This is Addendum #1 to a Request for Prequalification issued by Radford University for electrical utility contractors to upgrade the medium voltage power delivery system on the university's campus in Radford, Virginia. The addendum modifies the original RFQ submitted on March 20, 2026, by rescheduling the non-mandatory pre-submission meeting from Tuesday, March 31, 2026, to Wednesday, April 1, 2026, at 2:00 p.m. in Armstrong Building Conference Room 186. The project scope includes construction of a new outdoor sheltered aisle medium voltage switchgear with 15kV class and 4.16kV distribution in a main-tie-main setup, modifications to the medium voltage substation, construction and demolition of overhead 4.16kV circuits, installation of new ductbanks and cabling with circuit reconfigurations, and coordination with the campus combined heat and power generation project. Sealed qualifications submissions are due by 2:00 p.m. on April 21, 2026, with an anticipated construction start in August 2026 and an initial phase duration of eight months. Written inquiries regarding the solicitation are due by April 2, 2026, with responses posted by April 9, 2026.
The addendum also clarifies terminology in Section VII Agency Qualification Criteria by replacing references to "metal-clad switchgear" with "Medium Voltage Switchgear" and "air-insulated substations" with "Medium Voltage Substation" in both subsections (a) and (b). Qualified contractors must hold Class A General Contractor licensing in Virginia and be capable of self-performing at least 60 percent of core competencies. Submissions must include seven copies of qualification statements with completed CO-16 forms, bonding letters, project listings, organizational charts, key personnel resumes, and a CO-16 Crosswalk. No specific contract award value or budget range is provided in the solicitation documents, and no set-aside designations for disadvantaged or minority-owned businesses are identified. Qualified contractors will receive written notice and a ten-day appeal period before selection to proceed to the RFP stage, where contract value information will be disclosed.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ADDENDUM #1
DATE: March 30, 2026
RFPQ – Request for Prequalification
217-18600 - Improve Campus Utilities Infrastructure - Electrical
The following changes are to be made to the Improve Campus Infrastructure – Electrical Request for Qualifications (RFQ) that was submitted on eVA on March 20, 2026.
1. On page 1 of 9, the line that states:
“A Non-mandatory Pre-Submission Meeting will be held on Tuesday, 31 March 2026 at 2pm at the Armstrong Building Conference Room 186 located at the address listed below.” Is changed to:
“A Non-mandatory Pre-Submission Meeting will be held on Wednesday, 1 April 2026 at 2pm at the Armstrong Building Conference Room 186 located at the address listed below.”
2. In Section VII Agency Qualification Criteria, the following changes are made:
a) 1. Metal-clad switchgear changed to “Medium Voltage Switchgear”
2. Air-insulated substations change to “Medium Voltage Substation”
b) 1. Metal-clad switchgear changed to “Medium Voltage Switchgear”
3. Air-insulated substations change to “Medium Voltage Substation”
End of Addendum #1