- Solicitation number
- CQ19261
About this file
Amendment #2
View the file
Other files
| File | Type | Posted |
|---|---|---|
| AMENDMENT__3____[CQ19261].pdf | ||
| IFB__CQ19261_Rev.2___Non-Hazardous_Reg._Waste_-_IDIQ.pdf | ||
| AMENDMENT__1____[CQ19261].pdf | ||
| AMENDMENT__1____[CQ19261].pdf | ||
| Unit_Price_Sheet__CQ19261.xlsx | XLSX spreadsheet | |
| IFB__CQ19261.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROC/BMN Rev. 10/95 — C:\Users\E024312\Desktop\MOD - Form.doc
WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY
600 5th Street St. N.W., Washington, D.C. 20001
AMENDMENT OF SOLICITATION / MODIFICATION OF CONTRACT
7.THIS BLOCK APPLIES ONLY TO AMENDMENTS OF SOLICITATIONS
8. ACCOUNTING AND APPROPRIATION DATA (If required)
9. THIS BLOCK APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS
10. DESCRIPTION OF AMENDMENT/MODIFICATION
N/A
N/A
7/23/2019
WMATA
600 5th Street N.W.
Washington, DC 20001 Margarita Rodriguez, Contract Administrator
CQ19261
7/23/2019
1) EXTENDING BID DUE DATE
From Wed. 7/24/2019 to Wed. 8/04/2019 @ 2PM est. (2 revised pages attached)
2) Revised Price Schedule Sheets .................................(5 revised pages attached)
Revisions on attached pages are identified with a vertical bar that appears in the right margin at the revision location.
In addition, page(s) footer are marked "AMENDMENT".
Margarita Rodriguez, CA 7/23/2019
#2
Non-Hazardous Regulated Waste (Liquids & Solids) - IDIQ
AMENDMENT #2
Invitation For Bids (Non-Federal)
Solicitation IFB No.: CQ19261
BIDS DUE: 2PM Wed. July 10, 2019 BIDS DUE: 2PM Wed. July 24, 2019 BIDS DUE: 2PM Wed. Aug. 07, 2019
FUNDING: OPR (160)
DBE: N/A
Date: June 12, 2019
Margarita Rodriguez Contract Administrator Office of Procurement and Materials mdrodriguez@wmata.com
WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY
NON-HAZARDOUS REGULATED WASTE
(LIQUIDS & SOLIDS) - IDIQ
INDEFINITE DELIVERY / INDEFINITE QUANTITY
AMENDMENT #1
SUPPLY AND SERVICE CONTRACT IFB: #CQ19261
Rev. 04/19
AMENDMENT #2
SOLICITATION, OFFER AND AWARD
CONTRACT NO. SOLICITATION NO. DATE ISSUED ADDRESS OFFER TO OFFICE OF PROCUREMENT
IFB: CQ19261
6/12/2019 Office of Procurement 600 Fifth Street NW
Washington, DC 20001 X ADVERTISED NEGOTIATED
SOLICITATION
Sealed offer of electronic bid submission through “PROCORE” for furnishing the supplies or services in the schedules will be received at Authority until WED. 2:00 P.M. Local time July 10, 2019 July 24, 2019 Aug. 07, 2019 (Hour) (Date) AMENDMENT #1 If this is an advertised solicitation, offers will be publicly opened at that time.
CAUTION – LATE OFFERS: See paragraph 6 of Solicitation Instructions.
All offers are subject to the following:
1. The Solicitation Instructions that are attached.
2. The Terms and Conditions that are attached.
3. The Price Schedule included herein and/or attached hereto.
4. Such other provisions, representations, certifications, and specifications, as are attached or incorporated herein by reference.
