This is an engineering drawing and specification document for the City of Sun Prairie, Wisconsin, detailing the replacement of two boilers in the Westside Community Service Building located at 2598 W Main Street. The project involves the demolition of existing boiler piping, insulation, and specialty devices down to existing shutoff valves and triple duty valves, followed by installation of new boilers on existing pads with complete piping and specialty device connections. The work includes connecting boilers to existing flue intake and exhaust systems, gas piping connections utilizing existing gas pressure regulators, and field coordination to verify and modify existing services as necessary. All work must comply with state and local codes and manufacturer instructions, with systems requiring testing, adjustment, calibration, and balancing in accordance with NEBB standards. The contract scope also includes an alternate bid option for replacement of current VFD pumps in the same location.

The engineering specifications require that all HVAC equipment meet IRI, AGA, and UL requirements, with all low-voltage wiring performed per the National Electric Code. The mechanical contractor bears responsibility for field verification of exact pipe routing, equipment locations, and clearances prior to submittal. Equipment must be provided complete with operation and maintenance manuals and system schematics, and a balance report shall be submitted to the engineer with one copy retained at the jobsite. Gas pipe sizing is based upon Schedule 40 black steel specifications. The project was prepared by RJ D Engineering, Inc. with a project number of 22.0196 and issued on July 1, 2022, during the design development phase.

View the file

Other files

File Type Posted
RFB 22-BM29.pdf PDF
Draft Contract.pdf PDF
Updated Bid Proposal Form.pdf PDF
RFB 22-BM29 Bid Opening Log.pdf PDF
RFB Questions Answers UPDATED.pdf PDF
RFB Questions Answers.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Boilers B20

Comm B21

Corridor B10

Elev Machine B23

Elevator

EL1

Storage B19

Workout B26

10''Ø (E)

8/8 (E) 3" G (E)

1 1/4" G (E)

B-1 (E)

B-2 (E)

WH (E)

WH (E)

4" (E)

ET (E)

1 1/2" (E)

1" (E)

HWR

G

P-1 (E) & P-2 (E)

(STACKED)

VFD'S

BFP (E)

Rolairtrol (E)

Pot Feeder (E)

HWS

HWS

HWS

6"Ø FLUE

6"Ø FLUE

6"Ø FLUE

6"Ø

FLU

E

3" G (E)

G

CW

CW

HWS

HWS

4" (E)

4" (E) 3 1/2" (E)

(TYP. ALL BRANCH

CONNECTIONS)

HWS

Boilers B20

Comm B21

Corridor B10

Elev Machine B23

Elevator

EL1

Storage B19

Workout B26

10''Ø (E)

8/8 (E) 3" G (E)

1 1/4" G (E)

WH (E)

WH (E)

4" (E)

ET (E)

1 1/2" (E)

1" (E)

HWR

G

P-1 (E) & P-2 (E)

(STACKED)

VFD'S

BFP (E)

Rolairtrol (E)

Pot Feeder (E) B-2

B-1

HWS

HWS

HWS

6"Ø FLUE

6"Ø FLUE

6"Ø FLUE

6"Ø

FLU

E

3" G (E)

G

CW

CW

HWS

HWS

4" (E)

4" (E) 3 1/2" (E)

(TYP. ALL BRANCH

CONNECTIONS)

HWS

SCALE:

M003

BOILER ROOM - HVAC

1/4"=1'-0"

NORTH

DEMOLITION KEYED NOTES:

DEMOLISH PIPING, INSULATION AND SPECIALTY DEVICES TO EXISTING SHUTOFF VALVE AND TRIPLE DUTY VALVE.1

KEYED NOTES:

INSTALL NEW BOILER IN LOCATION SHOWN ON EXISTING PAD. INSTALL PIPING AND SPECIALTY DEVICES AS SHOWN ON DETAIL 1/M000. CONNECT BOILER TO EXISTING FLUE INTAKE AND EXHAUST. CONTRACTOR SHALL FIELD VERIFY AND COORDINATE LOCATION OF EXISTING PIPING AND FLUE INTAKE/EXHAUST PRIOR TO SUBMITTALS. MODIFICATION

TO EXISTING SERVICES SHALL BE THE RESPONSIBILITY OF THE MECHANICAL CONTRACTOR.

CONNECT GAS PIPING TO NEW BOILER. UTILIZE EXISTING GAS PRESSURE REGULATOR.

DRAWN :

CHECKED :

DATE :

PHASE :

PROJECT

PROJECT # :

REVISIONS / ADDENDA

CONSULTANTS

ISSUED

220196

JDR

JDR

07/01/22

BD

COSP - WESTSIDE BLDG

BOILER REPLACEMENT

5525 NOBEL DRIVE

SUITE 110

MADISON, WI 53711

ph: 608.277.1728 fax: 608.271.7046

JDR Project No. 22.0196

D

ENGINEERING, INC.

RJ

Basement Partial Floor Plans - HVAC

M003

SCALE:

M003

BOILER ROOM - HVAC

1/4"=1'-0"

NORTH

GENERAL NOTES:

1. ALL WORK TO BE DONE IN COMPLIANCE WITH ALL STATE AND LOCAL CODES AND ALL MANUFACTURER'S

INSTRUCTIONS.

2. ALL PIPING SHALL RUN STRAIGHT AND TRUE AND SHALL BE INSTALLED IN A WORKMANLIKE MANNER.

3. HVAC CONTRACTOR OR BALANCING AGENT SHALL TEST, ADJUST, CALIBRATE AND BALANCE THE SYSTEMS AS REQUIRED BY APPLICABLE CODES AND IN ACCORDANCE WITH NEBB. THE BALANCE REPORT SHALL BE SUBMITTED TO

THE ENGINEER, AND ONE COPY RETAINED AT THE JOBSITE.

4. ALL EQUIPMENT IS TO BE PROVIDED COMPLETE WITH OPERATION & MAINTENANCE MANUALS AND SYSTEM

SCHEMATICS.

5. ALL HVAC EQUIPMENT TO MEET IRI, AGA, AND UL REQUIREMENTS.

6. ALL LOW-VOLTAGE WIRING BY HVAC CONTRACTOR PER NATIONAL ELECTRIC CODE.

7. HVAC CONTRACTOR TO FIELD VERIFY EXACT LOCATION OF PIPE ROUTING AND EQUIPMENT LOCATIONS AND

CLEARANCES ON JOB SITE.

8. GAS PIPE SIZING IS BASED UPON SCHEDULE 40 BLACK STEEL.

220196-T000
220196-M000
220196-M001
220196-M002
220196-M003
Sheets and Views
220196-M003

220196-E0001

File details come from the government source that posted it. Updated .