About this file

This federal contract opportunity solicitation seeks a contractor to complete corrective work for water infiltration at a Veterans Affairs medical center. The solicitation number is 36C25022B0009 and calls for the contractor to provide all tools, equipment, materials, labor and supervision necessary to complete the Correct Water Infiltration project numbered 610-20-102 at the Northern IN VA Medical Center located at 1700 E. 38th St. in Marion, Indiana. The solicitation refers to attached drawings, specifications and a Statement of Work for a full description of requirements. The contracting agency is listed as the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 10.

View the file

Other files for this federal contract opportunity

Other files attached to Z1DA--Correct Water Infiltration 610-20-102, newest first.
File Type Posted
Amendment A00006 Rev DWGs_Part5.pdf PDF
Amendment A00006 Rev DWGs_Part3.pdf PDF
Amendment A00006 Rev DWGs_Part2.pdf PDF
Amendment A00006 Rev DWGs_Part6.pdf PDF
Amendment A00006 Rev DWGs_Part7.pdf PDF
Amendment A00006 Rev DWGs_Part1.pdf PDF
Amendment A00006 Rev DWGs_Part4.pdf PDF
Amendment 0006 Summary.docx DOCX document
Amendment A00006 Rev DWGs_Part8.pdf PDF
Amendment36C25022B0009 A00006.pdf PDF
Amendment36C25022B0009 A00005.pdf PDF
Amendment 36C25022B0009 A00004.pdf PDF
610-20-102 Correct Water Infiltration pre bid site visit attendance.pdf PDF
2022-0427_Correct Water Infiltration AMEND 00001 DWGs_Part4.pdf PDF
2022-0427_Correct Water Infiltration AMEND 00001 DWGs_Part3.pdf PDF
2022-0427_Correct Water Infiltration AMEND 00001 DWGs_Part1.pdf PDF
2022-0427_Correct Water Infiltration AMEND 00001 DWGs_Part5.pdf PDF
2022-0427_Correct Water Infiltration AMEND 00001 DWGs_Part6.pdf PDF
2022-0427_Correct Water Infiltration AMEND 00001 DWGs_Part2.pdf PDF
Amendment A00003.docx DOCX document
Amendment 00002 Summary.pdf PDF
Amendment A00002 - RFI Responses.docx DOCX document
Amendment A00002 36C25022B0009.pdf PDF
36C25022B0009 Amendment A00001.pdf PDF
Wage Determination.txt TXT text file
RFI Form.doc DOC document
36C25022B0009 Solicitation.pdf PDF
610-20-102 Correct Water Infiltration - spec.pdf PDF
Contractor Certification Regarding Safety and Environmental.pdf PDF
Show all 29

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N

National Cemetary

National Cemetary

National Cemetary

Material Compound

Vehicle Compound

Cemetery Dump

DN

GI101

Sim

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

DRAWING OF 24

C :\U se rs

\c ar te \D oc um en ts

\0 _R ev it

Lo ca l M od el s\

\F

FE

_M ar io n

- W at er In fil tra tio n_

B1 (2

0)

_c ar te r.d an ie l0

3.

rv t 3/

/2

2:

:2

PM

GI001

COVER SHEET

03/11/2021 PQ BL

MARION, INDIANA

#610-20-102CONSTRUCTION

DOCUMENTS

CORRECT WATER

INFILTRATION

1. SEE GENERAL PROJECT NOTES FOR NEW WORK FOR ADDITIONAL REQUIREMENTS FOR WORK WITHIN THE EXISTING FACILITY.

2. THE GENERAL CONTRACTOR SHALL VERIFY ALL EXISTING DIMENSIONS AND FIELD CONDITIONS PRIOR TO DEMOLITION AND CONSTRUCTION. IF PROVIDED, THE GENERAL CONTRACTOR SHALL CAREFULLY EXAMINE EXISTING BUILDING DOCUMENTS. THE CONTRACTOR SHALL BRING ANY

DISCREPANCIES TO THE IMMEDIATE ATTENTION OF THE COR, CO, AND ARCHITECT.

3. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR THE PROTECTION OF EXISTING ITEMS TO REMAIN DURING DEMOLITION AND CONSTRUCTION.

4. MAINTAIN EXIT EGRESS PATHS TO EXISTING EXIT DOORS DURING CONSTRUCTION.

5. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR THE PROTECTION OF ALL CONSTRUCTION ROUTES BEYOND THE AREAS OF WORK AND THE

ROUTES MUST BE RETURNED TO THEIR ORIGINAL CONDITION AT THE END OF THE PROJECT.

6. MAINTAIN THE BUILDING IN A WEATHER TIGHT CONDITION AT ALL TIMES.

7. ALL DEMOLITION AND CONSTRUCTION ACTIVITIES SHALL BE COORDINATED WITH THE C.O.R. TO MINIMIZE DISRUPTIONS OF NORMAL FUNCTIONS OF

THE VA'S OCCUPIED AREAS.

8. IF CONSTRUCTION NOISE IS ANTICIPATED, SUBMIT A WRITTEN REQUEST TO THE C.O.R. FOR THE SCHEDULED TIME OF THE CONSTRUCTION ACTIVITIES. NO WORK SHALL BE DONE WITHOUT THE WRITTEN APPROVAL OF THE C.O.R. THE C.O.R. RESERVES THE RIGHT TO DISCONTINUE NOISY CONSTRUCTION AT ANY TIME. NO RADIOS SHALL BE PERMITTED AT ANY TIME IN WORK AREAS ADJACENT TO OCCUPIED SPACES.

9. ALL EXISTING SERVICES AND UTILITIES SHALL BE MAINTAINED TO AREAS THAT ARE IN OPERATION AND SERVED BY THEM. COORDINATE ALL DISRUPTIONS OR DISCONTINUATIONS OF UTILITIES AND SERVICES WITH C.O.R. NO SHUT DOWN OF EXISTING SERVICES IS ALLOWED TO OCCUR UNTIL RECEIVING THE C.O.R.'S WRITTEN APPROVAL OF THE SHUT DOWN SCHEDULE. PROVIDE TEMPORARY SERVICES AND/OR UTILITIES DURING

INTERRUPTIONS AS REQUIRED AND APPROVED BY THE C.O.R.

10. THE GENERAL CONTRACTOR SHALL TAKE ALL NECESSARY PRECAUTIONS TO PREVENT DAMAGE TO THE V.A.'S AREAS ADJACENT TO NEW CONSTRUCTION OR AREAS WHERE VARIOUS SYSTEM CONNECTIONS OR EXTENSIONS ARE REQUIRED. IN THESE AREAS, THE GENERAL CONTRACTOR IS RESPONSIBLE FOR DAMAGE CAUSED BY LACK OF SUFFICIENT PROTECTION FROM THE WEATHER AND FROM THE RESULTS OF ALL

CONSTRUCTION ACTIVITY INCLUDING BUT NOT LIMITED TO DUST AND WATER.

11. THE GENERAL CONTRACTOR SHALL RECEIVE WRITTEN APPROVAL FROM THE C.O.R. BEFORE USING OPEN FLAMES, WELDING RODS AND TORCHES.

THE GENERAL CONTRACTOR IS RESPONSIBLE FOR ALL MEANS AND METHODS TO PROHIBIT THE MIGRATION OF SMOKE AND OTHER PRODUCTS OF COMBUSTION INTO OCCUPIED AREAS OF THE EXISTING BUILDING AND FOR OBTAINING ALL REQUIRED PERMITS RELATED TO HOT WORK.

12. DO NOT OVERLOAD THE EXISTING BUILDING STRUCTURE. MAINTAIN THE STRUCTURAL INTEGRITY OF ALL STRUCTURAL FRAMING MEMBERS AND

SYSTEMS AT ALL TIMES.

1. ALL WORK SHALL BE DONE IN ACCORDANCE WITH APPLICABLE FEDERAL AUTHORITIES, CODES, RULES AND

REGULATIONS.

2. THESE DOCUMENTS SHOW THE MINIMUM CONSTRUCTION REQUIREMENTS AND THE MINIMUM QUALITY OF WORK EXPECTED. MORE STRINGENT REQUIREMENTS STIPULATED WITHIN RELEVANT MANUFACTURER’S INSTALLATION

INSTRUCTIONS WILL SUPERSEDE.

3. ANY UNFORESEEN OR UNCLEAR CONDITIONS SHALL BE REPORTED TO THE ARCHITECT AND C.O.R. PRIOR TO

PROCEEDING WITH WORK.

4. ANY CONFLICTS WITHIN THE DRAWINGS, BETWEEN THE DRAWINGS AND THE SPECIFICATIONS, OR BETWEEN THE DRAWINGS AND THE ACTUAL CONDITIONS AT THE SITE, ARE TO BE BROUGHT TO THE IMMEDIATE ATTENTION OF THE ARCHITECT AND C.O.R. THE CONTRACTOR SHALL NOT PROCEED WITH WORK UNTIL WRITTEN CLARIFICATION FROM THE

COR IS RECEIVED.

5. UNLESS OTHERWISE NOTED, ALL MATERIALS AND EQUIPMENT ARE TO BE INSTALLED PER THE APPLICABLE PROVISIONS

OF THESE DOCUMENTS AND THE MANUFACTURER’S INSTRUCTIONS.

6. ALL MATERIALS USED ARE REQUIRED TO BE NEW UNLESS OTHERWISE NOTED AND/OR OF A QUALITY TO MEET OR EXCEED ALL APPLICABLE INDUSTRY STANDARDS. WHERE SPECIFIED PRODUCTS OR MANUFACTURERS ARE NOT NOTED, THE CONTRACTOR IS REQUIRED TO NOTIFY THE ARCHITECT TO OBTAIN A MINIMUM STANDARD OF QUALITY.

7. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR ALL MEANS, METHODS AND TECHNIQUES FOR CONSTRUCTION.

8. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR JOB-SITE SAFETY INCLUDING BUT NOT LIMITED TO THE ADHERENCE

TO OSHA AND VAMC REGULATIONS.

9. ALL ELECTRICAL AND MECHANICAL WORK SHALL BE PERFORMED BY PERSONNEL LICENSED IN THE STATE WHERE THIS

PROJECT IS LOCATED.

10. REMOVE ALL DEBRIS PROPERLY FROM THE SITE. LOAD DEBRIS DIRECTLY ONTO TRUCKS OR INTO DUMPSTERS FOR REMOVAL. DISPOSE OF DEBRIS LEGALLY. DO NOT BURN DEBRIS ON THE SITE. DO NOT ALLOW DEBRIS TO ENTER SEWERS.