Bidder’s e-mail: Bidder’s phone number
SCHEDULE
ITEM NO. SUPPLIES/SERVICES QTY. UNIT TOTAL PRICE GRAND TOTAL - AMOUNT
(All 5 Years -Basis for Award)
PART I: Material Removal 1 LS $
$ PART II: Support & Materials 1 LS $
PART III: Emergency Response 1 LS $ See Price Schedule Sheet – for details/Unit Pricing
DUN & BRADSTREET ID NUMBER:
BIDDER
Name and Address (Street, city, county, state, and zip code)
Name and Title of Person Authorized to Sign Offer (Print or Type)
Signature Offer Date
Check if remittance is different from above — enter such address in Schedule AWARD (To be completed by The Authority)
ACCEPTANCE AND AWARD ARE HEREBY MADE FOR THE FOLLOWING ITEM(S):
ITEM NO. QUANTITY UNIT AWARD TOTAL
NON-HAZARDOUS REGULATED WASTE
(Liquids & Solids) - IDIQ
See price Schedule
$ UNIT PRICES
Name of Contracting Officer WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY AWARD DATE (Print of Type)
Item # Lump Sum (LS) Per Hour (HR)
ESTIMATED
QUANTITY
UOM UNIT PRICE EXTENDED TOTAL UNIT PRICE EXTENDED TOTAL UNIT PRICE EXTENDED TOTAL UNIT PRICE EXTENDED TOTAL UNIT PRICE EXTENDED TOTAL
1 Vacuum Truck with Operator - Mob/Demob 200 LS $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
2 Vacuum Truck with Operator - On-Site Time 1,000 HR $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - 3 Vacuum Truck with Operator & Laborer Mob/Demob 100 LS $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
4 Vacuum Truck with Operator & Laborer On-Site Time 500 HR $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
5 with Operator - Mob/Demob 50 LS $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - 6 with Operator - On-Site Time 250 HR $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
7 with Operator & Laborer Mob/Demob 50 LS $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
8 with Operator & Laborer On-Site Time 250 HR $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - 9 with Foreman -or- a Laborer Mob/Demob 200 LS $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
10 with Foreman -or- a Laborer On-Site Time 1,000 HR $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
11 with Foreman and a Laborer Mob/Demob 50 LS $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
12 with Foreman and a Laborer On-Site Time 250 HR $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
13 with Operator Mob/Demob 20 LS $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
14 with Operator - On-Site Time 400 HR $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
15 with Operator and a Laborer Mob/Demob 20 LS $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
16 with Operator and a Laborer On-Site Time 400 HR $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
17 with Foreman -or- a Laborer Mob/Demob 20 LS $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
18 with Foreman -or- a Laborer On-Site Time 250 HR $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
19 with Foreman and a Laborer Mob/Demob 20 LS $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - 20 with Foreman and a Laborer On-Site Time 250 HR $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
Street Sweeper Cleaner Truck with Left and right Gutter Brooms, Dust Control System, Magnet Pickup, and Abrasion Protection with Operator Mob/Demob (Day work 70%/Night work 30%) 50 LS $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
Street Sweeper Cleaner Truck
Left and right Gutter Brooms, Dust Control System, Magnet Pickup, and Abrasion Protection with Operator - On-Site Time (Day work 70%/Night work 30%) 250 HR $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
23 Supervisor vehicle Vehicle with a Supervisor Mob/Demob 5 LS $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
24 Supervisor vehicle Vehicle with a Supervisor On-Site Time 50 HR $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
25 Mob/Demob 5 LS $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
26 On-Site Time 50 HR $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
27 Chemist Vehicle with a Chemist Mob/Demob 5 LS $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
28 Chemist Vehicle with a Chemist On-Site Time 50 HR $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
29 LABOR RATE Utilized for Part I, Items A and F Laborer 1 HR $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
30 LABOR RATE Utilized for Part I, Items A and F Operator 1 HR $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
31 LABOR RATE Utilized for Part I, Items A and F Foreman 1 HR $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
32 LABOR RATE Utilized for Part I, Items A and F Laboratory Technician 1 HR $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
33 LABOR RATE Utilized for Part I, Items A and F Chemist 1 HR $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
34 LABOR RATE Utilized for Part I, Items A and F Supervisor 1 HR $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
35 DISPOSAL Oil/Water Mixture 150,000 GAL $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
36 DISPOSAL Oily Sludge/Solid 200,000 GAL $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - 37 DISPOSAL Antifreeze/Oil/Water Mixture 1,000 GAL $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - 38 DISPOSAL Antifreeze Sludge/Solids 250 GAL $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - 39 DISPOSAL Low/Hi pH Water (pH 3-pH 12) 3,000 GAL $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
40 DISPOSAL 1,300 CY $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
41 DISPOSAL Petroleum Impacted Soils 200 CY $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - 42 DISPOSAL Mud and Solids 1,300 CY $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - 43 DISPOSAL Street Sweeper Sweepings 60 CY $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
44 60 CY $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
45 Clean Cartridges Only 60 CY $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - (Unit price "MUST" be entered on each line item)
4TH YEAR 5TH YEAR
1ST YEAR 2ND YEAR 3RD YEAR 4TH YEAR 5TH YEAR
2ND YEAR 3RD YEAR
DESCRIPTION
(A) LABOR & VEHICLES
Catch Basin Cleaner/Vacuum Excavator - Truck
Auto Crane Service Truck
Lift Gate Box (16ft) / Stake Body
Price Schedule Sheet
NON-HAZARDOUS REGULATED WASTE (LIQUIDS & SOLIDS)
COMPANY:
1ST YEAR
PART I: MATERIAL DISPOSAL
SECTION I:
IFB: #CQ19261
NON-HAZARDOUS MATERIAL REMOVAL & DISPOSAL
10-12 CY
with Min 4,500 CFM
@ 28in Hg
Lift Gate Equipment Truck and/or Equipment
Service Truck
2,000 lb. Capacity Truck
5,000 lb.
