This is an engineering drawing and specification document for the City of Sun Prairie, Wisconsin, detailing the replacement of two boilers in the Westside Community Service Building located at 2598 W Main Street. The project involves the demolition of existing boiler piping, insulation, and specialty devices down to existing shutoff valves and triple duty valves, followed by installation of new boilers on existing pads with complete piping and specialty device connections. The work includes connecting boilers to existing flue intake and exhaust systems, gas piping connections utilizing existing gas pressure regulators, and field coordination to verify and modify existing services as necessary. All work must comply with state and local codes and manufacturer instructions, with systems requiring testing, adjustment, calibration, and balancing in accordance with NEBB standards. The contract scope also includes an alternate bid option for replacement of current VFD pumps in the same location.
The engineering specifications require that all HVAC equipment meet IRI, AGA, and UL requirements, with all low-voltage wiring performed per the National Electric Code. The mechanical contractor bears responsibility for field verification of exact pipe routing, equipment locations, and clearances prior to submittal. Equipment must be provided complete with operation and maintenance manuals and system schematics, and a balance report shall be submitted to the engineer with one copy retained at the jobsite. Gas pipe sizing is based upon Schedule 40 black steel specifications. The project was prepared by RJ D Engineering, Inc. with a project number of 22.0196 and issued on July 1, 2022, during the design development phase.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFB 22-BM29.pdf | ||
| Draft Contract.pdf | ||
| Updated Bid Proposal Form.pdf | ||
| RFB 22-BM29 Bid Opening Log.pdf | ||
| RFB Questions Answers UPDATED.pdf | ||
| RFB Questions Answers.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Boilers B20
Comm B21
Corridor B10
Elev Machine B23
Elevator
EL1
Storage B19
Workout B26
10''Ø (E)
8/8 (E) 3" G (E)
1 1/4" G (E)
B-1 (E)
B-2 (E)
WH (E)
WH (E)
4" (E)
ET (E)
1 1/2" (E)
1" (E)
HWR
G
P-1 (E) & P-2 (E)
(STACKED)
VFD'S
BFP (E)
Rolairtrol (E)
Pot Feeder (E)
HWS
HWS
HWS
6"Ø FLUE
6"Ø FLUE
6"Ø FLUE
6"Ø
FLU
E
3" G (E)
G
CW
CW
HWS
HWS
4" (E)
4" (E) 3 1/2" (E)
(TYP. ALL BRANCH
CONNECTIONS)
HWS
Boilers B20
Comm B21
Corridor B10
Elev Machine B23
Elevator
EL1
Storage B19
Workout B26
10''Ø (E)
8/8 (E) 3" G (E)
1 1/4" G (E)
WH (E)
WH (E)
4" (E)
ET (E)
1 1/2" (E)
1" (E)
HWR
G
P-1 (E) & P-2 (E)
(STACKED)
VFD'S
BFP (E)
Rolairtrol (E)
Pot Feeder (E) B-2
B-1
HWS
HWS
HWS
6"Ø FLUE
6"Ø FLUE
6"Ø FLUE
6"Ø
FLU
E
3" G (E)
G
CW
CW
HWS
HWS
4" (E)
4" (E) 3 1/2" (E)
(TYP. ALL BRANCH
CONNECTIONS)
HWS
SCALE:
M003
BOILER ROOM - HVAC
1/4"=1'-0"
NORTH
DEMOLITION KEYED NOTES:
DEMOLISH PIPING, INSULATION AND SPECIALTY DEVICES TO EXISTING SHUTOFF VALVE AND TRIPLE DUTY VALVE.1
KEYED NOTES:
INSTALL NEW BOILER IN LOCATION SHOWN ON EXISTING PAD. INSTALL PIPING AND SPECIALTY DEVICES AS SHOWN ON DETAIL 1/M000. CONNECT BOILER TO EXISTING FLUE INTAKE AND EXHAUST. CONTRACTOR SHALL FIELD VERIFY AND COORDINATE LOCATION OF EXISTING PIPING AND FLUE INTAKE/EXHAUST PRIOR TO SUBMITTALS. MODIFICATION
TO EXISTING SERVICES SHALL BE THE RESPONSIBILITY OF THE MECHANICAL CONTRACTOR.
CONNECT GAS PIPING TO NEW BOILER. UTILIZE EXISTING GAS PRESSURE REGULATOR.
DRAWN :
CHECKED :
DATE :
PHASE :
PROJECT
PROJECT # :
REVISIONS / ADDENDA
CONSULTANTS
ISSUED
220196
JDR
JDR
07/01/22
BD
COSP - WESTSIDE BLDG
BOILER REPLACEMENT
5525 NOBEL DRIVE
SUITE 110
MADISON, WI 53711
ph: 608.277.1728 fax: 608.271.7046
JDR Project No. 22.0196
D
ENGINEERING, INC.
RJ
Basement Partial Floor Plans - HVAC
M003
SCALE:
M003
BOILER ROOM - HVAC
1/4"=1'-0"
NORTH
GENERAL NOTES:
1. ALL WORK TO BE DONE IN COMPLIANCE WITH ALL STATE AND LOCAL CODES AND ALL MANUFACTURER'S
INSTRUCTIONS.
2. ALL PIPING SHALL RUN STRAIGHT AND TRUE AND SHALL BE INSTALLED IN A WORKMANLIKE MANNER.
3. HVAC CONTRACTOR OR BALANCING AGENT SHALL TEST, ADJUST, CALIBRATE AND BALANCE THE SYSTEMS AS REQUIRED BY APPLICABLE CODES AND IN ACCORDANCE WITH NEBB. THE BALANCE REPORT SHALL BE SUBMITTED TO
THE ENGINEER, AND ONE COPY RETAINED AT THE JOBSITE.
4. ALL EQUIPMENT IS TO BE PROVIDED COMPLETE WITH OPERATION & MAINTENANCE MANUALS AND SYSTEM
SCHEMATICS.
5. ALL HVAC EQUIPMENT TO MEET IRI, AGA, AND UL REQUIREMENTS.
6. ALL LOW-VOLTAGE WIRING BY HVAC CONTRACTOR PER NATIONAL ELECTRIC CODE.
7. HVAC CONTRACTOR TO FIELD VERIFY EXACT LOCATION OF PIPE ROUTING AND EQUIPMENT LOCATIONS AND
CLEARANCES ON JOB SITE.
8. GAS PIPE SIZING IS BASED UPON SCHEDULE 40 BLACK STEEL.
| 220196-T000 |
| 220196-M000 |
| 220196-M001 |
| 220196-M002 |
| 220196-M003 |
| Sheets and Views |
| 220196-M003 |
220196-E0001
File details come from the government source that posted it. Updated .