About this file

This is a cost schedule template for the State of Nevada's Radiation Control Program (RCP), a software implementation and maintenance project. The document outlines a multi-year contract structure encompassing software implementation services in Year 1, followed by maintenance and operations services in Years 2-4, with optional service years available. The implementation phase includes system testing, process analysis, data conversion, licensing modules, inspection modules, offline inspection capabilities, ad hoc reporting functionality, and post-implementation support. The contract includes a helpdesk and user support component during the setup phase and transitions into warranty coverage for six months in Year 2, with warranty and maintenance operations running concurrently for six months in Year 3, and full maintenance and operations services in Year 4 and beyond.

The cost schedule requires proposers to provide detailed pricing for all line items across multiple cost categories, including direct costs, indirect costs, travel and accommodation, materials and supplies, administrative expenses, hardware and software licensing, infrastructure integration, system testing, user acceptance testing, training, and production support. Proposers must also submit personnel rates for up to 40 classified positions, ranging from project executive to tester roles, with separate hourly rates specified for the implementation year, base contract years, and option years. The document includes a blended hourly rate structure for change request pools that encompasses project managers, database engineers, application developers, system analysts, system architects, and quality assurance engineers. All cost totals in the template currently display as $0.00, indicating this is a blank schedule for proposer completion with detailed cost basis documentation required below each section.

View the file

Other files

File Type Posted
40DHHS-S3545 - Cost Schedule.docx DOCX document
Certification-regarding-lobbying~21.pdf PDF
40DHHS-S3545 - Insurance Schedule.docx DOCX document
40DHHS-S3545 - reference-questionnaire.docx DOCX document
Certification-regarding-lobbying~18.pdf PDF
Insurance Schedule~7.docx DOCX document
Standard-form-contract.docx DOCX document
Quote Instructions (4).pdf PDF
Quote Instructions (1).pdf PDF
40DHHS-S3545 - Vendor-Information-Response.pdf PDF
Quote Instructions.pdf PDF
Quote Instructions (3).pdf PDF
40DHHS-S3545 - request-for-proposals - Final.docx DOCX document
40DHHS-S3545 - Questions and Answers.docx DOCX document
Standard-form-contract~18.docx DOCX document
Terms-and-conditions-for-services~24.pdf PDF
Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Section Summary Cost Schedule

NEVADA SUMMARY COST SCHEDULE- Radiation Control Program (RCP)

The proposer shall review RFP for guidance associated with this cost schedule estimates.

Item #Base Contract Years Cost SummaryCost
NevadaRadiation Control Program Costs - Base Contract Years
Software implimentation Services Year 1
System Testing and Implementation
Process Analysis and Planning
Data Conversion and Migration
Licensing Module
Inspection Module
Offiline Inspection Module
Ad Hoc Reports Licensing,Complaints, Inspections
Post -Implementation Support and Maintenance
Helpdesk and User Support Set Up

Base Contract Subtotal Section $0.00

Item #M&O Optional Year Cost SummaryCost
Nevada Radiation Control Program Costs - Optional Year
M&O Optional 3 Years Annual Service Maintenance Agreemnt

Optional Year Subtotal Section $0.00

Item #Total Base Contract and Optional Year Cost SummaryCost
Nevada Radiation Control Program - Cost Schedule
Total Base Contract Years
Total M&O and Optional Year

Base Contract and Optional Year Total $0.00

Item # Optional Services Cost Summary Cost

$0.00

Optional Services Subtotal Section $0.00

Item #Contract Personnel Hourly RatesBlended Rate
Nevada Radiation Control Program Change Request Pool Rate
Blended Hourly Rate for Change Request per hour Project Manager
Blended Hourly Rate for Change Request Database Engineer
Application Developer per hour
System Analyst per hour
System Architect per hour
Quality Assurance Engineer per ohur
Blended Rate for Change Request Pool Hours SectionERROR:#DIV/0!

&"Arial,Bold Italic"&A &"Arial,Bold Italic"Page &P

Section # RCPServices

RCP Services Cost Schedule
The proposer shall review RFP for guidance. Proposers shall provide the cost for each item identified in this schedule as well as a detailed description and associated cost for additional items identified by the proposer.

NOTE: When calculating line item costs here for Radiation Control Program (RCP) services the proposer shall include all associated deliverable costs for the applicable year, from cost schedule .