Capacity Truck
Oily Debris (including trash from within structures)
Laboratory Technician Vehicle with a Laboratory Technician
(B) BULK LIQUIDS / SOLIDS DISPOSAL
Petroleum Impacted Storm Filter / Bioretention Area Media, Media Only, All Filter Media Types
Petroleum Impacted Storm Filter Cartridges
AMENDMENT #2
NOTE 1: All Contractor Field Personnel (Supervisors, Foremen, Laborers, Technicians, and Chemists) shall have OSHA 40-hour HAZWOPER Training and be Confined Space Certified.
All Operators shall have OSHA 40-hour HAZWOPER Training and, where applicable, be Confined Space Trained. The labor pricing included with Line Items A1 - A34 shall be for work with PPE
NOTE 2: Line Items A1, A3, A5, A7, A9, A11, A13, A15, A17, A19, A21, A23, A25, and A27 include all costs for the truck or vehicle and the labor (time) associated with the travel from the Contractor's hub to the initial WMATA work site and, after work has been completed, from the final WMATA work site to the Contractor's hub, including all markup, G&A, etc.
NOTE 3:
Line Items A2, A4, A6, A8, A10, A12, A14, A16, A18, A20, A22, A24, 26, and A28 shall include all costs for the truck or vehicle and the labor associated with the performance of the on-site work and related travel between various WMATA facilities, including all markup, G&A, etc.
NOTE 4: Line Items A29 thrur A34 shall be fully burdened including all costs, markup, G&A, etc.
PRICE SCHEDULE SHEET
(Page 1 of 5)
Per Drum (DR)
QUANTITY
UOM UNIT PRICE EXTENDED TOTAL UNIT PRICE EXTENDED TOTAL UNIT PRICE EXTENDED TOTAL UNIT PRICE EXTENDED TOTAL UNIT PRICE EXTENDED TOTAL
46 DISPOSAL Oily Solids 200 DR $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
47 DISPOSAL Petroleum Contaminated Soil 150 DR $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
48 DISPOSAL Petroleum Contaminated Water 200 DR $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
49 DISPOSAL Mud and Solids 200 DR $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
50 DISPOSAL 40 DR $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
51 DISPOSAL Oily 12" Dia Cartridge and Filter Media 50 EA $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
52 DISPOSAL Oily 18" Dia Cartridge & Filter Media 50 EA $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
53 DISPOSAL Oily 27" Dia Cartridge &Filter Media 50 EA $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
54 1 - 275 Gallon Tote Tank Steel 2 TK $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
55 276 - 550 Gallon 2 TK $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
56 551 - 1000 Gallon 2 TK $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
UNIT PRICE EXTENDED TOTAL UNIT PRICE EXTENDED TOTAL UNIT PRICE EXTENDED TOTAL UNIT PRICE EXTENDED TOTAL UNIT PRICE EXTENDED TOTAL
57 Haz Vacuum Truck with Operator - Mob/Demob 10 LS $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
58 Haz Vacuum Truck with Operator - On-Site Time 200 HR $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
59 Haz Vacuum Truck with Operator and a Laborer Mob/Demob 10 LS $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - 60 Haz Vacuum Truck with Operator and a Laborer On-Site Time 200 HR $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
61 with Foreman -or- a Laborer Mob/Demob 10 LS $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
62 with Foreman -or- a Laborer On-Site Time 200 HR $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
63 with Foreman and a Laborer Mob/Demob 10 LS $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
