2022-0427_Correct Water Infiltration AMEND 00001 DWGs_Part4.pdf
PDF 5 MB Posted
- Attached to
- Z1DA--Correct Water Infiltration 610-20-102 Federal contract opportunity
- Solicitation number
- 36C25022B0009
About this file
This document package includes construction drawings and specifications for a federal contract opportunity to correct water infiltration at a Department of Veterans Affairs medical center. The contractor shall provide all labor, materials, equipment and supervision necessary to complete roof repairs on four buildings, replacing roofing materials with new stone coated steel shingles, standing seam metal roofing and related flashing. The work also involves tuckpointing and replacing damaged brick, as well as cleaning and repainting trim elements. The solicitation is issued by the VA Veterans Health Administration VISN 10 and responses are due by the date specified in the solicitation number 36C25022B0009. The construction drawings provide elevations and details of the repair scopes for each building.
View the file
Other files for this federal contract opportunity
Show all 29
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TYP.
TYP.
10 44
TYP.
TYP.
TYP.
TYP.
4 4
TYP.
TYP.
2 2 2 2
TYP. TYP.
5 5 5 5 5 5
TYP.
TYP.
TYP.
9 9
3 3
4 44 4
2 22 2
TYP.
TYP.
TYP.
TYP.
TYP.
12 12
1414 1414
BRICK TO BE CLEANED AND TUCK-POINTED - 340 SF - BUILDING 2
BRICK TO BE REMOVED AND REPLACED - 24 SF - BUILDING 2
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
DRAWING OF 24
C U s e rs
\n a te m
\O n e
D ri v e \D o c u m e n ts
\F F
E
M a ri o n
W a te r
In fi lt ra ti o n
B n a te
.m o u ld s .r v t
/2
/2
:2
:4
P
M
AE202
BUILDING 2 - ELEVATIONS
03/11/2021 PQ BL
MARION INDIANA
#610-20-102CONSTRUCTION
DOCUMENTS
CORRECT WATER
INFILTRATION
1/8" = 1'-0"
B2 - EAST ELEVATION
1/8" = 1'-0"
B2 - WEST ELEVATION
1/8" = 1'-0"
B2 - NORTH ELEVATION
1/8" = 1'-0"
B2 - SOUTH ELEVATION
1 REMOVE EXISTING ASPHALT SHINGLES AND UNDERLAYMENT - REPLACE WITH
NEW STONE COATED STEEL SHINGLES OVER #30 FELT UNDERLAYMENT OVER
EXISTING SHEATHING. REPLACE SHEATHING AND INSULATION WHERE
DAMAGED - ASSUME 10% SHEATHING AND INSULATION REPLACEMENT AT
RAFTERS - SEE SECTIONS AND DETAILS ON AE501 AND AE502.
2 REPLACE EXISTING BOX GUTTER - INSTALL NEW METAL GUTTER BOX, PEEL &
SEAL LINER, AND METAL CORNICE PROFILE AND ASSOCIATED BLOCKING,
TYPICAL UNLESS NOTED OTHERWISE - SEE DETAILS ON AE501 AND AE502.
3 REMOVE EXISTING ROOF HATCH - PATCH OPENING WITH WOOD FRAMING AND
SHEATHING - PREPARE TO RECEIVE NEW SHINGLES.
4 REMOVE EXISTING LOOSE OR RECEDING MORTAR FROM JOINT - TUCKPOINT
WITH NEW MORTAR - STAIN ALL NEW MORTAR TO MATCH EXISTING COLOR.
5 PROTECT EXISTING DOWNSPOUT DURING ALL PHASES OF CONSTRUCTION.
6 EXISTING DOWNSPOUT BOOT TO REMAIN.
7 RIDGE CAP BY SHINGLE MANUFACTURER TO MATCH ADJACENT SHINGLES -
TYPICAL.
8 EXISTING CORNICE WORK TO REMAIN - PAINT TO MATCH NEW CORNICE WORK.
9 NEW STEP FLASHING AT ROOF AND WALL INTERSECTION
10 REMOVE EXISTING DAMAGED BRICK - REPLACE WITH NEW BRICK TO MATCH
EXISTING IN SIZE, COLOR, AND SURFACE - STAIN ALL NEW MORTAR TO MATCH
EXISTING COLOR.
11 EXISTING PORCH ROOF TO REMAIN.
12 NEW 3"X4" COPPER COLOR DOWNSPOUT TO EXISTING BOOT.
13 REMOVE AND REPLACE EXISTING METAL ROOF WITH NEW STANDING SEAM
METAL ROOF - COLOR: COPPER.
14 NEW BASE FLASHING
15 NEW GUTTER FORMED FROM SAME MATERIAL AS ROOF PANELS - COLOR:
COPPER
16 INSTALL CLAMP-TO-SEAM SNOW GUARDS AT 24" AND 36" FROM FASCIA BOARD -
16" O.C. - COLOR: COPPER TO MATCH ROOFING MATERIAL.
A. THE ROOFING SYSTEM SHALL BE COMPLETELY WATERTIGHT AT THE END OF EACH DAY’S
CONSTRUCTION ACTIVITY. IF TEMPORARY ROOFING STRATEGIES ARE USED, MATERIALS
INSTALLED SHALL SERVE THE SAME FUNCTION AS EXISTING MATERIALS AND WILL BE
COMPATIBLE WITH EXISTING ROOF SYSTEM.
B. CONTRACTOR SHALL RELOCATE EXISTING SURFACE-MOUNTED LIGHTNING PROTECTION
SYSTEM AS NEEDED. REINSTALL SYSTEM AT COMPLETION OF ROOF WORK IN EACH ROOF
AREA. CONTRACTOR SHALL RECERTIFY ENTIRE LIGHTNING PROTECTION SYSTEM AT
CONCLUSION OF PROJECT.
C. NOTE REMOVED.
D. EXISTING PLUMBING VENTS ARE NOT SHOWN ON ROOF PLAN BUT SHALL BE INCLUDED IN THE
PROJECT BID AND COMPLETED ACCORDING TO DETAILS AND/OR ROOFING SYSTEM
REQUIREMENTS.
E. ALL DOORS AND WINDOWS ARE EXISTING TO REMAIN UNLESS NOTED OTHERWISE.
D R A W I N G N O T E S
G E N E R A L N O T E S
No. Revisions: Date:
1 ADDENDUM 001 04/27/2022
TYP.
TYP.
TYP. TYP.
TYP.
TYP.
TYP.
5 5
TYP.TYP.
TYP.
TYP.
TYP.
TYP.
TYP.
TYP.
TYP.
:5 AE203
:5 AE203 :6 AE203
:6 AE203
4 4
TYP.
TYP.
TYP.
TYP.
TYP.
TYP.
148 88
BRICK TO BE CLEANED AND TUCK-POINTED - 710 SF - BUILDING 3
BRICK TO BE REMOVED AND REPLACED - 70 SF - BUILDING 3
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
DRAWING OF 24
C U s e rs
\n a te m
\O n e
D ri v e \D o c u m e n ts
\F F
E
M a ri o n
W a te r
In fi lt ra ti o n
B n a te
.m o u ld s .r v t
/2
/2
:4
:0
P
M
AE203
BUILDING 3 - ELEVATIONS
03/11/2021 PQ BL
MARION, INDIANA
#610-20-102CONSTRUCTION
DOCUMENTS
CORRECT WATER
INFILTRATION
1/8" = 1'-0"
EAST ELEVATION
1/8" = 1'-0"
WEST ELEVATION
1/8" = 1'-0"
NORTH ELEVATION
1/8" = 1'-0"
SOUTH ELEVATION
1 REMOVE EXISTING ASPHALT SHINGLES AND UNDERLAYMENT - REPLACE WITH
NEW STONE COATED STEEL SHINGLES OVER #30 FELT UNDERLAYMENT OVER
EXISTING SHEATHING. REPLACE SHEATHING AND INSULATION WHERE
DAMAGED - ASSUME 10% SHEATHING AND INSULATION REPLACEMENT AT
RAFTERS - SEE SECTIONS AND DETAILS ON AE501 AND AE502.
2 REPLACE EXISTING BOX GUTTER - INSTALL NEW METAL GUTTER BOX, PEEL &
SEAL LINER, AND METAL CORNICE PROFILE AND ASSOCIATED BLOCKING,
TYPICAL UNLESS NOTED OTHERWISE - SEE DETAILS ON AE501 AND AE502.
3 REMOVE EXISTING ROOF HATCH - PATCH OPENING WITH WOOD FRAMING AND
SHEATHING - PREPARE TO RECEIVE NEW SHINGLES.
4 REMOVE EXISTING LOOSE OR RECEDING MORTAR FROM JOINT - TUCKPOINT
WITH NEW MORTAR - STAIN ALL NEW MORTAR TO MATCH EXISTING COLOR.
5 RIDGE CAP BY SHINGLE MANUFACTURER TO MATCH ADJACENT SHINGLES -
TYPICAL.
6 EXISTING CORNICE WORK TO REMAIN - PAINT TO MATCH NEW CORNICE WORK.
7 NEW STEP FLASHING AT ROOF AND WALL INTERSECTION
8 NEW BASE FLASHING
9 REMOVE EXISTING DAMAGED BRICK - REPLACE WITH NEW BRICK TO MATCH
EXISTING IN SIZE, COLOR, AND SURFACE - STAIN ALL NEW MORTAR TO MATCH
EXISTING COLOR.
10 REMOVE EFFLORESCENCE WITH AN ACIDIC CLEANER - DO NOT USE MURIATIC
ACID.
11 EXISTING PORCH ROOF TO REMAIN.
12 NEW 3"X4" COPPER COLOR DOWNSPOUT TO EXISTING BOOT.
13 REMOVE AND REPLACE EXISTING METAL ROOF WITH NEW STANDING SEAM
METAL ROOF - COLOR: COPPER.
15 NEW GUTTER FORMED FROM SAME MATERIAL AS ROOF PANELS - COLOR:
COPPER
16 INSTALL CLAMP-TO-SEAM SNOW GUARDS AT 24" AND 36" FROM FASCIA BOARD -
16" O.C. - COLOR: COPPER TO MATCH ROOFING MATERIAL.
A. THE ROOFING SYSTEM SHALL BE COMPLETELY WATERTIGHT AT THE END OF EACH DAY’S
CONSTRUCTION ACTIVITY. IF TEMPORARY ROOFING STRATEGIES ARE USED, MATERIALS
INSTALLED SHALL SERVE THE SAME FUNCTION AS EXISTING MATERIALS AND WILL BE
COMPATIBLE WITH EXISTING ROOF SYSTEM.
B. CONTRACTOR SHALL RELOCATE EXISTING SURFACE-MOUNTED LIGHTNING PROTECTION
SYSTEM AS NEEDED. REINSTALL SYSTEM AT COMPLETION OF ROOF WORK IN EACH ROOF
AREA. CONTRACTOR SHALL RECERTIFY ENTIRE LIGHTNING PROTECTION SYSTEM AT
CONCLUSION OF PROJECT.
C. NOTE REMOVED.
D. EXISTING PLUMBING VENTS ARE NOT SHOWN ON ROOF PLAN BUT SHALL BE INCLUDED IN THE
PROJECT BID AND COMPLETED ACCORDING TO DETAILS AND/OR ROOFING SYSTEM
REQUIREMENTS.
E. ALL DOORS AND WINDOWS ARE EXISTING TO REMAIN UNLESS NOTED OTHERWISE.
D R A W I N G N O T E S
G E N E R A L N O T E S
1/8" = 1'-0"
Elevation 2 - a 1/8" = 1'-0"
Elevation 1 - c
No. Revisions: Date:
TYP.
TYP.
TYP.
TYP.
10 11
TYP.
TYP.
TYP.
TYP.
2 2 2
TYP.
TYP.
TYP.
TYP.
TYP.
7 7 7
6 6
9 9
2 2
TYP. TYP.
TYP.
TYP.
TYP.
6 6
9 9
10 10 10 10 4 4
1212 1212
14 14
BRICK TO BE CLEANED AND TUCK-POINTED - 60 SF - BUILDING 4
BRICK TO BE REMOVED AND REPLACED - 120 SF - BUILDING 4
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
DRAWING OF 24
C U s e rs
\n a te m
\O n e
D ri v e \D o c u m e n ts
\F F
E
M a ri o n
W a te r
In fi lt ra ti o n
B n a te
.m o u ld s .r v t
/2
/2
:4
:4
P
M
AE204
BUILDING 4 - ELEVATIONS
03/11/2021 PQ BL
MARION, INDIANA
#610-20-102CONSTRUCTION
DOCUMENTS
CORRECT WATER
INFILTRATION
1/8" = 1'-0"
EAST ELEVATION
1/8" = 1'-0"
WEST ELEVATION
1/8" = 1'-0"
NORTH ELEVATION
1/8" = 1'-0"
SOUTH ELEVATION
1 REMOVE EXISTING ASPHALT SHINGLES AND UNDERLAYMENT - REPLACE WITH
NEW STONE COATED STEEL SHINGLES OVER #30 FELT UNDERLAYMENT OVER
EXISTING SHEATHING. REPLACE SHEATHING AND INSULATION WHERE
DAMAGED - ASSUME 10% SHEATHING AND INSULATION REPLACEMENT AT
RAFTERS - SEE SECTIONS AND DETAILS ON AE501 AND AE502.
2 REPLACE EXISTING BOX GUTTER - INSTALL NEW METAL GUTTER BOX, PEEL &
SEAL LINER, AND METAL CORNICE PROFILE AND ASSOCIATED BLOCKING,
TYPICAL UNLESS NOTED OTHERWISE - SEE DETAILS ON AE501 AND AE502.
3 REMOVE EXISTING ROOF HATCH - PATCH OPENING WITH WOOD FRAMING AND
SHEATHING - PREPARE TO RECEIVE NEW SHINGLES.
4 REMOVE EXISTING LOOSE OR RECEDING MORTAR FROM JOINT - TUCKPOINT
WITH NEW MORTAR - STAIN ALL NEW MORTAR TO MATCH EXISTING COLOR.
5 RIDGE CAP BY SHINGLE MANUFACTURER TO MATCH ADJACENT SHINGLES -
TYPICAL.
6 PROTECT EXISTING DOWNSPOUT DURING ALL PHASES OF CONSTRUCTION.
7 EXISTING DOWNSPOUT BOOT TO REMAIN.
8 EXISTING CORNICE WORK TO REMAIN - PAINT TO MATCH NEW CORNICE WORK.
9 NEW STEP FLASHING AT ROOF AND WALL INTERSECTION
10 REMOVE EXISTING DAMAGED BRICK - REPLACE WITH NEW BRICK TO MATCH
EXISTING IN SIZE, COLOR, AND SURFACE - STAIN ALL NEW MORTAR TO MATCH
EXISTING COLOR.
11 EXISTING PORCH ROOF TO REMAIN.
12 NEW BASE FLASHING
13 REMOVE AND REPLACE EXISTING METAL ROOF WITH NEW STANDING SEAM
METAL ROOF - COLOR: COPPER.
14 NEW 3"X4" COPPER COLOR DOWNSPOUT TO EXISTING BOOT.
15 NEW GUTTER FORMED FROM SAME MATERIAL AS ROOF PANELS - COLOR:
COPPER
A. THE ROOFING SYSTEM SHALL BE COMPLETELY WATERTIGHT AT THE END OF EACH DAY’S
CONSTRUCTION ACTIVITY. IF TEMPORARY ROOFING STRATEGIES ARE USED, MATERIALS
INSTALLED SHALL SERVE THE SAME FUNCTION AS EXISTING MATERIALS AND WILL BE
COMPATIBLE WITH EXISTING ROOF SYSTEM.
B. CONTRACTOR SHALL RELOCATE EXISTING SURFACE-MOUNTED LIGHTNING PROTECTION
SYSTEM AS NEEDED. REINSTALL SYSTEM AT COMPLETION OF ROOF WORK IN EACH ROOF
AREA. CONTRACTOR SHALL RECERTIFY ENTIRE LIGHTNING PROTECTION SYSTEM AT
CONCLUSION OF PROJECT.
C. NOTE REMOVED.
D. EXISTING PLUMBING VENTS ARE NOT SHOWN ON ROOF PLAN BUT SHALL BE INCLUDED IN THE
PROJECT BID AND COMPLETED ACCORDING TO DETAILS AND/OR ROOFING SYSTEM
REQUIREMENTS.
E. ALL DOORS AND WINDOWS ARE EXISTING TO REMAIN UNLESS NOTED OTHERWISE.
D R A W I N G N O T E S
G E N E R A L N O T E S
No. Revisions: Date:
| 07.14_AE202 - BUILDING 2 - ELEVATIONS |
| AE202 - BUILDING 2 - ELEVATIONS |
| 07.15_AE203 - BUILDING 3 - ELEVATIONS |
| AE203 - BUILDING 3 - ELEVATIONS |
| 07.16_AE204 - BUILDING 4 - ELEVATIONS |
| AE204 - BUILDING 4 - ELEVATIONS |
| AE101 - BUILDING 1 - ROOF PLAN |
| AE101 - BUILDING 1 - ROOF PLAN |
File details come from the government source that posted it. Updated .