Questions-Answers_Electrical Outlet Install.xlsx
XLSX spreadsheet 24 KB Posted
- Attached to
- Electrical Outlet Installation
- Solicitation number
- 15F06726Q0000122
About this file
This is a Questions and Answers document for the Electrical Outlet Installation solicitation (15F06726Q0000122) issued by the Department of Justice Federal Bureau of Investigation. The Q&A addresses industry inquiries regarding the installation of two new 20-amp quad electrical receptacles in the CRC Document Laboratory at the FBI Records Center in Winchester, Virginia.
Key technical details confirmed through the Q&A include: the existing electrical panel is an EATON brand with available space for new breakers; the distance from the panel to the outlet location is approximately 110 feet, with roughly 20 feet of new EMT (Electrical Metallic Tubing) raceway required and the remaining 90 feet utilizing existing EMT; ceilings are drop/open ceilings suitable for raceway routing; outlets will be flush-mounted (cut and fished in); ceiling height is 12 feet with lifts available; no obstacles such as concrete walls require drilling; and no permit is required for the work. Administrative requirements clarified include that no state-specific electrical licensing is required (any licensed electrician is acceptable), no performance or payment bonds are necessary, no security clearance is required (though a criminal background check is needed for visitor access), no site visits by subcontractors are permitted, no training delays are anticipated, and no amendments resulted from any of the questions answered. The document does not contain pricing information, response dates, or award dates.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFP 15F06726Q0000122_AM01 Electrical Outlet Installation Winchester.pdf | ||
| Questions-Answers_Electrical Outlet Install.xlsx | XLSX spreadsheet | |
| Questions-Answers_Electrical Outlet Install.xlsx | XLSX spreadsheet | |
| 15F06726Q0000122 Electrical Outlet Installation.pdf | ||
| CRC Outlet Install SOW.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Q&A
| Column1 | Question from Industry | FBI Response | Result in an Amendment | |
| 1 | What is the rough distance from the existing electrical panel to the new outlet location? | 110 feet | No | |
| 2 | Are the ceilings drop ceilings or hard ceilings for routing the raceways? | Drop ceilings/open ceilings | No | |
| 3 | Are there any obstacles such as concrete walls that will need to be drilled through from the panel to the new outlet location? | No. | No | |
| 4 | Is EMT the intended raceway type for the work? | Yes, estimated 20ft EMT | No | |
| 5 | Could you please provide pictures of this project. | No, secure location. | No | |
| 6 | Are bid bonds, payment bonds, performance bonds, insurance etc required for this opportunity? | No | No | |
| 7 | May we schedule our subcontractor for a site visit? | No | No | |
| 8 | I am writing to request clarification regarding licensing requirements for the Electrical Outlet Installation at the FBI Records Center in Winchester, VA. | |||
| Specifically, can the required electrical work be performed by a properly licensed electrician from another state (such as Texas), or must the electrician hold an active electrical license issued by the Commonwealth of Virginia or the local jurisdiction where the work will be performed? | Not state specific, just needs to be licensed. | No | ||
| 9 | What type of panel is it? (Brand / Model) | EATON | No | |
| 10 | Is there space to add new breakers? | Yes | No | |
| 11 | Will the outlets be surface mounted or flush mounted (cut & fished in?) | Flush | No | |
| 12 | Is the Lab considered a “SCIF” & will the penetrations be required to be Dielectric Brakes? | No | No | |
| 13 | Could you please confirm what type of background investigation or security clearance is required for this project, and what is needed to meet that requirement? | No clearance required, criminal background check for visitor access | No | |
| 14 | Do you know the ceiling height and do you have to have a security clearance to work in that facility? | 12 feet, lifts available for use | No | |
| 15 | On the Questions & Answers sheet, the rough distance is estimated to be 110’. You state that EMT is the intended raceway, but you say roughly 20’. If distance is 110’, what type of raceway is to be used for the other 90’? | Exisiting EMT | No | |
| 16 | Will a Permit be required for this work? | No | No | |
| 17 | Will there be any training required once onsite or any delay or waiting periods before work can begin? | No | No | |
| 18 | ||||
| 19 | ||||
| 20 | ||||
| 21 | ||||
| 22 | ||||
| 23 | ||||
| 24 | ||||
| 25 | ||||
| 26 | ||||
| 27 | ||||
| 28 | ||||
| 29 | ||||
| 30 | ||||
| 31 | ||||
| 32 | ||||
| 33 | ||||
| 34 | ||||
| 35 | ||||
| 36 | ||||
| 37 | ||||
| 38 | ||||
| 39 | ||||
| 40 | ||||
| 41 | ||||
| 42 | ||||
| 43 | ||||
| 44 | ||||
| 45 | ||||
| 46 | ||||
| 47 | ||||
| 48 | ||||
| 49 | ||||
| 50 | ||||
| 51 | ||||
| 52 | ||||
| 53 | ||||
| 54 | ||||
| 55 | ||||
| 56 | ||||
| 57 | ||||
| 58 | ||||
| 59 | ||||
| 60 | ||||
| 61 | ||||
| 62 | ||||
| 63 | ||||
| 64 | ||||
| 65 | ||||
| 66 | ||||
| 67 | ||||
| 68 | ||||
| 69 | ||||
| 70 | ||||
| 71 | ||||
| 72 | ||||
| 73 | ||||
| 74 | ||||
| 75 | ||||
| 76 | ||||
| 77 | ||||
| 78 | ||||
| 79 | ||||
| 80 | ||||
| 81 | ||||
| 82 | ||||
| 83 | ||||
| 84 | ||||
| 85 | ||||
| 86 | ||||
| 87 | ||||
| 88 | ||||
| 89 | ||||
| 90 | ||||
| 91 |
File details come from the government source that posted it. Updated .