64 with Foreman and a Laborer On-Site Time 200 HR $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
65 with a Supervisor Mob/Demob 5 LS $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
66 with a Supervisor On-Site Time 100 HR $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
67 with a Laboratory Technician Mob/Demob 5 LS $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
68 with a Laboratory Technician On-Site Time 30 HR $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
69 Chemist Vehicle with a Chemist Mob/Demob 5 LS $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
70 Chemist Vehicle with a Chemist On-Site Time 30 HR $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
71 Disposal Gasoline/Water Mixture 1,000 GL $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
72 Solids Removal Gasoline Sludge 250 GL $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
73 Disposal Flammable Liquids (Per 55 GALLON DRUM) 5 DR $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
74 Disposal Flammable Solids (Per 55 GALLON DRUM) 5 DR $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
75 Disposal 5 DR $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
76 Disposal Corrosive Water (Per 55 GALLON DRUM) 5 DR $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
SECTION II
PART I: (Line Items 1 thru 76) GRAND TOTAL: =
(Unit price "MUST" be entered on each line item)
Spent Activated Carbon Flammable Solids (Per 55 GALLON DRUM)
(Line Items 57 thru 76) TOTAL:
(G) HAZARDOUS MATERIAL VACUUM PUMP TRUCK PICK-UP DISPOSAL
(H) HAZARDOUS DRUM REMOVAL & DISPOSAL Per 55 GALLON DRUM
NOTE: The hazardous material line items included below (Line Items F, G, H) are intended for use only in the
- event of a large scale incident requiring a significant cleanup response.
5,000 lb.
Capacity Truck
Hazmat Supervisor Vehicle
Laboratory Technician Vehicle
4TH YEAR 5TH YEAR
COMPANY:
1ST YEAR 2ND YEAR 3RD YEAR
(D) STORMFILTER CARTRIDGE DISPOSAL
SECTION I (Line Items 1 thru 56) TOTAL:
PART I: MATERIAL REMOVAL (continued)
SECTION I: NON-HAZARDOUS MATERIAL REMOVAL & DISPOSAL
Per Tank (TK)
Double Wall Tank Fireguard Steel/Steel
Double Wall Tank Fireguard Steel/Steel
IFB: #CQ19261
(E) ABOVEGROUND TANK DISPOSAL
Haz Lift Gate Box (16ft)/Stake Body
(C) DRUMMED LIQUID / SOLIDS DISPOSAL
(F) HAZMAT LABOR & VEHICLES
SECTION II: HAZARDOUS MATERIAL REMOVAL & DISPOSAL
Spent Petroleum Contaminated Activated Carbon Vapor/Liquid
GRAND TOTAL
PART I
1ST YEAR 2ND YEAR 3RD YEAR 4TH YEAR 5TH YEAR
AMENDMENT #2
NOTE 1: All Contractor Field Personel (Supervisors, Foremen, Laborers, Technicians, and Chemists) shall have OSHA 40-hour HAZWOPER Training and be Confined Space Certified. All Operators shall have OSHA 40-hour HAZWOPER Training and, where applicable, be Confined Space Trained. The labor pricing included with line Items F1 - F14 shall be for work with PPE requirement of Level D
NOTE 2: Line Items F57, F59, F61, F63, F65, F67, and F69 include all costs for the truck or vehicle and the labor (time) associated with the travel from the Contractor's hub to the initial WMATA work site and, after work has been completed, from the final WMATA work site to the Contractor's hub, including all markup, G&A, etc.
NOTE 3: Line Items F58, F60, F62, F64, F66, F68, and F70 shall include all costs for the truck or vehicle and the labor associated with the performance of the on-site work and related travel between various WMATA facilities, including all markup, G&A, etc.
