descriptive pamphlet or sheet for all installed equipment. Provide training manuals if required.
C.5.0 KEY PERSONNEL RESPONSIBILITIES AND REQUIREMENTS
Credential substitution: The Government may allow substitutions for specified disciplines or professional registration. All engineering degrees must be from Accreditation Board of Engineering and Technology (ABET) or Engineers’ Council for Professional Development (ECPD) accredited programs. All degrees must be earned. No recognition will be given for honorary degrees. For professional positions (PGM, PE, and DQC), advanced degrees earned may be substituted for experience on the following basis:
Doctorate: Three years’ experience Masters: One year’s experience
For non-professional positions, technical degrees earned may be substituted for experience on the following basis:
Bachelors: Four years’ experience Associates: Two years’ experience
C.5.1 Program Manager
The Program Manager (PGM) has full program oversight over the entire contract. The PGM is not expected to be involved in the daily execution of each task order but will be contacted if problems cannot be resolved with other positions. The PGM shall be responsible for content in all proposals, making sure they comply with basic contract requirements. The PGM shall perform quality assurance for all task orders. The PGM shall organize, plan, direct, supervise, and control all technical and management programs. This includes multidisciplinary tasks and requirements. The PGM shall also perform fiscal and administrative duties and shall be a full-time employee of the prime contractor. The PGM shall have:
- A minimum of earned Bachelor of Science in Electrical or Mechanical Engineering.
- A minimum of ten (10) years’ experience (within the last twelve years) in facilities engineering, including at least five (5) years’ experience in the management of engineering design, installation, inspection, and facilities testing similar in size and complexity to the critical power systems installed at naval communication facilities or data centers.
- Professional Engineering License desired.
C.5.2 Project Manager
The Project Manager (PM) is responsible for status updates, financial tracking, scheduling, and all project correspondence and documentation. The PM is expected to be the Government’s primary point of contact for the assigned task order. The PM shall be an employee of the prime contractor. The PM shall have:
- A minimum of five (5) years’ experience (within the last eight years) in facilities engineering, with three (3) years’ experience managing projects similar in size and complexity to the critical power systems installed at naval communication facilities or data centers.
- Completed the course “Construction Quality Management (CQM) for Contractors” (desired).
C.5.3 Quality Control Manager
The Quality Control Manager (QCM) implements and manages the Quality Control Program. The QCM is required to perform three control phases, reviews and approves submittals, ensures testing is conducted, and provides QC certification and documentation required in the contract or subsequent task orders. The QCM shall be an employee of the prime contractor and shall report to an officer in the firm. The QCM shall not be subordinate to the Superintendent or PM. The QCM shall be an employee of the prime contractor The QCM shall have:
- A Master Electrician certification.
- Completed the course “Construction Quality Management (CQM) for Contractors” and maintain a current certificate.
- Be familiar with USACE EM 385-1-1 and have experience in hazard identification, safety compliance, and sustainability.
- Have seven (7) years (within the last 10 years) of combined experience as a Superintendent, PM, or PE on projects similar in size and complexity to the critical power systems installed at communications facilities or data centers.
- At least three (3) years’ experience as a QCM.
C.5.4 Site Safety and Health Officer
The Site Safety and Health Officer (SSHO) manages, implements, and enforces the Contractor’s Safety and Health Program based on the accepted Accident Prevention Plan. The primary SSHO shall be an employee of the prime contractor. Alternate SSHOs may be employees of onsite subcontractors. The SSHO shall have:
- A minimum of five (5) years of construction safety experience or three (3) years with a Certified Safety Professional (CSP) or Safety and Health degree.
- Completed the 30-hour OSHA Construction Safety class.
- Be familiar with USACE EM 385-1-1 and have experience in hazard identification, safety compliance, and sustainability.
- Completed 40-hour EM 385 safety course.
C.5.5 Superintendent
The Superintendent (also known as the Site Manager) performs quality assurance and scope compliance with the task order. The Superintendent shall be onsite during project execution and oversee all subcontractor and trades’ work. The Superintendent is responsible for complying with all applicable Health, Safety, and Environmental regulations in the area. The Superintendent doesn’t have to be an employee of the prime contractor and shall have:
- A minimum of seven (7) years’ experience (within the last 10 years) on projects similar in size and complexity to the critical power systems installed at communications facilities or data centers.