DO NOT ALLOW PILED DEBRIS TO ENDANGER STRUCTURES, BLOCK EXISTS OR ROADWAYS. COMBUSTIBLE WASTE WHICH COULD CREATE A FIRE HAZARD SHALL NOT BE PERMITTED TO ACCUMULATE IN OR AROUND THE CONSTRUCTION SITE..

G E N E R A L N O T E S - E X I S T I N G F A C I L I T I E S : G E N E R A L N O T E S - N E W W O R K :

VA NORTHERN INDIANA HEALTHCARE SYSTEM -

MARION CAMPUS

#610-20-102

1700 E. 38th STREET MARION, IN 46953

13. ALL DEMOLISHED MATERIAL, EXCEPT MATERIAL THAT IS LISTED OR MARKED BY THE ARCHITECT FOR RETENTION, SHALL BECOME THE PROPERTY OF THE CONTRACTOR AND IT SHALL BE DISPOSED OF. NO DEBRIS RESULTING FROM WORK SHALL BE LEFT IN THE CONSTRUCTION ROUTES BEYOND

THE AREAS OF WORK.

14. REMOVAL OF A PARTICULAR ITEM IS TO INCLUDE ALL RELATED ITEMS, SUCH AS REMOVAL OF WALLS WOULD INCLUDE ASSOCIATED DOORS, HARDWARE, ELECTRICAL, PLUMBING, MECHANICAL, ETC. REFER TO DEMOLITION DRAWINGS FOR MORE INFORMATION. FOR ALL REMOVALS, THE GENERAL CONTRACTOR SHALL COORDINATE WITH ALL OTHER DISCIPLINES INCLUDING BUT NOT LIMITED TO MECHANICAL, ELECTRICAL AND

PLUMBING.

15. THE CONTRACTOR SHALL PROVIDE TEMPORARY SUPPORT FOR ITEMS NOT DEMOLISHED OR REMOVED AS REQUIRED UNTIL PERMANENT SUPPORT

IS PROVIDED IN THE FINAL CONSTRUCTION.

16. WHERE EXISTING SURFACES ARE TO BE REFINISHED OR ARE TO SERVE AS SUBSTRATE FOR THE ATTACHMENT OR APPLICATION OF NEW MATERIALS OR CONSTRUCTION, PREPARE OR ALTER THE EXISTING SURFACES AS NECESSARY TO PROPERLY ACCOMMODATE THE NEW MATERIALS.

17. FIELD VERIFY SIZES AND DIMENSIONS OF ALL EXISTING UTILITIES THAT IMPACT THE NEW WORK. DETERMINE THE SIZE AND LOCATION THE PENETRATIONS FROM THE EXISTING UTILITIES WITHIN THE NEW WORK. SEAL TIGHT TO ALL PENETRATIONS AND CAULK.

18. PENETRATIONS THROUGH EXISTING FIRE RATED CONSTRUCTION MUST BE PROPERLY CLOSED AND FIRE SAFE'D TO ACHIEVE THE PROPER FIRE

RATING BY THE END OF CONSTRUCTION OPERATIONS FOR EACH DAY.

19. NEW HOLES IN EXISTING ROOF STRUCTURES FOR NEW WORK MUST BE COORDINATED WITH THE EXISTING STRUCTURE SO THAT CRITICAL

STRUCTURAL MEMBERS ARE NOT DAMAGED.

20. UNLESS OTHERWISE NOTED, THE GENERAL CONTRACTOR IS RESPONSIBLE FOR VERIFYING ALL EXISTING SALVAGED STOCK BEFORE ORDERING

NEW MATERIAL.

V I C I N I T Y M A P M A R I O N V A C A M P U S S I T E P L A N

SHEET NUMBER SHEET NAME BID

GENERAL

GI001 COVER SHEET *

GI101 OVERALL ROOF PLAN *

ARCHITECTURAL

AE101 BUILDING 1 - ROOF PLAN *

AE102 BUILDING 2 - ROOF PLAN *

AE103 BUILDING 3 - ROOF PLAN *

AE104 BUILDING 4 - ROOF PLAN *

AE105 BUILDING 5 - ROOF PLAN *

AE106 BUILDING 6 - ROOF PLAN *

AE107 BUILDING 15 - ROOF PLAN *

AE108 BUILDING 16 - ROOF PLAN *

AE109 BUILDING 17 - ROOF PLAN *

AE110 BUILDING 124 - ROOF PLAN *

AE201 BUILDING 1 - ELEVATIONS *

AE202 BUILDING 2 - ELEVATIONS *

AE203 BUILDING 3 - ELEVATIONS *

AE204 BUILDING 4 - ELEVATIONS *

AE205 BUILDING 5 - ELEVATIONS *

AE206 BUILDING 6 - ELEVATIONS *

AE207 BUILDING 15 - ELEVATIONS *

AE208 BUILDING 16 - ELEVATIONS *

AE209 BUILDING 17 - ELEVATIONS *

AE210 BUILDING 124 - ELEVATIONS *

AE501 ENLARGED ELEVATIONS AND DETAILS *

AE502 ENLARGED PLANS AND DETAILS *

D R A W I N G L I S T

DEPARTMENT OF VETERANS AFFAIRS

"CORRECT WATER INFILTRATION"

11. COORDINATE ALL WORK WITH ALL OTHER DISCIPLINES, INCLUDING, BUT NOT LIMITED TO MECHANICAL, ELECTRICAL, PLUMBING & SITE DRAWINGS. EXACT SIZE AND LOCATION OF ALL ROOF AND FLOOR OPENINGS SHOWN ON ARCHITECTURAL DRAWINGS SHALL BE VERIFIED WITH THE ASSOCIATED SUB-CONTRACTORS PRIOR TO CONSTRUCTION.

12. DO NOT SCALE DRAWINGS. DIMENSIONS SHALL GOVERN. ALL PLAN DIMENSIONS ARE TAKEN TO FINISH FACE OF

CONSTRUCTION.

13. ALL CONCEALED WOOD SHALL BE FIRE RETARDANT TREATED.

14. THE GENERAL CONTRACTOR SHALL COORDINATE WITH ALL OTHER DISCIPLINES INCLUDING BUT NOT LIMITED TO MECHANICAL, ELECTRICAL, AND PLUMBING. SEAL CONSTRUCTION TIGHT TO ALL PENETRATIONS AND CAULK.

15. ALL PENETRATIONS THROUGH FIRE RATED CONSTRUCTION MUST BE FIRE SAFE'D IN ACCORDANCE WITH THE

SPECIFICATIONS.

16. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR COORDINATING ALL EQUIPMENT INSTALLATION AND VERIFYING ALL REQUIRED ROUGH OPENINGS, AND ROUGH-IN DIMENSIONS WITH THE EQUIPMENT MANUFACTURER, C.O.R. AND

ARCHITECT PRIOR TO CONSTRUCTION.

17. CONTRACTOR SHALL SUBMIT MANUFACTURER'S INSTALLATION INSTRUCTIONS FOR STONE COATED STEEL SHINGLES.

SUBMIT DETAILS FOR EXPANSION JOINTS, VALLEYS, RIDGES, ROOF PENETRATIONS, AND ROOF / WALL INTERSECTIONS.

DRAWINGS SHOW GENERAL INTENT -- INSTALLATION INSTRUCTIONS AND DETAILS WILL VARY BY MANUFACTURER

SELECTED.

Revisions: Date:

BUILDING 124

SEE SHEETS AE110, AE210

BUILDING 17

SEE SHEETS AE109, AE209

BUILDING 15

SEE SHEETS AE107, AE207

BUILDING 16

SEE SHEETS AE108, AE208

BUILDING 1

SEE SHEETS AE101, AE201

BUILDING 2

SEE SHEETS AE102, AE202

BUILDING 3

SEE SHEETS AE103, AE203

BUILDING 4

SEE SHEETS AE104, AE204

BUILDING 5

SEE SHEETS AE105, AE205

BUILDING 6

SEE SHEETS AE106, AE206

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

DRAWING OF 24

C :\U se rs

\c ar te \D oc um en ts

\0 _R ev it

Lo ca l M od el s\

\F

FE

_M ar io n

- W at er In fil tra tio n_

B1 (2

0)

_c ar te r.d an ie l0

3.

rv t 3/

/2

2:

:5

PM

GI101

OVERALL ROOF PLAN

03/11/2021 PQ BL

MARION, INDIANA

#610-20-102CONSTRUCTION

DOCUMENTS

CORRECT WATER

INFILTRATION

SCALE: 1/32" = 1'-0"

OVERALL ROOF PLAN1

G E N E R A L N O T E S

A. THE ROOFING SYSTEM SHALL BE COMPLETELY WATERTIGHT AT THE END OF EACH DAY’S

CONSTRUCTION ACTIVITY. IF TEMPORARY ROOFING STRATEGIES ARE USED, MATERIALS

INSTALLED SHALL SERVE THE SAME FUNCTION AS EXISTING MATERIALS AND WILL BE

COMPATIBLE WITH EXISTING ROOF SYSTEM.

B. CONTRACTOR SHALL RELOCATE EXISTING SURFACE-MOUNTED LIGHTNING PROTECTION

SYSTEM AS NEEDED. REINSTALL SYSTEM AT COMPLETION OF ROOF WORK IN EACH ROOF

AREA. CONTRACTOR SHALL RECERTIFY ENTIRE LIGHTNING PROTECTION SYSTEM AT

CONCLUSION OF PROJECT.

C. SEE LEAD-BASED PAINT REPORT AND SPECIFICATION FOR ABATEMENT INFORMATION.

D. MISCELLANEOUS CONDUITS THRU ROOF SLABS AT MECHANICAL UNITS ARE NOT SHOWN BUT

SHALL BE INCLUDED IN THE PROJECT BID AND COMPLETED ACCORDING TO DETAILS AND/OR

ROOFING SYSTEM REQUIREMENTS. COORDINATE REMOVAL WITH NEW WORK PLANS AND

SECTIONS.

AE2012

AE201

AE201

AE201 3

24' - 10"

:1

:1

12:1212:12

:1

12:12

:1

:1

:1

13:1213:12

:1

:1

:1

:1

:1

14:1214:12

:1

12:12

12:12 12:12

12:12

:1

:1

12:12

:1

12:1212:12

:1

TYP.

TYP.