PRICE SCHEDULE SHEET
(Page 2 of 5)
Item #
QUANTITY
UOM UNIT PRICE EXTENDED TOTAL UNIT PRICE EXTENDED TOTAL UNIT PRICE EXTENDED TOTAL UNIT PRICE EXTENDED TOTAL UNIT PRICE EXTENDED TOTAL
Per Test
I-1 TPH (Total Petroleum Hydrocarbons) Method 8015 Modified 5 EA $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
I-2 Petroleum Hydrocarbon
Analysis 5 EA $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
I-3 Characterize Hazardous
Waste 10 EA $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
I-4 GC/MS Methods 8010 & 8020 2 EA $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
I-5 TCLP Extraction 2 EA $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
I-6 TCLP Extraction for RCRA 8
Metals 2 EA $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
I-7 PCB's (Method 608/8082) 2 EA $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
J-7 FURNISH 55 GAL. Solids Drum (1A2/X400/S) 25 EA $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
J-8 FURNISH 55 GAL. LIQUID Drum (1A1/X1.5/300) 10 EA $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - J-9 FURNISH 85 GAL. Drum (1H2/X440/S) 5 EA $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
J-10 5" DIAMETER x 10' Oil-Only Absorbent Floating Boom 5 EA $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - J-11 15" x 20" Oil-Only Absorbent Pad 100 ea/Case 10 CS $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - J-12 15" x 20" Universal Absorbent Pad (oil/water/coolant) 100 ea/Case 10 CS $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - J-13 Dry Loose Absorbent (Oil/water/coolant) 40lb. /bag 20 BAG $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - J-14 Ultratech 48 in x 36 in x 18 in Ultra-Drain Guard Part #9217 (Oil & Sediment) 40 EA $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - J-15 Ultratech 60 in x 60 in x 18 in Ultra-Drain Guard Part #9356 (Oil & Sediment) 10 EA $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - J-16 Ultratech 48 in x 36 in x 18 in Ultra-Drain Guard Part #9227 (Trash & Debris) 40 EA $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
J-17 With No Used Cartridge Return CSF- Fill / 12" or 18" Dia 20 EA $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
J-18 With No Used Cartridge Return Perlite- Fill / 12" or 18" Dia 5 EA $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
J-19 With No Used Cartridge Return ZPG - Fill / 12" or 18" Dia 5 EA $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
J-20 With No Used Cartridge Return Phosphosorb Fill / 12" or 18" Dia 5 EA $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
J-21 With No Used Cartridge Return GAC Fill / 12 or 18" Dia 5 EA $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
J-22 With No Used Cartridge Return MRX Fill / 12" or 18" Dia 5 EA $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - J-23 With No Used Cartridge Return CSF - Fill / 27" Dia 20 EA $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - J-24 With No Used Cartridge Return Perlite - Fill / 27" Dia 5 EA $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - J-25 With No Used Cartridge Return ZPG - Fill / 27" Dia 5 EA $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - J-26 With No Used Cartridge Return Phosphosorb Fill / 27" Dia 5 EA $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - J-27 With No Used Cartridge Return GAC Fill / 27" Dia 5 EA $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - J-28 With No Used Cartridge Return MRX Fill / 27" Dia 5 EA $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
J-29 CSF- Fill / 12" or 18" Dia 40 PL $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
J-30 Perlite- Fill / 12" or 18" Dia 40 PL $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - J-31 ZPG- Fill / 12" or 18" Dia 5 PL $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - J-32 Phosphosorb Fill / 12" or 18" Dia 5 PL $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - J-33 Used Empty Cartridges GAC Fill / 12 or 18" Dia 5 PL $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - J-34 to Contech MRX Fill / 12" or 18" Dia 5 PL $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - J-35 for Credit CSF - Fill / 27" Dia 40 PL $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - J-36 Perlite - Fill / 27" Dia 40 PL $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - J-37 ZPG - Fill / 27" Dia 5 PL $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - J-38 NOTE: Pallet (PL) - 4 Each Phosphosorb Fill / 27" Dia 5 PL $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - J-39 GAC Fill / 27" Dia 5 PL $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - J-40 MRX Fill / 27" Dia 5 PL $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
J-41
On-Site Storm Filter Media Replacement for Filters 12"-30" Height with Media
200 EA $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
(Unit price "MUST" be entered on each line item)
Price Schedule Sheet
NON-HAZARDOUS REGULATED WASTE (LIQUIDS & SOLIDS)
COMPANY:
PART II: SUPPORT & MATERIALS
IFB: #CQ19261
1ST YEAR 2ND YEAR 3RD YEAR 4TH YEAR 5TH YEAR
