Contractor Certification Regarding Safety and Environmental.pdf

PDF 128 KB Posted

Attached to
Z1DA--Correct Water Infiltration 610-20-102 Federal contract opportunity
Solicitation number
36C25022B0009
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 10

About this file

This document contains a contractor certification form and information on a related federal contract opportunity. The contractor certification form requires the contractor to disclose the number of serious, willful, or repeat OSHA violations in the last three years and provide an explanation for any violations, as four or more could result in a determination of non-responsibility. It also requires disclosure of the contractor's current insurance experience modification rate and support from their insurance carrier.

The related federal contract opportunity is solicitation number 36C25022B0009 to provide all tools, equipment, materials, labor and supervision necessary to complete a water infiltration correction project numbered 610-20-102 at the Northern IN VA Medical Center in Marion, Indiana. The requirement refers to attached drawings, specifications and a statement of work for a full description. The contracting agency is the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 10.

View the file

Other files for this federal contract opportunity

Other files attached to Z1DA--Correct Water Infiltration 610-20-102, newest first.
File Type Posted
Amendment 0006 Summary.docx DOCX document
Amendment A00006 Rev DWGs_Part8.pdf PDF
Amendment36C25022B0009 A00006.pdf PDF
Amendment A00006 Rev DWGs_Part6.pdf PDF
Amendment A00006 Rev DWGs_Part5.pdf PDF
Amendment A00006 Rev DWGs_Part3.pdf PDF
Amendment A00006 Rev DWGs_Part2.pdf PDF
Amendment A00006 Rev DWGs_Part7.pdf PDF
Amendment A00006 Rev DWGs_Part1.pdf PDF
Amendment A00006 Rev DWGs_Part4.pdf PDF
Amendment36C25022B0009 A00005.pdf PDF
Amendment 36C25022B0009 A00004.pdf PDF
610-20-102 Correct Water Infiltration pre bid site visit attendance.pdf PDF
2022-0427_Correct Water Infiltration AMEND 00001 DWGs_Part1.pdf PDF
2022-0427_Correct Water Infiltration AMEND 00001 DWGs_Part5.pdf PDF
2022-0427_Correct Water Infiltration AMEND 00001 DWGs_Part6.pdf PDF
2022-0427_Correct Water Infiltration AMEND 00001 DWGs_Part2.pdf PDF
Amendment A00003.docx DOCX document
2022-0427_Correct Water Infiltration AMEND 00001 DWGs_Part4.pdf PDF
2022-0427_Correct Water Infiltration AMEND 00001 DWGs_Part3.pdf PDF
Amendment 00002 Summary.pdf PDF
Amendment A00002 - RFI Responses.docx DOCX document
Amendment A00002 36C25022B0009.pdf PDF
36C25022B0009 Amendment A00001.pdf PDF
36C25022B0009 Solicitation.pdf PDF
610-20-102 Correct Water Infiltration - comb dwgs.pdf PDF
Wage Determination.txt TXT text file
RFI Form.doc DOC document
610-20-102 Correct Water Infiltration - spec.pdf PDF
Show all 29

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Contractor Certification Regarding Project: 610-20-102

2019 2020 2021 Number of serious, willful, or repeat violations from OSHA within the last 3 years. Please attach explanation for any violations. (Four serious, one repeat, or one willful violation could result in being determined non-responsible.)

Company’s Current Insurance Experience Modification Rate (EMR) = _____________

(Note: Contractor must support the EMR with a signed letter from Insurance Carrier on their letterhead.)

Signature: ______________________________________________

Typed Name: ______________________________________________________

Title: ______________________________________________________

Contractor Certification Regarding Project: 610-20-102

File details come from the government source that posted it. Updated .