Description of RFP Services Year 1

RFP

Cost Year 2

RFP

CostTotal RFP Cost
RCP Services
Software Implemntation Service 1 year
Process Analyst and Planning
Licensing Module
Inspection Module
Offline Inspetion Module
Ad Hoc Reports Licensing, Complaints and Inspections
Other and Indirect Costs
Travel and Accommodation (if applicable)
Materials and Supplies
Administrative Expenses
Hardware/Software, Licensing and Infrastructure
Integration
System Test
User Acceptaance Testing (UAT)
Training
Production

RCPSERVICES SUB-TOTAL $ - 0 $0.00

&"Arial,Bold Italic"&A &"Arial,Bold Italic"Page &P

Section # Optional Services

Nevada Optional Services
The proposer shall review RFP for guidance. Proposers shall provide the cost for each item identified in this schedule as well as a detailed description and associated cost for additional items identified by the proposer. Note: The optional services cost should be calculated per annual basis.
Description of Optional ServicesCost
Nevada RCP Optional Services
Functionality for Optional Requirements

OPTIONAL SERVICES SUB TOTAL $0.00

Below this line, proposer shall provide additional information as needed to convey the basis of your proposed cost amounts presented in this schedule. If cost amounts vary by volume of services, please describe as appropriate.

Section # M&O Services

Maintenance and Operations Cost Schedule, Base Contract Years -
The proposer shall review RFP for guidance. Proposers shall provide the cost for each item identified in this schedule as well as a detailed description and associated cost for additional items identified by the proposer.

NOTE: When calculating line item costs here for M&O services regarding RFP, the proposer shall include all associated deliverable costs for the applicable year, from cost schedule.

Description of Maintentance and Operations Services Year 2 Warranty (6 months) Cost Year 3 Warranty (6 months) and M&O (6 months) Cost Year 4 M&O Cost Total Cost by Service Line for M&O Base Contract Years Nevada Radiation Control Program (RCP)

Direct Costs
Warranty
Operations and Maintenance of the CCWIS and All Components
Help Desk Operations
Reporting and Analytics
Contract Transition & Closeout
Other and Indirect Costs
Travel and Accommodation (if applicable)
Materials and Supplies
Administrative Expenses
Costs - Direct Hardware/Software, Licensing and Infrastructure
Integration
361355
User Acceptaance Testing (UAT)
Training
Production

M&O BASE CONTRACT YEARS SUB TOTAL $0.00 $0.00 $0.00 $0.00

Below this line, proposer shall provide additional information as needed to convey the basis of your proposed cost amounts presented in this schedule.

&"Arial,Bold Italic"&A &"Arial,Bold Italic"Page &P

Section # M&O Option Year

Maintenance and Operations Cost Schedule, Option Year -
The proposer shall review RFP for guidance. Proposers shall provide the cost for each item identified in this schedule as well as a detailed description and associated cost for additional items identified by the proposer.

NOTE: When calculating line item costs here for M&O services regarding RFP, the proposer shall include all associated deliverable costs for the applicable year, from cost schedule.

Description of Maintentance and Operations ServicesM&O Option Year Cost
Nevada Radiation Control Program (RCP)
Direct Costs
Operations and Maintenance of the RCP and All Components
Help Desk Operations
Reporting and Analytics
Contract Transition & Closeout
Other and Indirect Costs
Travel and Accommodation (if applicable)
Materials and Supplies
Administrative Expenses
Costs - Direct Hardware/Software, Licensing and Infrastructure
Integration
System Test
User Acceptaance Testing (UAT)
Training
Production

M&O OPTION YEARS SUB TOTAL $0.00

&"Arial,Bold Italic"&A &"Arial,Bold Italic"Page &P

Section # Personnel Rates

Personnel Rates by Year -
The proposer shall review RFP for guidance.
Item #Personnel PositionHourly Rate -
DDI (Year 1)Hourly Rate -
Base Contract (Years 2-3)Hourly Rate - Option Year
Nevada Radiation Control Program (RCP)Personnel Rates
1Project Executive
2Project Manager
3Technical Lead
4Implementation Lead
5Operations Manager
6Integration Manager
7Database Administration
8Functional Lead
9Test Lead
10Senior Business Analyst
11PMO/QA Lead
12Senior Programmer Analyst
13Business Analyst
14Senior Training Analyst
15Senior System Analyst
16QA Analyst
17Programmer Analyst
18System Analyst
19Tester
20Training Analyst
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40

File details come from the government source that posted it. Updated .