TYP.

TYP.

TYP.

TYP.

TYP.

TYP.

TYP.

TYP.

TYP.

TYP.

TYP.

TYP.

TYP.

TYP. TYP.

TYP.

TYP.2

AE501

Sim6

AE501

Sim

AE501

Sim 6

AE501

Sim

AE2017 AE201 5

TYP.

TYP.

TYP.

TYP.

11 122'

0" 1'

0"

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

DRAWING OF 24

C :\U se rs

\c ar te \D oc um en ts

\0 _R ev it

Lo ca l M od el s\

\F

FE

_M ar io n

- W at er In fil tra tio n_

B1 (2

0)

_c ar te r.d an ie l0

3.

rv t 3/

/2

2:

:5

PM

AE101

BUILDING 1 - ROOF PLAN

03/11/2021 PQ BL

MARION, INDIANA

#610-20-102CONSTRUCTION

DOCUMENTS

CORRECT WATER

INFILTRATION

KEY PLAN

SCALE: 1/8" = 1'-0"

BUILDING 1 - ROOF PLAN1

1 REMOVE EXISTING ASPHALT SHINGLES AND UNDERLAYMENT - REPLACE

WITH NEW STONE COATED STEEL SHINGLES OVER #30 FELT

UNDERLAYMENT OVER EXISTING SHEATHING. REPLACE SHEATHING AND

INSULATION WHERE DAMAGED - ASSUME 10% SHEATHING AND

INSULATION REPLACEMENT AT RAFTERS - SEE SECTIONS AND DETAILS ON

AE501 AND AE502.

2 VALLEY FLASHING BY SHINGLE MANUFACTURER.

3 RIDGE CAP BY SHINGLE MANUFACTURER TO MATCH ADJACENT SHINGLES

- TYPICAL.

4 REMOVE EXISTING ROOF HATCH - PATCH OPENING WITH WOOD FRAMING

AND SHEATHING - PREPARE TO RECEIVE NEW SHINGLES.

6 PROVIDE NEW STEP FLASHING AT INTERSECTION WITH WALL.

7 REMOVE AND REPLACE EXISTING METAL ROOF WITH NEW STANDING

SEAM METAL ROOF - COLOR: COPPER.

8 NEW 3"X4" COPPER COLOR DOWNSPOUT TO EXISTING BOOT.

9 REPLACE EXISTING BOX GUTTER - INSTALL NEW METAL GUTTER BOX,

PEEL & SEAL LINER, AND METAL CORNICE PROFILE AND ASSOSICATED

BLOCKING - SEE DETAILS ON AE501 AND AE502.

10 EXISTING COPPER ROOF TO REMAIN. EXISTING COPPER GUTTERS AND

DOWNSPOUTS TO REMAIN.

11 NEW GUTTER FORMED FROM SAME MATERIAL AS ROOF PANELS - COLOR:

COPPER.

12 INSTALL CLAMP-TO-SEAM SNOW GUARDS AT 24" AND 36" FROM FASCIA

BOARD - 16" O.C. - COLOR: COPPER TO MATCH ROOFING MATERIAL.

A. THE ROOFING SYSTEM SHALL BE COMPLETELY WATERTIGHT AT THE END OF EACH DAY’S

CONSTRUCTION ACTIVITY. IF TEMPORARY ROOFING STRATEGIES ARE USED, MATERIALS

INSTALLED SHALL SERVE THE SAME FUNCTION AS EXISTING MATERIALS AND WILL BE

COMPATIBLE WITH EXISTING ROOF SYSTEM.

B. CONTRACTOR SHALL RELOCATE EXISTING SURFACE-MOUNTED LIGHTNING PROTECTION

SYSTEM AS NEEDED. REINSTALL SYSTEM AT COMPLETION OF ROOF WORK IN EACH ROOF

AREA. CONTRACTOR SHALL RECERTIFY ENTIRE LIGHTNING PROTECTION SYSTEM AT

CONCLUSION OF PROJECT.

C. SEE LEAD-BASED PAINT REPORT AND SPECIFICATION FOR ABATEMENT INFORMATION.

D. EXISTING PLUMBING VENTS ARE NOT SHOWN ON ROOF PLAN BUT SHALL BE INCLUDED IN THE

PROJECT BID AND COMPLETED ACCORDING TO DETAILS AND/OR ROOFING SYSTEM

REQUIREMENTS.

E. ALL DOORS AND WINDOWS ARE EXISTING TO REMAIN UNLESS NOTED OTHERWISE.

D R A W I N G N O T E SG E N E R A L N O T E S

AE2022

AE202

AE202

AE202 3

:1

:1

12:1212:12

:1

12:12

:1

:1

:1

12:12 12:12

:1

:1

12:1212:12

12:12

12:12 12:12

12:12

:1

:1

12:12

:1

12:1212:12

:1

TYP. TYP.

TYP.

TYP.

TYP.

TYP.

TYP.

TYP.

TYP.

TYP.

TYP.

TYP.

TYP.

TYP.

TYP.

TYP.

TYP.

TYP.

TYP.

TYP.

TYP.

TYP.

TYP.

AE501

Sim4

AE501

Sim

AE501

Sim

AE501

Sim

TYP.

4 4

TYP.

TYP.

TYP.

TYP.

11 11122'

0" 1'

0"

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

DRAWING OF 24

C :\U se rs

\c ar te \D oc um en ts

\0 _R ev it

Lo ca l M od el s\

\F

FE

_M ar io n

- W at er In fil tra tio n_

B2 (2

0)

_c ar te r.d an ie l0

3.

rv t 3/

/2

4:

:1

PM

AE102

BUILDING 2 - ROOF PLAN

03/11/2021 PQ BL

MARION INDIANA

#610-20-102CONSTRUCTION

DOCUMENTS

CORRECT WATER

INFILTRATION

KEY PLAN

SCALE: 1/8" = 1'-0"

BUILDING 2 - ROOF PLAN1

1 REMOVE EXISTING ASPHALT SHINGLES AND UNDERLAYMENT - REPLACE

WITH NEW STONE COATED STEEL SHINGLES OVER #30 FELT

UNDERLAYMENT OVER EXISTING SHEATHING. REPLACE SHEATHING AND

INSULATION WHERE DAMAGED - ASSUME 10% SHEATHING AND

INSULATION REPLACEMENT AT RAFTERS - SEE SECTIONS AND DETAILS ON

AE501 AND AE502.

2 VALLEY FLASHING BY SHINGLE MANUFACTURER.

3 RIDGE CAP BY SHINGLE MANUFACTURER TO MATCH ADJACENT SHINGLES

- TYPICAL.

4 REMOVE EXISTING ROOF HATCH - PATCH OPENING WITH WOOD FRAMING

AND SHEATHING - PREPARE TO RECEIVE NEW SHINGLES.

5 PROTECT EXISTING DOWNSPOUT DURING ALL PHASES OF

CONSTRUCTION.

6 PROVIDE NEW STEP FLASHING AT INTERSECTION WITH WALL.

7 REMOVE AND REPLACE EXISTING METAL ROOF WITH NEW STANDING

SEAM METAL ROOF - COLOR: COPPER.

8 REPLACE EXISTING BOX GUTTER - INSTALL NEW METAL GUTTER BOX,

PEEL & SEAL LINER, AND METAL CORNICE PROFILE AND ASSOSICATED

BLOCKING - SEE DETAILS ON AE501 AND AE502.

9 EXISTING DOWNSPOUT SHALL REMAIN - EXTEND EXISTING DOWNSPOUT

TO EXISTING BOOT - APPROXIMATELY 12 INCHES.

10 EXISTING COPPER ROOF TO REMAIN. EXISTING COPPER GUTTERS AND

DOWNSPOUTS TO REMAIN.

11 NEW 3"X4" COPPER COLOR DOWNSPOUT TO EXISTING BOOT.

12 NEW GUTTER FORMED FROM SAME MATERIAL AS ROOF PANELS - COLOR:

COPPER

13 INSTALL CLAMP-TO-SEAM SNOW GUARDS AT 24" AND 36" FROM FASCIA

BOARD - 16" O.C. - COLOR: COPPER TO MATCH ROOFING MATERIAL.

A. THE ROOFING SYSTEM SHALL BE COMPLETELY WATERTIGHT AT THE END OF EACH DAY’S

CONSTRUCTION ACTIVITY. IF TEMPORARY ROOFING STRATEGIES ARE USED, MATERIALS

INSTALLED SHALL SERVE THE SAME FUNCTION AS EXISTING MATERIALS AND WILL BE

COMPATIBLE WITH EXISTING ROOF SYSTEM.

B. CONTRACTOR SHALL RELOCATE EXISTING SURFACE-MOUNTED LIGHTNING PROTECTION

SYSTEM AS NEEDED. REINSTALL SYSTEM AT COMPLETION OF ROOF WORK IN EACH ROOF

AREA. CONTRACTOR SHALL RECERTIFY ENTIRE LIGHTNING PROTECTION SYSTEM AT

CONCLUSION OF PROJECT.

C. SEE ASBESTOS ABATEMENT REPORT AND SPECIFICATIONS FOR ABATEMENT WORK.

D. EXISTING PLUMBING VENTS ARE NOT SHOWN ON ROOF PLAN BUT SHALL BE INCLUDED IN THE

PROJECT BID AND COMPLETED ACCORDING TO DETAILS AND/OR ROOFING SYSTEM

REQUIREMENTS.

E. ALL DOORS AND WINDOWS ARE EXISTING TO REMAIN UNLESS NOTED OTHERWISE.

AE2032

AE203

AE203

AE203 3

:1

:1

12:1212:12

:1

12:12

:1

:1

:1

12:1212:12

:1

:1

:1

:1

:1

212:1212:12

:1

12:12

12:12 12:12

12:12

:1

:1

12:12

:1

12:1212:12

:1

TYP.

TYP.

TYP.

TYP.

TYP.

TYP.

TYP.

TYP.

TYP.

TYP.

TYP.

TYP.

TYP.

TYP.

TYP.

TYP. TYP.

TYP.

TYP.2

AE501

Sim

AE501

Sim

AE501

Sim

AE501

Sim

AE203 AE203 6

TYP.

TYP.

TYP.

TYP.

