610-20-102 Correct Water Infiltration - spec.pdf

PDF 3 MB Posted

Attached to
Z1DA--Correct Water Infiltration 610-20-102 Federal contract opportunity
Solicitation number
36C25022B0009
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 10

About this file

This solicitation requests proposals for a correct water infiltration project at the Northern Indiana VA Medical Center in Marion, Indiana. Contractors must provide all tools, equipment, materials, labor and supervision necessary to complete the project, which includes roofing, masonry and gutter repairs to multiple buildings as specified in the attachments, drawings and statement of work. The solicitation was issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 10. Responses are due based on the standard solicitation timeline. The selected contractor will be required to adhere to all terms, conditions and regulations applicable to federal construction contracts.

View the file

Other files for this federal contract opportunity

Other files attached to Z1DA--Correct Water Infiltration 610-20-102, newest first.
File Type Posted
Amendment 0006 Summary.docx DOCX document
Amendment A00006 Rev DWGs_Part8.pdf PDF
Amendment36C25022B0009 A00006.pdf PDF
Amendment A00006 Rev DWGs_Part6.pdf PDF
Amendment A00006 Rev DWGs_Part7.pdf PDF
Amendment A00006 Rev DWGs_Part1.pdf PDF
Amendment A00006 Rev DWGs_Part4.pdf PDF
Amendment A00006 Rev DWGs_Part5.pdf PDF
Amendment A00006 Rev DWGs_Part3.pdf PDF
Amendment A00006 Rev DWGs_Part2.pdf PDF
Amendment36C25022B0009 A00005.pdf PDF
610-20-102 Correct Water Infiltration pre bid site visit attendance.pdf PDF
Amendment 36C25022B0009 A00004.pdf PDF
2022-0427_Correct Water Infiltration AMEND 00001 DWGs_Part1.pdf PDF
2022-0427_Correct Water Infiltration AMEND 00001 DWGs_Part5.pdf PDF
2022-0427_Correct Water Infiltration AMEND 00001 DWGs_Part6.pdf PDF
2022-0427_Correct Water Infiltration AMEND 00001 DWGs_Part2.pdf PDF
Amendment A00003.docx DOCX document
Amendment 00002 Summary.pdf PDF
2022-0427_Correct Water Infiltration AMEND 00001 DWGs_Part4.pdf PDF
2022-0427_Correct Water Infiltration AMEND 00001 DWGs_Part3.pdf PDF
Amendment A00002 - RFI Responses.docx DOCX document
Amendment A00002 36C25022B0009.pdf PDF
36C25022B0009 Amendment A00001.pdf PDF
36C25022B0009 Solicitation.pdf PDF
Contractor Certification Regarding Safety and Environmental.pdf PDF
610-20-102 Correct Water Infiltration - comb dwgs.pdf PDF
Wage Determination.txt TXT text file
RFI Form.doc DOC document
Show all 29

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEPARTMENT OF VETERANS AFFAIRS

MARION IN, VA

1700 E. 38th STREET

MARION, IN 46953

CORRECT WATER INFILTRATION

VA Project No.: #610‐20‐102

Construction Documents Phase

Prepared By:

March 11, 2021

Correct Water Infiltration, Marion #610-20-102

07-01-20

00 01 10-1

TABLE OF CONTENTS

DEPARTMENT OF VETERANS AFFAIRS

VHA MASTER SPECIFICATIONS

TABLE OF CONTENTS

Section 00 01 10

SECTION NO. DIVISION AND SECTION TITLES DATE

DIVISION 00 - SPECIAL SECTIONS

00 01 15 List of Drawing Sheets 05-20

DIVISION 01 - GENERAL REQUIREMENTS

01 00 00 General Requirements 03-20 01 32 16.15 Project Schedules (Small Projects – Design/Bid/Build 03-20 01 33 23 Shop Drawings, Product Data, and Samples 05-17 01 35 26 Safety Requirements 07-20 01 42 19 Reference Standards 11-20 01 45 00 Quality Control 02-21 01 57 19 Temporary Environmental Controls 01-11 01 74 19 Construction Waste Management 09-13 01 81 13 Sustainable Construction Requirements 10-17

DIVISION 02 – EXISTING CONDITIONS

02 41 00 Demolition 08-17 02 83 33.13 Lead-Based Paint Removal and Disposal 08-16

DIVISION 03 – CONCRETE

Not Used

DIVISION 04 – MASONRY

04 01 00 Maintenance of Masonry 02-16 04 05 13 Masonry Mortaring 10-17 04 20 00 Unit Masonry 08-17

DIVISION 05 – METALS

Not Used

DIVISION 06 – WOOD, PLASTICS AND COMPOSITES

06 10 00 Rough Carpentry 10-17 06 20 00 Finish Carpentry 08-16

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

07 01 50.19 Preparation for Re-Roofing 02-16 07 31 40 Stone Coated Metal Shingles 02-16 07 41 13.16 Standing-Seam Metal Roof Panels

07-01-20

00 01 10-2

TABLE OF CONTENTS

SECTION NO. DIVISION AND SECTION TITLES DATE

07 52 16.11 Cold Adhesive Styrene-Butadiene-Styrene Modified Bituminous Membrane Roofing

08-16

07 53 23.22 Peel and Seal Roofing 02-16 07 60 00 Flashing and Sheet Metal 07-14 07 71 00 Roof Specialties 10-15 07 72 00 Roof Accessories 10-15 07 84 00 Firestopping 02-16 07 92 00 Joint Sealants 10-17

DIVISION 08 - OPENINGS

08 51 13 Aluminum Windows 04-20 08 80 00 Glazing 10-15 08 90 00 Louvers and Vents 05-15

DIVISION 09 – FINISHES

09 91 00 Painting 01-16

DIVISION 10 – SPECIALTIES

Not Used

DIVISION 11 – EQUIPMENT

Not Used

DIVISION 12 – FURNISHINGS

Not Used

DIVISION 13 - SPECIAL CONSTRUCTION

Not Used

DIVISION 14– CONVEYING EQUIPEMENT

Not Used

DIVISION 21- FIRE SUPPRESSION

Not Used

DIVISION 22 – PLUMBING

Not Used

DIVISION 23 – HEATING, VENTILATING, AND AIR

CONDITIONING (HVAC)

Not Used

07-01-20

00 01 10-3

SECTION NO. DIVISION AND SECTION TITLES DATE

DIVISION 25 – INTEGRATED AUTOMATION

DIVISION 26 – ELECTRICAL

26 41 00 Facility Lightning Protection 01-17

DIVISION 27 – COMMUNICATIONS

Not Used

DIVISION 28 – ELECTRONIC SAFETY AND SECURITY

Not Used

DIVISION 31 – EARTHWORK

Not Used

DIVISION 32 – EXTERIOR IMPROVEMENTS

Not Used

DIVISION 33 – UTILITIES

Not Used

DIVISION 34 – TRANSPORTATION

Not Used

DIVISION 48 – Electrical Power Generation

05-01-20

00 01 15 - 1

SECTION 00 01 15

LIST OF DRAWING SHEETS

The drawings listed below accompanying this specification form a part of the contract.

Drawing No. Title

GI001 COVER SHEET

GI101 OVERALL ROOF PLAN

ARCHITECTURAL

AE101 BUILDING 1 - ROOF PLAN

AE102 BUILDING 2 - ROOF PLAN

AE103 BUILDING 3 - ROOF PLAN

AE104 BUILDING 4 - ROOF PLAN

AE105 BUILDING 5 - ROOF PLAN

AE106 BUILDING 6 - ROOF PLAN

AE107 BUILDING 15 - ROOF PLAN

AE108 BUILDING 16 - ROOF PLAN

AE109 BUILDING 17 - ROOF PLAN

AE110 BUILDING 124 - ROOF PLAN

AE201 BUILDING 1 - ELEVATIONS

AE202 BUILDING 2 - ELEVATIONS

AE203 BUILDING 3 - ELEVATIONS

AE204 BUILDING 4 - ELEVATIONS

AE205 BUILDING 5 - ELEVATIONS

AE206 BUILDING 6 - ELEVATIONS

AE207 BUILDING 15 - ELEVATIONS

AE208 BUILDING 16 - ELEVATIONS

AE209 BUILDING 17 - ELEVATIONS

AE210 BUILDING 124 - ELEVATIONS

AE501 ENLARGED ELEVATIONS AND DETAILS

- - - E N D - - -

03-01-20 i

GENERAL REQUIREMENTS

FSECTION 01 00 00

GENERAL REQUIREMENTS

TABLE OF CONTENTS

1.1 SAFETY REQUIREMENTS

1.2 GENERAL INTENTION

1.3 STATEMENT OF BID ITEM(S)

1.4 SPECIFICATIONS AND DRAWINGS FOR CONTRACTOR

1.5 CONSTRUCTION SECURITY REQUIREMENTS

1.6 OPERATIONS AND STORAGE AREAS

1.7 ALTERATIONS

1.8 DISPOSAL AND RETENTION

1.9 PROTECTION OF EXISTING VEGETATION, STRUCTURES, EQUIPMENT, UTILITIES, AND

IMPROVEMENTS

1.10 RESTORATION

1.11 PHYSICAL DATA

1.12 AS-BUILT DRAWINGS

1.13 WARRANTY MANAGEMENT

1.14 USE OF ROADWAYS

1.15 TEMPORARY TOILETS

1.16 AVAILABILITY AND USE OF UTILITY SERVICES

1.17 TESTS

1.18 INSTRUCTIONS

1.19 RELOCATED ITEMS

1.20 HISTORIC PRESERVATION

03-01-20

01 00 00 -1

GENERAL REQUIREMENTS

SECTION 01 00 00

GENERAL REQUIREMENTS

1.1 SAFETY REQUIREMENTS

Refer to section 01 35 26, SAFETY REQUIREMENTS for safety and infection control requirements.

1.2 GENERAL INTENTION

A. Contractor shall completely prepare site for building operations, including demolition and removal of existing portions of roofs and brick facades, and furnish labor and materials and perform work for

Correct Water Infiltration #610-20-102 as required by drawings and specifications.

B. Visits to the site by Bidders shall be made only by appointment with the Medical Center Engineering Officer.

C. Office of FFE Inc. as Architect-Engineers, will render certain technical services during construction. Such services shall be considered as advisory to the Government and shall not be construed as expressing or implying a contractual act of the Government without affirmations by Contracting Officer or his duly authorized representative.

D. All employees of general contractor and subcontractors shall comply with VA security management program and obtain permission of the VA police, be identified by project and employer, and restricted from unauthorized access.

1.3 STATEMENT OF BID ITEM(S)

A. ITEM I, GENERAL CONSTRUCTION: Work includes general construction, alterations, necessary removal of existing roofing, roof construction and masonry repair.

B. ALTERNATE NO.1: WORK INCLUDES ALL ITEM I WITHOUT BUILDING 15, 16, AND

17 FALL PROTECTION SYSTEM INCLUDED IN ROOFING SCOPE.

1.4 SPECIFICATIONS AND DRAWINGS FOR CONTRACTOR

A. Drawings and contract documents may be obtained from the website where the solicitation is posted. Additional copies will be at Contractor's expense.

03-01-20

01 00 00 -2

GENERAL REQUIREMENTS

1.5 CONSTRUCTION SECURITY REQUIREMENTS

A. Security Plan:

1. The security plan defines both physical and administrative security procedures that will remain effective for the entire duration of the project.

2. The General Contractor is responsible for assuring that all sub-contractors working on the project and their employees also comply with these regulations.

B. Security Procedures:

1. General Contractor’s employees shall not enter the project site without appropriate badge. They may also be subject to inspection of their personal effects when entering or leaving the project site.

2. Before starting work the General Contractor shall give one week’s notice to the Contracting Officer so that escort arrangements can be provided for the employees. This notice is separate from any notices required for utility shutdown described later in this section.

3. No photography of VA premises is allowed without written permission of the Contracting Officer.

4. VA reserves the right to close down or shut down the project site and order General Contractor’s employees off the premises in the event of a national emergency. The General Contractor may return to the site only with the written approval of the Contracting Officer.

C. Key Control:

1. The General Contractor shall provide duplicate keys and lock combinations to the Contracting officers representative (COR) for the purpose of security inspections of every area of project including tool boxes and parked machines and take any emergency action.

D. Document Control:

1. Before starting any work, the General Contractor/Sub Contractors shall submit an electronic security memorandum describing the

03-01-20

01 00 00 -3

GENERAL REQUIREMENTS

approach to following goals and maintaining confidentiality of

“sensitive information”.

2. The General Contractor is responsible for safekeeping of all drawings, project manual and other project information. This information shall be shared only with those with a specific need to accomplish the project.

3. Certain documents, sketches, videos or photographs and drawings may be marked “Law Enforcement Sensitive” or “Sensitive Unclassified”.

Secure such information in separate containers and limit the access to only those who will need it for the project. Return the information to the Contracting Officer upon request.

4. These security documents shall not be removed or transmitted from the project site without the written approval of Contracting

Officer.

5. All paper waste or electronic media such as CD’s and diskettes shall be shredded and destroyed in a manner acceptable to the VA.

6. Notify Contracting Officer and Site Security Officer immediately when there is a loss or compromise of “sensitive information”.

7. All electronic information shall be stored in specified location following VA standards and procedures using an Engineering Document

Management Software (EDMS).

a. Security, access and maintenance of all project drawings, both scanned and electronic shall be performed and tracked through the

EDMS system.

b. “Sensitive information” including drawings and other documents may be attached to e-mail provided all VA encryption procedures are followed.

E. Motor Vehicle Restrictions

1. Vehicle authorization request shall be required for any vehicle entering the site and such request shall be submitted 24 hours before the date and time of access. Access shall be restricted to picking up and dropping off materials and supplies.

03-01-20

01 00 00 -4

GENERAL REQUIREMENTS

1.6 OPERATIONS AND STORAGE AREAS

A. The Contractor shall confine all operations (including storage of materials) on Government premises to areas authorized or approved by the Contracting Officer. The Contractor shall hold and save the

Government, its officers and agents, free and harmless from liability of any nature occasioned by the Contractor's performance.

B. Temporary buildings (e.g., storage sheds, shops, offices) and utilities may be erected by the Contractor only with the approval of the

Contracting Officer and shall be built with labor and materials furnished by the Contractor without expense to the Government. The temporary buildings and utilities shall remain the property of the

Contractor and shall be removed by the Contractor at its expense upon completion of the work. With the written consent of the Contracting

Officer, the buildings and utilities may be abandoned and need not be removed.

C. The Contractor shall, under regulations prescribed by the Contracting

Officer, use only established roadways, or use temporary roadways constructed by the Contractor when and as authorized by the Contracting

Officer. When materials are transported in prosecuting the work, vehicles shall not be loaded beyond the loading capacity recommended by the manufacturer of the vehicle or prescribed by any Federal, State, or local law or regulation. When it is necessary to cross curbs or sidewalks, the Contractor shall protect them from damage. The

Contractor shall repair or pay for the repair of any damaged curbs, sidewalks, or roads.

(FAR 52.236-10)

D. Working space and space available for storing materials shall be as determined by the COR.

E. Workers are subject to rules of Medical Center applicable to their conduct.

F. Execute work so as to interfere as little as possible with normal functioning of Medical Center as a whole, including operations of utility services, fire protection systems and any existing equipment, and with work being done by others. Use of equipment and tools that transmit vibrations and noises through the building structure, are not

03-01-20

01 00 00 -5

GENERAL REQUIREMENTS

permitted in buildings that are occupied, during construction, jointly by patients or medical personnel, and Contractor's personnel, except as permitted by COR where required by limited working space.

1. Do not store materials and equipment in other than assigned areas.

2. Schedule delivery of materials and equipment to immediate construction working areas within buildings in use by Department of

Veterans Affairs in quantities sufficient for not more than two work days. Provide unobstructed access to Medical Center areas required to remain in operation.

3. Where access by Medical Center personnel to vacated portions of buildings is not required, storage of Contractor's materials and equipment will be permitted subject to fire and safety requirements.

G. Phasing:

The Medical Center must maintain its operation 24 hours a day 7 days a week. Therefore, any interruption in service shall be scheduled and coordinated with the COR to ensure that no lapses in operation occur.

It is the CONTRACTOR'S responsibility to develop a work plan and schedule detailing, at a minimum, the procedures to be employed, the equipment and materials to be used, the interim life safety measure to be used during the work, and a schedule defining the duration of the work with milestone subtasks. The work to be outlined shall include, but not be limited to:

To ensure such executions, Contractor shall furnish the COR with a schedule of approximate phasing dates on which the Contractor intends to accomplish work in each specific area of site, building or portion thereof. In addition, Contractor shall notify the COR two weeks in advance of the proposed date of starting work in each specific area of site, building or portion thereof. Arrange such phasing dates to ensure accomplishment of this work in successive phases mutually agreeable to

Medical Center Director, COR and Contractor, as follows:

Phasing: All buildings are available to the contractors at all times.

H. Construction Fence: Before construction operations begin, Contractor shall provide a chain link construction fence, 2.1m (seven feet) minimum height, around the construction area indicated on the drawings.

03-01-20

01 00 00 -6

GENERAL REQUIREMENTS

Provide gates as required for access with necessary hardware, including hasps and padlocks. Fasten fence fabric to terminal posts with tension bands and to line posts and top and bottom rails with tie wires spaced at maximum 375mm (15 inches). Bottom of fences shall extend to 25mm

(one inch) above grade. Remove the fence when directed by COR.

I. When a building and/or construction site is turned over to Contractor, Contractor shall accept entire responsibility including upkeep and maintenance therefore:

1. Contractor shall maintain a minimum temperature of 4 degrees C (40 degrees F) at all times, except as otherwise specified.

2. Contractor shall maintain in operating condition existing fire protection and alarm equipment. In connection with fire alarm equipment, Contractor shall make arrangements for pre-inspection of site with Fire Department or Company (Department of Veterans Affairs or municipal) whichever will be required to respond to an alarm from

Contractor's employee or watchman.

J. To minimize interference of construction activities with flow of

Medical Center traffic, comply with the following:

1. Keep roads, walks and entrances to grounds, to parking and to occupied areas of buildings clear of construction materials, debris and standing construction equipment and vehicles.

K. Coordinate the work for this contract with other construction operations as directed by COR. This includes the scheduling of traffic and the use of roadways, as specified in Article, USE OF ROADWAYS.

1.7 ALTERATIONS

A. Survey: Before any work is started, the Contractor shall make a thorough survey with the areas of buildings in which alterations occur and areas which are anticipated routes of access, and furnish a report, signed by both, to the Contracting Officer. This report shall list by rooms and spaces:

1. Shall note any discrepancies between drawings and existing conditions at site.

03-01-20

01 00 00 -7

GENERAL REQUIREMENTS

2. Shall designate areas for working space, materials storage and routes of access to areas within buildings where alterations occur and which have been agreed upon by Contractor and COR.

B. Any items required by drawings to be either reused or relocated or both, found during this survey to be nonexistent, or in opinion of COR, to be in such condition that their use is impossible or impractical, shall be furnished and/or replaced by Contractor with new items in accordance with specifications which will be furnished by Government.

Provided the contract work is changed by reason of this subparagraph B, the contract will be modified accordingly, under provisions of clause entitled "DIFFERING SITE CONDITIONS" (FAR 52.236-2) and "CHANGES" (FAR

52.243-4).

C. Re-Survey: Thirty days before expected partial or final inspection date, the Contractor and COR together shall make a thorough re-survey of the areas of buildings involved. They shall furnish a report on conditions then existing, as compared with conditions of same as noted in first condition survey report:

1. Re-survey report shall also list any damage caused by Contractor to surfaces, despite protection measures; and, will form basis for determining extent of repair work required of Contractor to restore damage caused by Contractor's workers in executing work of this contract.

D. Protection: Provide the following protective measures:

1. Wherever existing roof surfaces are disturbed they shall be protected against water infiltration. In case of leaks, they shall be repaired immediately upon discovery.

2. Temporary protection against damage for portions of existing structures and grounds where work is to be done, materials handled and equipment moved and/or relocated.

3. Protection of interior of existing structures at all times, from damage, dust and weather inclemency. Wherever work is performed, floor surfaces that are to remain in place shall be adequately protected prior to starting work, and this protection shall be maintained intact until all work in the area is completed.

03-01-20

01 00 00 -8

GENERAL REQUIREMENTS

1.8 DISPOSAL AND RETENTION

A. Materials and equipment accruing from work removed and from demolition of buildings or structures, or parts thereof, shall be disposed of as follows:

1. Reserved items which are to remain property of the Government are noted on drawings or in specifications as items to be stored. Items that remain property of the Government shall be removed or dislodged from present locations in such a manner as to prevent damage which would be detrimental to re-installation and reuse. Store such items where directed by COR.

2. Items not reserved shall become property of the Contractor and be removed by Contractor from Medical Center.

3. Items of portable equipment and furnishings located in rooms and spaces in which work is to be done under this contract shall remain the property of the Government. When rooms and spaces are vacated by the Department of Veterans Affairs during the alteration period, such items which are NOT required by drawings and specifications to be either relocated or reused will be removed by the Government in advance of work to avoid interfering with Contractor's operation. 4.

1.9 PROTECTION OF EXISTING VEGETATION, STRUCTURES, EQUIPMENT, UTILITIES, AND

IMPROVEMENTS

A. The Contractor shall preserve and protect all structures, equipment, and vegetation (such as trees, shrubs, and grass) on or adjacent to the work site, which are not to be removed and which do not unreasonably interfere with the work required under this contract. The Contractor shall only remove trees when specifically authorized to do so, and shall avoid damaging vegetation that will remain in place. If any limbs or branches of trees are broken during contract performance, or by the careless operation of equipment, or by workers, the Contractor shall trim those limbs or branches with a clean cut and paint the cut with a tree-pruning compound as directed by the Contracting Officer.

B. The Contractor shall protect from damage all existing improvements and utilities at or near the work site and on adjacent property of a third party, the locations of which are made known to or should be known by the Contractor. The Contractor shall repair any damage to those

03-01-20

01 00 00 -9

GENERAL REQUIREMENTS

facilities, including those that are the property of a third party, resulting from failure to comply with the requirements of this contract or failure to exercise reasonable care in performing the work. If the

Contractor fails or refuses to repair the damage promptly, the

Contracting Officer may have the necessary work performed and charge the cost to the Contractor.

(FAR 52.236-9)

C. Refer to Section 01 57 19, TEMPORARY ENVIRONMENTAL CONTROLS, for additional requirements on protecting vegetation, soils and the environment. Refer to Articles, "Alterations", "Restoration", and

"Operations and Storage Areas" for additional instructions concerning repair of damage to structures and site improvements.

D. Refer to FAR clause 52.236-7, "Permits and Responsibilities," which is included in General Conditions. A National Pollutant Discharge

Elimination System (NPDES) permit is required for this project. The

Contractor is considered an "operator" under the permit and has extensive responsibility for compliance with permit requirements. VA will make the permit application available at the (appropriate medical center) office. The apparent low bidder, contractor and affected subcontractors shall furnish all information and certifications that are required to comply with the permit process and permit requirements.

Many of the permit requirements will be satisfied by completing construction as shown and specified. Some requirements involve the

Contractor's method of operations and operations planning and the

Contractor is responsible for employing best management practices. The affected activities often include, but are not limited to the following:

- Designating areas for equipment maintenance and repair;

- Providing waste receptacles at convenient locations and provide regular collection of wastes;

- Locating equipment wash down areas on site, and provide appropriate control of wash-waters;

- Providing protected storage areas for chemicals, paints, solvents, fertilizers, and other potentially toxic materials; and

03-01-20

01 00 00 -10

GENERAL REQUIREMENTS

- Providing adequately maintained sanitary facilities.

1.10 RESTORATION

A. Remove, cut, alter, replace, patch and repair existing work as necessary to install new work. Except as otherwise shown or specified, do not cut, alter or remove any structural work, and do not disturb any ducts, plumbing, steam, gas, or electric work without approval of the

COR. Existing work to be altered or extended and that is found to be defective in any way, shall be reported to the COR before it is disturbed. Materials and workmanship used in restoring work, shall conform in type and quality to that of original existing construction, except as otherwise shown or specified.

B. Upon completion of contract, deliver work complete and undamaged.

Existing work (walls, ceilings, partitions, floors, mechanical and electrical work, lawns, paving, roads, walks, etc.) disturbed or removed as a result of performing required new work, shall be patched, repaired, reinstalled, or replaced with new work, and refinished and left in as good condition as existed before commencing work.

C. At Contractor's own expense, Contractor shall immediately restore to service and repair any damage caused by Contractor's workers to existing piping and conduits, wires, cables, etc., of utility services or of fire protection systems and communications systems (including telephone) which are not scheduled for discontinuance or abandonment.

D. Expense of repairs to such utilities and systems not shown on drawings or locations of which are unknown will be covered by adjustment to contract time and price in accordance with clause entitled "CHANGES"

(FAR 52.243-4) and "DIFFERING SITE CONDITIONS" (FAR 52.236-2).

1.11 PHYSICAL DATA

A. Data and information furnished or referred to below is for the

Contractor's information. The Government shall not be responsible for any interpretation of or conclusion drawn from the data or information by the Contractor.

1. The indications of physical conditions on the drawings and in the specifications are the result of site investigations by Terracon

Consultants, Inc.

03-01-20

01 00 00 -11

GENERAL REQUIREMENTS

(FAR 52.236-4)

B. Government does not guarantee that other materials will not be encountered nor that proportions, conditions or character of several materials will not vary from those indicated by explorations. Bidders are expected to examine site of work and logs of borings; and, after investigation, decide for themselves character of materials and make their bids accordingly. Upon proper application to Department of

Veterans Affairs, bidders will be permitted to make subsurface explorations of their own at site.

1.12 AS-BUILT DRAWINGS

A. The contractor shall maintain two full size sets of as-built drawings which will be kept current during construction of the project, to include all contract changes, modifications and clarifications.

B. All variations shall be shown in the same general detail as used in the contract drawings. To ensure compliance, as-built drawings shall be made available for the COR review, as often as requested.

C. Contractor shall deliver two approved completed sets of as-built drawings in the electronic version (scanned PDF) to the COR within 15 calendar days after each completed phase and after the acceptance of the project by the COR.

D. Paragraphs A, B, & C shall also apply to all shop drawings.

1.13 WARRANTY MANAGEMENT

A. Warranty Management Plan: Develop a warranty management plan which contains information relevant to FAR 52.246-21 Warranty of Construction at least 30 days before the planned pre-warranty conference, submit one set of the warranty management plan. Include within the warranty management plan all required actions and documents to assure that the

Government receives all warranties to which it is entitled. The plan shall be in narrative form and contain sufficient detail to render it suitable for use by future maintenance and repair personnel, whether tradesman, or of engineering background, not necessarily familiar with this contract. The term “status” as indicated below shall include due date and whether item has been submitted or was approved. Warranty information made available during the construction phase shall be submitted to the Contracting Officer for approval prior to each monthly

03-01-20

01 00 00 -12

GENERAL REQUIREMENTS

invoice for payment. Assemble approved information in a binder and turn over to the Government upon acceptance of the work. The construction warranty period will begin on the date of the project acceptance and continue for the product warranty period. A joint 4 month and 9 month warranty inspection will be conducted, measured from time of acceptance, by the Contactor and the Contracting Officer. Include in the warranty management plan, but not limited to, the following:

1. Roles and responsibilities of all personnel associated with the warranty process, including points of contact and telephone numbers within the company of the Contractor, subcontractors, manufacturers or suppliers involved.

2. Furnish with each warranty the name, address and telephone number of each of the guarantor’s representatives nearest project location.

3. Listing and status of delivery of all Certificates of Warranty for extended warranty items, to include roofs, HVAC balancing, pumps, motors, transformers and for all commissioned systems such as fire protection and alarm systems, sprinkler systems and lightning protection systems, etc.

4. A list for each warranted equipment item, feature of construction or system indicating:

a. Name of item.

b. Model and serial numbers.

c. Location where installed.

d. Name and phone numbers of manufacturers and suppliers.

e. Name and phone numbers of manufacturers or suppliers.

f. Names, addresses and phone numbers of sources of spare parts.

g. Warranties and terms of warranty. Include one-year overall warranty of construction, including the starting date of warranty of construction. Items which have extended warranties shall be indicated with separate warranty expiration dates.

h. Starting point and duration of warranty period.

03-01-20

01 00 00 -13

GENERAL REQUIREMENTS

i. Summary of maintenance procedures required to continue the warranty in force.

j. Cross-reference to specific pertinent Operation and Maintenance manuals.

k. Organizations, names and phone numbers of persons to call for warranty service.

l. Typical response time and repair time expected for various warranted equipment.

5. The plans for attendance at the 4 and 9-month post construction warranty inspections conducted by the government.

6. Procedure and status of tagging of all equipment covered by extended warranties.

7. Copies of instructions to be posted near selected pieces of equipment where operation is critical for warranty and/or safety reasons.

B. Performance Bond: The Performance Bond shall remain effective throughout the construction period.

1. In the event the Contractor fails to commence and diligently pursue any construction warranty work required, the Contracting Officer will have the work performed by others, and after completion of the work, will charge the remaining construction warranty funds of expenses incurred by the Government while performing the work, including, but not limited to administrative expenses.

2. In the event sufficient funds are not available to cover the construction warranty work performed by the Government at the contractor’s expenses, the Contracting Officer will have the right to recoup expenses from the bonding company.

3. Following oral or written notification of required construction warranty repair work, the Contractor shall respond in a timely manner. Written verification will follow oral instructions. Failure to respond will be cause for the Contracting Officer to proceed against the Contractor.

03-01-20

01 00 00 -14

GENERAL REQUIREMENTS

C. Pre-Warranty Conference: Prior to contract completion, and at a time designated by the Contracting Officer, the Contractor shall meet with the Contracting Officer to develop a mutual understanding with respect to the requirements of this section. Communication procedures for

Contractor notification of construction warranty defects, priorities with respect to the type of defect, reasonable time required for

Contractor response, and other details deemed necessary by the

Contracting Officer for the execution of the construction warranty will be established/ reviewed at this meeting. In connection with these requirements and at the time of the Contractor’s quality control completion inspection, furnish the name, telephone number and address of a licensed and bonded company which is authorized to initiate and pursue construction warranty work action on behalf of the Contractor.

This point of contract will be located within the local service area of the warranted construction, be continuously available and be responsive to Government inquiry on warranty work action and status. This requirement does not relieve the Contractor of any of its responsibilities in conjunction with other portions of this provision.

D. Contractor’s Response to Construction Warranty Service Requirements:

Following oral or written notification by the Contracting Officer, the

Contractor shall respond to construction warranty service requirements in accordance with the “Construction Warranty Service Priority List” and the three categories of priorities listed below. Submit a report on any warranty item that has been repaired during the warranty period.

Include within the report the cause of the problem, date reported, corrective action taken, and when the repair was completed. If the

Contractor does not perform the construction warranty within the timeframe specified, the Government will perform the work and back charge the construction warranty payment item established.

1. First Priority Code 1. Perform onsite inspection to evaluate situation, and determine course of action within 4 hours, initiate work within 6 hours and work continuously to completion or relief.

2. Second Priority Code 2. Perform onsite inspection to evaluate situation, and determine course of action within 8 hours, initiate work within 24 hours and work continuously to completion or relief.

03-01-20

01 00 00 -15

GENERAL REQUIREMENTS

3. Third Priority Code 3. All other work to be initiated within 3 work days and work continuously to completion or relief.

4. The “Construction Warranty Service Priority List” is as follows:

Code 1-Roof Leaks

a. Damage to property is occurring.

Code 3

a. All work not listed above.

E. Warranty Tags: At the time of installation, tag each warranted item with a durable, oil and water-resistant tag approved by the Contracting

Officer. Attach each tag with a copper wire and spray with a silicone waterproof coating. Also submit two record copies of the warranty tags showing the layout and design. The date of acceptance and the QC signature shall remain blank until the project is accepted for beneficial occupancy. Show the following information on the tag.

03-01-20

01 00 00 -16

GENERAL REQUIREMENTS

1.14 USE OF ROADWAYS

A. For hauling, use only established public roads and roads on Medical

Center property and, when authorized by the COR, such temporary roads which are necessary in the performance of contract work. Temporary roads shall be constructed and restoration performed by the Contractor at Contractor's expense. When necessary to cross curbing, sidewalks, or similar construction, they shall be protected by well-constructed bridges.

B. When certain buildings (or parts of certain buildings) are required to be completed in advance of general date of completion, all roads leading thereto shall be completed and available for use at time set for completion of such buildings or parts thereof.

1.15 TEMPORARY TOILETS

A. Provide where directed, (for use of all Contractor's workers) ample temporary sanitary toilet accommodations with suitable sewer and water connections; or, when approved by COR, provide suitable dry closets where directed. Keep such places clean and free from flies, and all connections and appliances connected therewith shall be removed prior to completion of contract, and premises left perfectly clean.

1.16 AVAILABILITY AND USE OF UTILITY SERVICES

A. The Government shall make all reasonably required amounts of utilities available to the Contractor from existing outlets and supplies, as specified in the contract. The amount to be paid by the Contractor for chargeable electrical services shall be the prevailing rates charged to the Government. The Contractor shall carefully conserve any utilities furnished without charge.

B. The Contractor, at Contractor's expense and in a workmanlike manner, in compliance with code and as satisfactory to the Contracting Officer, shall install and maintain all necessary temporary connections and distribution lines, and all meters required to measure the amount of electricity used for the purpose of determining charges. Before final acceptance of the work by the Government, the Contractor shall remove all the temporary connections, distribution lines, meters, and associated paraphernalia and repair restore the infrastructure as required.

03-01-20

01 00 00 -17

GENERAL REQUIREMENTS

C. Contractor shall install meters at Contractor's expense and furnish the

Medical Center a monthly record of the Contractor's usage of electricity as hereinafter specified.

D. Electricity (for Construction and Testing): Furnish all temporary electric services.

1. Obtain electricity by connecting to the Medical Center electrical distribution system. The Contractor shall meter and pay for electricity required for electric cranes and hoisting devices, electrical welding devices and any electrical heating devices providing temporary heat. Electricity for all other uses is available at no cost to the Contractor.

1.17 TESTS

A. All related components as defined above shall be functioning when any system component is tested. Tests shall be completed within a reasonably period of time during which operating and environmental conditions remain reasonably constant and are typical of the design conditions.

B. Individual test result of any component, where required, will only be accepted when submitted with the test results of related components and of the entire system.

1.18 INSTRUCTIONS

A. Contractor shall furnish Maintenance and Operating manuals (hard copies and electronic) and verbal instructions when required by the various sections of the specifications and as hereinafter specified.

B. Manuals: Maintenance and operating manuals and one compact disc (four hard copies and one electronic copy each) for each separate piece of equipment shall be delivered to the COR coincidental with the delivery of the equipment to the job site. Manuals shall be complete, detailed guides for the maintenance and operation of equipment. They shall include complete information necessary for starting, adjusting, maintaining in continuous operation for long periods of time and dismantling and reassembling of the complete units and sub-assembly components. Manuals shall include an index covering all component parts clearly cross-referenced to diagrams and illustrations. Illustrations shall include "exploded" views showing and identifying each separate

03-01-20

01 00 00 -18

GENERAL REQUIREMENTS

item. Emphasis shall be placed on the use of special tools and instruments. The function of each piece of equipment, component, accessory and control shall be clearly and thoroughly explained. All necessary precautions for the operation of the equipment and the reason for each precaution shall be clearly set forth. Manuals shall reference the exact model, style and size of the piece of equipment and system being furnished. Manuals referencing equipment similar to but of a different model, style, and size than that furnished will not be accepted.

C. Instructions: Contractor shall provide qualified, factory-trained manufacturers' representatives to give detailed training to assigned

Department of Veterans Affairs personnel in the operation and complete maintenance for each piece of equipment. All such training will be at the job site. These requirements are more specifically detailed in the various technical sections. Instructions for different items of equipment that are component parts of a complete system, shall be given in an integrated, progressive manner. All instructors for every piece of component equipment in a system shall be available until instructions for all items included in the system have been completed.

This is to assure proper instruction in the operation of inter-related systems. All instruction periods shall be at such times as scheduled by the COR and shall be considered concluded only when the COR is satisfied in regard to complete and thorough coverage. The contractor shall submit a course outline with associated material to the COR for review and approval prior to scheduling training to ensure the subject matter covers the expectations of the VA and the contractual requirements. The Department of Veterans Affairs reserves the right to request the removal of, and substitution for, any instructor who, in the opinion of the COR, does not demonstrate sufficient qualifications in accordance with requirements for instructors above.

1.19 RELOCATED ITEMS

A. Contractor shall disconnect, dismantle as necessary, remove and reinstall in new location, all existing items indicated shown to be relocated by the Contractor.

B. Perform relocation of such equipment or items at such times and in such a manner as directed by the COR.

03-01-20

01 00 00 -19

GENERAL REQUIREMENTS

C. Suitably cap existing service lines, such as steam, condensate return, water, drain, gas, air, vacuum and/or electrical, at the main whenever such lines are disconnected from equipment to be relocated. Remove abandoned lines in finished areas and cap as specified herein before under paragraph "Abandoned Lines".

D. Provide all mechanical and electrical service connections, fittings, fastenings and any other materials necessary for assembly and installation of relocated equipment; and leave such equipment in proper operating condition.

1.20 HISTORIC PRESERVATION

Where the Contractor or any of the Contractor's employees, prior to, or during the construction work, are advised of or discover any possible archeological, historical and/or cultural resources, the Contractor shall immediately notify the COR verbally, and then with a written follow up.

- - - E N D - - -

Attachments:

010000 Attachment A – Lead Report.pdf 010000 Attachment B – Asbestos Report.pdf

Terracon Consul tants, Inc., 611 Lunken Park Dr ive, Cincinnat i , OH 45226 P (513) 321-5816 terracon.com

July 28, 2020

FFE, Inc.

110 Boggs Lane, Suite 170 Cincinnati, OH 45246

Attn: Mr. Patrick R. Quinn, AIA, CDT, LEED BD+C, WELL AP Senior Architect T: (217) 493-1976 E: patrick.quinn@ffe-serv.com

Re: Results - Limited Paint Sampling for Lead-Content Analysis VA Project: Correct Water Infiltration VA Project No.: 610-20-102 VA Northern Indiana Health Care System Marion Campus 1700 E. 38th Street Marion, Indiana 46953 Terracon Project No. N1207198

Dear Mr. Quinn:

Terracon Consultants, Inc. (Terracon) appreciates the opportunity to submit this letter report to FFE Inc. (Client) regarding the lead analytical results for limited paint sampling for the above-referenced project at the Marion, Indiana Campus of the VA Northern Indiana Health Care System (Marion, Indiana VA). We understand that this survey was requested for the purpose of a planned renovation regarding impacts to the roofs associated with Buildings 15, 16, 17, 124, 172, and 174 and the gutter systems associated with Buildings 15, 16, 17, and 124.

Terracon representative Mr. Lemuel Weyer conducted the limited paint sampling on July 15, 2020.

Sample collection was performed using a clean straight-edge razor to remove paint from designated surfaces. Collected paint samples were placed in sealable containers, labeled with unique sample numbers, and submitted under chain of custody to EMSL Analytical Inc. (EMSL) of Indianapolis, Indiana. Paint chip samples were submitted for analysis by Atomic Absorption Spectroscopy (AAS) per EPA Method SW846/3050B/7000B. EMSL is accredited for lead in paint analysis by the American Industrial Hygiene Association’s (AIHA®) Environmental Lead Laboratory Accreditation Program (ELLAP), accreditation number 157245.

Lead Paint Analytical Results Summary The metal gutter systems and wood facia boards associated with Buildings 15, 16, and 17 are each painted white. Terracon collected three (3) paint samples for lead-content analysis from each of the aforementioned buildings (a composite sample of white paint from gutters and facia boards from each of the three buildings). Buildings 124, 172 and 174 did not appear to have any painted surfaces which were likely to be impacted by the renovation project. The analytical results

Results - Limited Paint Sampling for Lead-Content Analysis Project: Correct Water Infiltration ■ Marion, Indiana VA July 28, 2020 ■ Terracon Project No. N1207198

Responsive n Resourceful n Reliable 2 indicated that all three (3) white paint samples contained a lead level above the analytical limit of detection; therefore, all metal gutter systems and wood facia boards associated with Buildings 15, 16, and 17 were identified as having lead in the white paint coatings.

A sample and results summary table and the laboratory analytical report are attached.

Regulation Summary Occupational Safety and Health Administration (OSHA) standard, 29 Code of Federal Regulations (CFR) 1926.62 (Lead in Construction), does not reference a specific concentration of lead in a surface coating for applicability of the aforementioned regulation. The requirements under OSHA 29 CFR 1926.62 are applicable to any concentration of lead found above analytical limit of detection (LOD). When disturbed, paints containing lead in any concentration represent an airborne exposure hazard that could exceed the OSHA legally enforceable action level (AL) or permissible exposure limit (PEL). Contractors that bid or conduct work activities that will disturb surfaces with analytically-confirmed lead-containing paint should be made aware of those so that they can plan for proper compliance with applicable federal and state regulations, and applicable VA specifications. Additionally, contractors should be aware that any untested paint surfaces should be assumed to also contain lead unless sampling and analysis refute lead-content.

Closing This sampling event was conducted for project specific areas. The sampling was of a limited nature specific to prominent and readily accessible painted surfaces that may be impacted by renovation and may not have included every painted surface. The sampling was conducted in a manner consistent with the level of care and skill ordinarily exercised by members of the profession currently practicing under similar conditions in the same locale. The results, findings and recommendations expressed in this letter report are based on conditions observed during the sampling event. This letter report has been prepared on behalf of and exclusively for use and reliance by the Client and is not a bidding document. Contractors or consultants reviewing this limited sampling report must draw their own conclusions regarding whether further investigation or remediation is deemed necessary. Terracon does not warrant the work of regulatory agencies, laboratories, or other third-parties supplying information, which may have been used in the preparation of this report. No warranty, express or implied, is made.

July 28, 2020 ■ Terracon Project No. N1207198

Responsive n Resourceful n Reliable 3

Terracon appreciates the opportunity to provide this service to FFE, Inc. If you have questions regarding this letter report or if we can be of further service, please contact the undersigned at (513) 321-5816.

Sincerely, Terracon Consultants, Inc.

Josh Vogel Joseph Tussey, CHMM Project Manager Senior Associate/Group Manager

Attachments: 1) Sample & Results Summary Table

2) Laboratory Analytical Report

July 28, 2020 ■ Terracon Project No. N1207198

Responsive n Resourceful n Reliable 4

Attachment 1: Sample & Results Summary Table

Terracon Sample # Component Paint

Color (surface) Substrate Sample Location Results (% lead by weight)

L-01

Gutter System &

Facia Board Composite

White Metal

Gutters/ Wood Facia

Southwest Corner of Building 15

7.1%lead

L-02

Gutter System &

Facia Board Composite

White Metal

Gutters/ Wood Facia

Northeast Corner of Building 16

0.52% lead

L-03

Gutter System &

Facia Board Composite

White Metal

Gutters/ Wood Facia

Northeast Corner of Building 17

0.89% lead

July 28, 2020 ■ Terracon Project No. N1207198

Responsive n Resourceful n Reliable 5

Attachment 2: Laboratory Analytical Report

ConcentrationAnalyzed Weight RDL LeadClient SampleDescription Collected

Test Report: Lead in Paint Chips by Flame AAS (SW 846 3050B/7000B)*

EMSL Analytical, Inc.

6340 CastlePlace Dr., Indianapolis, IN 46250 Phone/Fax: (317) 803-2997 / (317) 803-3047 http://www.EMSL.com indianapolislab@emsl.com

Attn: Lem Weyer Terracon Consultants, Inc.

611 Lunken Park Drive Cincinnati, OH 45226

Received: 07/17/20 10:12 AM

MARION VAMC CORRECT WATER INFILTRATION - N1207198

Fax: (513) 321-0294 Phone: (513) 321-5816

Project:

7/15/2020Collected:

162013835 CustomerID: HCNU50 CustomerPO: N1207198 ProjectID:

EMSL Order:

Site: GUTTER / WHITE / WOOD / SOUTWEST CORNER OF BUILDING

7.1 % wt7/17/2020 0.2557 g 162013835-0001

0.207/15/2020L-01 % wt

Site: GUTTER / WHITE / WOOD / NORTHEAST CORNER OF BUILDING

0.52 % wt7/17/2020 0.2559 g 162013835-0002

0.207/15/2020L-02 % wt

Site: GUTTER / WHITE / WOOD / NORTHEAST CORNER OF BUILDING

0.89 % wt7/17/2020 0.2525 g 162013835-0003

0.207/15/2020L-03 % wt

Page 1 of 1Test Report PB w/RDL-2.0.0.0 Printed: 7/24/2020 8:31:22 AM

Doug Wiegand, Laboratory Manager or other approved signatory

EMSL maintains liability limited to cost of analysis. Interpretation and use of test results are the responsibility of the client. This report relates only to the samples reported above, and may not be reproduced, except in full, without written approval by EMSL. EMSL bears no responsibility for sample collection activities or analytical method limitations. The report reflects the samples as received.

Results are generated from the field sampling data (sampling volumes and areas, locations, etc.) provided by the client on the Chain of Custody. Samples are within quality control criteria and met method specifications unless otherwise noted.

Analysis following Lead in Paint by EMSL SOP/Determination of Environmental Lead by FLAA. Reporting limit is 0.008% wt based on the minimum sample weight per our SOP. "<" (less than) result signifies the analyte was not detected at or above the reporting limit. Measurement of uncertainty is available upon request. Definitions of modifications are available upon request.

Samples analyzed by EMSL Analytical, Inc. Indianapolis, IN AIHA-LAP, LLC--ELLAP 157245, OH E10040

Initial report from 07/24/2020 08:31:22 http://www.EMSL.com mailto:indianapolislab@emsl.com

OrderID: 162013835

OrderID: 162013835

Asbestos Survey VA Project: Correct Water Infiltration

VA Project Number: 610-20-102 Northern Indiana Health Care System

Marion Campus 1700 E. 38th Street

Marion, Indiana 46953

July 28, 2020

Terracon Project No. N1207198

Prepared for:

FFE, Inc.

Cincinnati, Ohio 45215

Prepared by:

Terracon Consultants, Inc.

Cincinnati, Ohio 45226

Terracon Consultants, Inc . 611 Lunken Park Dr ive C inc innat i, OH 45226 P 513-321-5816 F 513-321-0294 t er racon.com

July 28, 2020

FFE, Inc.

438 Springfield Pike, Suite C Cincinnati, Ohio 45215

Attn: Mr. Patrick R. Quinn, AIA, CDT, LEED BD+C, WELL AP Senior Architect T: (217) 493-1976 E: patrick.quinn@ffe-serv.com

Re: Asbestos Survey Report Project: Correct Water Infiltration VA Project No.: 610-20-102 VA Northern Indiana Health Care System Marion Campus 1700 E. 38th Street Marion, Indiana 46953 Terracon Project No. N1207198

Dear Mr. Quinn:

Terracon Consultants, Inc.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .