This document is a bid sheet for the Cripple Creek Stream Restoration and Riparian Reclamation: Phase 1 project, scheduled for May 2025, located in South Carolina. The bid sheet outlines a comprehensive stream improvement project involving multiple construction and ecological restoration tasks, including mobilization, erosion and sediment control, clearing and grubbing, excavation, and installation of various stream stabilization features. The project encompasses 1.5 acres and includes specific quantities for items such as cross vanes (2 units), boulder riffles (4 units), boulder and rock toe treatments (800 and 700 linear feet respectively), and various vegetation establishment components like live stakes (80 bundles) and plugs/bare root stems (400 units).
The bid sheet specifies several notable logistical details, including a requirement to use Twin Chimneys Landfill in Honea Path, SC for spoil material disposal at no tipping fee, and offers boulders at no cost when used on the project. The document includes a 5% contingency line item and requires GPS as the preferred measurement method, though other methods may be accepted. Quantities are provided in various units including cubic yards (CY), linear feet (LF), square yards (SY), acres (AC), and each (EA), allowing contractors to precisely calculate potential project costs. The bid sheet provides a structured format for contractors to input unit prices and calculate total project costs across 20 distinct line items related to stream restoration and ecological rehabilitation.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ITEM # DESCRIPTION QTY UNIT UNIT PRICE TOTAL PRICE
1 MOBILIZATION - LS -
2 AS-BUILTS - LS -
3 EROSION AND SEDIMENT CONTROL - LS -
4 CLEARING AND GRUBBING 1.5 AC
5 BEDDING STONE 70 CY
6 RIPRAP, BOULDERS AND AGGREGATE 30 CY
EXCAVATION, FILLING, AND GRADING:
CUT AND FILL IN PLACE
680 CY
EXCAVATION, FILLING, AND GRADING:
CUT AND REMOVE OFFSITE
3,070 CY
9 CROSS VANE 2 EA
10 SINGLE ARM VANE 2 EA
11 BOULDER RIFFLE 4 EA
12 BOULDER TOE 800 LF
13 ROCK TOE 700 LF
14 COIR TURF REINFORCEMENT MATTING (700G) 2,700 SY
15 COIR TURF REINFORCEMENT MATTING (320G) 500 SY
16 PERMANENT TRM 1,100 SY
SEEDING, MULCHING AND VEGETATION
ESTABLISHMENT
1.5 AC
18 LIVE STAKES 80 BN
19 PLUGS/BARE ROOT STEMS 400 EA
20 CONTINGENCY 5 % -
CRIPPLE CREEK STREAM RESTORATION AND RIPRARIAN RECLAMATION: PHASE 1
BID SHEET
MAY 2025
TOTAL
NOTE: IT IS THE CONTRACTOR'S RESPONSIBILITY TO CONSTRUCT IN ACCORDANCE WITH THE PLANS.
GPS IS THE PREFERRED METHOD, BUT OTHER METHODS MAY BE ACCEPTED.
NOTE: ALL SPOIL MATERIAL MUST BE TAKEN TO TWIN CHIMNEY'S LANDFILL (11075 AUGUSTA RD., HONEA PATH, SC 29654). THERE WILL BE NO TIPPING FEE.
NOTE: BOULDERS ARE AVAILABLE AT NO COST WHEN USED ON THIS PROJECT, LOCATED AT TWIN
CHIMNEYS LANDFILL (11075 AUGUSTA RD., HONEA PATH, SC 29654). SEE ATTACHMENT FOR
ADDITIONAL INFORMATION.