10 112'

0" 1'

0"

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

DRAWING OF 24

C :\U se rs

\c ar te \D oc um en ts

\0 _R ev it

Lo ca l M od el s\

\F

FE

_M ar io n

- W at er In fil tra tio n_

B3 (2

0)

_c ar te r.d an ie l0

3.

rv t 3/

/2

2:

:5

PM

AE103

BUILDING 3 - ROOF PLAN

03/11/2021 PQ BL

MARION, INDIANA

#610-20-102CONSTRUCTION

DOCUMENTS

CORRECT WATER

INFILTRATION

KEY PLAN

SCALE: 1/8" = 1'-0"

BUILDING 3 - ROOF PLAN1

1 REMOVE EXISTING ASPHALT SHINGLES AND UNDERLAYMENT - REPLACE

WITH NEW STONE COATED STEEL SHINGLES OVER #30 FELT

UNDERLAYMENT OVER EXISTING SHEATHING. REPLACE SHEATHING AND

INSULATION WHERE DAMAGED - ASSUME 10% SHEATHING AND

INSULATION REPLACEMENT AT RAFTERS - SEE SECTIONS AND DETAILS ON

AE501 AND AE502.

2 VALLEY FLASHING BY SHINGLE MANUFACTURER.

3 RIDGE CAP BY SHINGLE MANUFACTURER TO MATCH ADJACENT SHINGLES

- TYPICAL.

4 REMOVE EXISTING ROOF HATCH - PATCH OPENING WITH WOOD FRAMING

AND SHEATHING - PREPARE TO RECEIVE NEW SHINGLES.

5 PROTECT EXISTING DOWNSPOUT DURING ALL PHASES OF

CONSTRUCTION.

6 PROVIDE NEW STEP FLASHING AT INTERSECTION WITH WALL.

7 REMOVE AND REPLACE EXISTING METAL ROOF WITH NEW STANDING

SEAM METAL ROOF - COLOR: COPPER.

8 REPLACE EXISTING BOX GUTTER - INSTALL NEW METAL GUTTER BOX,

PEEL & SEAL LINER, AND METAL CORNICE PROFILE AND ASSOSICATED

BLOCKING - SEE DETAILS ON AE501 AND AE502.

9 EXISTING COPPER ROOF TO REMAIN. EXISTING COPPER GUTTERS AND

DOWNSPOUTS TO REMAIN.

10 NEW 3"X4" COPPER COLOR DOWNSPOUT TO EXISTING BOOT.

11 NEW GUTTER FORMED FROM SAME MATERIAL AS ROOF PANELS - COLOR:

COPPER

12 INSTALL CLAMP-TO-SEAM SNOW GUARDS AT 24" AND 36" FROM FASCIA

BOARD - 16" O.C. - COLOR: COPPER TO MATCH ROOFING MATERIAL.

A. THE ROOFING SYSTEM SHALL BE COMPLETELY WATERTIGHT AT THE END OF EACH DAY’S

CONSTRUCTION ACTIVITY. IF TEMPORARY ROOFING STRATEGIES ARE USED, MATERIALS

INSTALLED SHALL SERVE THE SAME FUNCTION AS EXISTING MATERIALS AND WILL BE

COMPATIBLE WITH EXISTING ROOF SYSTEM.

B. CONTRACTOR SHALL RELOCATE EXISTING SURFACE-MOUNTED LIGHTNING PROTECTION

SYSTEM AS NEEDED. REINSTALL SYSTEM AT COMPLETION OF ROOF WORK IN EACH ROOF

AREA. CONTRACTOR SHALL RECERTIFY ENTIRE LIGHTNING PROTECTION SYSTEM AT

CONCLUSION OF PROJECT.

C. SEE ASBESTOS ABATEMENT REPORT AND SPECIFICATIONS FOR ABATEMENT WORK.

D. EXISTING PLUMBING VENTS ARE NOT SHOWN ON ROOF PLAN BUT SHALL BE INCLUDED IN THE

PROJECT BID AND COMPLETED ACCORDING TO DETAILS AND/OR ROOFING SYSTEM

REQUIREMENTS.

E. ALL DOORS AND WINDOWS ARE EXISTING TO REMAIN UNLESS NOTED OTHERWISE.

AE2042

AE204

AE204

AE204 3

:1

:1

12:1212:12

:1

12:12

:1

:1

:1

12:12 12:12

:1

2 12 :1

12:1212:1212:12

12:12 12:12

12:12

:1

:1

12:12

:1

12:1212:12

:1

3 3

TYP. TYP.

TYP.

TYP.

TYP.

TYP.

TYP.

TYP.

TYP.

TYP.

TYP.

TYP.

TYP.

TYP.

TYP.

TYP.

TYP.

TYP.

TYP.

TYP.

TYP.

TYP.

TYP.

AE501

Sim

AE501

Sim

AE501

Sim

AE501

Sim

TYP.

TYP.

TYP.

1010 11 12

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

DRAWING OF 24

C :\U se rs

\c ar te \D oc um en ts

\0 _R ev it

Lo ca l M od el s\

\F

FE

_M ar io n

- W at er In fil tra tio n_

B4 (2

0)

_c ar te r.d an ie l0

3.

rv t 3/

/2

3:

:1

PM

AE104

BUILDING 4 - ROOF PLAN

03/11/2021 PQ BL

MARION, INDIANA

#610-20-102CONSTRUCTION

DOCUMENTS

CORRECT WATER

INFILTRATION

KEY PLAN

SCALE: 1/8" = 1'-0"

ROOF PLAN1

1 REMOVE EXISTING ASPHALT SHINGLES AND UNDERLAYMENT - REPLACE

WITH NEW STONE COATED STEEL SHINGLES OVER #30 FELT

UNDERLAYMENT OVER EXISTING SHEATHING. REPLACE SHEATHING AND

INSULATION WHERE DAMAGED - ASSUME 10% SHEATHING AND

INSULATION REPLACEMENT AT RAFTERS - SEE SECTIONS AND DETAILS ON

AE501 AND AE502.

2 VALLEY FLASHING BY SHINGLE MANUFACTURER.

3 RIDGE CAP BY SHINGLE MANUFACTURER TO MATCH ADJACENT SHINGLES

- TYPICAL.

4 REMOVE EXISTING ROOF HATCH - PATCH OPENING WITH WOOD FRAMING

AND SHEATHING - PREPARE TO RECEIVE NEW SHINGLES.

5 PROTECT EXISTING DOWNSPOUT DURING ALL PHASES OF

CONSTRUCTION.

6 PROVIDE NEW STEP FLASHING AT INTERSECTION WITH WALL.

7 REMOVE AND REPLACE EXISTING METAL ROOF WITH NEW STANDING

SEAM METAL ROOF - COLOR: COPPER.

8 REPLACE EXISTING BOX GUTTER - INSTALL NEW METAL GUTTER BOX,

PEEL & SEAL LINER, AND METAL CORNICE PROFILE AND ASSOSICATED

BLOCKING - SEE DETAILS ON AE501 AND AE502.

9 EXISTING COPPER ROOF TO REMAIN. EXISTING COPPER GUTTERS AND

DOWNSPOUTS TO REMAIN.

10 NEW 3"X4" COPPER COLOR DOWNSPOUT TO EXISTING BOOT.

11 NEW GUTTER FORMED FROM SAME MATERIAL AS ROOF PANELS - COLOR:

COPPER

12 INSTALL CLAMP-TO-SEAM SNOW GUARDS AT 24" AND 36" FROM FASCIA

BOARD - 16" O.C. - COLOR: COPPER TO MATCH ROOFING MATERIAL.

A. THE ROOFING SYSTEM SHALL BE COMPLETELY WATERTIGHT AT THE END OF EACH DAY’S

CONSTRUCTION ACTIVITY. IF TEMPORARY ROOFING STRATEGIES ARE USED, MATERIALS

INSTALLED SHALL SERVE THE SAME FUNCTION AS EXISTING MATERIALS AND WILL BE

COMPATIBLE WITH EXISTING ROOF SYSTEM.

B. CONTRACTOR SHALL RELOCATE EXISTING SURFACE-MOUNTED LIGHTNING PROTECTION

SYSTEM AS NEEDED. REINSTALL SYSTEM AT COMPLETION OF ROOF WORK IN EACH ROOF

AREA. CONTRACTOR SHALL RECERTIFY ENTIRE LIGHTNING PROTECTION SYSTEM AT

CONCLUSION OF PROJECT.

C. SEE ASBESTOS ABATEMENT REPORT AND SPECIFICATIONS FOR ABATEMENT WORK.

D. EXISTING PLUMBING VENTS ARE NOT SHOWN ON ROOF PLAN BUT SHALL BE INCLUDED IN THE

PROJECT BID AND COMPLETED ACCORDING TO DETAILS AND/OR ROOFING SYSTEM

REQUIREMENTS.

E. ALL DOORS AND WINDOWS ARE EXISTING TO REMAIN UNLESS NOTED OTHERWISE.

AE2052

AE205

AE205

AE205 3

:1

:1

12:1212:12

:1

12:12

:1

:1

:1

12:1212:12

:1

:1

:1

:1

:1

211:1211:12

:1

12:12

12:12 12:12

12:12

:1

:1

12:12

:1

12:1212:12

:1

TYP.

TYP.

TYP.

TYP.

TYP.

TYP.

TYP.

TYP.

TYP.

TYP.

TYP.

TYP.

TYP.

TYP.

TYP.

TYP. TYP.

3 3

TYP.

TYP.

2 222

4 5

77 6

AE501

Sim

AE501

Sim

AE501

Sim

AE501

Sim

TYP.

TYP.

TYP.

TYP.

9 10 112'

0" 1'

0"

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

DRAWING OF 24

C :\U se rs

\c ar te \D oc um en ts

\0 _R ev it

Lo ca l M od el s\

\F

FE

_M ar io n

- W at er In fil tra tio n_

B5 (2

0)

_c ar te r.d an ie l0

3.

rv t 3/

/2

3:

:2

PM

AE105

BUILDING 5 - ROOF PLAN

03/11/2021 PQ BL

MARION, INDIANA

#610-20-102CONSTRUCTION

DOCUMENTS

CORRECT WATER

INFILTRATION

KEY PLAN

SCALE: 1/8" = 1'-0"

BUILDING 5 - ROOF PLAN1

1 REMOVE EXISTING ASPHALT SHINGLES AND UNDERLAYMENT - REPLACE

WITH NEW STONE COATED STEEL SHINGLES OVER #30 FELT

UNDERLAYMENT OVER EXISTING SHEATHING. REPLACE SHEATHING AND

INSULATION WHERE DAMAGED - ASSUME 10% SHEATHING AND

INSULATION REPLACEMENT AT RAFTERS - SEE SECTIONS AND DETAILS ON

AE501 AND AE502.