5TH YEAR (J) EQUIPMENT & MATERIALS
DESCRIPTION
(I) ANALYTICAL TESTING
WMATA Full Suite TPH/DRO, TPH/GRO, BTEX, Napthalene, and MTBE
This includes Corrosivity (Method 1110), Ignitability (Methods 1010/1020), Reactivity (Method SW 846), pH (Mehtod 9040)
(Method 1311) -- FULL SUITE: Including volatiles (Method 8240), semivolatiles (Method 8370), pesticides (Method 8080), herbicides (Method 8150), inorganics RCRA 8 Metals (Methods 7130/7131, 7420/7421, 7760/7761, 7520/7521, 7470/7471)
Halogenated & Aromatic Volatile Organics
Methods 7130/7131, 7420/7421, 7520/7521, 7470/7471
1ST YEAR 2ND YEAR 3RD YEAR
Contractor to Empty, Clean, Palletize, Bulk, and Return
4TH YEAR
New Filled Contech
Stormfilter Filter Cartridge
New Filled Contech Storm Filters
(4ea)
Including But Not Limited to CSF, Perlite, ZPG, Phosphosorb, GAC, MRX, or Sand. Contractor to Remove Cartridge from Vault, Disassemble Cartridge, Remove Spent Media (place media in container for ultimate disposal), Clean Cartridge Filtering Screen, Reassemble Cartridge with New Media, and Install Refurbished Cartridge within Vault.
AMENDMENT #2
NOTE 1: Line Items J7 through J16 shall include all costs for purchase, delivery, removal, installation, markup, G&A, etc., with the exception of labor and vehicles which are covered in Item A.
NOTE 2: Line Items J17 through J28 shall include all costs for purchase, delivery, including markup, G&A, etc., with the exception of the labor (spent cartridge removal, new cartridge installation) which is covered in Item A and Disposal covered in Item D.
NOTE 3: Line Items J29 through J40 shall include all costs for purchase, delivery, cartridge removal, media removal, cartridge installation bulking empty cartridges on pallets, loading, including markup, G&A, etc., with the exception of the labor (spent cartridge removal, new cartridge installation, and spent cartridge media removal) and vehicles which are covered in Item A and spent media disposal covered in Item B.
NOTE 4: Line Item J41 shall include all costs for purchase and delivery of new media, cartridge removal, cartridge disassembly, removal of spent media and transfer to container for disposal, cartridge cleaning, cartridge reassembly with new media, and installation of refurbished cartridge in vault, including markup, G&A, etc., with the exception of labor and vehicles covered in Item A and spent media disposal
PRICE SCHEDULE SHEET
(Page 3 of 5)7
J-42 2500 psi (min 2 gpm) Pressure Washer 5 DY $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - J-43 2500 psi (min 2 gpm) 5 DY $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
J-44 5KW Generator Including 100 ft 12/3 Extension Cord 5 DY $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
J-45 20KW Diesel Generator 5 DY $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
J-46 100-120 CFM Air
Compressor 5 DY $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
J-47 175 - 220 CFM Air
Compressor 5 DY $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
J-48 60 GPM 2" 5 DY $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
J-49 150 GPM 3" 5 DY $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
J-50 44"+ Confined Space Air
Horn 5 DY $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
J-51 Confined Space
Axial Fan 5 DY $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
J-52 Confined Space
Entry Setup 20 DY $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
J-53 Bobcat with Power Broom Attachment for Parking Lot Cleaning 20 DY $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
Per Container (CTN) / Per Week (WK)
ESTIMATED
QUANTITY
UOM UNIT PRICE EXTENDED TOTAL UNIT PRICE EXTENDED TOTAL UNIT PRICE EXTENDED TOTAL UNIT PRICE EXTENDED TOTAL UNIT PRICE EXTENDED TOTAL
K-54 10 cubic yard container with liner and cover Mob/Demob 5 CTN $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
K-55 10 cubic yard container with liner and cover On-Site Weekly 5 WK $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
K-56 30 cubic yard container with liner and cover Mob/Demob 5 CTN $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
K-57 30 cubic yard container with liner and cover On-Site Weekly 5 WK $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
K-58 8,000-10,000 Gallon Closed top clean frac tank Mob/Demob 5 CTN $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - K-59 8,000-10,000 Gallon Closed top clean frac tank On-Site Weekly 5 WK $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - K-60 18,000-22,000 Gallon Closed top clean frac tank Mob/Demob 5 CTN $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - K-61 18,000-22,000 Gallon Closed top clean frac tank On-Site Weekly 5 WK $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - K-62 Frac Tank Cleaning 8,000-22,000 Gallon 10 EA $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
PART II: (Line Items I1 thru K-62) GRAND TOTAL: =
(Unit price "MUST" be entered on each line item)
(Unit price "MUST" be entered on each line item)
Tow Behind Including junction box and 3 ea 100ft 12/3 extension cords.
Diesel Tow Behind Including 200 ft of hose and connection for diaphragm pump or air horn
Double Diaphragm Pneumatic Pump with 100 ft Suction and 100 ft Discharge Hose
Double Diaphragm Pneumatic Pump with 100 ft Suction Hose and 100 ft Discharge Hose
Diesel Tow Behind Including 200 ft of hose and connection for diaphragm pump or air horn
(J) EQUIPMENT & MATERIALS (continued)
PART II: SUPPORT & MATERIAL (continued)
3RD YEAR
IFB: #CQ19261
Hot Water Pressure Washer (Fuel Oil)
Per Day (DY)
(K) ROLL-OFFS AND FRAC TANKS
minimum 2,000 cfm (minimum) with removable 36" square base plate and 48" square base plate including 100 ft of grounding cable.
capable of 1,200 cfm with 8" duct connections.
Including 20" high stand, 30ft of grounded 8" flex duct, a 90 degree manhole entry duct section, and 50 ft 12/3 extension cord.
(Includes 1 ea Tripod; 1 ea Man Retrieval Hoist; 1 ea self retracting lifeline min 15 feet; 1 ea Side Equipment Hoist; 1 ea 12 ft Narrow Fiberglass Manhole
Ladder; 3ea full body harnesses; 1,200 CFM blower; 20" Hign Stand for Blower;
2 ea 16 ft lengths Blower Duct; 4 Gas Confined Space Meter (LEL, O2, CO, H2S);
1 ea Calibration Kit with Span Gas and Regulator, and 3 ea "Tyvek QC" suits)
1ST YEAR 2ND YEAR 4TH YEAR 5TH YEAR
GRAND TOTAL
PART II
AMENDMENT #2
NOTE 5: Line Items J42 through J53 shall include all costs for "rental", delivery, installation, fuel, and maintenance, including markup, G&A, etc., with the exception of the labor which is covered in Item A
NOTE 1: Line items K54, K56, K58, and K60 shall include all transportation costs for deliverly and removal from the WMATA facility and shall include the on-site weekly storage costs for the initial 7 calendar days on-site at a WMATA facility.
NOTE 2: Line Items K55, K57, K59, and K61 shall include all on-site weekly (7 calendar days) storage costs after the initial week.
The costs for the initial week are included in the Mob/Demob
PRICE SCHEDULE SHEET
(Page 4 of 5)8
Item # Lump Sum (LS) Per
Hour (HR)
ESTIMATED
QUANTITY
UOM UNIT PRICE EXTENDED TOTAL UNIT PRICE EXTENDED TOTAL UNIT PRICE EXTENDED TOTAL UNIT PRICE EXTENDED TOTAL UNIT PRICE EXTENDED TOTAL
L-63 ER- VACUUM TRUCK with an Operator Mob/Demob 10 LS $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
L-64 ER- VACUUM TRUCK with an Operator On-Site Time 120 HR $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
L-65 ER- VACUUM TRUCK with an Operator & a Laborer Mob/Demob 10 LS $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
L-66 ER- VACUUM TRUCK with an Operator & a Laborer On-Site Time 120 HR $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
L-67 with an Operator Mob/Demob 10 LS $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
L-68 with an Operator On-Site Time 120 HR $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
L-69 with an Operator & a Laborer Mob/Demob 10 LS $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
L-70 with an Operator & a Laborer On-Site Time 120 HR $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
L-71 with a Foreman -or- a Laborer Mob/Demob 5 LS $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
L-72 with a Foreman -or- a Laborer On-Site Time 50 HR $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
L-73 with a Foreman & a Laborer Mob/Demob 5 LS $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
L-74 with a Foreman & a Laborer On-Site Time 50 HR $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
L-75 with an Operator Mob/Demob 5 LS $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
L-76 with an Operator On-Site Time 50 HR $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
L-77 with Operator& a Laborer Mob/Demob 5 LS $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
L-78 with Operator& a Laborer On-Site Time 50 HR $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
L-79 with a Foreman -or- a Laborer Mob/Demob 5 LS $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
L-80 with a Foreman -or- a Laborer On-Site Time 50 HR $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
L-81 with a Foreman and a Laborer Mob/Demob 5 LS $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
L-82 with a Foreman and a Laborer On-Site Time 50 HR $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
L-83 with a Supervisor Mob/Demob 5 LS $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - L-84 with a Supervisor On-Site Time 50 HR $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
L-85 with a Laboratory Technician Mob/Demob 5 LS $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
L-86 with a Laboratory Technician On-Site Time 50 HR $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - L-87 with a Chemist Mob/Demob 5 LS $ - $ - $ - $ - $ - $ - $ - $ - $ - L-88 with a Chemist On-Site Time 50 HR $ - $ - $ - $ - $ - $ - $ - $ - $ -
L-89 LABOR RATE utilized for Part III Line Items ER - Laborer 1 HR $ - $ - $ - $ - $ - $ - $ - $ - $ -
L-90 LABOR RATE utilized for Part III Line Items ER - Operator 1 HR $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
L-91 LABOR RATE utilized for Part III Line Items ER - Foreman 1 HR $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
L-92 LABOR RATE utilized for Part III Line Items ER - Laboratory Technician 1 HR $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
L-93 LABOR RATE utilized for Part III Line Items ER - Chemist 1 HR $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
L-94 LABOR RATE utilized for Part III Line Items ER - Supervisor 1 HR $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
PART III: (Line Items L63 thru L94) GRAND TOTAL: = $
(Unit price "MUST" be entered on each line item)
PART III
PART III: EMERGENCY RESPONSE
COMPANY:
3RD YEAR
IFB: #CQ19261
(L) EMERGENCY RESPONSE (ER)
DESCRIPTION
1ST YEAR 2ND YEAR
10-12 CY
with Min 4,500 CFM
@ 28in Hg Truck
ER Catch Basin Cleaner/Vacuum Excavator - Truck
ER - Lift Gate Equipment Truck or Equipment Service
Truck
ER - Auto Crane Service Truck with
2000 lb. Capacity
ER - Lift Gate Box (16ft) /Stake Body 5,000 lb capacity Truck
ER - Supervisor Vehicle
ER - Laboratory Technician Vehicle
ER - Chemist Vehicle
GRAND TOTAL
4TH YEAR 5TH YEAR
AMENDMENT #2
NOTE 1: All Contractor Field Personel (Supervisors, Foremen, Laborers, Technicians, and Chemists) shall have OSHA 40-hour HAZWOPER Training and be Confined Space Certified. All Operators shall have OSHA 40-hour HAZWOPER Training and, where applicable, be Confined Space Trained. The labor pricing included with line Items L1 - L32 shall be for work with PPE
NOTE 2: Line Items L63, L65, L67, L69, L71, L73, L74, L77, L79, L81, L83, L85 and L87 include all costs for the truck or vehicle and the labor (time) associated with the travel from the Contractor's hub to the initial WMATA work site and, after work has been completed, from the final WMATA work site to the Contractor's
NOTE 3: Line Items L64, L66 L68, L70, L72, L74, L76, L78, L18, L20, L22, L24, and L26 shall include all costs for the truck or vehicle and the labor associated with the performance of the on-site work and related travel between various WMATA facilities, including all markup, G&A, etc.
NOTE 4: Line Items L89 thru L94 shall be fully burdened including all costs, markup, G&A, etc.
PRICE SCHEDULE SHEET
(Page 5 of 5)