CrippleCreek_BidSheet.pdf

PDF 402 KB Posted

Attached to
Cripple Creek - Stream Improvement and Riparian Area Reclamation (SCIIP)
Solicitation number
IFB #26002
Issued by
Greenville County, South Carolina

About this file

This document is a Bid Sheet for the Cripple Creek Stream Restoration and Riparian Reclamation: Phase 1 project scheduled for May 2025. The bid sheet details a comprehensive stream restoration project involving multiple construction and environmental restoration activities, including mobilization, erosion and sediment control, clearing and grubbing, excavation, and vegetation establishment. The project encompasses 1.5 acres and includes various specialized elements such as cross vanes, boulder riffles, rock toes, and turf reinforcement matting. Key quantities include 3,070 cubic yards of offsite excavation, 800 linear feet of boulder toe work, 2,700 square yards of coir turf reinforcement matting, and 400 plugs/bare root stems for ecological restoration.

The bid sheet includes several notable specifications that impact project logistics and costs. All spoil material must be transported to Twin Chimneys Landfill in Honea Path, SC, with no tipping fees, and boulders are available at no cost when used on the project. A 5% contingency is built into the bid sheet. GPS is the preferred measurement method, though other methods may be accepted. The project requires precise implementation of stream restoration techniques, including various erosion control and revegetation strategies. The bidder will be responsible for constructing the project according to provided plans, with a focus on ecological restoration and stream channel stabilization.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ITEM # DESCRIPTION QTY UNIT UNIT PRICE TOTAL PRICE

1 MOBILIZATION - LS -

2 AS-BUILTS - LS -

3 EROSION AND SEDIMENT CONTROL - LS -

4 CLEARING AND GRUBBING 1.5 AC

5 BEDDING STONE 70 CY

6 RIPRAP, BOULDERS AND AGGREGATE 30 CY

EXCAVATION, FILLING, AND GRADING:

CUT AND FILL IN PLACE

680 CY

EXCAVATION, FILLING, AND GRADING:

CUT AND REMOVE OFFSITE

3,070 CY

9 CROSS VANE 2 EA

10 SINGLE ARM VANE 2 EA

11 BOULDER RIFFLE 4 EA

12 BOULDER TOE 800 LF

13 ROCK TOE 700 LF

14 COIR TURF REINFORCEMENT MATTING (700G) 2,700 SY

15 COIR TURF REINFORCEMENT MATTING (320G) 500 SY

16 PERMANENT TRM 1,100 SY

SEEDING, MULCHING AND VEGETATION

ESTABLISHMENT

1.5 AC

18 LIVE STAKES 80 BN

19 PLUGS/BARE ROOT STEMS 400 EA

20 CONTINGENCY 5 % -

CRIPPLE CREEK STREAM RESTORATION AND RIPRARIAN RECLAMATION: PHASE 1

BID SHEET

MAY 2025

TOTAL

NOTE: IT IS THE CONTRACTOR'S RESPONSIBILITY TO CONSTRUCT IN ACCORDANCE WITH THE PLANS.

GPS IS THE PREFERRED METHOD, BUT OTHER METHODS MAY BE ACCEPTED.

NOTE: ALL SPOIL MATERIAL MUST BE TAKEN TO TWIN CHIMNEY'S LANDFILL (11075 AUGUSTA RD., HONEA PATH, SC 29654). THERE WILL BE NO TIPPING FEE.

NOTE: BOULDERS ARE AVAILABLE AT NO COST WHEN USED ON THIS PROJECT, LOCATED AT TWIN

CHIMNEYS LANDFILL (11075 AUGUSTA RD., HONEA PATH, SC 29654). SEE ATTACHMENT FOR

ADDITIONAL INFORMATION.

File details come from the government source that posted it. Updated .