Copy of dgs-30-172_04-15_co-16-crosswalk-of-firm-and-key-personnel-experience.pdf

PDF 174 KB Posted

Attached to
RFPQ Improve Campus Utilities Infrastructure - Electrical
Solicitation number
RFPQ-116409
Issued by
Portsmouth City, Virginia

About this file

This is a crosswalk form (DGS-30-172 CO-16) designed to document firm representative projects and key personnel experience for a construction contract opportunity with Radford University in Virginia. The form requires bidders to list a maximum of three representative projects that demonstrate relevant qualifications for electrical utility infrastructure work. For each project, firms must provide comprehensive data including the project name, location, function, the firm's role in delivery, project delivery method, pre-construction services provided (for Construction Management at Risk delivery), project size in square footage and parking spaces, similarities to the Radford University campus electrical upgrade project, construction schedule status with completion dates and variance analysis, contract value data including original and final amounts with change order growth, and documentation of non-owner requested change orders and disputes. The form specifically requires identification of key personnel who participated in the representative projects, including at minimum the Project Manager, Superintendent, and Preconstruction Services Manager for CM@Risk projects, along with their roles and duration of participation on each referenced project.

The document serves as a standardized evaluation tool to crosswalk key personnel experience across the firm's representative projects and the proposed Radford University electrical utility infrastructure upgrade. Radford University seeks Class A General Contractor-licensed electrical utility contractors capable of self-performing the majority of the electrical project scope without significant subcontracting of core competencies. The crosswalk format allows evaluators to verify that proposed key personnel have directly participated in similar past projects of comparable scope and complexity, establishing a clear connection between firm experience and project team capability for the medium voltage power delivery system upgrades on the Radford University campus in Radford, Virginia.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DGS-30-172 CO-16 Crosswalk of Firm and Key Personnel Experience

(04/15)

1. The purpose of this tab is to summarize key data from the firm's most relevant, representative projects.

2. It is intended that "Firm Representative Projects" at the first tab be completed before "Key Personnel Experience" at the second tab.

3. It is also intended to "crosswalk" or highlight the experience of the key personnel for our project on these firm representative projects (see last column).

4. The sample data provided at "project 1" is nominal and does not represent an actual project; it is for illustrative purposes only.

5. Note how the key personnel participation examples (see last column on this tab) on these "firm representative projects" crosswalks to the "key personnel" experience at next tab.

SEE DATA REQUIRED AT MULTIPLE TABS!!

Firm's Representative

Projects

Firm's Role in

Project

Project

Delivery

Method

Pre-Construction

Services

Provided?

Project Size Project Similarities Project Status and

Schedule

Project Cost Data Non-Owner

Requested

Change Orders

KEY PERSONNEL PARTICIPATION IN

FIRM'S REPRESENTATIVE PROJECTS

LIST A MAXIMUM OF 3 PROJECTS

ON THIS FORM; THESE 3

PROJECTS SHOULD BE THE SAME

3 PROJECTS LISTED IN THE RFQ,

PARA VI.3 (EXPERIENCE) OF THE

CO-16 THAT BEST DEMONSTRATE

YOUR FIRM'S RELEVANT

QUALIFICATIONS. Provide the project's name, location, and function (i.e.: office/admin, higher education instructional, etc).

Provide your firm's role in this project (i.e.: CM, prime/GC, or sub).

Enter CM for

Construction

Management at

Risk, D-B for

Design-Build, D-B-

B for Design-Bid-

Build, or other appropriate description.

FOR CM@RISK

ONLY: Were preconstruction services provided?

(Enter YES or NO or N/A if not CM.)

Provide the size in SF (new and/or renovated) and # parking spaces in a deck (if any).

Succinctly describe how the referenced project is similar/relevant to our project.

Enter % construction complete. if complete, identify the original substantial completion date (at contract award);

the actual substantial completion date (at owner acceptance); the number of months late or early, and the % late or early. If not yet completed, enter the required contract completion date.

Enter original contract value

(GMP for CM) at award; current or final (at owner acceptance) contract value; $ growth; % growth; and total number of change orders.

Enter the number and value of all

NON-OWNER

requested change orders, disputes or claims.

Provide the names of any key personnel for our project who ALSO participated in the firm's referenced project. At a minimum, key personnel must include

Project Manager, Superintendent, and

Preconstruction Services

Manager(CM@RISK ONLY). Provide the role and the # of months they participated on this firm representative project.

(DATA ON THIS NOMINAL

PROJECT FOR ILLUSTRATIVE

PURPOSES ONLY.) Project 1:

Construct addition to the VA

Museum of Fine Arts, Richmond, VA, to provide additional office, educational, museum spaces.

CM CM YES 25,000 SF (new);

5,000 SF (renov);

200 spaces.

The project involved a similar-sized addition to the existing museum which had to remain in operation during construction; the site was very constrained;

similar educational, admin, and museum spaces were provided.

100%. 1 Jan 2010; 1 Apr

2010; 3 months growth;

15% growth.

25M; 30M; 5M; 25% growth; 5 change orders.

1, $500k. Jones (Project Manager; 24 months); Smith

(Superintendent, 18 months); Reed

(Preconstruction Services Manager, 9 months)

Enter Project 2 Data on this row. Jones (Project Manager; 12 months); Smith

(Superintendent, 12 months)

Enter Project 3 Data on this row. Reed (Preconstruction Services Manager, 6 months)

SEE DATA REQUIRED AT MULTIPLE TABS!!

File details come from the government source that posted it. Updated .