This is a Statement of Work (SOW) issued by the Federal Bureau of Investigation's Finance and Facilities Division for electrical outlet installation at the Central Records Complex (CRC) Document Laboratory, effective January 13, 2026.
The contractor shall furnish all labor, materials, tools, equipment, supervision, and incidentals necessary to install two (2) new 20-amp quad electrical receptacles at Government-designated locations within the CRC Document Laboratory. The scope includes providing and installing one (1) new 20-amp branch circuit from the existing electrical panel to a new junction box above the ceiling, installing new raceways from the junction box to each outlet location in accordance with applicable codes, installing new outlet boxes and wiring, coordinating localized electrical outages with advance Government notice, testing all newly installed outlets for proper operation and compliance, labeling outlets with corresponding circuit numbers, and updating the electrical panel schedule. Work shall be performed at the FBI CRC Document Laboratory facility with exact location details provided at award. The contractor must provide qualified personnel with appropriate licenses, certifications, and experience in commercial electrical installation. All materials and equipment must be new, commercially available, and suitable for their intended purpose, with pricing for materials clearly identified and separately priced if applicable. All work must comply with the National Electrical Code (NEC), applicable state and local electrical codes, OSHA requirements, manufacturer installation instructions, and FBI facility access, safety, and security requirements. The Government will inspect the work upon completion and accept it when all outlets are installed as specified and function properly, electrical panel schedules are updated accurately, work complies with applicable codes and safety standards, and the work area is clean and free of debris.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFP 15F06726Q0000122_AM01 Electrical Outlet Installation Winchester.pdf | ||
| Questions-Answers_Electrical Outlet Install.xlsx | XLSX spreadsheet | |
| Questions-Answers_Electrical Outlet Install.xlsx | XLSX spreadsheet | |
| Questions-Answers_Electrical Outlet Install.xlsx | XLSX spreadsheet | |
| 15F06726Q0000122 Electrical Outlet Installation.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FEDERAL BUREAU OF INVESTIGATION
FINANCE AND FACILITIES DIVISION | PROCUREMENT SECTION
Outlet for CRC Version 1.0 Page 1
Electrical Outlet Installation
For
Central Records Complex (CRC)/
FFD Division
Statement of Work
13 January 2026
Outlet for CRC Version 1.0 Page 2
1. Background
The Federal Bureau of Investigation (FBI), Facilities & Fleet Division (FFD), requires the installation of additional electrical outlets in the CRC Document Laboratory to support new document scanning equipment. The existing electrical infrastructure does not provide sufficient dedicated power capacity for the required equipment.
The Government seeks a contractor to furnish all labor, materials, equipment, supervision, and incidentals necessary to complete this requirement.
2. Scope of Work
The Contractor shall provide all labor, materials, tools, equipment, supervision, and incidentals necessary to furnish and install two (2) new 20-amp quad electrical receptacles in the CRC Document Laboratory.
The work includes, but is not limited to, the following tasks:
• Furnish and install two (2) new 20A quad receptacles at Government-designated locations within the Document Lab.
• Provide and install one (1) new 20A branch circuit from the existing electrical panel to a new junction box above the ceiling at the proposed outlet location.
• Install new raceways from the junction box to each new outlet location in accordance with applicable codes and standards.
• Install new outlet boxes, wiring, and electrical devices required to complete the installation.
• Coordinate and perform localized electrical outages as necessary to safely complete the work, with advance notice to the Government.
• Test all newly installed outlets to verify proper operation and compliance.
• Label all new outlets with corresponding circuit numbers.
• Update the electrical panel schedule to reflect the newly installed circuit(s).
3. Place of Performance
Work shall be performed at the FBI CRC Document Laboratory at a Government-designated facility. Exact location details will be provided at the time of award.
Outlet for CRC Version 1.0 Page 3
4. Period of Performance
The Contractor shall complete all work within the period of performance specified in the RFQ and resulting order, inclusive of coordination, installation, testing, and closeout activities.
5. Labor Requirements
The Contractor shall provide qualified personnel with appropriate licenses, certifications, and experience to perform commercial electrical installation services. Labor categories, staffing approach, and estimated hours shall be proposed by the Contractor and must be appropriate for the scope of work.
6. Materials and Equipment
• The Contractor shall provide all materials and equipment necessary to complete the work.
• Materials may include, but are not limited to, conduit, wiring, junction boxes, outlet boxes, receptacles, fittings, and associated hardware.
• All materials and equipment shall be new, commercially available, and suitable for their intended purpose.
• Pricing for materials shall be clearly identified and separately priced, if applicable.
7. Standards and Compliance
All work shall be performed in accordance with:
• National Electrical Code (NEC)
• Applicable state and local electrical codes
• Occupational Safety and Health Administration (OSHA) requirements
• Manufacturer installation instructions
• FBI facility access, safety, and security requirements
8. Government Furnished Property (GFP)
No Government Furnished Property is anticipated for this requirement unless otherwise specified in the RFQ.
Outlet for CRC Version 1.0 Page 4
9. Inspection and Acceptance
The Government will inspect the work upon completion. Acceptance will occur when the Government verifies that:
• All outlets are installed as specified and function properly.
• Electrical panel schedules have been updated accurately.
• Work complies with applicable codes and safety standards.
• The work area is clean and free of debris.
10. Government Points of Contact
The Government will identify a Contracting Officer and, if applicable, a Contracting Officer’s Representative (COR) in the RFQ and/or resulting award.
| 1. Background |
| 2. Scope of Work |
| 3. Place of Performance |
| 4. Period of Performance |
| 5. Labor Requirements |
| 6. Materials and Equipment |
| 7. Standards and Compliance |
| 8. Government Furnished Property (GFP) |
| 9. Inspection and Acceptance |
| 10. Government Points of Contact |