Questions-Answers_Electrical Outlet Install.xlsx
XLSX spreadsheet 24 KB Posted
- Attached to
- Electrical Outlet Installation
- Solicitation number
- 15F06726Q0000122
About this file
This file is a Questions and Answers document for the Electrical Outlet Installation solicitation (15F06726Q0000122) issued by the FBI. The Q&A provides clarification on technical, logistical, and regulatory requirements for installing two (2) new 20-amp quad electrical receptacles in the CRC Document Laboratory at the FBI Records Center in Winchester, Virginia.
Key project specifications include: approximately 110 feet of distance from the existing electrical panel to the new outlet location; drop ceilings for raceway routing; an EATON brand electrical panel with available space for new breakers; flush-mounted outlets; 12-foot ceiling height with lifts available; EMT raceway type for approximately 20 feet with existing EMT comprising the remaining 90 feet; and no requirement for dielectric brakes or security clearances. The contractor must employ a properly licensed electrician (not state-specific to Virginia), with no permits required for the work. Additional clarifications confirm that no bid bonds, payment bonds, or performance bonds are required; site visits for subcontractors are permitted; the facility is not a SCIF; no formal training or waiting periods are necessary before work commences; and a criminal background check is required only for visitor access to the facility.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFP 15F06726Q0000122_AM01 Electrical Outlet Installation Winchester.pdf | ||
| Questions-Answers_Electrical Outlet Install.xlsx | XLSX spreadsheet | |
| Questions-Answers_Electrical Outlet Install.xlsx | XLSX spreadsheet | |
| 15F06726Q0000122 Electrical Outlet Installation.pdf | ||
| CRC Outlet Install SOW.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Q&A
| Column1 | Question from Industry | FBI Response | Result in an Amendment | |
| 1 | What is the rough distance from the existing electrical panel to the new outlet location? | 110 feet | No | |
| 2 | Are the ceilings drop ceilings or hard ceilings for routing the raceways? | Drop ceilings/open ceilings | No | |
| 3 | Are there any obstacles such as concrete walls that will need to be drilled through from the panel to the new outlet location? | No. | No | |
| 4 | Is EMT the intended raceway type for the work? | Yes, estimated 20ft EMT | No | |
| 5 | Could you please provide pictures of this project. | No, secure location. | No | |
| 6 | Are bid bonds, payment bonds, performance bonds, insurance etc required for this opportunity? | No | No | |
| 7 | May we schedule our subcontractor for a site visit? | Yes | No | |
| 8 | I am writing to request clarification regarding licensing requirements for the Electrical Outlet Installation at the FBI Records Center in Winchester, VA. | |||
| Specifically, can the required electrical work be performed by a properly licensed electrician from another state (such as Texas), or must the electrician hold an active electrical license issued by the Commonwealth of Virginia or the local jurisdiction where the work will be performed? | Not state specific, just needs to be licensed. | No | ||
| 9 | What type of panel is it? (Brand / Model) | EATON | No | |
| 10 | Is there space to add new breakers? | Yes | No | |
| 11 | Will the outlets be surface mounted or flush mounted (cut & fished in?) | Flush | No | |
| 12 | Is the Lab considered a “SCIF” & will the penetrations be required to be Dielectric Brakes? | No | No | |
| 13 | Could you please confirm what type of background investigation or security clearance is required for this project, and what is needed to meet that requirement? | No clearance required, criminal background check for visitor access | No | |
| 14 | Do you know the ceiling height and do you have to have a security clearance to work in that facility? | 12 feet, lifts available for use | No | |
| 15 | On the Questions & Answers sheet, the rough distance is estimated to be 110’. You state that EMT is the intended raceway, but you say roughly 20’. If distance is 110’, what type of raceway is to be used for the other 90’? | Exisiting EMT | No | |
| 16 | Will a Permit be required for this work? | No | No | |
| 17 | Will there be any training required once onsite or any delay or waiting periods before work can begin? | No | No | |
| 18 | ||||
| 19 | ||||
| 20 | ||||
| 21 | ||||
| 22 | ||||
| 23 | ||||
| 24 | ||||
| 25 | ||||
| 26 | ||||
| 27 | ||||
| 28 | ||||
| 29 | ||||
| 30 | ||||
| 31 | ||||
| 32 | ||||
| 33 | ||||
| 34 | ||||
| 35 | ||||
| 36 | ||||
| 37 | ||||
| 38 | ||||
| 39 | ||||
| 40 | ||||
| 41 | ||||
| 42 | ||||
| 43 | ||||
| 44 | ||||
| 45 | ||||
| 46 | ||||
| 47 | ||||
| 48 | ||||
| 49 | ||||
| 50 | ||||
| 51 | ||||
| 52 | ||||
| 53 | ||||
| 54 | ||||
| 55 | ||||
| 56 | ||||
| 57 | ||||
| 58 | ||||
| 59 | ||||
| 60 | ||||
| 61 | ||||
| 62 | ||||
| 63 | ||||
| 64 | ||||
| 65 | ||||
| 66 | ||||
| 67 | ||||
| 68 | ||||
| 69 | ||||
| 70 | ||||
| 71 | ||||
| 72 | ||||
| 73 | ||||
| 74 | ||||
| 75 | ||||
| 76 | ||||
| 77 | ||||
| 78 | ||||
| 79 | ||||
| 80 | ||||
| 81 | ||||
| 82 | ||||
| 83 | ||||
| 84 | ||||
| 85 | ||||
| 86 | ||||
| 87 | ||||
| 88 | ||||
| 89 | ||||
| 90 | ||||
| 91 |
File details come from the government source that posted it. Updated .