Z1DA--Correct Water Infiltration 610-20-102 Federal contract opportunity
Solicitation number
36C25022B0009
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 10

About this file

This document package includes construction drawings and a related federal contract opportunity for corrective work. The drawings show proposed repairs to Buildings 5 and 6 at the Northern IN VA Medical Center, including replacing roofing, repairing brickwork, and repointing mortar. The contract opportunity is to provide all labor, materials, tools and supervision to complete the Correct Water Infiltration project according to the drawings, specifications and statement of work. The Department of Veterans Affairs is the contracting agency. The contractor must complete all work by the required completion date for a firm-fixed price included in their proposal. Relevant experience with similar historic building renovations and a safety plan will be evaluated in selection of the contract awardee.

View the file

Other files for this federal contract opportunity

Other files attached to Z1DA--Correct Water Infiltration 610-20-102, newest first.
File Type Posted
Amendment 0006 Summary.docx DOCX document
Amendment A00006 Rev DWGs_Part8.pdf PDF
Amendment36C25022B0009 A00006.pdf PDF
Amendment A00006 Rev DWGs_Part7.pdf PDF
Amendment A00006 Rev DWGs_Part1.pdf PDF
Amendment A00006 Rev DWGs_Part4.pdf PDF
Amendment A00006 Rev DWGs_Part5.pdf PDF
Amendment A00006 Rev DWGs_Part3.pdf PDF
Amendment A00006 Rev DWGs_Part2.pdf PDF
Amendment36C25022B0009 A00005.pdf PDF
610-20-102 Correct Water Infiltration pre bid site visit attendance.pdf PDF
Amendment 36C25022B0009 A00004.pdf PDF
2022-0427_Correct Water Infiltration AMEND 00001 DWGs_Part1.pdf PDF
2022-0427_Correct Water Infiltration AMEND 00001 DWGs_Part5.pdf PDF
2022-0427_Correct Water Infiltration AMEND 00001 DWGs_Part6.pdf PDF
2022-0427_Correct Water Infiltration AMEND 00001 DWGs_Part2.pdf PDF
Amendment A00003.docx DOCX document
Amendment 00002 Summary.pdf PDF
2022-0427_Correct Water Infiltration AMEND 00001 DWGs_Part4.pdf PDF
2022-0427_Correct Water Infiltration AMEND 00001 DWGs_Part3.pdf PDF
Amendment A00002 - RFI Responses.docx DOCX document
Amendment A00002 36C25022B0009.pdf PDF
36C25022B0009 Amendment A00001.pdf PDF
36C25022B0009 Solicitation.pdf PDF
610-20-102 Correct Water Infiltration - spec.pdf PDF
Contractor Certification Regarding Safety and Environmental.pdf PDF
610-20-102 Correct Water Infiltration - comb dwgs.pdf PDF
Wage Determination.txt TXT text file
RFI Form.doc DOC document
Show all 29

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TYP.

TYP.

TYP. TYP.

TYP.

TYP.

TYP.

10 10

TYP.

TYP. TYP.

4 11

TYP.

TYP.

TYP.

6 6

TYP. TYP.

3 3

TYP.

TYP.

TYP.

6 6

TYP.

TYP.

TYP.

99 99

BRICK TO BE CLEANED AND TUCK-POINTED - 350 SF - BUILDING 5

BRICK TO BE REMOVED AND REPLACED - 40 SF - BUILDING 5

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

DRAWING OF 24

C U s e rs

\n a te m

\O n e

D ri v e \D o c u m e n ts

\F F

E

M a ri o n

W a te r

In fi lt ra ti o n

B n a te

.m o u ld s .r v t

/1

/2

:5

:5

A

M

AE205

BUILDING 5 - ELEVATIONS

03/11/2021 PQ BL

MARION, INDIANA

#610-20-102CONSTRUCTION

DOCUMENTS

CORRECT WATER

INFILTRATION

1/8" = 1'-0"

EAST ELEVATION

1/8" = 1'-0"

WEST ELEVATION

1/8" = 1'-0"

NORTH ELEVATION

1/8" = 1'-0"

SOUTH ELEVATION

1 REMOVE EXISTING ASPHALT SHINGLES AND UNDERLAYMENT - REPLACE WITH

NEW STONE COATED STEEL SHINGLES OVER #30 FELT UNDERLAYMENT OVER

EXISTING SHEATHING. REPLACE SHEATHING AND INSULATION WHERE

DAMAGED - ASSUME 10% SHEATHING AND INSULATION REPLACEMENT AT

RAFTERS - SEE SECTIONS AND DETAILS ON AE501 AND AE502.

2 REPLACE EXISTING BOX GUTTER - INSTALL NEW METAL GUTTER BOX, PEEL &

SEAL LINER, AND METAL CORNICE PROFILE AND ASSOCIATED BLOCKING,

TYPICAL UNLESS NOTED OTHERWISE - SEE DETAILS ON AE501 AND AE502.

3 REMOVE EXISTING ROOF HATCH - PATCH OPENING WITH WOOD FRAMING AND

SHEATHING - PREPARE TO RECEIVE NEW SHINGLES.

4 REMOVE EXISTING LOOSE OR RECEDING MORTAR FROM JOINT - TUCKPOINT

WITH NEW MORTAR - STAIN ALL NEW MORTAR TO MATCH EXISTING COLOR.

5 NEW 3"X4" COPPER COLOR DOWNSPOUT TO EXISTING BOOT.

6 EXISTING DOWNSPOUT BOOT TO REMAIN.

7 EXISTING CORNICE WORK TO REMAIN - PAINT TO MATCH NEW CORNICE WORK.

8 NEW STEP FLASHING AT ROOF AND WALL INTERSECTION

9 NEW BASE FLASHING

10 RIDGE CAP BY SHINGLE MANUFACTURER TO MATCH ADJACENT SHINGLES -

TYPICAL.

11 REMOVE EXISTING DAMAGED BRICK - REPLACE WITH NEW BRICK TO MATCH

EXISTING IN SIZE, COLOR, AND SURFACE - STAIN ALL NEW MORTAR TO MATCH

EXISTING COLOR.

12 REMOVE EXISTING CONCRETE CAP AND REPLACE WITH PRECAST CONCRETE

CAP TO MATCH EXISTING.

13 REMOVE LOOSE FACE OF LIMESTONE LINTEL - SEAL AND STAIN TO MATCH

ADJACENT LIMESTONE LINTEL IN COLOR.

14 EXISTING PORCH ROOF TO REMAIN.

15 REMOVE AND REPLACE EXISTING METAL ROOF WITH NEW STANDING SEAM

METAL ROOF - COLOR: COPPER.

16 INSTALL CLAMP-TO-SEAM SNOW GUARDS AT 24" AND 36" FROM FASCIA BOARD -

16" O.C. - COLOR: COPPER TO MATCH ROOFING MATERIAL.

A. THE ROOFING SYSTEM SHALL BE COMPLETELY WATERTIGHT AT THE END OF EACH DAY’S

CONSTRUCTION ACTIVITY. IF TEMPORARY ROOFING STRATEGIES ARE USED, MATERIALS

INSTALLED SHALL SERVE THE SAME FUNCTION AS EXISTING MATERIALS AND WILL BE

COMPATIBLE WITH EXISTING ROOF SYSTEM.

B. CONTRACTOR SHALL RELOCATE EXISTING SURFACE-MOUNTED LIGHTNING PROTECTION

SYSTEM AS NEEDED. REINSTALL SYSTEM AT COMPLETION OF ROOF WORK IN EACH ROOF

AREA. CONTRACTOR SHALL RECERTIFY ENTIRE LIGHTNING PROTECTION SYSTEM AT

CONCLUSION OF PROJECT.

C. NOTE REMOVED.

D. EXISTING PLUMBING VENTS ARE NOT SHOWN ON ROOF PLAN BUT SHALL BE INCLUDED IN THE

PROJECT BID AND COMPLETED ACCORDING TO DETAILS AND/OR ROOFING SYSTEM

REQUIREMENTS.

E. ALL DOORS AND WINDOWS ARE EXISTING TO REMAIN UNLESS NOTED OTHERWISE.

D R A W I N G N O T E S

G E N E R A L N O T E S

No. Revisions: Date:

1 ADDENDUM 001 04/27/2022

TYP.

TYP.

TYP.

TYP.

TYP.

TYP.

TYP.

TYP.

2 2 2

TYP. TYP.

5 5

5 5

TYP.

TYP.

TYP.

9 9

2 2

TYP. TYP.

5 5

TYP.

TYP.

TYP.

9 9

10 10

13 1414

1616 1616

BRICK TO BE CLEANED AND TUCK-POINTED - 125 SF - BUILDING 6

BRICK TO BE REMOVED AND REPLACED - 55 SF - BUILDING 6

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

DRAWING OF 24

C U s e rs

\n a te m

\O n e

D ri v e \D o c u m e n ts

\F F

E

M a ri o n

W a te r

In fi lt ra ti o n

B n a te

.m o u ld s .r v t

/1

/2

:5

:2

A

M

AE206

BUILDING 6 - ELEVATIONS

03/11/2021 PQ BL

MARION, INDIANA

#610-20-102CONSTRUCTION

DOCUMENTS

CORRECT WATER

INFILTRATION

1/8" = 1'-0"

B6 - EAST ELEVATION

1/8" = 1'-0"

B6 - WEST ELEVATION

1/8" = 1'-0"

B6 - NORTH ELEVATION

1/8" = 1'-0"

B6 - SOUTH ELEVATION

1 REMOVE EXISTING ASPHALT SHINGLES AND UNDERLAYMENT - REPLACE WITH

NEW STONE COATED STEEL SHINGLES OVER #30 FELT UNDERLAYMENT OVER

EXISTING SHEATHING. REPLACE SHEATHING AND INSULATION WHERE

DAMAGED - ASSUME 10% SHEATHING AND INSULATION REPLACEMENT AT

RAFTERS - SEE SECTIONS AND DETAILS ON AE501 AND AE502.

2 REPLACE EXISTING BOX GUTTER - INSTALL NEW METAL GUTTER BOX, PEEL &

SEAL LINER, AND METAL CORNICE PROFILE AND ASSOCIATED BLOCKING,

TYPICAL UNLESS NOTED OTHERWISE - SEE DETAILS ON AE501 AND AE502.

3 REMOVE EXISTING ROOF HATCH - PATCH OPENING WITH WOOD FRAMING AND

SHEATHING - PREPARE TO RECEIVE NEW SHINGLES.

4 REMOVE EXISTING LOOSE OR RECEDING MORTAR FROM JOINT - TUCKPOINT

WITH NEW MORTAR - STAIN ALL NEW MORTAR TO MATCH EXISTING COLOR.

5 PROTECT EXISTING DOWNSPOUT DURING ALL PHASES OF CONSTRUCTION.

6 EXISTING DOWNSPOUT BOOT TO REMAIN.

7 EXISTING CORNICE WORK TO REMAIN - PAINT TO MATCH NEW CORNICE WORK.

8 RIDGE CAP BY SHINGLE MANUFACTURER TO MATCH ADJACENT SHINGLES -

TYPICAL.

9 NEW STEP FLASHING AT ROOF AND WALL INTERSECTION

10 REMOVE EXISTING DAMAGED BRICK - REPLACE WITH NEW BRICK TO MATCH

EXISTING IN SIZE, COLOR, AND SURFACE - STAIN ALL NEW MORTAR TO MATCH

EXISTING COLOR.

11 REMOVE EFFLORESCENCE WITH AN ACIDIC CLEANER - DO NOT USE MURIATIC

ACID.

12 EXISTING PORCH ROOF TO REMAIN.

13 NEW GUTTER FORMED FROM SAME MATERIAL AS ROOF PANELS - COLOR:

COPPER

14 REMOVE AND REPLACE EXISTING METAL ROOF WITH NEW STANDING SEAM

METAL ROOF - COLOR: COPPER.

15 NEW 3"X4" COPPER COLOR DOWNSPOUT TO EXISTING BOOT.

16 NEW BASE FLASHING

17 INSTALL CLAMP-TO-SEAM SNOW GUARDS AT 24" AND 36" FROM FASCIA BOARD -

16" O.C. - COLOR: COPPER TO MATCH ROOFING MATERIAL.

A. THE ROOFING SYSTEM SHALL BE COMPLETELY WATERTIGHT AT THE END OF EACH DAY’S

CONSTRUCTION ACTIVITY. IF TEMPORARY ROOFING STRATEGIES ARE USED, MATERIALS

INSTALLED SHALL SERVE THE SAME FUNCTION AS EXISTING MATERIALS AND WILL BE

COMPATIBLE WITH EXISTING ROOF SYSTEM.

B. CONTRACTOR SHALL RELOCATE EXISTING SURFACE-MOUNTED LIGHTNING PROTECTION

SYSTEM AS NEEDED. REINSTALL SYSTEM AT COMPLETION OF ROOF WORK IN EACH ROOF

AREA. CONTRACTOR SHALL RECERTIFY ENTIRE LIGHTNING PROTECTION SYSTEM AT

CONCLUSION OF PROJECT.

C. NOTE REMOVED.

D. EXISTING PLUMBING VENTS ARE NOT SHOWN ON ROOF PLAN BUT SHALL BE INCLUDED IN THE

PROJECT BID AND COMPLETED ACCORDING TO DETAILS AND/OR ROOFING SYSTEM

REQUIREMENTS.

E. ALL DOORS AND WINDOWS ARE EXISTING TO REMAIN UNLESS NOTED OTHERWISE.

D R A W I N G N O T E S

G E N E R A L N O T E S

No. Revisions: Date:

1 ADDENDUM 001 04/27/2022

07.17_AE205 - BUILDING 5 - ELEVATIONS
AE205 - BUILDING 5 - ELEVATIONS
07.18_AE206 - BUILDING 6 - ELEVATIONS
AE206 - BUILDING 6 - ELEVATIONS