- Engineering and Construction Management experience.
- Possess a Health and Safety in construction certificate.
- Construction Quality Control experience.
C.6.0 PERFORMANCE REQUIREMENTS
The contractor is responsible for providing all services and materials required for the design, procurement, integration, installation, renovation, alteration, assessment/inspection, and repair of critical power systems. This includes all project phases, from initial design and system installation to training, removal, and disposal. All work shall be performed in support of the NAVFAC EXWC Critical Power Product and Services line, as defined in the basic PWS and individual task order PWSs issued by the Government.
The contractor shall provide a turn-key design using Commercial Off-The-Shelf (COTS) and/or Government Off- The-Shelf (GOTS) equipment. The design shall meet the intent and performance criteria defined in both the basic PWS and the applicable task order PWS. The design must integrate seamlessly with existing systems, preserving existing functionality. Equipment shall be of the highest quality and, unless otherwise specified, conform to NFPA, ISO, and UFC Emergency Power Supply System standards.
C.6.1 Progress Meeting
The Contractor shall have monthly Progress Meetings at a time and location agreed to by the COR, PM and Contractor. Alternatively, the meeting can be held on MS Teams or other accessible platform. The Contracting Officer’s Representative (COR) must agree if there are any deviations to the time frame.
C.6.2 Special Considerations
Individual task orders may require accelerated schedules.
Contractors may require access to SECRET information as defined in Department of Defense Manual 3020.45-M Volume 3: Defense Critical Infrastructure Program (DCIP) Security Classification Manual (SCM). A minimum and valid SECRET security clearance is required. Contractors may require access to Sensitive Compartmented Information Facilities (SCIF) to inspect, repair, install, or test critical power systems. Prime contractors and subcontractors shall be U.S. citizens in good standing. Many locations require all employees working onsite to pass a background investigation before site access is granted.
The contractor may be required to ship tools and materials to remote locations worldwide.
C.6.3 Software and Hardware
All software code shall be the property of the Government. Customized COTS applications or contractor created applications for a specific project shall be documented and provided to the Government in non-compiled and compiled formats. The Contractor shall provide all necessary device licenses to allow local government representative(s) to operate, adjust, and maintain all devices installed at a site with Critical Power equipment.
C.6.4 Safety and Health
The Contractor shall develop and implement a safety program according to EM-385-1-1, Safety and Health Requirements Manual and/or other applicable references. The Contractor’s Safety Team shall have an assigned Site Safety and Health Officer (SSHO) responsible for the safety program in all installations defined in the individual task order PWS. The SSHO shall manage the Safety Program. This duty can also be assigned to the Contractor’s onsite supervisor.
The Contractor’s Safety Plan shall meet EM 385-1-1, Section 1. An Accident Prevention Plan (APP) shall be prepared which contains Activity Hazard Analyses (AHAs) that are specific to each installation.
C.6.5 Quality Control, Systems Testing and Acceptance
The Quality Control (QC) Plan outlines the Contractor's processes, practices, procedures, and methodologies for delivering a quality product to the Government. It includes proactive identification and resolution of existing or potential issues, ensuring corrective actions are implemented throughout the contract lifecycle. Furthermore, the plan specifies inspections and testing procedures that comply with the Critical Power System Services Program's technical performance requirements as well as operational capabilities defined in both the basic contract and individual task order Performance Work Statements (PWS).
The Contractor is responsible for the operational performance of the installed/modified systems and components, verifying this performance through on-site testing. This testing is outlined in the Function and Performance Test (FPT) plan, which includes plans for commissioning, a functional system demonstration, and system testing. The Commissioning Plan covers scheduling, roles, communication, reporting, approvals, and coordination from design through client handover. The Functional System Demonstration Plan verifies that the proposed design meets requirements. The system testing plan consists of a pre-installation test to verify that the existing system design complies with the basic contract PWS and applicable task order PWSs.
System testing will be witnessed by the Government. The Contractor shall review the test results with the Government. The NAVFAC EXWC Critical Power government representative and site representative will consolidate test comments and make recommendations for Government acceptance. The Government team will review test documentation and test results as well as determine whether to accept the system. The PCO or ACO will formally notify the Contractor that the system has been accepted.
C.6.6 Environmental
The Contractor shall comply with all applicable Federal, State, Local, and Region/Installation/Site-specific environmental requirements. The Contractor shall develop and implement an Environmental Plan that outlines processes for: (1) assessing environmental risks; (2) planning work activities to eliminate or control foreseeable environmental impacts; and (3) complying with relevant environmental laws and regulations. The Environmental Plan will consist of two sections: (1) general section addressing requirements applicable to all Government sites and
(2) site-specific section addressing the unique requirements of a specific site.
C.7.0 PLACE OF PERFORMANCE
The place of performance will be specified in individual task orders. Best commercial practice shall apply in preparation and packaging of delivered supplies. Mark all shipments in accordance with MIL-STD-129 or applicable reference. Worldwide locations include: Japan/Far East; Hawaii; Guam; Alaska; Europe; Africa; Middle East/Bahrain; Diego Garcia.
C.8.0 ACCESS, PASSES, AND WORK HOURS
All contractors and subcontractors are required to comply with installation security requirements regarding access to personnel, vehicles, and equipment. The Contractor is responsible for obtaining all security passes for personnel, vehicles, and equipment; this includes subcontractors.
Access to Buildings/Occupied Buildings: The Contractor may work inside or around existing occupied buildings.
The Contractor is responsible (via the Contracting Officer or appropriate Government designated personnel) for obtaining access to buildings and facilities as well as arrange for them to be opened and closed. The Contractor shall not enter buildings without prior approval of the Contracting Officer or appropriate Government designated personnel. Buildings and their contents shall always be secure. The Contractor shall coordinate temporary closures with the installation as required to maintain security. The Contractor will not be permitted in security-regulated buildings or other areas unless cleared by the Security Officer.
Passes and Badges: Contractor employees and representatives performing work under this contract are required to be either United States citizens or documented legal residents; status shall be verified by the prime contractor. The Contractor shall obtain required employee and vehicle passes. Each Contractor employee shall wear the Government issued badge where designated, typically in the front of the outer clothing.
Contractor Vehicles: All vehicles shall display a valid state license plate and safety inspection sticker, if applicable, and shall be maintained in good shape. The company name shall be clearly visible on each Contractor vehicle. Vehicle registration, proof of insurance, and driver licenses are required.
Working Hours: Unless otherwise indicated, work will be located at a government compound or military installation. Contractor working hours shall be between 0700 and 1700, Monday through Friday. If the Contractor desires to work outside of normal working hours, and if the Government can support, the Contractor is required to obtain advance approval from the Contracting Officer or appropriate Government personnel. The Contracting Officer or appropriate Government personnel shall be notified at least 48 hours in advance for approval to access the job site and/or to work outside normal working hours.
C.9.0 SUBMITTALS AND DELIVERABLES
Each Task Order shall have a list of submittals and deliverables with details such as content, format, timing, and receiving party. The table below provides an example.
SUBMITTAL/BENCHMARK DUE DATE RECEIVED STATUS
Milestone Schedule Shop Drawings Manufacturer’s catalog/specifications Design/Construction Schedule Quality Control Plan Material Safety Data Sheets Test and Commissioning Plan Factory Test Reports Waste Management Plan Accident Prevention Plan (APP) with Safety/Health/AHA Schedule of Prices Operation and Maintenance Information Licenses and Permits Badge Requests Method of Procedure (MOP) or Work Execution Plan (WEP) Design Development Documents Submittal Register Performance and Payment Bonds (as required) Environmental Protection Plan Certificates of Insurance DD Form 1354 (if required) 35% Design Package 65% Design Package 95% Design Package Issue for Construction (IFC) As-built Drawings Training Plan
C.10.0 GOVERNMENT FURNISHED INFORMATION AND EQUIPMENT
The Government may provide information, equipment, and material on individual task orders.
C.11.0 CONTRACTING OFFICER’S REPRESENTATIVE (COR)
The COR is a government employee appointed by the Contracting Officer who provides technical direction and guidance. COR appointment letters are for specific task order requirements and vary in the amount of authority. The COR serves as the point of contact for the Contractor and is responsible for monitoring the contractor’s progress in fulfilling the requirements specified in the task order. The COR will inform the Contracting Officer of any technical or contractual concerns.