IFB__CQ19261_Rev.2___Non-Hazardous_Reg._Waste_-_IDIQ.pdf
PDF 2 MB Posted
- Solicitation number
- CQ19261
About this file
IFB CQ19261 -- applicable pages revised per Amendment #2
View the file
Other files
| File | Type | Posted |
|---|---|---|
| AMENDMENT__3____[CQ19261].pdf | ||
| AMENDMENT__2____[CQ19261].pdf | ||
| AMENDMENT__1____[CQ19261].pdf | ||
| AMENDMENT__1____[CQ19261].pdf | ||
| Unit_Price_Sheet__CQ19261.xlsx | XLSX spreadsheet | |
| IFB__CQ19261.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT #2
Invitation For Bids (Non-Federal)
Solicitation IFB No.: CQ19261
BIDS DUE: 2PM Wed. July 10, 2019 BIDS DUE: 2PM Wed. July 24, 2019 BIDS DUE: 2PM Wed. Aug. 07, 2019
FUNDING: OPR (160)
DBE: N/A
Date: June 12, 2019
Margarita Rodriguez Contract Administrator Office of Procurement and Materials mdrodriguez@wmata.com
WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY
NON-HAZARDOUS REGULATED WASTE
(LIQUIDS & SOLIDS) - IDIQ
INDEFINITE DELIVERY / INDEFINITE QUANTITY
AMENDMENT #1
mailto:mdrodriguez@wmata.com
Rev. 04/19
Table of Contents
NOTICE TO BIDDERS
NOTICE TO ALL VENDORS
SOLICITATION, OFFER AND AWARD
PRICE SCHEDULE CONTINUATION SHEET
IFB SOLICITATION INSTRUCTIONS
1. INTRODUCTION
2. GOODS TO BE FURNISHED/SERVICES TO BE SUPPLIED
3. COMMUNICATIONS WITH THE AUTHORITY
4. PREPARATION OF BIDS
5. EXPLANATIONS TO BIDDERS
6. PRE-BID CONFERENCE [N/A]
7. AMENDMENTS PRIOR TO DATE SET FOR OPENING OF BIDS
8. ACKNOWLEDGMENT OF AMENDMENTS
9. PREPARATION OF BIDS
10. SUBMITTAL OF BIDS
11. RESPONSIVE BIDS
12. LATE BIDS AND MODIFICATIONS OR WITHDRAWALS PRIOR TO BID OPENING
13. BID ACCEPTANCE PERIOD AND BIDDER’S DEFAULT
14. BID GUARANTEE [N/A]
15. BID MISTAKE
16. REPRESENTATIONS, CERTIFICATIONS, AND ACKNOWLEDGMENTS
17. LAWS AND REGULATIONS
18. ROYALTY INFORMATION [N/A]
19. REQUIREMENT FOR COST DATA FOR CONTRACT AWARD
20. PRE-AWARD INFORMATION/BIDDER RESPONSIBILITY
21. PRE-AWARD RESPONSIBILITY MEETING
22. SITE VISIT/INSPECTION OFFEROR’S FACILITIES
23. BASIS FOR CONTRACT AWARD
24. EQUAL EMPLOYMENT OPPORTUNITY
25. PERFORMANCE/PAYMENT BONDS [N/A]
26. OPPORTUNITY FOR SMALL AND LOCAL BUSINESS ENTERPRISES TO BID
27. OPPORTUNITY FOR DISADVANTAGED BUSINESS ENTERPRISES TO BID
28. NOTICE OF PROTEST POLICY
29. WMATA’S TAX EXEMPT STATUS
30. ENGLISH LANGUAGE AND UNITED STATES CURRENCY
31. BRAND NAME OR EQUAL
TOC-1
REPRESENTATIONS & CERTIFICATIONS
1. TYPE OF BUSINESS ORGANIZATION
2. AFFILIATION AND IDENTIFYING DATA
3. SMALL BUSINESS & LOCAL PREFERENCE PROGRAM (SBLPP)
4. COVENANT AGAINST GRATUITIES
5. CONTINGENT FEES
6. DEBARMENT, SUSPENSION, INELIGIBILITY, AND VOLUNTARY EXCLUSION
7. CERTIFICATION OF INDEPENDENT PRICE DETERMINATION
8. NONDISCRIMINATION ASSURANCE
9. DISCLOSURES OF INTERESTS OF WMATA BOARD MEMBERS
10. CRIMINAL BACKGROUND SCREENING CERTIFICATION (QUARTERLY)
11. CERTIFICATION REQUIRED FOR ALL SAFETY-SENSITIVE CONTRACTS
PRE-AWARD EVALUATION DATA
TERMS AND CONDITIONS
CHAPTER I – TERMS AND CONDITIONS
1. AGREEMENT
2. ARRANGEMENT OF CONTRACTUAL PROVISIONS
3. ORDER OF PRECEDENCE
4. REQUIREMENTS CONTRACT [N/A]
5. INDEFINITE QUANTITY CONTRACT
6. ORDERING
7. ORDER LIMITATIONS
8. AUDIT, AVAILABILITY, AND INSPECTION OF RECORDS
9. AVAILABILITY OF FUNDS FOR THE NEXT FISCAL YEAR
10. CONTRACTING OFFICER’S TECHNICAL REPRESENTATIVE (COTR)
CHAPTER II – TIME/DELAYS/LIQUIDATED DAMAGES
1. PERIOD OF PERFORMANCE
2. OPTIONS- EVALUATION [N/A]
3. OPTIONS- EXERCISE [N/A]
4. OPTION FOR INCREASED OR DECREASED QUANTITIES OF SUPPLIES [N/A]
5. OPTIONS TO EXTEND SERVICES [N/A]
6. OPTION TO EXTEND THE TERM OF THE CONTRACT
7. OPTIONS EXERCISED OUT OF SEQUENCE
8. LIQUIDATED DAMAGES FOR DELAY [N/A]
9. EXTENSIONS OF TIME/FORCE MAJEURE
10. THE AUTHORITY’S DELAY
11. NOTICE TO THE AUTHORITY OF LABOR DISPUTES
12. NOTIFICATION OF BANKRUPTCY OR INSOLVENCY
TOC-2
CHAPTER III – ACCEPTANCE/INSPECTIONS/DEFICIENCIES
1. INSPECTION OF SERVICES
2. INSPECTION OF SUPPLIES
3. ACCEPTANCE OF SUPPLIES
4. NEW MATERIAL [SUPPLIES]
5. WARRANTY OF SUPPLIES
6. WARRANTY OF SERVICES
7. CORRECTION OF DEFICIENCIES
8. FIRST ARTICLE INSPECTION
9. F.O.B. DESTINATION
10. QUALITY ASSURANCE/QUALITY CONTROL
CHAPTER IV—CHANGES/ PRICING ADJUSTMENTS
1. CHANGE ORDERS
2. PRICING OF ADJUSTMENTS
3. ACCOUNTING AND RECORD KEEPING FOR ADJUSTMENTS
CHAPTER V – INVOICES/PAYMENTS/ DEDUCTIONS
1. BILLING AND PAYMENT
2. PRICE REDUCTION FOR DEFECTIVE COST OR PRICING DATA –
MODIFICATIONS
3. SUBCONTRACTOR PAYMENTS
4. GARNISHMENT OF PAYMENTS
CHAPTER VI – CONTRACT TERMINATION/STOP WORK ORDERS/DISPUTES
1. STOP WORK ORDERS
2. TERMINATION FOR DEFAULT
3. TERMINATION FOR CONVENIENCE
4. ASSIGNMENT
5. DISPUTES
CHAPTER VII – INDEMNIFICATION/INSURANCE/RISK OF LOSS
1. INDEMNIFICATION
2. INSURANCE REQUIREMENTS
3. TITLE AND RISK OF LOSS
4. INAPPLICABILITY OF CLAUSES REQUIRING UNAUTHORIZED OBLIGATIONS
CHAPTER VIII – INTELLECTUAL PROPERTY RIGHTS
1. PATENT INDEMNITY
2. SET-OFF
3. RIGHTS IN TECHNICAL DATA – LIMITED [N/A]
4. RIGHTS IN TECHNICAL DATA – UNLIMITED
5. NOTICE AND ASSISTANCE REGARDING PATENT AND COPYRIGHT
INFRINGEMENT [SUPPLIES]
TOC-3
CHAPTER IX – ADDITIONAL COVENANTS/LEGAL REQUIREMENTS
1. NONDISCRIMINATION ASSURANCE
2. CONTRACT WORK HOURS AND SAFETY STANDARDS ACT- OVERTIME
COMPENSATION
3. WALSH-HEALEY PUBLIC CONTRACTS ACT
4. DAVIS-BACON ACT [N/A]
5. COPELAND ANTI-KICKBACK ACT – FTA [N/A]
6. CONVICT LABOR
7. COVENANT AGAINST CONTINGENT FEES
8. SEAT BELT USE POLICY
9. SENSITIVE SECURITY INFORMATION
10. LAWS AND REGULATIONS
11. HAZARDOUS MATERIAL IDENTIFICATION AND MATERIAL SAFETY DATA
12. LIVING WAGE [N/A]
13. METRIC SYSTEM
14. MANDATORY DISCLOSURE
15. WHISTLEBLOWER PROTECTION – NON-FEDERAL
16. WORKPLACE VIOLENCE/ZERO TOLERANCE
