County-Specs-02110-Clearing.pdf

PDF 44 KB Posted

Attached to
Suffolk Drive Drainage Improvements
Solicitation number
IFB #27023
Issued by
Greenville County, South Carolina

About this file

This is a standard specifications document issued by Greenville County Public Works for Section 02110: Site Clearing, applicable to the Suffolk Drive Drainage Improvements project in Greenville, South Carolina. The specifications outline the scope of work required for clearing and grubbing operations, including the removal and disposal of trees, brush, debris, stumps, roots, and other objectionable organic material within designated grading areas. The work encompasses cutting and removal of all trees and brush, with grubbing operations requiring removal of stumps entirely and extraction of roots and matted roots to a minimum depth of 18 inches below the existing ground surface. All cleared and grubbed materials must be removed from the site and disposed of off-site. The specifications require that designated trees to be retained must be carefully protected during grading operations, with any damaged or destroyed trees to be replaced at fair market value as determined by the County Engineer at the Contractor's expense. Certification of clearing and grubbing operations by the County Engineer is required prior to rough grading, filling, or as mandated by local government agencies.

The specifications establish standard technical requirements and procedures to be followed by contractors performing site clearing work on County projects. Traffic control requirements for work in public streets, roads, and highways must comply with applicable regulatory authority requirements, including adherence to the South Carolina Manual on Uniform Traffic Control Devices for Streets and Highways (1982, latest revision) as a minimum standard for State Highway work. The specifications reference related sections of the overall contract documents, including General Provisions and Special Provisions, which apply to all sections of work. No specific pricing, contract term, bonding requirements, or award information is contained within this specifications section, as it serves as a technical standard document rather than a project-specific bid solicitation.

View the file

Other files

Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SITE CLEARING 02110-1

GREENVILLE COUNTY

PUBLIC WORKS

STANDARD SPECIFICATIONS

SECTION 02110

SITE CLEARING

SITE CLEARING 02110-2

SITE CLEARING

SECTION 02110

RELATED DOCUMENTS: Attention is directed to related sections of the Specifications, as they pertain to the guidelines, materials, and methods described in this section. Also, the General Provisions and Special Provisions of the Contract shall apply to all Sections of the Work.

1.0 SCOPE

a. General: This section includes furnishing all labor, materials, equipment, and all services necessary for any clearing, and/or clearing and grubbing required within the areas of operation.

b. Traffic Control: The Contractor shall be responsible for conducting all work in public streets, roads and highways in accordance with any and all Regulatory Authorities current requirements. As a minimum, for any work in State Highways, the Contractor shall meet the requirements of Traffic Controls for Street and Highway Construction Part V of the South Carolina Manual on Uniform Traffic Control Devices for Streets and Highways - 1982, latest revision.

2.0 CLEARING AND GRUBBING

a. Clearing - On all areas where grading, excavating and filling are to be done, and on all border areas, clearing shall consist of cutting, removal and disposal of all trees, brush, debris and other objectionable material resting on or protruding above ground within the limits of grading.

b. Grubbing - Grubbing shall consist of the removal and disposal of stumps, roots, and other objectionable organic material within the limits of grading. Stumps shall be removed entirely.

Roots and matted roots shall be grubbed out at least 18 inches below the existing surface.

c. Disposal of Materials - All materials removed as a result of clearing and grubbing operations shall be removed from and disposed of off-site.

d. Trees - Those trees that are indicated to be saved shall be carefully protected during grading operations. If the trees are damaged or destroyed due to the Contractor's negligence, they will be replaced at the fair market value determined by the County Engineer and paid for by the Contractor.

3.0 CERTIFICATION

The clearing and grubbing operations shall be certified by the County Engineer prior to rough grading, filling, or as required by Local Government Agencies.

END OF SECTION