Amendment 0006 Summary.docx
DOCX document 30 KB Posted
- Attached to
- Z1DA--Correct Water Infiltration 610-20-102 Federal contract opportunity
- Solicitation number
- 36C25022B0009
About this file
This document provides an amendment to an invitation for bid for a correct water infiltration project at the Veterans Affairs Medical Center in Marion, Indiana. The amendment includes clarifications to drawings and specifications. Specifically, it modifies notes on several drawings to clarify that new box gutters will be installed only at existing wood cornice locations on Buildings 15-17 to match existing, rather than at dormers which will retain existing aluminum gutters. The amendment renames details on drawings AE501 and AE502 for improved clarity. No other changes are made to specifications. The related federal contract opportunity is solicitation number 36C25022B0009 to provide all labor, materials, tools, and equipment necessary to complete the Correct Water Infiltration project numbered 610-20-102 at the specified VA Medical Center location according to the drawings, specifications, and statement of work. The contracting agency is the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 10.
View the file
Other files for this federal contract opportunity
Show all 29
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
“CORRECT WATER INFILTRATION” PROJECT FOR THE
VETERANS AFFAIRS MEDICAL CENTER (VAMC)—NORTHERN INDIANA HEALTHCARE SYSTEM – MARION CAMPUS
PROJECT NUMBER: 610-20-102
UPDATED SPECIFICATIONS AND EXPLANATION OF REVISIONS
QUESTIONS AND ANSWERS (RFIs)
TO INVITATION FOR BID (IFB) NUMBER
36C25022B0009
IFB AMENDMENT NUMBER A00006 (AE #00002)
QUESTIONS AND ANSWERS
RFI #1 Question:
a) There is a note on multiple drawings calling out to install new metal cornice profile and associated blocking and states to see details AE501 and AE502.
Detail 6 shows the new aluminum gutter detail and then detail 7 AE501 shows a box gutter detail at wood cornice and states “Cornice shall be rebuilt to match existing construction”. Though the drawings do not indicate at all WHERE this wood cornice exists vs the metal cornice. There is no way to get an accurate quantity of each type of cornice. Can you please clarify and show on the drawings where each type of cornice exists.
Answer: Please see the following breakdown of cornices:
Buildings 1-6: Aluminum cornice profile – See detail 6/AE501 Buildings 15-17: Wood cornice – See detail 4/AE501 Building 124: Stone cornice – See detail 6/AE502 See revised Drawings in this Amendment for clarification. New box gutters will only be installed at existing locations – Dormers will not have new box gutters; existing aluminum K-style gutters will be existing to remain (per detail 5/AE501).
DRAWING MODIFICATIONS
AE107:
1. The note regarding the replacement of the existing box gutter has been modified to show a new wood box gutter to match existing. Reference to the detail on AE501 has been updated. Notes within the Revit software have put this modified note at the end of the Drawing Notes and renumbered previous notes across the sheet.
AE108:
2. The note regarding the replacement of the existing box gutter has been modified to show a new wood box gutter to match existing. Reference to the detail on AE501 has been updated. Notes within the Revit software have put this modified note at the end of the Drawing Notes and renumbered previous notes across the sheet. Additional tags have been added to the roof plan to clarify this is the typical condition at gutters on Building 16.
AE109:
3. The note regarding the replacement of the existing box gutter has been modified to show a new wood box gutter to match existing. Reference to the detail on AE501 has been updated. Notes within the Revit software have put this modified note at the end of the Drawing Notes and renumbered previous notes across the sheet.
AE207:
4. The note regarding the replacement of the existing box gutter has been modified to show a new wood box gutter to match existing. Reference to the detail on AE501 has been updated. Notes within the Revit software have put this modified note at the end of the Drawing Notes and renumbered previous notes across the sheet. Additional tags have been added to the roof plan to clarify this is the typical condition at gutters on Building 15.
AE208:
5. The note regarding the replacement of the existing box gutter has been modified to show a new wood box gutter to match existing. Reference to the detail on AE501 has been updated. Notes within the Revit software have put this modified note at the end of the Drawing Notes and renumbered previous notes across the sheet.
AE209:
6. The note regarding the replacement of the existing box gutter has been modified to show a new wood box gutter to match existing. Reference to the detail on AE501 has been updated. Notes within the Revit software have put this modified note at the end of the Drawing Notes and renumbered previous notes across the sheet.
7. Notes were removed from the elevation that erroneously called out a new box gutter at the dormers.
AE501:
8. Detail 6 has been renamed “BOX GUTTER DETAIL AT ALUMINUM CORNICE”
AE502:
9. Detail 6 has been renamed “BOX GUTTER DETAIL AT STONE CORNICE”
SPECIFICATION MODIFICATIONS
None.