CRFQ DOT2500000019 Exhibit B Drawings.pdf
PDF 115 KB Posted
- Attached to
- HEADWALL AND BLOCK MAT VARIOUS SIZES
- Solicitation number
- CRFQ-0803-DOT2500000019-1
- Issued by
- Upshur County, West Virginia
About this file
This document appears to be a technical drawing and specifications for a 36-inch HDPE precast modular sloped headwall, provided as an exhibit for a competitive bid opportunity (CRFQ DOT2500000019) with the West Virginia Department of Transportation, Division of Highways. The headwall is designed for use with a 36-inch I.D. profile wall HDPE pipe, with details on the dimensions, reinforcement, bolted connections, and square blockouts to connect adjacent headwalls. The drawings include notes on installation requirements, such as grouting the pipe into the receiving channel and chamfering edges. No additional details are provided regarding the overall contract scope, quantities, response dates, award information, or pricing terms.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| CRFQ DOT2500000019 Terms and Cond.pdf | ||
| CRFQ DOT2500000019 Exhibit A Pricing Page.xlsx | XLSX spreadsheet | |
| CRFQ DOT2500000019 Inst To Vendors.pdf | ||
| CRFQ DOT2500000019 Specifications.pdf | ||
| Final_CRFQ_0803_DOT2500000019_1_WV_CRFQ_FORM.PDF |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
35°
4'-6"
6"
3'-6"6"
3'-0"
3'-6"
1'-0"
8"
6'-8"
8"
4'-11.5"
5'-11.5"
8"
MIDLINE OF PIPE BARREL. (2 EACH SIDE)
BOLTED CONNECTION. PLACED ALONG
WITH 1.5" DIAMETER HOLE FOR RECESSED
4"W X 4"H X 3"D SQUARE BLOCKOUT
CENTER OF MASS IN TOP FACE.
LIFTING LUGS PLACED NEAR
1'-8"
County Sheet Sheets Total
No.Year
Fiscal Project No.
Federal
No.
Project
State
No.
Dist.
State
Div.
Roads Public
3W.V.
THE WEST VIRGINIA DEPARTMENT OF TRANSPORTATION
DIVISION OF HIGHWAYS
DETAIL
-30/2- S337
0.01
2023 PLEASANTS
PRECAST MODULAR SLOPED HEADWALL - 36" HDPE
1'
4'-11.5"
BOLTED CONNECTIONS WILL BE GROUTED AFTER PLACEMENT TO PROVIDE A SMOOTH SURFACE.
4. SQUARE BLOCKOUTS TO BE PLACED ALONG MIDLINE OF PIPE BARREL TO CONNECT ADJACENT HEADWALLS.
3. TOP AND FRONT EDGES TO BE CHAMFERED 3/4". FOOTING AND SIDE EDGES ARE NOT TO BE CHAMFERED.
2. REINFORCEMENT IS TO BE PER HEADWALL MANUFACTURER.
36" HDPE PIPE WILL BE INSERTED INTO 8" DEEP RECEIVING CHANNEL AND GROUTED IN PLACE.
1. PRECAST SLOPED HEADWALL IS SIZED FOR A 36" I.D. PROFILE WALL HDPE PIPE WITH O.D. OF 41".
NOTES: