Amendment A00006 Rev DWGs_Part7.pdf
PDF 3 MB Posted
- Attached to
- Z1DA--Correct Water Infiltration 610-20-102 Federal contract opportunity
- Solicitation number
- 36C25022B0009
About this file
This set of documents includes construction drawings and specifications for a federal contract opportunity to correct water infiltration at two buildings on the Northern Indiana VA Medical Center campus in Marion, Indiana. The contractor will be required to remove and replace roofing materials on Buildings 15 and 16, including asphalt shingles, metal roofing, dormer louvers, downspouts, and box gutters. The drawings provide elevations of each building with notes specifying the scope of work, such as patching openings, reinstalling lightning protection systems, and tuckpointing and staining brick. The related solicitation provides additional details, including the solicitation number, a description of requirements to complete the Correct Water Infiltration project numbered 610-20-102, and identifies the contracting agency as the Department of Veterans Affairs Veterans Health Administration VISN 10.
View the file
Other files for this federal contract opportunity
Show all 29
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AE501
TYP. TYP.
2 2
6 6
10 10
AE501
6 6
81 1
TYP. TYP.
11 1
2 2
3 3
6 6 6 6
10 10
AE501
2 2
BRICK TO BE CLEANED AND TUCK-POINTED - 50 SF - BUILDING 15
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
DRAWING OF 24
C U s e rs
\n a te m \O n e
D ri v e
\D o c u m e n ts \F
F E
M a ri o n
W a te r In fi lt ra ti o n
B n a te
.m o u ld s .r v t
/1
/2
:4
:5
A
M
AE207
BUILDING 15 - ELEVATIONS
03/11/2021 PQ BL
MARION, INDIANA
#610-20-102CONSTRUCTION
DOCUMENTS
CORRECT WATER
INFILTRATION
1 REMOVE EXISTING ASPHALT SHINGLES AND UNDERLAYMENT - REPLACE
WITH NEW STONE COATED STEEL SHINGLES OVER #30 FELT
UNDERLAYMENT OVER EXISTING SHEATHING. REPLACE SHEATHING AND
INSULATION WHERE DAMAGED - ASSUME 10% SHEATHING AND INSULATION
REPLACEMENT AT RAFTERS - SEE SECTIONS AND DETAILS ON AE501 AND
AE502.
2 EXISTING METAL ROOF TO REMAIN - PREPARE SURFACE AND APPLY 3-PLY
SELF-ADHERED SBS MODIFIED BITUMIN MEMBRANE TO EXTENT OF METAL
ROOF AND EXTEND 24" UP ADJACENT ROOF SLOPE. INSTALL NEW
BLOCKING WHERE REQUIRED. SEE DETAIL 9/AE501.
3 PROTECT EXISTING DOWNSPOUT DURING ALL PHASES OF CONSTRUCTION.
4 REPLACE EXISTING DORMER LOUVER WITH NEW LOUVER - SEE SECTIONS
AND DETAILS.
5 REMOVE EXISTING LOOSE OR RECEDING MORTAR FROM JOINT -
TUCKPOINT WITH NEW MORTAR - STAIN ALL NEW MORTAR TO MATCH
EXISTING COLOR.
6 EXISTING DOWNSPOUT BOOT TO REMAIN.
7 EXISTING ROOF HATCH TO REMAIN.
8 NEW EXPANSION JOINT AT EXISTING LOCATION - DETAILS PER SHINGLE
MANUFACTURER.
9 PROVIDE NEW STEP FLASHING AT INTERSECTION WITH WALL.
10 REPLACE EXISTING BOX GUTTER - INSTALL NEW GUTTER BOX, PEEL &
SEAL LINER, AND WOOD CORNICE PROFILE AND ASSOCIATED BLOCKING,
TYPICAL UNLESS NOTED OTHERWISE - SEE DETAIL 4 ON AE501.
A. THE ROOFING SYSTEM SHALL BE COMPLETELY WATERTIGHT AT THE END OF EACH DAY’S
CONSTRUCTION ACTIVITY. IF TEMPORARY ROOFING STRATEGIES ARE USED, MATERIALS
INSTALLED SHALL SERVE THE SAME FUNCTION AS EXISTING MATERIALS AND WILL BE
COMPATIBLE WITH EXISTING ROOF SYSTEM.
B. CONTRACTOR SHALL RELOCATE EXISTING SURFACE-MOUNTED LIGHTNING PROTECTION
SYSTEM AS NEEDED. REINSTALL SYSTEM AT COMPLETION OF ROOF WORK IN EACH ROOF
AREA. CONTRACTOR SHALL RECERTIFY ENTIRE LIGHTNING PROTECTION SYSTEM AT
CONCLUSION OF PROJECT.
C. NOTED REMOVED.
D. EXISTING PLUMBING VENTS ARE NOT SHOWN ON ROOF PLAN BUT SHALL BE INCLUDED IN THE
PROJECT BID AND COMPLETED ACCORDING TO DETAILS AND/OR ROOFING SYSTEM
REQUIREMENTS.
E. MISCELLANEOUS MECHANICAL, PLUMBING, OR ELECTRICAL PENETRATIONS THRU ROOF MAY
NOT BUT SHOWN BUT SHALL BE INCLUDED IN THE PROJECT BID AND COMPLETED
ACCORDING TO ROOFING SYSTEM REQUIREMENTS. COORDINATE REMOVAL WITH NEW
WORK PLANS AND SECTIONS. ALL PENETRATIONS SHALL BE FLASHED AND MAINTAIN
WATERTIGHTNESS THROUGHOUT COMPLETION OF CONSTRUCTION.
F. EXISTING STRUCTURAL AND FRAMING MEMBERS TO REMAIN UNLESS NOTED OTHERWISE.
D R A W I N G N O T E S
G E N E R A L N O T E S
SCALE: 1/8" = 1'-0"
BUILDING 15 - NORTH ELEVATION
SCALE: 1/8" = 1'-0"
BUILDING 15 - EAST ELEVATION
SCALE: 1/8" = 1'-0"
BUILDING 15 - SOUTH ELEVATION
SCALE: 1/8" = 1'-0"
BUILDING 15 - WEST ELEVATION
No. Revisions: Date:
1 ADDENDUM 001 04/27/2022
2 ADDENDUM 002 05/17/2022
AE501
11 11 11
4 444
9 9
AE501
2 2
1 8
10 10
AE501
11 11 11
3 3
6 6
10 10 10 10 10
AE501
10 10
BRICK TO BE CLEANED AND TUCK-POINTED - 50 SF - BUILDING 16
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
DRAWING OF 24
C U s e rs
\n a te m \O n e
D ri v e
\D o c u m e n ts \F
F E
M a ri o n
W a te r In fi lt ra ti o n
B n a te
.m o u ld s .r v t
/1
/2
:2
:3
A
M
AE208
BUILDING 16 - ELEVATIONS
03/11/2021 PQ BL
MARION, INDIANA
#610-20-102CONSTRUCTION
DOCUMENTS
CORRECT WATER
INFILTRATION
1 REMOVE EXISTING ASPHALT SHINGLES AND UNDERLAYMENT - REPLACE
WITH NEW STONE COATED STEEL SHINGLES OVER #30 FELT
UNDERLAYMENT OVER EXISTING SHEATHING. REPLACE SHEATHING AND
INSULATION WHERE DAMAGED - ASSUME 10% SHEATHING AND
INSULATION REPLACEMENT AT RAFTERS - SEE SECTIONS AND DETAILS ON
AE501 AND AE502.
2 EXISTING METAL ROOF TO REMAIN - PREPARE SURFACE AND APPLY 3-PLY
SELF-ADHERED SBS MODIFIED BITUMIN MEMBRANE TO EXTENT OF METAL
ROOF AND EXTEND 24" UP ADJACENT ROOF SLOPE. INSTALL NEW
BLOCKING WHERE REQUIRED. SEE DETAIL 9/AE501.
3 PROTECT EXISTING DOWNSPOUT DURING ALL PHASES OF
CONSTRUCTION.
4 REPLACE EXISTING DORMER LOUVER WITH NEW LOUVER - SEE SECTIONS
AND DETAILS.
5 REMOVE EXISTING LOOSE OR RECEDING MORTAR FROM JOINT -
TUCKPOINT WITH NEW MORTAR - STAIN ALL NEW MORTAR TO MATCH
EXISTING COLOR.
6 EXISTING DOWNSPOUT BOOT TO REMAIN.
7 EXISTING ROOF HATCH TO REMAIN.
8 REMOVE EXISTING MECHANICAL DUCTWORK TO BELOW ROOF SURFACE -
SUPPORT EXISTING WITHIN ATTIC SPACE - VERIFY EXHAUST IS INACTIVE
PRIOR TO CONSTRUCTION - PATCH OPENING WITH WOOF FRAMING AND
SHEATHING - PREPARE TO RECEIVE NEW SHINGLES
9 PROVIDE NEW STEP FLASHING AT INTERSECTION WITH WALL.
10 REPLACE EXISTING BOX GUTTER - INSTALL NEW GUTTER BOX, PEEL &
SEAL LINER, AND WOOD CORNICE PROFILE AND ASSOCIATED BLOCKING,
TYPICAL UNLESS NOTED OTHERWISE - SEE DETAIL 4 ON AE501.
D R A W I N G N O T E S
G E N E R A L N O T E S
SCALE: 1/8" = 1'-0"
BUILDING 16 - SOUTH ELEVATION
SCALE: 1/8" = 1'-0"
BUILDING 16 - EAST ELEVATION
SCALE: 1/8" = 1'-0"
BUILDING 16 - NORTH ELEVATION
SCALE: 1/8" = 1'-0"
BUILDING 16 - WEST ELEVATION
A. THE ROOFING SYSTEM SHALL BE COMPLETELY WATERTIGHT AT THE END OF EACH DAY’S
CONSTRUCTION ACTIVITY. IF TEMPORARY ROOFING STRATEGIES ARE USED, MATERIALS
INSTALLED SHALL SERVE THE SAME FUNCTION AS EXISTING MATERIALS AND WILL BE
COMPATIBLE WITH EXISTING ROOF SYSTEM.
B. CONTRACTOR SHALL RELOCATE EXISTING SURFACE-MOUNTED LIGHTNING PROTECTION
SYSTEM AS NEEDED. REINSTALL SYSTEM AT COMPLETION OF ROOF WORK IN EACH ROOF
AREA. CONTRACTOR SHALL RECERTIFY ENTIRE LIGHTNING PROTECTION SYSTEM AT
CONCLUSION OF PROJECT.
C. NOTE REMOVED.
D. EXISTING PLUMBING VENTS ARE NOT SHOWN ON ROOF PLAN BUT SHALL BE INCLUDED IN THE
PROJECT BID AND COMPLETED ACCORDING TO DETAILS AND/OR ROOFING SYSTEM
REQUIREMENTS.
E. MISCELLANEOUS MECHANICAL, PLUMBING, OR ELECTRICAL PENETRATIONS THRU ROOF MAY
NOT BUT SHOWN BUT SHALL BE INCLUDED IN THE PROJECT BID AND COMPLETED
ACCORDING TO ROOFING SYSTEM REQUIREMENTS. COORDINATE REMOVAL WITH NEW
WORK PLANS AND SECTIONS. ALL PENETRATIONS SHALL BE FLASHED AND MAINTAIN
WATERTIGHTNESS THROUGHOUT COMPLETION OF CONSTRUCTION.
F. EXISTING STRUCTURAL AND FRAMING MEMBERS TO REMAIN UNLESS NOTED OTHERWISE.
No. Revisions: Date:
1 ADDENDUM 001 04/27/2022
2 ADDENDUM 002 05/17/2022
| 07.19_AE207 - BUILDING 15 - ELEVATIONS |
| AE207 - BUILDING 15 - ELEVATIONS |
| 07.20_AE208 - BUILDING 16 - ELEVATIONS |
| AE208 - BUILDING 16 - ELEVATIONS |