CrippleCreek_Planset.pdf
PDF 80 MB Posted
- Solicitation number
- IFB #26002
- Issued by
- Greenville County, South Carolina
About this file
Based on the provided document details, this appears to be a project plan for the Cripple Creek Stream Improvement and Riparian Area Reclamation (SCIIP) project located in South Carolina. The project involves an 800-foot stream restoration and improvement initiative within the Reedy River watershed, focused on mitigating stream erosion and enhancing riparian ecosystem health. Specific restoration techniques will include bank regrading to achieve a 3:1 slope, implementing soil lifts, installing coir and turf reinforcement matting, constructing boulder walls, and applying various bank toe treatments.
The proposed stream restoration will incorporate multiple in-stream structural features, including cross vanes, boulder and constructed riffles, stream drops, j-hook vanes, and single arm vanes. The project may potentially involve stream re-routing or daylighting to improve overall watershed functionality. While specific funding sources and budget details are not explicitly outlined, the project appears to be a comprehensive environmental restoration effort aimed at improving stream stability, reducing erosive energy, and potentially enhancing ecological conditions in the Reedy River watershed region of South Carolina.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .