Amendment A00006 Rev DWGs_Part8.pdf
PDF 3 MB Posted
- Attached to
- Z1DA--Correct Water Infiltration 610-20-102 Federal contract opportunity
- Solicitation number
- 36C25022B0009
About this file
This package includes construction drawings and specifications for a roof replacement project at two buildings located at the Northern IN VA Medical Center in Marion, Indiana. The drawings depict existing conditions and call out scope items such as removing and replacing asphalt shingles with new stone-coated steel shingles, repairing dormers, windows and louvers, reworking box gutters and downspouts, and applying new roofing membranes. Specification sections provide additional requirements for materials, flashing details and general notes. Solicitation 36C25022B0009 from the Department of Veterans Affairs seeks bids to complete the Correct Water Infiltration project numbered 610-20-102 per the included drawings and specifications. The selected contractor will furnish all labor, equipment and materials to repair and waterproof the roofs at buildings 17 and 124 on the Marion VA campus.
View the file
Other files for this federal contract opportunity
Show all 29
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AE501
1 11 1111
7 7
555 5 5
AE501
2 2
11 11 11 11
3 3
7 7 7
9 9
5 5
AE501
BRICK TO BE CLEANED AND TUCK-POINTED - 50 SF - BUILDING 17
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
DRAWING OF 24
C U s e rs
\n a te m \O n e
D ri v e
\D o c u m e n ts \F
F E
M a ri o n
W a te r In fi lt ra ti o n
B n a te
.m o u ld s .r v t
/1
/2
:2
:0
A
M
AE209
BUILDING 17 - ELEVATIONS
03/11/2021 PQ BL
MARION, INDIANA
#610-20-102CONSTRUCTION
DOCUMENTS
CORRECT WATER
INFILTRATION
SCALE: 1/8" = 1'-0"
BUILDING 17 - NORTH ELEVATION
SCALE: 1/8" = 1'-0"
BUILDING 17 - EAST ELEVATION
SCALE: 1/8" = 1'-0"
BUILDING 17 - SOUTH ELEVATION
1 REMOVE EXISTING ASPHALT SHINGLES AND UNDERLAYMENT - REPLACE
WITH NEW STONE COATED STEEL SHINGLES OVER #30 FELT
UNDERLAYMENT OVER EXISTING SHEATHING. REPLACE SHEATHING AND
INSULATION WHERE DAMAGED - ASSUME 10% SHEATHING AND
INSULATION REPLACEMENT AT RAFTERS - SEE SECTIONS AND DETAILS ON
AE501 AND AE502.
2 EXISTING METAL ROOF TO REMAIN - PREPARE SURFACE AND APPLY 3-PLY
SELF-ADHERED SBS MODIFIED BITUMIN MEMBRANE TO EXTENT OF METAL
ROOF AND EXTEND 24" UP ADJACENT ROOF SLOPE. INSTALL NEW
BLOCKING WHERE REQUIRED. SEE DETAIL 9/AE501.
3 PROTECT EXISTING DOWNSPOUT DURING ALL PHASES OF
CONSTRUCTION.
4 REPLACE EXISTING DORMER LOUVER WITH NEW LOUVER - SEE SECTIONS
AND DETAILS.
5 REPLACE EXISTING BOX GUTTER - INSTALL NEW GUTTER BOX, PEEL &
SEAL LINER, AND WOOD CORNICE PROFILE AND ASSOCIATED BLOCKING,
TYPICAL UNLESS NOTED OTHERWISE - SEE DETAIL 4 ON AE501.
6 REMOVE EXISTING LOOSE OR RECEDING MORTAR FROM JOINT -
TUCKPOINT WITH NEW MORTAR - STAIN ALL NEW MORTAR TO MATCH
EXISTING COLOR.
7 EXISTING DOWNSPOUT BOOT TO REMAIN.
8 EXISTING ROOF HATCH TO REMAIN.
9 PROVIDE NEW STEP FLASHING AT INTERSECTION WITH WALL.
10 REMOVE EXISTING MECHANICAL DUCTWORK TO BELOW ROOF SURFACE -
SUPPORT EXISTING WITHIN ATTIC SPACE - VERIFY EXHAUST IS INACTIVE
PRIOR TO CONSTRUCTION - PATCH OPENING WITH WOOF FRAMING AND
SHEATHING - PREPARE TO RECEIVE NEW SHINGLES
D R A W I N G N O T E S
G E N E R A L N O T E S
SCALE: 1/8" = 1'-0"
BUILDING 17 - WEST ELEVATION
A. THE ROOFING SYSTEM SHALL BE COMPLETELY WATERTIGHT AT THE END OF EACH DAY’S
CONSTRUCTION ACTIVITY. IF TEMPORARY ROOFING STRATEGIES ARE USED, MATERIALS
INSTALLED SHALL SERVE THE SAME FUNCTION AS EXISTING MATERIALS AND WILL BE
COMPATIBLE WITH EXISTING ROOF SYSTEM.
B. CONTRACTOR SHALL RELOCATE EXISTING SURFACE-MOUNTED LIGHTNING PROTECTION
SYSTEM AS NEEDED. REINSTALL SYSTEM AT COMPLETION OF ROOF WORK IN EACH ROOF
AREA. CONTRACTOR SHALL RECERTIFY ENTIRE LIGHTNING PROTECTION SYSTEM AT
CONCLUSION OF PROJECT.
C. NOTE REMOVED.
D. EXISTING PLUMBING VENTS ARE NOT SHOWN ON ROOF PLAN BUT SHALL BE INCLUDED IN THE
PROJECT BID AND COMPLETED ACCORDING TO DETAILS AND/OR ROOFING SYSTEM
REQUIREMENTS.
E. MISCELLANEOUS MECHANICAL, PLUMBING, OR ELECTRICAL PENETRATIONS THRU ROOF MAY
NOT BUT SHOWN BUT SHALL BE INCLUDED IN THE PROJECT BID AND COMPLETED
ACCORDING TO ROOFING SYSTEM REQUIREMENTS. COORDINATE REMOVAL WITH NEW
WORK PLANS AND SECTIONS. ALL PENETRATIONS SHALL BE FLASHED AND MAINTAIN
WATERTIGHTNESS THROUGHOUT COMPLETION OF CONSTRUCTION.
F. EXISTING STRUCTURAL AND FRAMING MEMBERS TO REMAIN UNLESS NOTED OTHERWISE.
No. Revisions: Date:
1 ADDENDUM 001 04/27/2022
2 ADDENDUM 002 05/17/2022
AE502
9 9
AE502
AE502
11 11
4 4
7 7 7 7
B B
9 9
AE502
4 8
AE502
11 11
3 3
A AB
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
DRAWING OF 24
C U s e rs
\n a te m \O n e
D ri v e
\D o c u m e n ts
\F F
E
M a ri o n
W a te r
In fi lt ra ti o n B n a te
.m o u ld s .r v t
/1
/2
:3
:3
A
M
AE210
BUILDING 124 - ELEVATIONS
03/11/2021 PQ BL
MARION, INDIANA
#610-20-102CONSTRUCTION
DOCUMENTS
CORRECT WATER
INFILTRATION
SCALE: 1/8" = 1'-0"
BUILDING 124 - NORTH ELEVATION
SCALE: 1/8" = 1'-0"
BUILDING 124 - EAST ELEVATION
1 REMOVE EXISTING ASPHALT SHINGLES AND UNDERLAYMENT - REPLACE
WITH NEW STONE COATED STEEL SHINGLES OVER #30 FELT
UNDERLAYMENT OVER EXISTING SHEATHING. REPLACE SHEATHING AND
INSULATION WHERE DAMAGED - ASSUME 10% SHEATHING AND
INSULATION REPLACEMENT AT RAFTERS - SEE SECTIONS AND DETAILS ON
AE501 AND AE502.
2 EXISTING METAL ROOF TO REMAIN - PREPARE SURFACE AND APPLY 3-PLY
SELF-ADHERED SBS MODIFIED BITUMIN MEMBRANE TO EXTENT OF METAL
ROOF AND EXTEND 24" UP ADJACENT ROOF SLOPE. INSTALL NEW
BLOCKING WHERE REQUIRED. SEE DETAIL 9/AE501.
3 PROTECT EXISTING DOWNSPOUT DURING ALL PHASES OF
CONSTRUCTION.
4 REPLACE EXISTING DORMER LOUVER WITH NEW LOUVER - SEE SECTIONS
AND DETAILS.
5 REPLACE EXISTING DORMER WINDOW WITH NEW ALUMINUM WINDOWS.
SEE SECTIONS AND DETAILS.
6 REMOVE EXISTING MEMBRANE ROOF - REPLACE WITH NEW
SELF-ADHERED TWO PLY MODIFIED BITUMIN ROOFING MEMBRANE - SEE
SECTIONS AND DETAILS.
7 EXISTING DOWNSPOUT BOOT TO REMAIN.
8 REMOVE EXISTING MECHANICAL DUCTWORK TO BELOW ROOF SURFACE -
SUPPORT EXISTING WITHIN ATTIC SPACE - VERIFY EXHAUST IS INACTIVE
PRIOR TO CONSTRUCTION - PATCH OPENING WITH WOOF FRAMING AND
SHEATHING - PREPARE TO RECEIVE NEW SHINGLES
9 EXISTING STONE CORNICE AND BOX GUTTER FRAMING TO REMAIN -
REPLACE EXISTING SHEET METAL LINER AND APPLY NEW PEEL AND SEAL
OVER METAL LINER.
D R A W I N G N O T E S
G E N E R A L N O T E S
SCALE: 1/8" = 1'-0"
BUILDING 124 - SOUTH ELEVATION
SCALE: 1/8" = 1'-0"
BUILDING 124 - WEST ELEVATION
A. THE ROOFING SYSTEM SHALL BE COMPLETELY WATERTIGHT AT THE END OF EACH DAY’S
CONSTRUCTION ACTIVITY. IF TEMPORARY ROOFING STRATEGIES ARE USED, MATERIALS
INSTALLED SHALL SERVE THE SAME FUNCTION AS EXISTING MATERIALS AND WILL BE
COMPATIBLE WITH EXISTING ROOF SYSTEM.
B. CONTRACTOR SHALL RELOCATE EXISTING SURFACE-MOUNTED LIGHTNING PROTECTION
SYSTEM AS NEEDED. REINSTALL SYSTEM AT COMPLETION OF ROOF WORK IN EACH ROOF
AREA. CONTRACTOR SHALL RECERTIFY ENTIRE LIGHTNING PROTECTION SYSTEM AT
CONCLUSION OF PROJECT.
C. NOTE REMOVED.
D. EXISTING PLUMBING VENTS ARE NOT SHOWN ON ROOF PLAN BUT SHALL BE INCLUDED IN THE
PROJECT BID AND COMPLETED ACCORDING TO DETAILS AND/OR ROOFING SYSTEM
REQUIREMENTS.
E. MISCELLANEOUS MECHANICAL, PLUMBING, OR ELECTRICAL PENETRATIONS THRU ROOF MAY
NOT BUT SHOWN BUT SHALL BE INCLUDED IN THE PROJECT BID AND COMPLETED
ACCORDING TO ROOFING SYSTEM REQUIREMENTS. COORDINATE REMOVAL WITH NEW
WORK PLANS AND SECTIONS. ALL PENETRATIONS SHALL BE FLASHED AND MAINTAIN
WATERTIGHTNESS THROUGHOUT COMPLETION OF CONSTRUCTION.
F. EXISTING STRUCTURAL AND FRAMING MEMBERS TO REMAIN UNLESS NOTED OTHERWISE.
No. Revisions: Date:
1 ADDENDUM 001 04/27/2022
V .I
.F
/4
V.I.F.
9' - 5 1/2"
PREPARE SURFACE AND APPLY
SELF-ADHERED SBS MODIFIED
BITUMIN MEMBRANE.
NEW STONE COATED STEEL SHINGLES
OVER UNDERLAYMENT.
STONE COATED
STEEL SHINGLES
REMOVE LOOSE PAINT -
REPAINT EXISTING WOOD
TRIM AND MOLDING, TYP.
STEP FLASHING
BEYOND SHINGLES
METAL EDGE CLOSURE
PANEL PER SHINGLE
MANUFACTURER
V.I.F.
2' - 6"
V .I
.F
NEW ALUMINUM
LOUVER WITH METAL
MESH SCREEN
PREPARE SURFACE AND
APPLY SELF-ADHERED
SBS MODIFIED BITUMIN
MEMBRANE.
REMOVE LOOSE
PAINT - REPAINT
EXISTING WOOD
TRIM AND MOLDING,
TYP.
AE502
Sim
AE502
Sim
V .I
.F
/4
V.I.F.
9' - 5 1/2"
PREPARE SURFACE AND APPLY
SELF-ADHERED SBS MODIFIED
BITUMIN MEMBRANE.
NEW STONE COATED STEEL SHINGLES
OVER UNDERLAYMENT
STONE COATED
STEEL SHINGLES
EXISTING WOOD
MOLDING TO
REMAIN
STEP FLASHING
BEYOND SHINGLE
METAL EDGE
CLOSURE PANEL
PER SHINGLE
MANUFACTURER
REMOVE LOOSE
PAINT - REPAINT
EXISTING WOOD TRIM
AND MOLDING, TYP.
EXISTING MASONRY WALL
CONSTRUCTION TO REMAIN
EXISTING WOOD TRUSS CONSTRUCTION
TO REMAIN
STONE COATED STEEL SHINGLES
FELT UNDERLAYMENT
EXISTING SHEATHING TO REMAIN
1' - 0
" MIN
EXTERIOR GRADE SHEATHING
EXISTING 2X WOOD BLOCKING
CORNICE TRIM
EXTERIOR GRADE SOLID WOOD
NOTE: CORNICE
SHALL BE REBUILT TO
MATCH EXISTING
CONSTRUCTION
CONTINUOUS "PEEL & SEAL" SELF-
ADHERED LINER OVER GALVANIZED
STEEL GUTTER BOX.1' EXTENSION
AGAINST ROOF. SEE DIMENSION.
EXTERIOR GRADE SOLID WOOD
ATTACHED TO MASONRY
GALVANIZED STEEL
GUTTER BOX - SLOPE TO DRAIN AT
MINIMUM 1/16" PER LINEAR FOOT
EXISTING TRUSS
EXISTING 2X GUTTER
BOARD BACKUP
EXISTING GUTTER
DRIP EDGE EXTENDING 4" INTO
ROOF AND 2" INTO GUTTER
#30 ROOF UNDERLAYMENT
STONE COATED STEEL SHINGLES
EXISTING SHEATHING
TO REMAIN
EXISTING 1X FASCIA
BOARD
EXISTING MASONRY WALL
CONSTRUCTION TO REMAIN
EXISTING WOOD TRUSS
CONSTRUCTION TO
REMAIN
STONE COATED
STEEL SHINGLES
#30 FELT UNDERLAYMENT
EXISTING SHEATHING TO REMAIN
EXTERIOR GRADE
SHEATHING
EXISTING WOOD
BLOCKING TO REMAIN
PREFORMED
ALUMINUM
CORNICE TRIM
EXTERIOR GRADE
SOLID WOOD
CONTINUOUS "PEEL & SEAL" SELF-
ADHERED LINER OVER GALVANIZED
STEEL GUTTER BOX. 1' EXTENSION
AGAINST ROOF. SEE DIMENSION.
PVC DOWNSPOUT
CONNECTION, TYP.
1X FASCIA BOARD
1' - 0
" MIN
EXISTING
ROOF STRUCTURE
NEW FELT
UNDERLAYMENT
STONE COATED
METAL ROOF SHINGLE
AND CLOSURE CLIP
2X BLOCKING
FLAT CAP ATTACHED
AT BLOCKING
EXISTING
ROOF SHEATHING
SBS LAYER ONE
(FULLY ADHERE, EXTEND DRY
DOWN VERTICAL FACE)
METAL EDGE (PRIME METAL FLANGE, SET IN
MASTIC & FASTEN 3" O.C. STAGGERED)
SBS LAYER TWO (FULLY ADHERE)
SBS LAYER THREE (FULLY ADHERE)
PS-209 ELASTOMERIC SEALANT
CONTINUOUS CLEAT FOR METAL EDGE
EXISTING METAL ROOF
2 LAYERS 1/4" GYPSUM COVER BOARD
CONSTRUCTION SEALANT
REGLET FLASHING
CAULK SEALANT
FLOATING HEAD/END WALL TRIM
ZEE CLOSURE
METAL ROOF PANEL
EXISTING WOOD DECKING
STANDING SEAM CLIP
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
DRAWING OF 24
C U s e rs
\n a te m \O n e
D ri v e
\D o c u m e n ts \F
F E
M a ri o n
W a te r In fi lt ra ti o n
B n a te
.m o u ld s .r v t
/1
/2
:3
:1
A
M
AE501
ENLARGED ELEVATIONS AND
DETAILS
03/11/2021 PQ BL
MARION, INDIANA
#610-20-102CONSTRUCTION
DOCUMENTS
CORRECT WATER
INFILTRATION
SCALE: 1/2" = 1'-0"
TYPICAL DORMER ELEVATION - LEFT
SCALE: 1/2" = 1'-0"
TYPICAL DORMER ELEVATION - FRONT
SCALE: 1/2" = 1'-0"
TYPICAL DORMER ELEVATON - RIGHT
SCALE: 1 1/2" = 1'-0"
BOX GUTTER DETAIL AT WOOD CORNICE
SCALE: 1 1/2" = 1'-0"
EXISTING ALUMINUM GUTTER DETAIL
SCALE: 1 1/2" = 1'-0"
BOX GUTTER DETAIL AT ALUMINUM CORNICE
SCALE: 3" = 1'-0"
EXPANSION JOINT - SECTION
SCALE: 3" = 1'-0"
SBS ROOF EDGE DETAIL
SCALE: 1 1/2" = 1'-0"
FLOATING HEAD/ END WALL DETAIL
No. Revisions: Date:
1 ADDENDUM 002 05/17/2022
4' - 0"
/2
PREPARE SURFACE AND
APPLY SELF-ADHERED SBS
MODIFIED BITUMIN MEMBRANE.
FLASHING
EXISTING WOOD TRIM -
REMOVE LOOSE AINT AND
REPAINT TO MATCH EXISTING.
SEE LEAD PAINT REPORT.
AE502
Sim
AE502
Sim V
.I .F
/2
V.I.F.
9' - 7 1/4"
PREPARE SURFACE AND APPLY SELF-
ADHERED SBS MODIFIED BITUMIN MEMBRANE.
EXISTING BRICK
WALL AT DORMER
STEP FLASHING.
ALIGN HORIZONTAL
WITH MORTAR JOINT
V .I
.F
/2
V.I.F.
9' - 7"
PREPARE SURFACE AND APPLY SELF-
ADHERED SBS MODIFIED BITUMIN MEMBRANE.
EXISTING BRICK
WALL AT
DORMERS
STEP FLASHING.
ALIGN HORIZONTAL
WITH MORTAR JOINT
4' - 0"
/4
PREPARE SURFACE AND
APPLY SELF-ADHERED SBS
MODIFIED BITUMIN MEMBRANE.
B
FLASHING
EXISTING WOOD TRIM - REMOVE
LOOSE PAINT AND REPAINT TO
MATCH EXISTING. SEE LEAD
PAINT REPORT.
AE502
Sim
AE502
Sim
V .I
.F
V.I.F.
3' - 0"
2 1/4" V.I.F.
2' - 7 1/2"
2 1/4" V.I.F.
3' - 0"
PREPARE SURFACE AND APPLY
SELF-ADHERED SBS MODIFIED
BITUMIN MEMBRANE.
A A
REMOVE EXISTING
WOOD WINDOW -
REPLACE WITH NEW
ALUMINUM WINDOW
TYP.
EXISTING WOOD TRIM -
REMOVE LOOSE PAINT AND
REPAINT TO MATCH
EXISTING. SEE LEAD-PAINT
REPORT.
REMOVE EXISTING
LOUVER - REPLACE WITH
NEW ALUMINUM LOUVER
WITH METAL MESH SCREEN
AE502
Sim
AE502
Sim
AE502
Sim
AE502
Sim EXISTING
STONE CORNICE
EXISTING WOOD
FRAMING
STONE COATED
STEEL SHINGLES
#30 FELT
UNDERLAYMENT
EXISTING SHEATHING
TO REMAIN
PEEL AND SEAL
ROOF MEMBRANE
EXISTING
EXTERIOR
MASONRY WALL
V .I
.F
V.I.F.
3' - 0"
V.I.F.
3' - 0"
V .I
.F
/4
TYPE A TYPE B
EXISTING
SHEATHING AND
DORMER FRAMING
TO REMAIN. REFER
TO ROOF PLANS FOR
ROOFING SCOPE.
NEW ALUMINUM
LOUVERS AND
FRAME TO
MATCH EXISTING
CONSTRUCTION
V.I.F.
4"V
.I .F
INSECT SCREEN
JOINT SEALANT
AND BACKER ROD
EXISTING ROUGH
OPENING. VERIFY EXISTING
DIMENSIONS IN FIELD
EXISTING RAFTER
V.I.F.
4"
STONE COATED
STEEL SHINGLES
NEW ALUMINUM
LOUVERS AND
FRAME TO
MATCH EXISTING
CONSTRUCTION
V .I
.F
/4
V .I
.F
EXISTING SILL
CONSTRUCTION
TO REMAIN
INSECT SCREEN
METAL FLASHING AND
DRIP EDGE
JOINT SEALANT
AND BACKER ROD
EXISTING ROUGH
OPENING. VERIFY
DIMENSIONS IN
FIELD
RAFTER
STONE COATED
STEEL SHINGLES
NEW GLAZING
TO MATCH EXISTING
CONSTRUCTION
EXISTING
SILL CONSTRUCTION
TO REMAIN
NEW ALUMINUM WINDOW
TO MATCH EXISTING
CONSTRUCTION
JOINT SEALANT
AND BACKER ROD
METAL FLASHING
AND DRIP EDGE
EXISTING
ROOF TO
REMAIN
NEW GLAZING
TO MATCH EXISTING
CONSTRUCTION
NEW ALUMINUM WINDOW
TO MATCH EXISTING
CONSTRUCTION
JOINT SEALANT
AND BACKER ROD
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
DRAWING OF 24
C U s e rs
\n a te m \O n e
D ri v e
\D o c u m e n ts
\F F
E
M a ri o n
W a te r
In fi lt ra ti o n B n a te
.m o u ld s .r v t
/1
/2
:3
:2
A
M
AE502
ENLARGED PLANS AND DETAILS
03/11/2021 PQ BL
MARION, INDIANA
#610-20-102CONSTRUCTION
DOCUMENTS
CORRECT WATER
INFILTRATION
SCALE: 1/2" = 1'-0"
TYPICAL DORMER ELEVATION - LOUVER
SCALE: 1/2" = 1'-0"
TYPICAL SIDE ELEVATION - RIGHT
SCALE: 1/2" = 1'-0"
TYPICAL SIDE ELEVATION - LEFT
SCALE: 1/2" = 1'-0"
TYPICAL DORMER ELEVATION - WINDOW
SCALE: 1/2" = 1'-0"
DORMER ELEVATION - TWO WINDOW
SCALE: 1" = 1'-0"
BOX CUTTER DETAIL AT STONE CORNICE
WINDOW SCHEDULE
TYPE
MARK COUNT
FRAME
MATERIAL HEIGHT WIDTH COMMENTS Head Sill
A 2 ALUMINUM 4' - 6" 3' - 0" 1 10/AE502 9/AE502
B 5 ALUMINUM 3' - 3 1/4" 3' - 0" 1 10/AE502 9/AE502
SCALE: 1/2" = 1'-0"
WINDOW LEGEND
SCALE: 1 1/2" = 1'-0"
LOUVER DETAIL - HEAD
SCALE: 1 1/2" = 1'-0"
LOUVER DETAIL - SILL
SCALE: 1 1/2" = 1'-0"
WINDOW DETAIL - SILL
SCALE: 1 1/2" = 1'-0"
WINDOW DETAIL - HEAD
COMMENTS:
1. VERIFY EXISTING OPENING DIMENSIONS IN THE FIELD
No. Revisions: Date:
1 ADDENDUM 002 05/17/2022
| 07.21_AE209 - BUILDING 17 - ELEVATIONS |
| AE209 - BUILDING 17 - ELEVATIONS |
| 07.22_AE210 - BUILDING 124 - ELEVATIONS |
| AE210 - BUILDING 124 - ELEVATIONS |
File details come from the government source that posted it. Updated .