2 VALLEY FLASHING BY SHINGLE MANUFACTURER.

3 RIDGE CAP BY SHINGLE MANUFACTURER TO MATCH ADJACENT SHINGLES

- TYPICAL.

4 NEW 3"X4" COPPER COLOR DOWNSPOUT TO EXISTING BOOT.

5 REMOVE EXISTING ROOF HATCH - PATCH OPENING WITH WOOD FRAMING

AND SHEATHING - PREPARE TO RECEIVE NEW SHINGLES.

6 PROVIDE NEW STEP FLASHING AT INTERSECTION WITH WALL.

7 REMOVE AND REPLACE EXISTING METAL ROOF WITH NEW STANDING

SEAM METAL ROOF - COLOR: COPPER.

8 REPLACE EXISTING BOX GUTTER - INSTALL NEW METAL GUTTER BOX,

PEEL & SEAL LINER, AND METAL CORNICE PROFILE AND ASSOSICATED

BLOCKING - SEE DETAILS ON AE501 AND AE502.

9 NEW 3"X4" COPPER COLOR DOWNSPOUT TO EXISTING BOOT.

10 NEW GUTTER FORMED FROM SAME MATERIAL AS ROOF PANELS - COLOR:

COPPER

11 INSTALL CLAMP-TO-SEAM SNOW GUARDS AT 24" AND 36" FROM FASCIA

BOARD - 16" O.C. - COLOR: COPPER TO MATCH ROOFING MATERIAL.

A. THE ROOFING SYSTEM SHALL BE COMPLETELY WATERTIGHT AT THE END OF EACH DAY’S

CONSTRUCTION ACTIVITY. IF TEMPORARY ROOFING STRATEGIES ARE USED, MATERIALS

INSTALLED SHALL SERVE THE SAME FUNCTION AS EXISTING MATERIALS AND WILL BE

COMPATIBLE WITH EXISTING ROOF SYSTEM.

B. CONTRACTOR SHALL RELOCATE EXISTING SURFACE-MOUNTED LIGHTNING PROTECTION

SYSTEM AS NEEDED. REINSTALL SYSTEM AT COMPLETION OF ROOF WORK IN EACH ROOF

AREA. CONTRACTOR SHALL RECERTIFY ENTIRE LIGHTNING PROTECTION SYSTEM AT

CONCLUSION OF PROJECT.

C. SEE ASBESTOS ABATEMENT REPORT AND SPECIFICATIONS FOR ABATEMENT WORK.

D. EXISTING PLUMBING VENTS ARE NOT SHOWN ON ROOF PLAN BUT SHALL BE INCLUDED IN THE

PROJECT BID AND COMPLETED ACCORDING TO DETAILS AND/OR ROOFING SYSTEM

REQUIREMENTS.

E. ALL DOORS AND WINDOWS ARE EXISTING TO REMAIN UNLESS NOTED OTHERWISE.

AE2062

AE206

AE206

AE206 3

:1

:1

12:1212:12

:1

12:12

:1

:1

:1

12:12 12:12

:1

2 12 :1

12:1212:12

12:12

12:12 12:12

12:12

:1

:1

12:12

:1

12:1212:12

:1

3 3

TYP. TYP.

TYP.

TYP.

TYP.

TYP.

TYP.

TYP.

TYP.

TYP.

TYP.

TYP.

TYP.

TYP.

TYP.

TYP.

TYP.

TYP.

TYP.

TYP.

TYP.

TYP.

TYP.

2 222

AE501

Sim

AE501

Sim

AE501

Sim

AE501

Sim

5 5

8 9

TYP.

TYP.

TYP.

TYP.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

DRAWING OF 24

C :\U se rs

\c ar te \D oc um en ts

\0 _R ev it

Lo ca l M od el s\

\F

FE

_M ar io n

- W at er In fil tra tio n_

B6 (2

0)

_c ar te r.d an ie l0

3.

rv t 3/

/2

3:

:3

PM

AE106

BUILDING 6 - ROOF PLAN

03/11/2021 PQ BL

MARION, INDIANA

#610-20-102CONSTRUCTION

DOCUMENTS

CORRECT WATER

INFILTRATION

KEY PLAN

SCALE: 1/8" = 1'-0"

BUILDING 6 - ROOF PLAN1

1 REMOVE EXISTING ASPHALT SHINGLES AND UNDERLAYMENT - REPLACE

WITH NEW STONE COATED STEEL SHINGLES OVER #30 FELT

UNDERLAYMENT OVER EXISTING SHEATHING. REPLACE SHEATHING AND

INSULATION WHERE DAMAGED - ASSUME 10% SHEATHING AND

INSULATION REPLACEMENT AT RAFTERS - SEE SECTIONS AND DETAILS ON

AE501 AND AE502.

2 VALLEY FLASHING BY SHINGLE MANUFACTURER.

3 RIDGE CAP BY SHINGLE MANUFACTURER TO MATCH ADJACENT SHINGLES

- TYPICAL.

4 REMOVE EXISTING ROOF HATCH - PATCH OPENING WITH WOOD FRAMING

AND SHEATHING - PREPARE TO RECEIVE NEW SHINGLES.

5 PROTECT EXISTING DOWNSPOUT DURING ALL PHASES OF

CONSTRUCTION.

6 PROVIDE NEW STEP FLASHING AT INTERSECTION WITH WALL.

7 REMOVE AND REPLACE EXISTING METAL ROOF WITH NEW STANDING

SEAM METAL ROOF - COLOR: COPPER.

8 NEW 3"X4" COPPER COLOR DOWNSPOUT TO EXISTING BOOT.

9 NEW GUTTER FORMED FROM SAME MATERIAL AS ROOF PANELS - COLOR:

COPPER

10 EXISTING COPPER ROOF TO REMAIN. EXISTING COPPER GUTTERS AND

DOWNSPOUTS TO REMAIN.

11 REPLACE EXISTING BOX GUTTER - INSTALL NEW METAL GUTTER BOX,

PEEL & SEAL LINER, AND METAL CORNICE PROFILE AND ASSOSICATED

BLOCKING - SEE DETAILS ON AE501 AND AE502.

12 INSTALL CLAMP-TO-SEAM SNOW GUARDS AT 24" AND 36" FROM FASCIA

BOARD - 16" O.C. - COLOR: COPPER TO MATCH ROOFING MATERIAL.

A. THE ROOFING SYSTEM SHALL BE COMPLETELY WATERTIGHT AT THE END OF EACH DAY’S

CONSTRUCTION ACTIVITY. IF TEMPORARY ROOFING STRATEGIES ARE USED, MATERIALS

INSTALLED SHALL SERVE THE SAME FUNCTION AS EXISTING MATERIALS AND WILL BE

COMPATIBLE WITH EXISTING ROOF SYSTEM.

B. CONTRACTOR SHALL RELOCATE EXISTING SURFACE-MOUNTED LIGHTNING PROTECTION

SYSTEM AS NEEDED. REINSTALL SYSTEM AT COMPLETION OF ROOF WORK IN EACH ROOF

AREA. CONTRACTOR SHALL RECERTIFY ENTIRE LIGHTNING PROTECTION SYSTEM AT

CONCLUSION OF PROJECT.

C. SEE ASBESTOS ABATEMENT REPORT AND SPECIFICATIONS FOR ABATEMENT WORK.

D. EXISTING PLUMBING VENTS ARE NOT SHOWN ON ROOF PLAN BUT SHALL BE INCLUDED IN THE

PROJECT BID AND COMPLETED ACCORDING TO DETAILS AND/OR ROOFING SYSTEM

REQUIREMENTS.

E. ALL DOORS AND WINDOWS ARE EXISTING TO REMAIN UNLESS NOTED OTHERWISE.

AE207

AE2073

AE207

AE207 4

AE501

11 11

TYP.

TYP.

TYP.

TYP.

TYP.

BUILDING 172

BUILDING 124

BUILDING 174

BUILDING 16

BUILDING 127

TYP.

TYP.

TYP.

TYP.

4:12

4:

4:

4:

4:

4:

4:

4:12

6:126:12

4:

4:12

4:12

4:

4:12

4:12 4:12

4:

6:126:12

TYP.

TYP. TYP.

12 12 12

121212

AE501

Sim

AE501

Sim

AE501

Sim 13

AE501

Sim

TYP.

TYP.

TYP.

TYP.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

DRAWING OF 24

C :\U se rs

\c ar te \D oc um en ts

\0 _R ev it

Lo ca l M od el s\

\F

FE

_M ar io n

- W at er In fil tra tio n_

B1

(2

0) _c ar te r.d an ie l0

3.

rv t

3/

/2

4:

:5

PM

AE107

BUILDING 15 - ROOF PLAN

03/11/2021 PQ BL

MARION, INDIANA

#610-20-102CONSTRUCTION

DOCUMENTS

CORRECT WATER

INFILTRATION

SCALE: 1/8" = 1'-0"

BUILDING 15 - ROOF PLAN

1 REMOVE EXISTING ASPHALT SHINGLES AND UNDERLAYMENT - REPLACE

WITH NEW STONE COATED STEEL SHINGLES OVER #30 FELT

UNDERLAYMENT OVER EXISTING SHEATHING. REPLACE SHEATHING AND

INSULATION WHERE DAMAGED - ASSUME 10% SHEATHING AND INSULATION

REPLACEMENT AT RAFTERS - SEE SECTIONS AND DETAILS ON AE501 AND

AE502.

2 EXISTING METAL ROOF TO REMAIN - PREPARE SURFACE AND APPLY 3-PLY

SELF-ADHERED SBS MODIFIED BITUMIN MEMBRANE TO EXTENT OF METAL

ROOF AND EXTEND 24" UP ADJACENT ROOF SLOPE. INSTALL NEW

BLOCKING WHERE REQUIRED. SEE DETAIL 9/AE501.

3 NO WORK IN THIS AREA.

4 SEE SHEETS AE110 AND AE210 FOR DEMOLITION AND NEW WORK AT

BUILDING 124.

5 SEE SHEETS AE108 AND AE208 FOR DEMOLITION AND NEW WORK AT

BUILDING 16.

6 NEW EXPANSION JOINT AT EXISTING LOCATION - DETAILS PER SHINGLE

MANUFACTURER.

7 EXISTING ROOF HATCH TO REMAIN.

8 EXISTING METAL CAP TO REMAIN - PREPARE SURFACE AND APPLY

SELF-ADHERED SBS.

9 RIDGE CAP BY SHINGLE MANUFACTURER TO MATCH ADJACENT SHINGLES -

TYPICAL.

10 VALLEY FLASHING BY SHINGLE MANUFACTURER.

11 PROVIDE NEW STEP FLASHING AT INTERSECTION WITH WALL.

12 PROTECT EXISTING DOWNSPOUT DURING ALL PHASES OF CONSTRUCTION.

13 CONTINUOUS BOX GUTTER - LINE GUTTER WITH "PEEL AND SEAL"

ADHERED MEMBRANE. MINIMIZE SEAMS - OVERLAP ALL JOINTS BY

MINIMUM 6

14 EXISTING ALUMINUM GUTTER TO REMAIN.

15 ALTERNATE #1: FALL PROTECTION ROOF ANCHOR SPACED AT 20’ O.C., NO

MORE THAN 24” FROM ROOF PEAK. INSTALL INTO STRUCTURAL FRAMING

AND COORDINATE WITH SHINGLE INSTALLATION.

16 CRICKET BY SHINGLE MANUFACTURER TO MATCH ADJACENT SHINGLES.

D R A W I N G N O T E S

G E N E R A L N O T E S

KEY PLAN

A. THE ROOFING SYSTEM SHALL BE COMPLETELY WATERTIGHT AT THE END OF EACH DAY’S

CONSTRUCTION ACTIVITY. IF TEMPORARY ROOFING STRATEGIES ARE USED, MATERIALS

INSTALLED SHALL SERVE THE SAME FUNCTION AS EXISTING MATERIALS AND WILL BE

COMPATIBLE WITH EXISTING ROOF SYSTEM.

B. CONTRACTOR SHALL RELOCATE EXISTING SURFACE-MOUNTED LIGHTNING PROTECTION

SYSTEM AS NEEDED. REINSTALL SYSTEM AT COMPLETION OF ROOF WORK IN EACH ROOF

AREA. CONTRACTOR SHALL RECERTIFY ENTIRE LIGHTNING PROTECTION SYSTEM AT

CONCLUSION OF PROJECT.

C. SEE LEAD BASED PAINT ABATEMENT REPORT AND SPECIFICATIONS FOR ABATEMENT WORK.

D. EXISTING PLUMBING VENTS ARE NOT SHOWN ON ROOF PLAN BUT SHALL BE INCLUDED IN THE

PROJECT BID AND COMPLETED ACCORDING TO DETAILS AND/OR ROOFING SYSTEM

REQUIREMENTS.

E. MISCELLANEOUS MECHANICAL, PLUMBING, OR ELECTRICAL PENETRATIONS THRU ROOF MAY

NOT BUT SHOWN BUT SHALL BE INCLUDED IN THE PROJECT BID AND COMPLETED

ACCORDING TO ROOFING SYSTEM REQUIREMENTS. COORDINATE REMOVAL WITH NEW

WORK PLANS AND SECTIONS. ALL PENETRATIONS SHALL BE FLASHED AND MAINTAIN

WATERTIGHTNESS THROUGHOUT COMPLETION OF CONSTRUCTION.

F. EXISTING STRUCTURAL AND FRAMING MEMBERS TO REMAIN UNLESS NOTED OTHERWISE.

AE208

AE2083

AE208

AE208 4

AE501

3 3

BUILDING 15

BUILDING 17

BUILDING 174

4:

4:

4:12 4:12

4:

4:

4:

4:

2:

2:122:12

6:126:12

6:

6:

4:124:12

4:

TYP.

TYP.

TYP.

TYP.

TYP.

TYP.

TYP.

TYP.

TYP.

TYP.

TYP.

TYP.

TYP.

TYP.

TYP.

14 14 14

AE501

Sim

AE501

Sim

AE501

Sim

AE501

Sim

AE501

Sim

AE501

Sim

AE501

TYP.

16 16

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

DRAWING OF 24

C :\U se rs

\c ar te \D oc um en ts

\0 _R ev it

Lo ca l M od el s\

\F

FE

_M ar io n

- W at er In fil tra tio n_

B1

(2

0) _c ar te r.d an ie l0

3.

rv t

3/

/2

4:

:2

PM

AE108

BUILDING 16 - ROOF PLAN

03/11/2021 PQ BL

MARION, INDIANA

#610-20-102CONSTRUCTION

DOCUMENTS

CORRECT WATER

INFILTRATION

SCALE: 1/8" = 1'-0"

BUILDING 16 - ROOF PLAN

1 REMOVE EXISTING ASPHALT SHINGLES AND UNDERLAYMENT - REPLACE

WITH NEW STONE COATED STEEL SHINGLES OVER #30 FELT

UNDERLAYMENT OVER EXISTING SHEATHING. REPLACE SHEATHING AND

INSULATION WHERE DAMAGED - ASSUME 10% SHEATHING AND

INSULATION REPLACEMENT AT RAFTERS - SEE SECTIONS AND DETAILS ON

AE501 AND AE502.

2 EXISTING METAL ROOF TO REMAIN - PREPARE SURFACE AND APPLY 3-PLY

SELF-ADHERED SBS MODIFIED BITUMIN MEMBRANE TO EXTENT OF METAL

ROOF AND EXTEND 24" UP ADJACENT ROOF SLOPE. INSTALL NEW

BLOCKING WHERE REQUIRED. SEE DETAIL 9/AE501.

3 CONTINUOUS BOX GUTTER - LINE GUTTER WITH "PEEL AND SEAL"

ADHERED MEMBRANE. MINIMIZE SEAMS - OVERLAP ALL JOINTS BY

MINIMUM 6

4 REPLACE EXISTING BOX GUTTER - INSTALL NEW METAL GUTTER BOX,

PEEL & SEAL LINER, AND METAL CORNICE PROFILE AND ASSOSICATED

BLOCKING - SEE DETAILS ON AE501 AND AE502.

5 SEE SHEETS AE107 AND AE207 FOR DEMOLITION AND NEW WORK AT

BUILDING 15.

6 SEE SHEETS AE109 AND AE209 FOR DEMOLITION AND NEW WORK AT

BUILDING 17.

7 NO WORK IN THIS AREA.

8 EXISTING ROOF HATCH TO REMAIN.

9 REMOVE EXISTING MECHANICAL DUCTWORK TO BELOW ROOF SURFACE -

SUPPORT EXISTING WITHIN ATTIC SPACE - VERIFY EXHAUST IS INACTIVE

PRIOR TO CONSTRUCTION - PATCH OPENING WITH WOOF FRAMING AND

SHEATHING - PREPARE TO RECEIVE NEW SHINGLES

10 EXISTING METAL CAP TO REMAIN - PREPARE SURFACE AND APPLY

SELF-ADHERED SBS.

11 RIDGE CAP BY SHINGLE MANUFACTURER TO MATCH ADJACENT SHINGLES

- TYPICAL.

12 VALLEY FLASHING BY SHINGLE MANUFACTURER.

13 PROVIDE NEW STEP FLASHING AT INTERSECTION WITH WALL.

14 PROTECT EXISTING DOWNSPOUT DURING ALL PHASES OF

CONSTRUCTION.

15 EXISTING ALUMINUM GUTTER TO REMAIN.

16 ALTERNATE #1: FALL PROTECTION ROOF ANCHOR SPACED AT 20’ O.C., NO

MORE THAN 24” FROM ROOF PEAK. INSTALL INTO STRUCTURAL FRAMING

AND COORDINATE WITH SHINGLE INSTALLATION.

17 CRICKET BY SHINGLE MANUFACTURER TO MATCH ADJACENT SHINGLES.

D R A W I N G N O T E S

G E N E R A L N O T E S

KEY PLAN

A. THE ROOFING SYSTEM SHALL BE COMPLETELY WATERTIGHT AT THE END OF EACH DAY’S

CONSTRUCTION ACTIVITY. IF TEMPORARY ROOFING STRATEGIES ARE USED, MATERIALS

INSTALLED SHALL SERVE THE SAME FUNCTION AS EXISTING MATERIALS AND WILL BE

COMPATIBLE WITH EXISTING ROOF SYSTEM.

B. CONTRACTOR SHALL RELOCATE EXISTING SURFACE-MOUNTED LIGHTNING PROTECTION

SYSTEM AS NEEDED. REINSTALL SYSTEM AT COMPLETION OF ROOF WORK IN EACH ROOF

AREA. CONTRACTOR SHALL RECERTIFY ENTIRE LIGHTNING PROTECTION SYSTEM AT

CONCLUSION OF PROJECT.

C. SEE LEAD BASED PAINT ABATEMENT REPORT AND SPECIFICATIONS FOR ABATEMENT WORK.

D. EXISTING PLUMBING VENTS ARE NOT SHOWN ON ROOF PLAN BUT SHALL BE INCLUDED IN THE

PROJECT BID AND COMPLETED ACCORDING TO DETAILS AND/OR ROOFING SYSTEM

REQUIREMENTS.

E. MISCELLANEOUS MECHANICAL, PLUMBING, OR ELECTRICAL PENETRATIONS THRU ROOF MAY

NOT BUT SHOWN BUT SHALL BE INCLUDED IN THE PROJECT BID AND COMPLETED

ACCORDING TO ROOFING SYSTEM REQUIREMENTS. COORDINATE REMOVAL WITH NEW

WORK PLANS AND SECTIONS. ALL PENETRATIONS SHALL BE FLASHED AND MAINTAIN

WATERTIGHTNESS THROUGHOUT COMPLETION OF CONSTRUCTION.

AE209

AE2092

AE209

AE209 3

AE501

3 3

BUILDING 16

4:

4:

4:12 4:12

4:

4:

4:

4:

4:12 4:12

4:

4:

4:124:12

4:12

4:

4:12

4:

TYP.

TYP.

TYP.

TYP.

TYP.

TYP.

TYP.

TYP.

TYP.

TYP.

TYP.

TYP.

TYP.

AE501

Sim4

AE501

Sim

AE501

Sim

AE501

Sim

AE501

Sim

AE501

Sim

TYP.

TYP.

