Amendment A00006 Rev DWGs_Part4.pdf

PDF 4 MB Posted

Attached to
Z1DA--Correct Water Infiltration 610-20-102 Federal contract opportunity
Solicitation number
36C25022B0009
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 10

About this file

This package includes construction drawings and specifications for a federal roofing project. The contractor shall provide all labor, materials, equipment and supervision to complete corrective water infiltration work at Building 124 and other buildings at the Northern IN VA Medical Center in Marion, Indiana, per drawings AE110 through AE202 and the Statement of Work. Work includes removing and replacing asphalt shingles with new stone-coated steel shingles, repairing and replacing box gutters, patching roof openings, cleaning and repointing brick, and installing new downspouts, flashing, snow guards and standing seam metal roofing. The solicitation number is 36C25022B0009 and was issued by the Department of Veterans Affairs Veterans Health Administration VISN 10 for project 610-20-102 located at their facility in Marion, Indiana.

View the file

Other files for this federal contract opportunity

Other files attached to Z1DA--Correct Water Infiltration 610-20-102, newest first.
File Type Posted
Amendment 0006 Summary.docx DOCX document
Amendment A00006 Rev DWGs_Part8.pdf PDF
Amendment36C25022B0009 A00006.pdf PDF
Amendment A00006 Rev DWGs_Part6.pdf PDF
Amendment A00006 Rev DWGs_Part7.pdf PDF
Amendment A00006 Rev DWGs_Part1.pdf PDF
Amendment A00006 Rev DWGs_Part5.pdf PDF
Amendment A00006 Rev DWGs_Part3.pdf PDF
Amendment A00006 Rev DWGs_Part2.pdf PDF
Amendment36C25022B0009 A00005.pdf PDF
610-20-102 Correct Water Infiltration pre bid site visit attendance.pdf PDF
Amendment 36C25022B0009 A00004.pdf PDF
2022-0427_Correct Water Infiltration AMEND 00001 DWGs_Part1.pdf PDF
2022-0427_Correct Water Infiltration AMEND 00001 DWGs_Part5.pdf PDF
2022-0427_Correct Water Infiltration AMEND 00001 DWGs_Part6.pdf PDF
2022-0427_Correct Water Infiltration AMEND 00001 DWGs_Part2.pdf PDF
Amendment A00003.docx DOCX document
Amendment 00002 Summary.pdf PDF
2022-0427_Correct Water Infiltration AMEND 00001 DWGs_Part4.pdf PDF
2022-0427_Correct Water Infiltration AMEND 00001 DWGs_Part3.pdf PDF
Amendment A00002 - RFI Responses.docx DOCX document
Amendment A00002 36C25022B0009.pdf PDF
36C25022B0009 Amendment A00001.pdf PDF
36C25022B0009 Solicitation.pdf PDF
610-20-102 Correct Water Infiltration - spec.pdf PDF
Contractor Certification Regarding Safety and Environmental.pdf PDF
610-20-102 Correct Water Infiltration - comb dwgs.pdf PDF
Wage Determination.txt TXT text file
RFI Form.doc DOC document
Show all 29

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AE2101

AE210

AE502

TYP.

TYP.

TYP.

TYP.

TYP.

AE210

AE210 4

BUILDING 172

:1

:1

6:12

:1

6:12

:1

:1

6:12

:1

:1

:1

6:12

6:12

6:12

TYP.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

DRAWING OF 24

C U s e rs

\n a te m \O n e

D ri v e

\D o c u m e n ts

\F F

E

M a ri o n

W a te r

In fi lt ra ti o n B n a te

.m o u ld s .r v t

/1

/2

:3

:3

A

M

AE110

BUILDING 124 - ROOF PLAN

03/11/2021 PQ BL

MARION, INDIANA

#610-20-102CONSTRUCTION

DOCUMENTS

CORRECT WATER

INFILTRATION

SCALE: 1/8" = 1'-0"

BUILDING 124 - ROOF PLAN

1 REMOVE EXISTING ASPHALT SHINGLES AND UNDERLAYMENT - REPLACE

WITH NEW STONE COATED STEEL SHINGLES OVER #30 FELT

UNDERLAYMENT OVER EXISTING SHEATHING. REPLACE SHEATHING AND

INSULATION WHERE DAMAGED - ASSUME 10% SHEATHING AND

INSULATION REPLACEMENT AT RAFTERS - SEE SECTIONS AND DETAILS ON

AE501 AND AE502.

2 EXISTING METAL ROOF TO REMAIN - PREPARE SURFACE AND APPLY 3-PLY

SELF-ADHERED SBS MODIFIED BITUMIN MEMBRANE TO EXTENT OF METAL

ROOF AND EXTEND 24" UP ADJACENT ROOF SLOPE. INSTALL NEW

BLOCKING WHERE REQUIRED. SEE DETAIL 9/AE501.

3 NO WORK IN THIS AREA.

4 REMOVE EXISTING MECHANICAL DUCTWORK TO BELOW ROOF SURFACE -

SUPPORT EXISTING WITHIN ATTIC SPACE - VERIFY EXHAUST IS INACTIVE

PRIOR TO CONSTRUCTION - PATCH OPENING WITH WOOF FRAMING AND

SHEATHING - PREPARE TO RECEIVE NEW SHINGLES

5 RIDGE CAP BY SHINGLE MANUFACTURER TO MATCH ADJACENT SHINGLES -

TYPICAL.

6 PROTECT EXISTING DOWNSPOUT DURING ALL PHASES OF

CONSTRUCTION.

7 EXISTING STONE CORNICE AND BOX GUTTER FRAMING TO REMAIN -

REPLACE EXISTING SHEET METAL LINER AND APPLY NEW PEEL AND SEAL

OVER METAL LINER.

D R A W I N G N O T E S

G E N E R A L N O T E S

KEY PLAN

A. THE ROOFING SYSTEM SHALL BE COMPLETELY WATERTIGHT AT THE END OF EACH DAY’S

CONSTRUCTION ACTIVITY. IF TEMPORARY ROOFING STRATEGIES ARE USED, MATERIALS

INSTALLED SHALL SERVE THE SAME FUNCTION AS EXISTING MATERIALS AND WILL BE

COMPATIBLE WITH EXISTING ROOF SYSTEM.

B. CONTRACTOR SHALL RELOCATE EXISTING SURFACE-MOUNTED LIGHTNING PROTECTION

SYSTEM AS NEEDED. REINSTALL SYSTEM AT COMPLETION OF ROOF WORK IN EACH ROOF

AREA. CONTRACTOR SHALL RECERTIFY ENTIRE LIGHTNING PROTECTION SYSTEM AT

CONCLUSION OF PROJECT.

C. NOTE REMOVED.

D. EXISTING PLUMBING VENTS - COLOR: COPPER. INCLUDED IN THE PROJECT BID AND

COMPLETED ACCORDING TO DETAILS AND/OR ROOFING SYSTEM REQUIREMENTS.

E. MISCELLANEOUS MECHANICAL, PLUMBING, OR ELECTRICAL PENETRATIONS THRU ROOF MAY

NOT BUT SHOWN BUT SHALL BE INCLUDED IN THE PROJECT BID AND COMPLETED

ACCORDING TO ROOFING SYSTEM REQUIREMENTS. COORDINATE REMOVAL WITH NEW

WORK PLANS AND SECTIONS. ALL PENETRATIONS SHALL BE FLASHED AND MAINTAIN

WATERTIGHTNESS THROUGHOUT COMPLETION OF CONSTRUCTION.

F. EXISTING STRUCTURAL AND FRAMING MEMBERS TO REMAIN UNLESS NOTED OTHERWISE.

No. Revisions: Date:

1 ADDENDUM 001 04/27/2022

TYP.

TYP.

9 9

TYP. TYP.

TYP.

14 14

TYP.

TYP.

TYP.

TYP.

TYP.

3 14 14 14

TYP.

TYP.

TYP.

TYP.

TYP.

TYP.

14 3

14 14

:7 AE201

:7 AE201

:5 AE201

:5 AE201

3 3

TYP.

TYP.

TYP.

TYP.

TYP.

TYP.

14 3

12 121212

BRICK TO BE CLEANED AND TUCK-POINTED - 530 SF - BUILDING 1

BRICK TO BE REMOVED AND REPLACED - 140 SF - BUILDING 1

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

DRAWING OF 24

C U s e rs

\n a te m

\O n e

D ri v e \D o c u m e n ts

\F F

E

M a ri o n

W a te r

In fi lt ra ti o n

B n a te

.m o u ld s .r v t

/1

/2

:5

:0

A

M

AE201

BUILDING 1 - ELEVATIONS

03/11/2021 PQ BL

MARION, INDIANA

#610-20-102CONSTRUCTION

DOCUMENTS

CORRECT WATER

INFILTRATION

1/8" = 1'-0"

B1 - EAST ELEVATION

1/8" = 1'-0"

B1 - WEST ELEVATION

1/8" = 1'-0"

B1 - NORTH ELEVATION

1/8" = 1'-0"

B1 - SOUTH ELEVATION

1 REMOVE EXISTING ASPHALT SHINGLES AND UNDERLAYMENT - REPLACE WITH

NEW STONE COATED STEEL SHINGLES OVER #30 FELT UNDERLAYMENT OVER

EXISTING SHEATHING. REPLACE SHEATHING AND INSULATION WHERE

DAMAGED - ASSUME 10% SHEATHING AND INSULATION REPLACEMENT AT

RAFTERS - SEE SECTIONS AND DETAILS ON AE501 AND AE502.

2 REPLACE EXISTING BOX GUTTER - INSTALL NEW METAL GUTTER BOX, PEEL &

SEAL LINER, AND METAL CORNICE PROFILE AND ASSOCIATED BLOCKING,

TYPICAL UNLESS NOTED OTHERWISE - SEE DETAILS ON AE501 AND AE502.

3 REMOVE EXISTING LOOSE OR RECEDING MORTAR FROM JOINT - TUCKPOINT

WITH NEW MORTAR - STAIN ALL NEW MORTAR TO MATCH EXISTING COLOR.

4 REMOVE EXISTING ROOF HATCH - PATCH OPENING WITH WOOD FRAMING AND

SHEATHING - PREPARE TO RECEIVE NEW SHINGLES.

5 REMOVE AND REPLACE EXISTING METAL ROOF WITH NEW STANDING SEAM

METAL ROOF - COLOR: COPPER.

6 CLEAN AND TUCK-POINT BRICK NEAR DOWNSPOUT.

7 NEW 3"X4" COPPER COLOR DOWNSPOUT TO EXISTING BOOT.

8 NEW 3"X4" COPPER COLOR DOWNSPOUT TO EXISTING BOOT.

9 EXISTING DOWNSPOUT BOOT TO REMAIN.

10 EXISTING CORNICE WORK TO REMAIN - PAINT TO MATCH NEW CORNICE WORK.

11 NEW STEP FLASHING AT ROOF AND WALL INTERSECTION

12 NEW BASE FLASHING

13 RIDGE CAP BY SHINGLE MANUFACTURER TO MATCH ADJACENT SHINGLES -

TYPICAL.

14 REMOVE EXISTING DAMAGED BRICK - REPLACE WITH NEW BRICK TO MATCH

EXISTING IN SIZE, COLOR, AND SURFACE - STAIN ALL NEW MORTAR TO MATCH

EXISTING COLOR.

15 EXISTING PORCH ROOF TO REMAIN.

16 REMOVE LOOSE FACE OF LIMESTONE SILL - SEAL AND STAIN TO MATCH

ADJACENT LIMESTONE SILL IN COLOR.

17 NEW GUTTER FORMED FROM SAME MATERIAL AS ROOF PANELS - COLOR:

COPPER.

18 INSTALL CLAMP-TO-SEAM SNOW GUARDS AT 24" AND 36" FROM FASCIA BOARD -

16" O.C. - COLOR: COPPER TO MATCH ROOFING MATERIAL.

A. THE ROOFING SYSTEM SHALL BE COMPLETELY WATERTIGHT AT THE END OF EACH DAY’S

CONSTRUCTION ACTIVITY. IF TEMPORARY ROOFING STRATEGIES ARE USED, MATERIALS

INSTALLED SHALL SERVE THE SAME FUNCTION AS EXISTING MATERIALS AND WILL BE

COMPATIBLE WITH EXISTING ROOF SYSTEM.

B. CONTRACTOR SHALL RELOCATE EXISTING SURFACE-MOUNTED LIGHTNING PROTECTION

SYSTEM AS NEEDED. REINSTALL SYSTEM AT COMPLETION OF ROOF WORK IN EACH ROOF

AREA. CONTRACTOR SHALL RECERTIFY ENTIRE LIGHTNING PROTECTION SYSTEM AT

CONCLUSION OF PROJECT.

C. NOTE REMOVED.

D. EXISTING PLUMBING VENTS - COLOR: COPPER. INCLUDED IN THE PROJECT BID AND

COMPLETED ACCORDING TO DETAILS AND/OR ROOFING SYSTEM REQUIREMENTS.

E. ALL DOORS AND WINDOWS ARE EXISTING TO REMAIN UNLESS NOTED OTHERWISE.

D R A W I N G N O T E S

G E N E R A L N O T E S

1/8" = 1'-0"

Elevation 2 - a 1/8" = 1'-0"

Elevation 1 - a

1 ADDENDUM 001 04/27/22

TYP.

TYP.

10 44

TYP.

TYP.

TYP.

TYP.

4 4

TYP.

TYP.

2 2 2 2

TYP. TYP.

5 5 5 5 5 5

TYP.

TYP.

TYP.

9 9

3 3

4 44 4

2 22 2

TYP.

TYP.

TYP.

TYP.

TYP.

12 12

1414 1414

BRICK TO BE CLEANED AND TUCK-POINTED - 340 SF - BUILDING 2

BRICK TO BE REMOVED AND REPLACED - 24 SF - BUILDING 2

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

DRAWING OF 24

C U s e rs

\n a te m

\O n e

D ri v e \D o c u m e n ts

\F F

E

M a ri o n

W a te r

In fi lt ra ti o n

B n a te

.m o u ld s .r v t

/1

/2

:5

:2

A

M

AE202

BUILDING 2 - ELEVATIONS

03/11/2021 PQ BL

MARION INDIANA

#610-20-102CONSTRUCTION

DOCUMENTS

CORRECT WATER

INFILTRATION

1/8" = 1'-0"

B2 - EAST ELEVATION

1/8" = 1'-0"

B2 - WEST ELEVATION

1/8" = 1'-0"

B2 - NORTH ELEVATION

1/8" = 1'-0"

B2 - SOUTH ELEVATION

1 REMOVE EXISTING ASPHALT SHINGLES AND UNDERLAYMENT - REPLACE WITH

NEW STONE COATED STEEL SHINGLES OVER #30 FELT UNDERLAYMENT OVER

EXISTING SHEATHING. REPLACE SHEATHING AND INSULATION WHERE

DAMAGED - ASSUME 10% SHEATHING AND INSULATION REPLACEMENT AT

RAFTERS - SEE SECTIONS AND DETAILS ON AE501 AND AE502.

2 REPLACE EXISTING BOX GUTTER - INSTALL NEW METAL GUTTER BOX, PEEL &

SEAL LINER, AND METAL CORNICE PROFILE AND ASSOCIATED BLOCKING,

TYPICAL UNLESS NOTED OTHERWISE - SEE DETAILS ON AE501 AND AE502.

3 REMOVE EXISTING ROOF HATCH - PATCH OPENING WITH WOOD FRAMING AND

SHEATHING - PREPARE TO RECEIVE NEW SHINGLES.

4 REMOVE EXISTING LOOSE OR RECEDING MORTAR FROM JOINT - TUCKPOINT

WITH NEW MORTAR - STAIN ALL NEW MORTAR TO MATCH EXISTING COLOR.

5 PROTECT EXISTING DOWNSPOUT DURING ALL PHASES OF CONSTRUCTION.

6 EXISTING DOWNSPOUT BOOT TO REMAIN.

7 RIDGE CAP BY SHINGLE MANUFACTURER TO MATCH ADJACENT SHINGLES -

TYPICAL.

8 EXISTING CORNICE WORK TO REMAIN - PAINT TO MATCH NEW CORNICE WORK.

9 NEW STEP FLASHING AT ROOF AND WALL INTERSECTION

10 REMOVE EXISTING DAMAGED BRICK - REPLACE WITH NEW BRICK TO MATCH

EXISTING IN SIZE, COLOR, AND SURFACE - STAIN ALL NEW MORTAR TO MATCH

EXISTING COLOR.

11 EXISTING PORCH ROOF TO REMAIN.

12 NEW 3"X4" COPPER COLOR DOWNSPOUT TO EXISTING BOOT.

13 REMOVE AND REPLACE EXISTING METAL ROOF WITH NEW STANDING SEAM

METAL ROOF - COLOR: COPPER.

14 NEW BASE FLASHING

15 NEW GUTTER FORMED FROM SAME MATERIAL AS ROOF PANELS - COLOR:

COPPER

16 INSTALL CLAMP-TO-SEAM SNOW GUARDS AT 24" AND 36" FROM FASCIA BOARD -

16" O.C. - COLOR: COPPER TO MATCH ROOFING MATERIAL.

A. THE ROOFING SYSTEM SHALL BE COMPLETELY WATERTIGHT AT THE END OF EACH DAY’S

CONSTRUCTION ACTIVITY. IF TEMPORARY ROOFING STRATEGIES ARE USED, MATERIALS

INSTALLED SHALL SERVE THE SAME FUNCTION AS EXISTING MATERIALS AND WILL BE

COMPATIBLE WITH EXISTING ROOF SYSTEM.

B. CONTRACTOR SHALL RELOCATE EXISTING SURFACE-MOUNTED LIGHTNING PROTECTION

SYSTEM AS NEEDED. REINSTALL SYSTEM AT COMPLETION OF ROOF WORK IN EACH ROOF

AREA. CONTRACTOR SHALL RECERTIFY ENTIRE LIGHTNING PROTECTION SYSTEM AT

CONCLUSION OF PROJECT.

C. NOTE REMOVED.

D. EXISTING PLUMBING VENTS ARE NOT SHOWN ON ROOF PLAN BUT SHALL BE INCLUDED IN THE

PROJECT BID AND COMPLETED ACCORDING TO DETAILS AND/OR ROOFING SYSTEM

REQUIREMENTS.

E. ALL DOORS AND WINDOWS ARE EXISTING TO REMAIN UNLESS NOTED OTHERWISE.

D R A W I N G N O T E S

G E N E R A L N O T E S

1 ADDENDUM 001 04/27/2022

07.12_AE110 - BUILDING 124 - ROOF PLAN
AE110 - BUILDING 124 - ROOF PLAN
07.13_AE201 - BUILDING 1 - ELEVATIONS
AE201 - BUILDING 1 - ELEVATIONS

File details come from the government source that posted it. Updated .