17. DRUG AND ALCOHOL TESTING (FOR SAFETY SENSITIVE FUNCTIONS ONLY)
18. EMPLOYMENT RESTRICTION WARRANTY
19. GRATUITIES
20. OFFICIALS NOT TO BENEFIT
21. ORGANIZATIONAL CONFLICTS OF INTEREST
22. CONTRACTOR PERSONNEL
23. FALSE STATEMENTS, CLAIMS OR SUBMISSIONS
CHAPTER X – MISCELLANEOUS ADDITIONAL PROVISIONS
1. PUBLIC COMMUNICATION
2. CHOICE OF LAW, CONSENT TO JURISDICTION AND VENUE
3. SEVERABILITY
4. SURVIVAL
CHAPTER XI – ADDITIONAL PROVISIONS
1. AMERICANS WITH DISABILITIES ACT ACCESSIBILITY
2. RETAINAGE [N/A]
3. GOVERNMENT-WIDE DEBARMENT OR SUSPENSION
4. FALSE STATEMENTS OR CLAIMS CIVIL AND CRIMINAL FRAUD
5. PROGRESS PAYMENTS
6. BONDING FOR CONSTRUCTION PROJECTS EXCEEDING $150,000 [N/A]
7. BONDING REQUIREMENTS- GENERAL
CHAPTER XII-WMATA POLICIES
1. SAFETY REQUIREMENTS
2. CRIMINAL BACKGROUND CHECK REQUIREMENT
3. WORKPLACE VIOLENCE/ZERO TOLERANCE
TOC-4
MID-ATLANTIC COOPERATIVE RIDER CLAUSE
TECHNICAL SPECIFICATIONS
EXHIBIT No. 1 Confined Space Entry Requirements for Storm water Management and Non-Hazardous Industrial Waste Treatment Structures
EXHIBIT No. 2
WMATA FACILITY LOCATIONS
APPENDIX C – SMALL BUSINESS LOCAL PREFERENCE PROGRAM (SBLPP)
TOC-5
Washington Metropolitan Area Transit Authority
IFB: CQ19261
Rev. 04/19
Date: June 12, 2019
SUBJECT: IFB No. CQ19261 Non-Hazardous Regulated Waste (Liquids & Solids) - IDIQ Indefinite Delivery / Indefinite Quantity
Dear Sir/Madam:
The Washington Metropolitan Area Transit Authority (WMATA) is seeking bids from qualified contractor(s) to provide all the necessary services for removal and disposal of non-hazardous regulated waste from Metro Facilities. The project includes, but is not limited to the furnishing of all labor, equipment, materials, inspection, samples/testing reports, transportation, supervision, and incidentals necessary to provide the above mentioned services.
Period of Performance, shall be (5) five years, commencing from the “Notice to Proceed Date” (NTP). Basis of Award; Firm Fixed Unit price as indicated in the attached price schedule sheet.
One award will be issued to the responsible and responsive bidder offering the overall lowest total price.
Please note quantities in the price schedule sheet – are estimates only; actual quantities ordered may vary.
Bid Documents are available in pdf format can be downloaded free of charge as follows:
WMATA’s website: https://supplier.wmata.com/psp/supplier/SUPPLIER/ERP/h/?tab=DEFAULT
A pre-bid conference will not be held, and your company’s bid must be submitted in accordance with the IFB’s terms and conditions.
Electronic bid submission “ONLY”, no paper bids will be accepted, via “PROCORE”.
WMATA’s Project Management Software System (PROCORE).
Please refer to the IFB solicitation instructions (16. Submittal of Bids).
Bidders are cautioned not to take exceptions or qualify their bid!
Bids must conform to the solicitation requirements.
The following documents must be completed, signed and submitted with your company’s bid:
Solicitation, Offer & Award Form Amendments (if applicable) -Award Survey;
Price Schedule
If you have any technical, contractual, or administrative questions, please direct them to my attention (email: mdRodriguez@wmata.com) no later than close of business, Fri. June 21, 2019. WMATA will provide written answers to all those who obtain the IFB and provide their e-mail addresses.
WMATA reserves the right to reject any or all bids.
Sincerely, Margarita Rodriguez, CA Office of Procurement and Materials
Enclosure:
Margarita Rodriguez Contract Administrator III Procurement & Materials - Construction
Digitally signed by Margarita Rodriguez DN: cn=Margarita Rodriguez, o=WMATA, ou=Office of Procurement & Materials, email=mdRodriguez@WMATA.com, c=US Location: WMATA -JGB - 4th Floor (#403A) Date: 2019.06.11 18:14:28 -04'00' https://supplier.wmata.com/psp/supplier/SUPPLIER/ERP/h/?tab=DEFAULT mailto:mdRodriguez@wmata.com
INTRODUCTORY INFORMATION
SOLICITATION CERTIFICATIONS PAGE
IFB: CQ19261
Non-Hazardous Regulated Waste (Liquids & Solids) - IDIQ
Indefinite Delivery / Indefinite Quantity
APPROVED FOR RELEASE
Claire Fox, Deputyicl,EMIH Dept. of Safety & Environmental Mgmt. (SAFE)
Sherreen N. T olliter, Contract Manager Office of Procurement & Materials - Construction
END OF SECTION
Rev.04/19
NOTICE TO BIDDERS
IMPORTANT
PLEASE READ CAREFULLY
To ensure submission of complete bids and to avoid irregularities that could result in a non-responsive bid, please check your company’s bid for each of the following common responsiveness problems:
1. Have you checked your company’s bid? Are all items included and checked for math errors?
2. If amendments are included, has your company acknowledged and recorded the number of amendments on the bid form?
3. Has your company signed and submitted the Solicitation, Offer & Award page(s)?
4. Has your company properly completed and checked the appropriate box for each
Certification and Representation? Have you included the Representations and Certifications with your company’s bid?
5. Has your company completed and included the Pre- Award Data form?
6. Has your company complied with the Appendix C requirement (if applicable)?
7. Has your company marked the bid submittal pages with solicitation number and addressed it to the Contract Administrator Margarita Rodriguez, for the electronic submission?
8. Has your company included copies of any required Certificate(s) of Insurance?
Note: Contractor’s pricing, if offered to other jurisdictions, will be the same regardless of quantities ordered. The Authority makes no representations regarding the quantities that may be ordered by any other jurisdictions.
NOTICE TO ALL VENDORS
Please be advised that all vendors and contractors who do business with the Washington Metropolitan Area Transit Authority (WMATA) must register in the WMATA Vendor Registration System. Registration is located at http://www.wmata.com
New Vendor Registration: https://www.wmata.com/business/procurement/index.cfm
If you are a vendor or contractor and HAVE done business with WMATA in the past, please electronically request your company’s User ID and Password at http://www.wmata.com Forgot User Id/Password.
Registered Vendor Benefits:
• Visibility to WMATA contract administrators and/or purchasing agents during the purchasing decision period;
• Visibility to other 17,500 registered vendors for possible business opportunities;
• Opportunity to update online, company information such as an e-mail address or contact person on-line;
• Ability to sign up for electronic payment option; and
• Ability to electronically reset user id and password.
Any questions regarding registration may be sent to clm@wmata.com.
http://www.wmata.com/ https://www.wmata.com/business/procurement/index.cfm http://www.wmata.com/ mailto:clm@wmata.com
WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY
SUPPLY AND SERVICE CONTRACT IFB: #CQ19261
AMENDMENT #2
SOLICITATION, OFFER AND AWARD
CONTRACT NO. SOLICITATION NO. DATE ISSUED ADDRESS OFFER TO OFFICE OF PROCUREMENT
6/12/2019 Office of Procurement 600 Fifth Street NW
Washington, DC 20001 X ADVERTISED NEGOTIATED
SOLICITATION
Sealed offer of electronic bid submission through “PROCORE” for furnishing the supplies or services in the schedules will be received at Authority until WED. 2:00 P.M. Local time July 10, 2019 July 24, 2019 Aug. 07, 2019 (Hour) (Date) AMENDMENT #1 If this is an advertised solicitation, offers will be publicly opened at that time.
CAUTION – LATE OFFERS: See paragraph 6 of Solicitation Instructions.
All offers are subject to the following:
1. The Solicitation Instructions that are attached.
2. The Terms and Conditions that are attached.
3. The Price Schedule included herein and/or attached hereto.
4. Such other provisions, representations, certifications, and specifications, as are attached or incorporated herein by reference.
Bidder’s e-mail: Bidder’s phone number
SCHEDULE
ITEM NO. SUPPLIES/SERVICES QTY. UNIT TOTAL PRICE GRAND TOTAL - AMOUNT
(All 5 Years -Basis for Award)
PART I: Material Removal 1 LS $
$ PART II: Support & Materials 1 LS $
PART III: Emergency Response 1 LS $ See Price Schedule Sheet – for details/Unit Pricing
DUN & BRADSTREET ID NUMBER:
BIDDER
Name and Address (Street, city, county, state, and zip code)
Name and Title of Person Authorized to Sign Offer (Print or Type)
Signature Offer Date
Check if remittance is different from above — enter such address in Schedule AWARD (To be completed by The Authority)
ACCEPTANCE AND AWARD ARE HEREBY MADE FOR THE FOLLOWING ITEM(S):
ITEM NO. QUANTITY UNIT AWARD TOTAL
NON-HAZARDOUS REGULATED WASTE
(Liquids & Solids) - IDIQ
See price Schedule
$ UNIT PRICES
Name of Contracting Officer WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY AWARD DATE (Print of Type)
Item # Lump Sum (LS) Per Hour (HR)
ESTIMATED
QUANTITY
UOM UNIT PRICE EXTENDED TOTAL UNIT PRICE EXTENDED TOTAL UNIT PRICE EXTENDED TOTAL UNIT PRICE EXTENDED TOTAL UNIT PRICE EXTENDED TOTAL
1 Vacuum Truck with Operator - Mob/Demob 200 LS $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
2 Vacuum Truck with Operator - On-Site Time 1,000 HR $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - 3 Vacuum Truck with Operator & Laborer Mob/Demob 100 LS $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
4 Vacuum Truck with Operator & Laborer On-Site Time 500 HR $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
5 with Operator - Mob/Demob 50 LS $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - 6 with Operator - On-Site Time 250 HR $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
7 with Operator & Laborer Mob/Demob 50 LS $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
8 with Operator & Laborer On-Site Time 250 HR $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - 9 with Foreman -or- a Laborer Mob/Demob 200 LS $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
10 with Foreman -or- a Laborer On-Site Time 1,000 HR $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
11 with Foreman and a Laborer Mob/Demob 50 LS $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
12 with Foreman and a Laborer On-Site Time 250 HR $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
13 with Operator Mob/Demob 20 LS $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
14 with Operator - On-Site Time 400 HR $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
15 with Operator and a Laborer Mob/Demob 20 LS $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
16 with Operator and a Laborer On-Site Time 400 HR $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
17 with Foreman -or- a Laborer Mob/Demob 20 LS $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
18 with Foreman -or- a Laborer On-Site Time 250 HR $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
19 with Foreman and a Laborer Mob/Demob 20 LS $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - 20 with Foreman and a Laborer On-Site Time 250 HR $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
Street Sweeper Cleaner Truck with Left and right Gutter Brooms, Dust Control System, Magnet Pickup, and Abrasion Protection with Operator Mob/Demob (Day work 70%/Night work 30%) 50 LS $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
Street Sweeper Cleaner Truck
Left and right Gutter Brooms, Dust Control System, Magnet Pickup, and Abrasion Protection with Operator - On-Site Time (Day work 70%/Night work 30%) 250 HR $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
23 Supervisor vehicle Vehicle with a Supervisor Mob/Demob 5 LS $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
24 Supervisor vehicle Vehicle with a Supervisor On-Site Time 50 HR $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
25 Mob/Demob 5 LS $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
26 On-Site Time 50 HR $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
27 Chemist Vehicle with a Chemist Mob/Demob 5 LS $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
28 Chemist Vehicle with a Chemist On-Site Time 50 HR $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
29 LABOR RATE Utilized for Part I, Items A and F Laborer 1 HR $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
30 LABOR RATE Utilized for Part I, Items A and F Operator 1 HR $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
31 LABOR RATE Utilized for Part I, Items A and F Foreman 1 HR $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
32 LABOR RATE Utilized for Part I, Items A and F Laboratory Technician 1 HR $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
33 LABOR RATE Utilized for Part I, Items A and F Chemist 1 HR $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
34 LABOR RATE Utilized for Part I, Items A and F Supervisor 1 HR $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
35 DISPOSAL Oil/Water Mixture 150,000 GAL $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
36 DISPOSAL Oily Sludge/Solid 200,000 GAL $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - 37 DISPOSAL Antifreeze/Oil/Water Mixture 1,000 GAL $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - 38 DISPOSAL Antifreeze Sludge/Solids 250 GAL $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - 39 DISPOSAL Low/Hi pH Water (pH 3-pH 12) 3,000 GAL $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
40 DISPOSAL 1,300 CY $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
41 DISPOSAL Petroleum Impacted Soils 200 CY $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - 42 DISPOSAL Mud and Solids 1,300 CY $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - 43 DISPOSAL Street Sweeper Sweepings 60 CY $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
44 60 CY $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
45 Clean Cartridges Only 60 CY $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - (Unit price "MUST" be entered on each line item)
4TH YEAR 5TH YEAR
1ST YEAR 2ND YEAR 3RD YEAR 4TH YEAR 5TH YEAR
2ND YEAR 3RD YEAR
DESCRIPTION
(A) LABOR & VEHICLES
Catch Basin Cleaner/Vacuum Excavator - Truck
Auto Crane Service Truck
Lift Gate Box (16ft) / Stake Body
Price Schedule Sheet
NON-HAZARDOUS REGULATED WASTE (LIQUIDS & SOLIDS)
COMPANY:
1ST YEAR
PART I: MATERIAL DISPOSAL
SECTION I:
IFB: #CQ19261
NON-HAZARDOUS MATERIAL REMOVAL & DISPOSAL
10-12 CY
with Min 4,500 CFM
@ 28in Hg
Lift Gate Equipment Truck and/or Equipment
Service Truck
2,000 lb. Capacity Truck
5,000 lb.
Capacity Truck
Oily Debris (including trash from within structures)
Laboratory Technician Vehicle with a Laboratory Technician
(B) BULK LIQUIDS / SOLIDS DISPOSAL
Petroleum Impacted Storm Filter / Bioretention Area Media, Media Only, All Filter Media Types
Petroleum Impacted Storm Filter Cartridges
AMENDMENT #2
NOTE 1: All Contractor Field Personnel (Supervisors, Foremen, Laborers, Technicians, and Chemists) shall have OSHA 40-hour HAZWOPER Training and be Confined Space Certified.
All Operators shall have OSHA 40-hour HAZWOPER Training and, where applicable, be Confined Space Trained. The labor pricing included with Line Items A1 - A34 shall be for work with PPE
NOTE 2: Line Items A1, A3, A5, A7, A9, A11, A13, A15, A17, A19, A21, A23, A25, and A27 include all costs for the truck or vehicle and the labor (time) associated with the travel from the Contractor's hub to the initial WMATA work site and, after work has been completed, from the final WMATA work site to the Contractor's hub, including all markup, G&A, etc.
NOTE 3:
Line Items A2, A4, A6, A8, A10, A12, A14, A16, A18, A20, A22, A24, 26, and A28 shall include all costs for the truck or vehicle and the labor associated with the performance of the on-site work and related travel between various WMATA facilities, including all markup, G&A, etc.
NOTE 4: Line Items A29 thrur A34 shall be fully burdened including all costs, markup, G&A, etc.
PRICE SCHEDULE SHEET
(Page 1 of 5)
Per Drum (DR)
QUANTITY
UOM UNIT PRICE EXTENDED TOTAL UNIT PRICE EXTENDED TOTAL UNIT PRICE EXTENDED TOTAL UNIT PRICE EXTENDED TOTAL UNIT PRICE EXTENDED TOTAL
46 DISPOSAL Oily Solids 200 DR $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
47 DISPOSAL Petroleum Contaminated Soil 150 DR $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
48 DISPOSAL Petroleum Contaminated Water 200 DR $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
49 DISPOSAL Mud and Solids 200 DR $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
50 DISPOSAL 40 DR $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
51 DISPOSAL Oily 12" Dia Cartridge and Filter Media 50 EA $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
52 DISPOSAL Oily 18" Dia Cartridge & Filter Media 50 EA $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
53 DISPOSAL Oily 27" Dia Cartridge &Filter Media 50 EA $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
54 1 - 275 Gallon Tote Tank Steel 2 TK $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
55 276 - 550 Gallon 2 TK $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
56 551 - 1000 Gallon 2 TK $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
UNIT PRICE EXTENDED TOTAL UNIT PRICE EXTENDED TOTAL UNIT PRICE EXTENDED TOTAL UNIT PRICE EXTENDED TOTAL UNIT PRICE EXTENDED TOTAL
57 Haz Vacuum Truck with Operator - Mob/Demob 10 LS $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
58 Haz Vacuum Truck with Operator - On-Site Time 200 HR $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
59 Haz Vacuum Truck with Operator and a Laborer Mob/Demob 10 LS $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - 60 Haz Vacuum Truck with Operator and a Laborer On-Site Time 200 HR $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
61 with Foreman -or- a Laborer Mob/Demob 10 LS $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
62 with Foreman -or- a Laborer On-Site Time 200 HR $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
63 with Foreman and a Laborer Mob/Demob 10 LS $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
64 with Foreman and a Laborer On-Site Time 200 HR $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
65 with a Supervisor Mob/Demob 5 LS $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
66 with a Supervisor On-Site Time 100 HR $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
67 with a Laboratory Technician Mob/Demob 5 LS $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
68 with a Laboratory Technician On-Site Time 30 HR $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
69 Chemist Vehicle with a Chemist Mob/Demob 5 LS $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
70 Chemist Vehicle with a Chemist On-Site Time 30 HR $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
71 Disposal Gasoline/Water Mixture 1,000 GL $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
72 Solids Removal Gasoline Sludge 250 GL $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
73 Disposal Flammable Liquids (Per 55 GALLON DRUM) 5 DR $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
74 Disposal Flammable Solids (Per 55 GALLON DRUM) 5 DR $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
75 Disposal 5 DR $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
76 Disposal Corrosive Water (Per 55 GALLON DRUM) 5 DR $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
SECTION II
PART I: (Line Items 1 thru 76) GRAND TOTAL: =
(Unit price "MUST" be entered on each line item)
Spent Activated Carbon Flammable Solids (Per 55 GALLON DRUM)
(Line Items 57 thru 76) TOTAL:
(G) HAZARDOUS MATERIAL VACUUM PUMP TRUCK PICK-UP DISPOSAL
(H) HAZARDOUS DRUM REMOVAL & DISPOSAL Per 55 GALLON DRUM
NOTE: The hazardous material line items included below (Line Items F, G, H) are intended for use only in the
- event of a large scale incident requiring a significant cleanup response.
5,000 lb.
Capacity Truck
Hazmat Supervisor Vehicle
Laboratory Technician Vehicle
4TH YEAR 5TH YEAR
COMPANY:
1ST YEAR 2ND YEAR 3RD YEAR
(D) STORMFILTER CARTRIDGE DISPOSAL
SECTION I (Line Items 1 thru 56) TOTAL:
PART I: MATERIAL REMOVAL (continued)
SECTION I: NON-HAZARDOUS MATERIAL REMOVAL & DISPOSAL
Per Tank (TK)
Double Wall Tank Fireguard Steel/Steel
Double Wall Tank Fireguard Steel/Steel
IFB: #CQ19261
(E) ABOVEGROUND TANK DISPOSAL
Haz Lift Gate Box (16ft)/Stake Body
(C) DRUMMED LIQUID / SOLIDS DISPOSAL
(F) HAZMAT LABOR & VEHICLES
SECTION II: HAZARDOUS MATERIAL REMOVAL & DISPOSAL
Spent Petroleum Contaminated Activated Carbon Vapor/Liquid
GRAND TOTAL
PART I
1ST YEAR 2ND YEAR 3RD YEAR 4TH YEAR 5TH YEAR
AMENDMENT #2
NOTE 1: All Contractor Field Personel (Supervisors, Foremen, Laborers, Technicians, and Chemists) shall have OSHA 40-hour HAZWOPER Training and be Confined Space Certified. All Operators shall have OSHA 40-hour HAZWOPER Training and, where applicable, be Confined Space Trained. The labor pricing included with line Items F1 - F14 shall be for work with PPE requirement of Level D
NOTE 2: Line Items F57, F59, F61, F63, F65, F67, and F69 include all costs for the truck or vehicle and the labor (time) associated with the travel from the Contractor's hub to the initial WMATA work site and, after work has been completed, from the final WMATA work site to the Contractor's hub, including all markup, G&A, etc.
NOTE 3: Line Items F58, F60, F62, F64, F66, F68, and F70 shall include all costs for the truck or vehicle and the labor associated with the performance of the on-site work and related travel between various WMATA facilities, including all markup, G&A, etc.
PRICE SCHEDULE SHEET
(Page 2 of 5)
Item #
QUANTITY
UOM UNIT PRICE EXTENDED TOTAL UNIT PRICE EXTENDED TOTAL UNIT PRICE EXTENDED TOTAL UNIT PRICE EXTENDED TOTAL UNIT PRICE EXTENDED TOTAL
Per Test
I-1 TPH (Total Petroleum Hydrocarbons) Method 8015 Modified 5 EA $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
I-2 Petroleum Hydrocarbon
Analysis 5 EA $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
I-3 Characterize Hazardous
Waste 10 EA $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
I-4 GC/MS Methods 8010 & 8020 2 EA $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
I-5 TCLP Extraction 2 EA $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
I-6 TCLP Extraction for RCRA 8
Metals 2 EA $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
I-7 PCB's (Method 608/8082) 2 EA $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
J-7 FURNISH 55 GAL. Solids Drum (1A2/X400/S) 25 EA $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
J-8 FURNISH 55 GAL. LIQUID Drum (1A1/X1.5/300) 10 EA $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - J-9 FURNISH 85 GAL. Drum (1H2/X440/S) 5 EA $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
J-10 5" DIAMETER x 10' Oil-Only Absorbent Floating Boom 5 EA $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - J-11 15" x 20" Oil-Only Absorbent Pad 100 ea/Case 10 CS $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - J-12 15" x 20" Universal Absorbent Pad (oil/water/coolant) 100 ea/Case 10 CS $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - J-13 Dry Loose Absorbent (Oil/water/coolant) 40lb. /bag 20 BAG $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - J-14 Ultratech 48 in x 36 in x 18 in Ultra-Drain Guard Part #9217 (Oil & Sediment) 40 EA $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - J-15 Ultratech 60 in x 60 in x 18 in Ultra-Drain Guard Part #9356 (Oil & Sediment) 10 EA $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - J-16 Ultratech 48 in x 36 in x 18 in Ultra-Drain Guard Part #9227 (Trash & Debris) 40 EA $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
J-17 With No Used Cartridge Return CSF- Fill / 12" or 18" Dia 20 EA $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
J-18 With No Used Cartridge Return Perlite- Fill / 12" or 18" Dia 5 EA $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
J-19 With No Used Cartridge Return ZPG - Fill / 12" or 18" Dia 5 EA $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
J-20 With No Used Cartridge Return Phosphosorb Fill / 12" or 18" Dia 5 EA $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
J-21 With No Used Cartridge Return GAC Fill / 12 or 18" Dia 5 EA $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
J-22 With No Used Cartridge Return MRX Fill / 12" or 18" Dia 5 EA $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - J-23 With No Used Cartridge Return CSF - Fill / 27" Dia 20 EA $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - J-24 With No Used Cartridge Return Perlite - Fill / 27" Dia 5 EA $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - J-25 With No Used Cartridge Return ZPG - Fill / 27" Dia 5 EA $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - J-26 With No Used Cartridge Return Phosphosorb Fill / 27" Dia 5 EA $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - J-27 With No Used Cartridge Return GAC Fill / 27" Dia 5 EA $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - J-28 With No Used Cartridge Return MRX Fill / 27" Dia 5 EA $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
J-29 CSF- Fill / 12" or 18" Dia 40 PL $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
J-30 Perlite- Fill / 12" or 18" Dia 40 PL $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - J-31 ZPG- Fill / 12" or 18" Dia 5 PL $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - J-32 Phosphosorb Fill / 12" or 18" Dia 5 PL $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - J-33 Used Empty Cartridges GAC Fill / 12 or 18" Dia 5 PL $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - J-34 to Contech MRX Fill / 12" or 18" Dia 5 PL $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - J-35 for Credit CSF - Fill / 27" Dia 40 PL $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - J-36 Perlite - Fill / 27" Dia 40 PL $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - J-37 ZPG - Fill / 27" Dia 5 PL $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - J-38 NOTE: Pallet (PL) - 4 Each Phosphosorb Fill / 27" Dia 5 PL $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - J-39 GAC Fill / 27" Dia 5 PL $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - J-40 MRX Fill / 27" Dia 5 PL $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
J-41
On-Site Storm Filter Media Replacement for Filters 12"-30" Height with Media
200 EA $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
(Unit price "MUST" be entered on each line item)
Price Schedule Sheet
NON-HAZARDOUS REGULATED WASTE (LIQUIDS & SOLIDS)
COMPANY:
PART II: SUPPORT & MATERIALS
IFB: #CQ19261
1ST YEAR 2ND YEAR 3RD YEAR 4TH YEAR 5TH YEAR
5TH YEAR (J) EQUIPMENT & MATERIALS
DESCRIPTION
(I) ANALYTICAL TESTING
WMATA Full Suite TPH/DRO, TPH/GRO, BTEX, Napthalene, and MTBE
This includes Corrosivity (Method 1110), Ignitability (Methods 1010/1020), Reactivity (Method SW 846), pH (Mehtod 9040)
(Method 1311) -- FULL SUITE: Including volatiles (Method 8240), semivolatiles (Method 8370), pesticides (Method 8080), herbicides (Method 8150), inorganics RCRA 8 Metals (Methods 7130/7131, 7420/7421, 7760/7761, 7520/7521, 7470/7471)
Halogenated & Aromatic Volatile Organics
Methods 7130/7131, 7420/7421, 7520/7521, 7470/7471
1ST YEAR 2ND YEAR 3RD YEAR
Contractor to Empty, Clean, Palletize, Bulk, and Return
4TH YEAR
New Filled Contech
Stormfilter Filter Cartridge
New Filled Contech Storm Filters
(4ea)
Including But Not Limited to CSF, Perlite, ZPG, Phosphosorb, GAC, MRX, or Sand. Contractor to Remove Cartridge from Vault, Disassemble Cartridge, Remove Spent Media (place media in container for ultimate disposal), Clean Cartridge Filtering Screen, Reassemble Cartridge with New Media, and Install Refurbished Cartridge within Vault.
AMENDMENT #2
NOTE 1: Line Items J7 through J16 shall include all costs for purchase, delivery, removal, installation, markup, G&A, etc., with the exception of labor and vehicles which are covered in Item A.
NOTE 2: Line Items J17 through J28 shall include all costs for purchase, delivery, including markup, G&A, etc., with the exception of the labor (spent cartridge removal, new cartridge installation) which is covered in Item A and Disposal covered in Item D.
NOTE 3: Line Items J29 through J40 shall include all costs for purchase, delivery, cartridge removal, media removal, cartridge installation bulking empty cartridges on pallets, loading, including markup, G&A, etc., with the exception of the labor (spent cartridge removal, new cartridge installation, and spent cartridge media removal) and vehicles which are covered in Item A and spent media disposal covered in Item B.
NOTE 4: Line Item J41 shall include all costs for purchase and delivery of new media, cartridge removal, cartridge disassembly, removal of spent media and transfer to container for disposal, cartridge cleaning, cartridge reassembly with new media, and installation of refurbished cartridge in vault, including markup, G&A, etc., with the exception of labor and vehicles covered in Item A and spent media disposal
PRICE SCHEDULE SHEET
(Page 3 of 5)7
J-42 2500 psi (min 2 gpm) Pressure Washer 5 DY $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - J-43 2500 psi (min 2 gpm) 5 DY $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
J-44 5KW Generator Including 100 ft 12/3 Extension Cord 5 DY $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
J-45 20KW Diesel Generator 5 DY $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
J-46 100-120 CFM Air
Compressor 5 DY $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
J-47 175 - 220 CFM Air
Compressor 5 DY $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
J-48 60 GPM 2" 5 DY $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
J-49 150 GPM 3" 5 DY $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
J-50 44"+ Confined Space Air
Horn 5 DY $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
J-51 Confined Space
Axial Fan 5 DY $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
J-52 Confined Space
Entry Setup 20 DY $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
J-53 Bobcat with Power Broom Attachment for Parking Lot Cleaning 20 DY $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
Per Container (CTN) / Per Week (WK)
ESTIMATED
QUANTITY
UOM UNIT PRICE EXTENDED TOTAL UNIT PRICE EXTENDED TOTAL UNIT PRICE EXTENDED TOTAL UNIT PRICE EXTENDED TOTAL UNIT PRICE EXTENDED TOTAL
K-54 10 cubic yard container with liner and cover Mob/Demob 5 CTN $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
K-55 10 cubic yard container with liner and cover On-Site Weekly 5 WK $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
K-56 30 cubic yard container with liner and cover Mob/Demob 5 CTN $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
K-57 30 cubic yard container with liner and cover On-Site Weekly 5 WK $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
K-58 8,000-10,000 Gallon Closed top clean frac tank Mob/Demob 5 CTN $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - K-59 8,000-10,000 Gallon Closed top clean frac tank On-Site Weekly 5 WK $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - K-60 18,000-22,000 Gallon Closed top clean frac tank Mob/Demob 5 CTN $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - K-61 18,000-22,000 Gallon Closed top clean frac tank On-Site Weekly 5 WK $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - K-62 Frac Tank Cleaning 8,000-22,000 Gallon 10 EA $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
PART II: (Line Items I1 thru K-62) GRAND TOTAL: =
(Unit price "MUST" be entered on each line item)
(Unit price "MUST" be entered on each line item)
Tow Behind Including junction box and 3 ea 100ft 12/3 extension cords.
Diesel Tow Behind Including 200 ft of hose and connection for diaphragm pump or air horn
Double Diaphragm Pneumatic Pump with 100 ft Suction and 100 ft Discharge Hose
Double Diaphragm Pneumatic Pump with 100 ft Suction Hose and 100 ft Discharge Hose
Diesel Tow Behind Including 200 ft of hose and connection for diaphragm pump or air horn
(J) EQUIPMENT & MATERIALS (continued)
PART II: SUPPORT & MATERIAL (continued)
3RD YEAR
IFB: #CQ19261
Hot Water Pressure Washer (Fuel Oil)
Per Day (DY)
(K) ROLL-OFFS AND FRAC TANKS
minimum 2,000 cfm (minimum) with removable 36" square base plate and 48" square base plate including 100 ft of grounding cable.
capable of 1,200 cfm with 8" duct connections.
Including 20" high stand, 30ft of grounded 8" flex duct, a 90 degree manhole entry duct section, and 50 ft 12/3 extension cord.
(Includes 1 ea Tripod; 1 ea Man Retrieval Hoist; 1 ea self retracting lifeline min 15 feet; 1 ea Side Equipment Hoist; 1 ea 12 ft Narrow Fiberglass Manhole
Ladder; 3ea full body harnesses; 1,200 CFM blower; 20" Hign Stand for Blower;
2 ea 16 ft lengths Blower Duct; 4 Gas Confined Space Meter (LEL, O2, CO, H2S);
1 ea Calibration Kit with Span Gas and Regulator, and 3 ea "Tyvek QC" suits)
1ST YEAR 2ND YEAR 4TH YEAR 5TH YEAR
GRAND TOTAL
PART II
AMENDMENT #2
NOTE 5: Line Items J42 through J53 shall include all costs for "rental", delivery, installation, fuel, and maintenance, including markup, G&A, etc., with the exception of the labor which is covered in Item A
NOTE 1: Line items K54, K56, K58, and K60 shall include all transportation costs for deliverly and removal from the WMATA facility and shall include the on-site weekly storage costs for the initial 7 calendar days on-site at a WMATA facility.
NOTE 2: Line Items K55, K57, K59, and K61 shall include all on-site weekly (7 calendar days) storage costs after the initial week.
The costs for the initial week are included in the Mob/Demob
PRICE SCHEDULE SHEET
(Page 4 of 5)8
Lump Sum (LS) Per
Hour (HR)
ESTIMATED
QUANTITY
UOM UNIT PRICE EXTENDED TOTAL UNIT PRICE EXTENDED TOTAL UNIT PRICE EXTENDED TOTAL UNIT PRICE EXTENDED TOTAL UNIT PRICE EXTENDED TOTAL
L-63 ER- VACUUM TRUCK with an Operator Mob/Demob 10 LS $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
L-64 ER- VACUUM TRUCK with an Operator On-Site Time 120 HR $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
L-65 ER- VACUUM TRUCK with an Operator & a Laborer Mob/Demob 10 LS $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
L-66 ER- VACUUM TRUCK with an Operator & a Laborer On-Site Time 120 HR $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
L-67 with an Operator Mob/Demob 10 LS $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
L-68 with an Operator On-Site Time 120 HR $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
L-69 with an Operator & a Laborer Mob/Demob 10 LS $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
L-70 with an Operator & a Laborer On-Site Time 120 HR $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
L-71 with a Foreman -or- a Laborer Mob/Demob 5 LS $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
L-72 with a Foreman -or- a Laborer On-Site Time 50 HR $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
L-73 with a Foreman & a Laborer Mob/Demob 5 LS $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
L-74 with a Foreman & a Laborer On-Site Time 50 HR $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
L-75 with an Operator Mob/Demob 5 LS $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
L-76 with an Operator On-Site Time 50 HR $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
L-77 with Operator& a Laborer Mob/Demob 5 LS $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
L-78 with Operator& a Laborer On-Site Time 50 HR $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
L-79 with a Foreman -or- a Laborer Mob/Demob 5 LS $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
L-80 with a Foreman -or- a Laborer On-Site Time 50 HR $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
L-81 with a Foreman and a Laborer Mob/Demob 5 LS $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
L-82 with a Foreman and a Laborer On-Site Time 50 HR $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
L-83 with a Supervisor Mob/Demob 5 LS $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - L-84 with a Supervisor On-Site Time 50 HR $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
L-85 with a Laboratory Technician Mob/Demob 5 LS $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
L-86 with a Laboratory Technician On-Site Time 50 HR $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - L-87 with a Chemist Mob/Demob 5 LS $ - $ - $ - $ - $ - $ - $ - $ - $ - L-88 with a Chemist On-Site Time 50 HR $ - $ - $ - $ - $ - $ - $ - $ - $ -
L-89 LABOR RATE utilized for Part III Line Items ER - Laborer 1 HR $ - $ - $ - $ - $ - $ - $ - $ - $ -
L-90 LABOR RATE utilized for Part III Line Items ER - Operator 1 HR $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
L-91 LABOR RATE utilized for Part III Line Items ER - Foreman 1 HR $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
L-92 LABOR RATE utilized for Part III Line Items ER - Laboratory Technician 1 HR $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
L-93 LABOR RATE utilized for Part III Line Items ER - Chemist 1 HR $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
L-94 LABOR RATE utilized for Part III Line Items ER - Supervisor 1 HR $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
PART III: (Line Items L63 thru L94) GRAND TOTAL: = $
(Unit price "MUST" be entered on each line item)
PART III
PART III: EMERGENCY RESPONSE
COMPANY:
3RD YEAR
IFB: #CQ19261
(L) EMERGENCY RESPONSE (ER)
DESCRIPTION
1ST YEAR 2ND YEAR
10-12 CY
with Min 4,500 CFM
@ 28in Hg Truck
ER Catch Basin Cleaner/Vacuum Excavator - Truck
ER - Lift Gate Equipment Truck or Equipment Service
Truck
ER - Auto Crane Service Truck with
2000 lb. Capacity
ER - Lift Gate Box (16ft) /Stake Body 5,000 lb capacity Truck
ER - Supervisor Vehicle
ER - Laboratory Technician Vehicle
ER - Chemist Vehicle
GRAND TOTAL
4TH YEAR 5TH YEAR
AMENDMENT #2
NOTE 1: All Contractor Field Personel (Supervisors, Foremen, Laborers, Technicians, and Chemists) shall have OSHA 40-hour HAZWOPER Training and be Confined Space Certified. All Operators shall have OSHA 40-hour HAZWOPER Training and, where applicable, be Confined Space Trained. The labor pricing included with line Items L1 - L32 shall be for work with PPE
NOTE 2: Line Items L63, L65, L67, L69, L71, L73, L74, L77, L79, L81, L83, L85 and L87 include all costs for the truck or vehicle and the labor (time) associated with the travel from the Contractor's hub to the initial WMATA work site and, after work has been completed, from the final WMATA work site to the Contractor's
NOTE 3: Line Items L64, L66 L68, L70, L72, L74, L76, L78, L18, L20, L22, L24, and L26 shall include all costs for the truck or vehicle and the labor associated with the performance of the on-site work and related travel between various WMATA facilities, including all markup, G&A, etc.
NOTE 4: Line Items L89 thru L94 shall be fully burdened including all costs, markup, G&A, etc.
PRICE SCHEDULE SHEET
(Page 5 of 5)
Lump Sum (LS) Per Hour (HR)
ESTIMATED
QUANTITY
UOM UNIT PRICE EXTENDED TOTAL UNIT PRICE EXTENDED TOTAL UNIT PRICE EXTENDED TOTAL UNIT PRICE EXTENDED TOTAL UNIT PRICE EXTENDED TOTAL
1 Vacuum Truck Operator - Mob/Demob 200 LS $ - $ $ - $ $ - $ $ - $ $ - $
2 Vacuum Truck Operator - On-Site Time 1,000 HR $ - $ $ - $ $ - $ $ - $ $ - $
3 Vacuum Truck Operator & Laborer Mob/Demob 100 LS $ - $ $ - $ $ - $ $ - $ $ - $
4 Vacuum Truck Operator & Laborer On-Site Time 500 HR $ - $ $ - $ $ - $ $ - $ $ - $
5 Operator - Mob/Demob 50 LS $ - $ $ - $ $ - $ $ - $ $ - $ 6 Operator - On-Site Time 250 HR $ - $ $ - $ $ - $ $ - $ $ - $ 7 Operator & Laborer Mob/Demob 50 LS $ - $ $ - $ $ - $ $ - $ $ - $
8 Operator & Laborer On-Site Time 250 HR $ - $ $ - $ $ - $ $ - $ $ - $ 9 Foreman -or- a Laborer Mob/Demob 200 LS $ - $ $ - $ $ - $ $ - $ $ - $
10 Foreman -or- a Laborer On-Site Time 1,000 HR $ - $ $ - $ $ - $ $ - $ $ - $
11 Foreman and a Laborer Mob/Demob 50 LS $ - $ $ - $ $ - $ $ - $ $ - $
12 Foreman and a Laborer On-Site Time 250 HR $ - $ $ - $ $ - $ $ - $ $ - $
13 Operator Mob/Demob 20 LS $ - $ $ - $ $ - $ $ - $ $ - $
14 Operator - On-Site Time 400 HR $ - $ $ - $ $ - $ $ - $ $ - $
15 Operator and a Laborer Mob/Demob 20 LS $ - $ $ - $ $ - $ $ - $ $ - $
16 Operator and a Laborer On-Site Time 400 HR $ - $ $ - $ $ - $ $ - $ $ - $
17 Foreman -or- a Laborer Mob/Demob 20 LS $ - $ $ - $ $ - $ $ - $ $ - $
18 Foreman -or- a Laborer On-Site Time 250 HR $ - $ $ - $ $ - $ $ - $ $ - $ 19 Foreman and a Laborer Mob/Demob 20 LS $ - $ $ - $ $ - $ $ - $ $ - $ 20 Foreman and a Laborer On-Site Time 250 HR $ - $ $ - $ $ - $ $ - $ $ - $
Street Sweeper Cleaner Truck with Left and right Gutter Brooms, Dust Control System, Magnet Pickup, and Abrasion Protection with Operator Mob/Demob (Day work 70%/Night work 30%) 50 LS $ - $ $ - $ $ - $ $ - $ $ - $
Street Sweeper Cleaner Truck
Left and right Gutter Brooms, Dust Control System, Magnet Pickup, and Abrasion Protection with Operator - On-Site Time (Day work 70%/Night work 30%) 250 HR $ - $ $ - $ $ - $ $ - $ $ - $
23 Supervisor Vehicle with a Supervisor Mob/Demob 5 LS $ - $ $ - $ $ - $ $ - $ $ - $
24 Supervisor Vehicle with a Supervisor On-Site Time 50 HR $ - $ $ - $ $ - $ $ - $ $ - $
25 Mob/Demob 5 LS $ - $ $ - $ $ - $ $ - $ $ - $
26 On-Site Time 50 HR $ - $ $ - $ $ - $ $ - $ $ - $
27 Chemist Vehicle with a Chemist Mob/Demob 5 LS $ - $ $ - $ $ - $ $ - $ $ - $
28 Chemist Vehicle with a Chemist On-Site Time 50 HR $ - $ $ - $ $ - $ $ - $ $ - $
29 LABOR RATE Utilized for Part I, Items A and F Laborer 1 HR $ - $ $ - $ $ - $ $ - $ $ - $
30 LABOR RATE Utilized for Part I, Items A and F Operator 1 HR $ - $ $ - $ $ - $ $ - $ $ - $
31 LABOR RATE Utilized for Part I, Items A and F Foreman 1 HR $ - $ $ - $ $ - $ $ - $ $ - $
32 LABOR RATE Utilized for Part I, Items A and F Laboratory Technician 1 HR $ - $ $ - $ $ - $ $ - $ $ - $
33 LABOR RATE Utilized for Part I, Items A and F Chemist 1 HR $ - $ $ - $ $ - $ $ - $ $ - $
34 LABOR RATE Utilized for Part I, Items A and F Supervisor 1 HR $ - $ $ - $ $ - $ $ - $ $ - $
35 REMOVAL Oil/Water Mixture 150,000 GAL $ - $ $ - $ $ - $ $ - $ $ - $ 36 REMOVAL Oily Sludge/Solid 200,000 GAL $ - $ $ - $ $ - $ $ - $ $ - $ 37 REMOVAL Antifreeze/Oil/Water Mixture 1,000 GAL $ - $ $ - $ $ - $ $ - $ $ - $ 38 REMOVAL Antifreeze Sludge/Solids 250 GAL $ - $ $ - $ $ - $ $ - $ $ - $ 39 REMOVAL Low/Hi pH Water (pH 3-pH 12) 3,000 GAL $ - $ $ - $ $ - $ $ - $ $ - $
40 REMOVAL 1,300 CY $ - $ $ - $ $ - $ $ - $ $ - $
41 REMOVAL Petroleum Impacted Soils 200 CY $ - $ $ - $ $ - $ $ - $ $ - $ 42 REMOVAL Mud and Solids 1,300 CY $ - $ $ - $ $ - $ $ - $ $ - $ 43 DISPOSAL Street Sweeper Sweepings 60 CY $ - $ $ - $ $ - $ $ - $ $ - $
44 60 CY $ - $ $ - $ $ - $ $ - $ $ - $
45 Clean Cartridges Only 60 CY $ - $ $ - $ $ - $ $ - $ $ - $
10-12 CY
with Min 4,500 CFM
@ 28in Hg
Lift Gate Equipment Truck and/or Equipment
Service Truck
2,000 lb.
Capacity Truck
5,000 lb.
Capacity Truck
Oily Debris (including trash from within structures)
Laboratory Technician Vehicle with a Laboratory Technician
(B) BULK LIQUIDS / SOLIDS REMOVAL & DISPOSAL
Petroleum Impacted Storm Filter / Bioretention Area Media, Media Only, All Filter Media Types
Petroleum Impacted Storm Filter Cartridges
NON-HAZARDOUS REGULATED WASTE (LIQUIDS & SOLIDS)
COMPANY:
1ST YEAR
PART I: MATERIAL REMOVAL
NON-HAZARDOUS MATERIAL REMOVAL & DISPOSALSECTION I:
DESCRIPTION
(A) LABOR & VEHICLES
Catch Basin Cleaner/Vacuum Excavator - Truck
Auto Crane Service Truck
Lift Gate Box (16ft) / Stake Body
4TH YEAR 5TH YEAR
1ST YEAR 2ND YEAR 3RD YEAR 4TH YEAR 5TH YEAR
2ND YEAR 3RD YEAR
PRICE SCHEDULE SHEET
(Page 1 of 5)
WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY
SUPPLY AND SERVICE CONTRACT IFB: #CQ19261
PRICE SCHEDULE CONTINUATION SHEET
REVISED
(See Amendment #2)
Per Drum (DR)
QUANTITY
UOM UNIT PRICE EXTENDED TOTAL UNIT PRICE EXTENDED TOTAL UNIT PRICE EXTENDED TOTAL UNIT PRICE EXTENDED TOTAL UNIT PRICE EXTENDED TOTAL
46 REMOVAL Oily Solids 200 DR $ - $ - $ - $ $ - $ - $ - $ - $ - $
47 REMOVAL Petroleum Contaminated Soil 150 DR $ - $ - $ - $ $ - $ - $ - $ - $ - $
48 REMOVAL Petroleum Contaminated Water 200 DR $ - $ - $ - $ $ - $ - $ - $ - $ - $
49 REMOVAL Mud and Solids 200 DR $ - $ - $ - $ $ - $ - $ - $ - $ - $
50 REMOVAL 40 DR $ - $ - $ - $ $ - $ - $ - $ - $ - $
51 DISPOSAL Oily 12" Dia Cartridge and Filter Media 50 EA $ - $ - $ - $ $ - $ - $ - $ - $ - $
52 DISPOSAL Oily 18" Dia Cartridge and Filter Media 50 EA $ - $ - $ - $ $ - $ - $ - $ - $ - $ 53 DISPOSAL Oily 27" Dia Cartridge and Filter Media 50 EA $ - $ - $ - $ $ - $ - $ - $ - $ - $
54 1 - 275 Gallon Tote Tank Steel 2 TK $ - $ - $ - $ $ - $ - $ - $ - $ - $
55 276 - 550 Gallon 2 TK $ - $ - $ - $ $ - $ - $ - $ - $ - $
56 551 - 1000 Gallon 2 TK $ - $ - $ - $ $ - $ - $ - $ - $ - $
UNIT PRICE EXTENDED TOTAL UNIT PRICE EXTENDED TOTAL UNIT PRICE EXTENDED TOTAL UNIT PRICE EXTENDED TOTAL UNIT PRICE EXTENDED TOTAL
57 Haz Vacuum Truck with an Operator - Mob/Demob 10 LS $ - $ $ - $ $ - $ $ - $ $ - $
58 Haz Vacuum Truck with an Operator - On-Site Time 200 HR $ - $ $ - $ $ - $ $ - $ $ - $ 59 Haz Vacuum Truck Operator and a Laborer Mob/Demob 10 LS $ - $ $ - $ $ - $ $ - $ $ - $ 60 Haz Vacuum Truck Operator and a Laborer On-Site Time 200 HR $ - $ $ - $ $ - $ $ - $ $ - $
61 with a Foreman -or- a Laborer Mob/Demob 10 LS $ - $ $ - $ $ - $ $ - $ $ - $
62 with a Foreman -or- a Laborer On-Site Time 200 HR $ - $ $ - $ $ - $ $ - $ $ - $
63 Foreman and a Laborer Mob/Demob 10 LS $ - $ $ - $ $ - $ $ - $ $ - $
64 Foreman and a Laborer On-Site Time 200 HR $ - $ $ - $ $ - $ $ - $ $ - $
65 with a Supervisor Mob/Demob 5 LS $ - $ $ - $ $ - $ $ - $ $ - $
66 with a Supervisor On-Site Time 100 HR $ - $ $ - $ $ - $ $ - $ $ - $ 67 with a Laboratory Technician Mob/Demob 5 LS $ - $ $ - $ $ - $ $ - $ $ - $ 68 with a Laboratory Technician On-Site Time 30 HR $ - $ $ - $ $ - $ $ - $ $ - $
69 Chemist Vehicle with a Chemist Mob/Demob 5 LS $ - $ $ - $ $ - $ $ - $ $ - $
70 Chemist Vehicle with a Chemist On-Site Time 30 HR $ - $ $ - $ $ - $ $ - $ $ - $
71 Removal & Disposal Gasoline/Water Mixture 1,000 GL $ - $ - $ - $ - $ - $ - $ - $ - $ - $
72 Solids Removal Gasoline Sludge 250 GL $ - $ - $ - $ - $ - $ - $ - $ - $ - $
73 Removal & Disposal Flammable Liquids (Per 55 GALLON DRUM) 5 DR $ - $ $ - $ $ - $ $ - $ $ - $
74 Removal & Disposal Flammable Solids (Per 55 GALLON DRUM) 5 DR $ - $ $ - $ $ - $ $ - $ $ - $
75 Removal & Disposal 5 DR $ - $ $ - $ $ - $ $ - $ $ - $
76 Removal & Disposal Corrosive Water (Per 55 GALLON DRUM) 5 DR $ - $ $ - $ $ - $ $ - $ $ - $
SECTION II
PART I: (Line Items 1 thru 76) GRAND TOTAL: =
PART I
GRAND TOTAL
1ST YEAR 2ND YEAR 3RD YEAR 4TH YEAR 5TH YEAR
Haz Lift Gate Box (16ft)/Stake Body
(C) DRUMMED LIQUID / SOLIDS REMOVAL & DISPOSAL
(F) HAZMAT LABOR & VEHICLES
SECTION II: HAZARDOUS MATERIAL REMOVAL & DISPOSAL
Spent Petroleum Contaminated Activated Carbon Vapor/Liquid
(D) STORMFILTER CARTRIDGE REMOVAL & DISPOSAL
SECTION I (Line Items 1 thru 56) TOTAL:
PART I: MATERIAL REMOVAL (continued)
SECTION I: NON-HAZARDOUS MATERIAL REMOVAL & DISPOSAL
Per Tank (TK)
Double Wall Tank Fireguard Steel/Steel
Double Wall Tank Fireguard Steel/Steel
IFB: #CQ19261
(E) ABOVEGROUND TANK REMOVAL & DISPOSAL
4TH YEAR 5TH YEAR
COMPANY:
1ST YEAR 2ND YEAR 3RD YEAR
Spent Activated Carbon Flammable Solids (Per 55 GALLON DRUM)
(Line Items 57 thru 76) TOTAL:
(G) HAZARDOUS MATERIAL VACUUM PUMP TRUCK PICK-UP REMOVAL & DISPOSAL
(H) HAZARDOUS DRUM REMOVAL & DISPOSAL Per 55 GALLON DRUM
NOTE: The hazardous material line items included below (Line Items F, G, H) are intended for use only in the
- event of a large scale incident requiring a significant cleanup response.
5,000 lb.
Capacity Truck
Hazmat Supervisor Vehicle
Laboratory Technician Vehicle
PRICE SCHEDULE SHEET
(Page 2 of 5)
QUANTITY
UOM UNIT PRICE EXTENDED TOTAL UNIT PRICE EXTENDED TOTAL UNIT PRICE EXTENDED TOTAL UNIT PRICE EXTENDED TOTAL UNIT PRICE EXTENDED TOTAL
Per Test
I-1 TPH (Total Petroleum Hydrocarbons) Method 8015 Modified 5 EA $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
I-2 Petroleum Hydrocarbon
Analysis 5 EA $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
I-3 Characterize Hazardous
Waste 10 EA $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
I-4 Halogenated & Aromatic Volatile Organics GC/MS Methods 8010 & 8020 2 EA $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
I-5 TCLP Extraction 2 EA $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
I-6 PCB's (Method 608/8082) 2 EA $ - $ - $ - $ - $ - $ - $ -…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.