TYP.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

DRAWING OF 24

C :\U se rs

\c ar te \D oc um en ts

\0 _R ev it

Lo ca l M od el s\

\F

FE

_M ar io n

- W at er In fil tra tio n_

B1

(2

0) _c ar te r.d an ie l0

3.

rv t

3/

/2

4:

:4

PM

AE109

BUILDING 17 - ROOF PLAN

03/11/2021 PQ BL

MARION, INDIANA

#610-20-102CONSTRUCTION

DOCUMENTS

CORRECT WATER

INFILTRATION

SCALE: 1/8" = 1'-0"

BUILDING 17 - ROOF PLAN1

1 REMOVE EXISTING ASPHALT SHINGLES AND UNDERLAYMENT - REPLACE WITH NEW

STONE COATED STEEL SHINGLES OVER #30 FELT UNDERLAYMENT OVER EXISTING

SHEATHING. REPLACE SHEATHING AND INSULATION WHERE DAMAGED - ASSUME

10% SHEATHING AND INSULATION REPLACEMENT AT RAFTERS - SEE SECTIONS AND

DETAILS ON AE501 AND AE502.

2 EXISTING METAL ROOF TO REMAIN - PREPARE SURFACE AND APPLY 3-PLY

SELF-ADHERED SBS MODIFIED BITUMIN MEMBRANE TO EXTENT OF METAL ROOF AND

EXTEND 24" UP ADJACENT ROOF SLOPE. INSTALL NEW BLOCKING WHERE REQUIRED.

SEE DETAIL 9/AE501.

3 CONTINUOUS BOX GUTTER - LINE GUTTER WITH "PEEL AND SEAL" ADHERED

MEMBRANE. MINIMIZE SEAMS - OVERLAP ALL JOINTS BY MINIMUM 6

4 SEE SHEETS AE108 AND AE208 FOR DEMOLITION AND NEW WORK AT BUILDING 16.

5 NO WORK IN THIS AREA.

6 EXISTING ROOF HATCH TO REMAIN.

7 EXISTING METAL CAP TO REMAIN - PREPARE SURFACE AND APPLY SELF-ADHERED

SBS.

8 RIDGE CAP BY SHINGLE MANUFACTURER TO MATCH ADJACENT SHINGLES - TYPICAL.

9 VALLEY FLASHING BY SHINGLE MANUFACTURER.

10 PROVIDE NEW STEP FLASHING AT INTERSECTION WITH WALL.

11 PROTECT EXISTING DOWNSPOUT DURING ALL PHASES OF CONSTRUCTION.

12 EXISTING ALUMINUM GUTTER TO REMAIN.

13 ALTERNATE #1: FALL PROTECTION ROOF ANCHOR SPACED AT 20’ O.C., NO MORE

THAN 24” FROM ROOF PEAK. INSTALL INTO STRUCTURAL FRAMING AND COORDINATE

WITH SHINGLE INSTALLATION.

14 CRICKET BY SHINGLE MANUFACTURER TO MATCH ADJACENT SHINGLES.

D R A W I N G N O T E S

G E N E R A L N O T E S

KEY PLAN

A. THE ROOFING SYSTEM SHALL BE COMPLETELY WATERTIGHT AT THE END OF EACH DAY’S

CONSTRUCTION ACTIVITY. IF TEMPORARY ROOFING STRATEGIES ARE USED, MATERIALS

INSTALLED SHALL SERVE THE SAME FUNCTION AS EXISTING MATERIALS AND WILL BE

COMPATIBLE WITH EXISTING ROOF SYSTEM.

B. CONTRACTOR SHALL RELOCATE EXISTING SURFACE-MOUNTED LIGHTNING PROTECTION

SYSTEM AS NEEDED. REINSTALL SYSTEM AT COMPLETION OF ROOF WORK IN EACH ROOF

AREA. CONTRACTOR SHALL RECERTIFY ENTIRE LIGHTNING PROTECTION SYSTEM AT

CONCLUSION OF PROJECT.

C. SEE LEAD BASED PAINT ABATEMENT REPORT AND SPECIFICATIONS FOR ABATEMENT WORK.

D. EXISTING PLUMBING VENTS ARE NOT SHOWN ON ROOF PLAN BUT SHALL BE INCLUDED IN THE

PROJECT BID AND COMPLETED ACCORDING TO DETAILS AND/OR ROOFING SYSTEM

REQUIREMENTS.

E. MISCELLANEOUS MECHANICAL, PLUMBING, OR ELECTRICAL PENETRATIONS THRU ROOF MAY

NOT BUT SHOWN BUT SHALL BE INCLUDED IN THE PROJECT BID AND COMPLETED

ACCORDING TO ROOFING SYSTEM REQUIREMENTS. COORDINATE REMOVAL WITH NEW

WORK PLANS AND SECTIONS. ALL PENETRATIONS SHALL BE FLASHED AND MAINTAIN

WATERTIGHTNESS THROUGHOUT COMPLETION OF CONSTRUCTION.

AE2101

AE210

AE502

TYP.

TYP.

TYP.

TYP.

TYP.

AE210

AE210 4

BUILDING 172

6:

6:

6:12

6:

6:12

4:

4:

6:12

6:

6:

6:

6:12

6:12

6:12

TYP.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

DRAWING OF 24

C :\U se rs

\c ar te \D oc um en ts

\0 _R ev it

Lo ca l M od el s\

\F

FE

_M ar io n

- W at er In fil tra tio n_

B1

(2

0) _c ar te r.d an ie l0

3.

rv t

3/

/2

4:

:3

PM

AE110

BUILDING 124 - ROOF PLAN

03/11/2021 PQ BL

MARION, INDIANA

#610-20-102CONSTRUCTION

DOCUMENTS

CORRECT WATER

INFILTRATION

SCALE: 1/8" = 1'-0"

BUILDING 124 - ROOF PLAN

1 REMOVE EXISTING ASPHALT SHINGLES AND UNDERLAYMENT - REPLACE

WITH NEW STONE COATED STEEL SHINGLES OVER #30 FELT

UNDERLAYMENT OVER EXISTING SHEATHING. REPLACE SHEATHING AND

INSULATION WHERE DAMAGED - ASSUME 10% SHEATHING AND

INSULATION REPLACEMENT AT RAFTERS - SEE SECTIONS AND DETAILS ON

AE501 AND AE502.

2 EXISTING METAL ROOF TO REMAIN - PREPARE SURFACE AND APPLY 3-PLY

SELF-ADHERED SBS MODIFIED BITUMIN MEMBRANE TO EXTENT OF METAL

ROOF AND EXTEND 24" UP ADJACENT ROOF SLOPE. INSTALL NEW

BLOCKING WHERE REQUIRED. SEE DETAIL 9/AE501.

3 EXISTING STONE CORNICE AND BOX GUTTER FRAMING TO REMAIN -

REPLACE EXISTING SHEET METAL LINER.

4 NO WORK IN THIS AREA.

5 REMOVE EXISTING MECHANICAL DUCTWORK TO BELOW ROOF SURFACE -

SUPPORT EXISTING WITHIN ATTIC SPACE - VERIFY EXHAUST IS INACTIVE

PRIOR TO CONSTRUCTION - PATCH OPENING WITH WOOF FRAMING AND

SHEATHING - PREPARE TO RECEIVE NEW SHINGLES

6 RIDGE CAP BY SHINGLE MANUFACTURER TO MATCH ADJACENT SHINGLES -

TYPICAL.

7 PROTECT EXISTING DOWNSPOUT DURING ALL PHASES OF

CONSTRUCTION.

D R A W I N G N O T E S

G E N E R A L N O T E S

KEY PLAN

A. THE ROOFING SYSTEM SHALL BE COMPLETELY WATERTIGHT AT THE END OF EACH DAY’S

CONSTRUCTION ACTIVITY. IF TEMPORARY ROOFING STRATEGIES ARE USED, MATERIALS

INSTALLED SHALL SERVE THE SAME FUNCTION AS EXISTING MATERIALS AND WILL BE

COMPATIBLE WITH EXISTING ROOF SYSTEM.

B. CONTRACTOR SHALL RELOCATE EXISTING SURFACE-MOUNTED LIGHTNING PROTECTION

SYSTEM AS NEEDED. REINSTALL SYSTEM AT COMPLETION OF ROOF WORK IN EACH ROOF

AREA. CONTRACTOR SHALL RECERTIFY ENTIRE LIGHTNING PROTECTION SYSTEM AT

CONCLUSION OF PROJECT.

C. SEE LEAD BASED PAINT ABATEMENT REPORT AND SPECIFICATIONS FOR ABATEMENT WORK.

D. EXISTING PLUMBING VENTS - COLOR: COPPER. INCLUDED IN THE PROJECT BID AND

COMPLETED ACCORDING TO DETAILS AND/OR ROOFING SYSTEM REQUIREMENTS.

E. MISCELLANEOUS MECHANICAL, PLUMBING, OR ELECTRICAL PENETRATIONS THRU ROOF MAY

NOT BUT SHOWN BUT SHALL BE INCLUDED IN THE PROJECT BID AND COMPLETED

ACCORDING TO ROOFING SYSTEM REQUIREMENTS. COORDINATE REMOVAL WITH NEW

WORK PLANS AND SECTIONS. ALL PENETRATIONS SHALL BE FLASHED AND MAINTAIN

WATERTIGHTNESS THROUGHOUT COMPLETION OF CONSTRUCTION.

TYP.

TYP.

9 9

TYP. TYP.

TYP.

14 14

TYP.

TYP.

TYP.

TYP.

TYP.

3 14 14 14

TYP.

TYP.

TYP.

TYP.

TYP.

TYP.

14 3

14 14

:7 AE201

:7 AE201

:5 AE201

:5 AE201

3 3

TYP.

TYP.

TYP.

TYP.

TYP.

TYP.

14 3

12 121212

BRICK TO BE CLEANED AND TUCK-POINTED - 530 SF - BUILDING 1

BRICK TO BE REMOVED AND REPLACED - 140 SF - BUILDING 1

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

DRAWING OF 24

C :\U se rs

\c ar te \D oc um en ts

\0 _R ev it

Lo ca l M od el s\

\F

FE

_M ar io n

- W at er In fil tra tio n_

B1 (2

0)

_c ar te r.d an ie l0

3.

rv t 3/

/2

2:

:1

PM

AE201

BUILDING 1 - ELEVATIONS

03/11/2021 PQ BL

MARION, INDIANA

#610-20-102CONSTRUCTION

DOCUMENTS

CORRECT WATER

INFILTRATION

1/8" = 1'-0"2 B1 - EAST ELEVATION

1/8" = 1'-0"3 B1 - WEST ELEVATION

1/8" = 1'-0"1 B1 - NORTH ELEVATION

1/8" = 1'-0"4 B1 - SOUTH ELEVATION

1 REMOVE EXISTING ASPHALT SHINGLES AND UNDERLAYMENT - REPLACE WITH

NEW STONE COATED STEEL SHINGLES OVER #30 FELT UNDERLAYMENT OVER

EXISTING SHEATHING. REPLACE SHEATHING AND INSULATION WHERE

DAMAGED - ASSUME 10% SHEATHING AND INSULATION REPLACEMENT AT

RAFTERS - SEE SECTIONS AND DETAILS ON AE501 AND AE502.

2 REPLACE EXISTING BOX GUTTER - INSTALL NEW METAL GUTTER BOX, PEEL &

SEAL LINER, AND METAL CORNICE PROFILE AND ASSOSICATED BLOCKING - SEE

DETAILS ON AE501 AND AE502.

3 REMOVE EXISTING LOOSE OR RECEDING MORTAR FROM JOINT - TUCKPOINT

WITH NEW MORTAR - STAIN ALL NEW MORTAR TO MATCH EXISTING COLOR.

4 REMOVE EXISTING ROOF HATCH - PATCH OPENING WITH WOOD FRAMING AND

SHEATHING - PREPARE TO RECEIVE NEW SHINGLES.

5 REMOVE AND REPLACE EXISTING METAL ROOF WITH NEW STANDING SEAM

METAL ROOF - COLOR: COPPER.

6 CLEAN AND TUCK-POINT BRICK NEAR DOWNSPOUT.

7 NEW 3"X4" COPPER COLOR DOWNSPOUT TO EXISTING BOOT.

8 NEW 3"X4" COPPER COLOR DOWNSPOUT TO EXISTING BOOT.

9 EXISTING DOWNSPOUT BOOT TO REMAIN.

10 EXISTING CORNICE WORK TO REMAIN - PAINT TO MATCH NEW CORNICE WORK.

11 NEW STEP FLASHING AT ROOF AND WALL INTERSECTION

12 NEW BASE FLASHING

13 RIDGE CAP BY SHINGLE MANUFACTURER TO MATCH ADJACENT SHINGLES -

TYPICAL.

14 REMOVE EXISTING DAMAGED BRICK - REPLACE WITH NEW BRICK TO MATCH

EXISTING IN SIZE, COLOR, AND SURFACE - STAIN ALL NEW MORTAR TO MATCH

EXISTING COLOR.

15 EXISTING PORCH ROOF TO REMAIN.

16 REMOVE LOOSE FACE OF LIMESTONE SILL - SEAL AND STAIN TO MATCH

ADJACENT LIMESTONE SILL IN COLOR.

17 NEW GUTTER FORMED FROM SAME MATERIAL AS ROOF PANELS - COLOR:

COPPER.

18 INSTALL CLAMP-TO-SEAM SNOW GUARDS AT 24" AND 36" FROM FASCIA BOARD -

16" O.C. - COLOR: COPPER TO MATCH ROOFING MATERIAL.

A. THE ROOFING SYSTEM SHALL BE COMPLETELY WATERTIGHT AT THE END OF EACH DAY’S

CONSTRUCTION ACTIVITY. IF TEMPORARY ROOFING STRATEGIES ARE USED, MATERIALS

INSTALLED SHALL SERVE THE SAME FUNCTION AS EXISTING MATERIALS AND WILL BE

COMPATIBLE WITH EXISTING ROOF SYSTEM.

B. CONTRACTOR SHALL RELOCATE EXISTING SURFACE-MOUNTED LIGHTNING PROTECTION

SYSTEM AS NEEDED. REINSTALL SYSTEM AT COMPLETION OF ROOF WORK IN EACH ROOF

AREA. CONTRACTOR SHALL RECERTIFY ENTIRE LIGHTNING PROTECTION SYSTEM AT

CONCLUSION OF PROJECT.

C. SEE LEAD-BASED PAINT REPORT AND SPECIFICATION FOR ABATEMENT INFORMATION.

D. EXISTING PLUMBING VENTS - COLOR: COPPER. INCLUDED IN THE PROJECT BID AND

COMPLETED ACCORDING TO DETAILS AND/OR ROOFING SYSTEM REQUIREMENTS.

E. ALL DOORS AND WINDOWS ARE EXISTING TO REMAIN UNLESS NOTED OTHERWISE.

D R A W I N G N O T E S

G E N E R A L N O T E S

1/8" = 1'-0"5 Elevation 2 - a 1/8" = 1'-0"7 Elevation 1 - a

2 2

TYP.

TYP.

10 44

TYP.

TYP.

TYP.

TYP.

4 4

TYP.

TYP.

2 2 2 2

TYP. TYP.

5 5 5 5 5 5

TYP.

TYP.

TYP.

9 9

3 3

4 44 4

2 22 2

TYP.

TYP.

TYP. TYP.

TYP.

12 12

1414 1414

BRICK TO BE CLEANED AND TUCK-POINTED - 340 SF - BUILDING 2

BRICK TO BE REMOVED AND REPLACED - 24 SF - BUILDING 2

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

DRAWING OF 24

C :\U se rs

\c ar te \D oc um en ts

\0 _R ev it

Lo ca l M od el s\

\F

FE

_M ar io n

- W at er In fil tra tio n_

B2 (2

0)

_c ar te r.d an ie l0

3.

rv t 3/

/2

4:

:3

PM

AE202

BUILDING 2 - ELEVATIONS

03/11/2021 PQ BL

MARION INDIANA

#610-20-102CONSTRUCTION

DOCUMENTS

CORRECT WATER

INFILTRATION

1/8" = 1'-0"2 B2 - EAST ELEVATION

1/8" = 1'-0"3 B2 - WEST ELEVATION

1/8" = 1'-0"1 B2 - NORTH ELEVATION

1/8" = 1'-0"4 B2 - SOUTH ELEVATION

1 REMOVE EXISTING ASPHALT SHINGLES AND UNDERLAYMENT - REPLACE WITH

NEW STONE COATED STEEL SHINGLES OVER #30 FELT UNDERLAYMENT OVER

EXISTING SHEATHING. REPLACE SHEATHING AND INSULATION WHERE

DAMAGED - ASSUME 10% SHEATHING AND INSULATION REPLACEMENT AT

RAFTERS - SEE SECTIONS AND DETAILS ON AE501 AND AE502.

2 REPLACE EXISTING BOX GUTTER - INSTALL NEW METAL GUTTER BOX, PEEL &

SEAL LINER, AND METAL CORNICE PROFILE AND ASSOSICATED BLOCKING - SEE

DETAILS ON AE501 AND AE502.

3 REMOVE EXISTING ROOF HATCH - PATCH OPENING WITH WOOD FRAMING AND

SHEATHING - PREPARE TO RECEIVE NEW SHINGLES.

4 REMOVE EXISTING LOOSE OR RECEDING MORTAR FROM JOINT - TUCKPOINT

WITH NEW MORTAR - STAIN ALL NEW MORTAR TO MATCH EXISTING COLOR.

5 PROTECT EXISTING DOWNSPOUT DURING ALL PHASES OF CONSTRUCTION.

6 EXISTING DOWNSPOUT BOOT TO REMAIN.

7 RIDGE CAP BY SHINGLE MANUFACTURER TO MATCH ADJACENT SHINGLES -

TYPICAL.

8 EXISTING CORNICE WORK TO REMAIN - PAINT TO MATCH NEW CORNICE WORK.

9 NEW STEP FLASHING AT ROOF AND WALL INTERSECTION

10 REMOVE EXISTING DAMAGED BRICK - REPLACE WITH NEW BRICK TO MATCH

EXISTING IN SIZE, COLOR, AND SURFACE - STAIN ALL NEW MORTAR TO MATCH

EXISTING COLOR.

11 EXISTING PORCH ROOF TO REMAIN.

12 NEW 3"X4" COPPER COLOR DOWNSPOUT TO EXISTING BOOT.

13 REMOVE AND REPLACE EXISTING METAL ROOF WITH NEW STANDING SEAM

METAL ROOF - COLOR: COPPER.

14 NEW BASE FLASHING

15 NEW GUTTER FORMED FROM SAME MATERIAL AS ROOF PANELS - COLOR:

COPPER

16 INSTALL CLAMP-TO-SEAM SNOW GUARDS AT 24" AND 36" FROM FASCIA BOARD -

16" O.C. - COLOR: COPPER TO MATCH ROOFING MATERIAL.

A. THE ROOFING SYSTEM SHALL BE COMPLETELY WATERTIGHT AT THE END OF EACH DAY’S

CONSTRUCTION ACTIVITY. IF TEMPORARY ROOFING STRATEGIES ARE USED, MATERIALS

INSTALLED SHALL SERVE THE SAME FUNCTION AS EXISTING MATERIALS AND WILL BE

COMPATIBLE WITH EXISTING ROOF SYSTEM.

B. CONTRACTOR SHALL RELOCATE EXISTING SURFACE-MOUNTED LIGHTNING PROTECTION

SYSTEM AS NEEDED. REINSTALL SYSTEM AT COMPLETION OF ROOF WORK IN EACH ROOF

AREA. CONTRACTOR SHALL RECERTIFY ENTIRE LIGHTNING PROTECTION SYSTEM AT

CONCLUSION OF PROJECT.

C. SEE ASBESTOS ABATEMENT REPORT AND SPECIFICATIONS FOR ABATEMENT WORK.

D. EXISTING PLUMBING VENTS ARE NOT SHOWN ON ROOF PLAN BUT SHALL BE INCLUDED IN THE

PROJECT BID AND COMPLETED ACCORDING TO DETAILS AND/OR ROOFING SYSTEM

REQUIREMENTS.

E. ALL DOORS AND WINDOWS ARE EXISTING TO REMAIN UNLESS NOTED OTHERWISE.

D R A W I N G N O T E S

G E N E R A L N O T E S

TYP.

TYP.

TYP. TYP.

TYP.

3 11

TYP.

TYP.

5 5

TYP.TYP.

TYP.

TYP.

TYP.

TYP.

TYP.

TYP.

TYP.

:5 AE203

:5 AE203 :6 AE203

:6 AE203

44 4

TYP.

TYP.

TYP.

TYP.

TYP.

TYP.

148 88

BRICK TO BE CLEANED AND TUCK-POINTED - 710 SF - BUILDING 3

BRICK TO BE REMOVED AND REPLACED - 70 SF - BUILDING 3

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .