Contract_Specifications.pdf
PDF 27 MB Posted
- Attached to
- Bartlett Lake Improvements (Project No. 20066-110) State and local contract opportunity
- Solicitation number
- IFB- 25 - 258
- Issued by
- Pinellas County, Florida
About this file
The file is a comprehensive set of contract specifications and technical documents for the Bartlett Lake Improvements Project (No. 20066-110) issued by the City of St. Petersburg's Engineering & Capital Improvements Department. The project involves maintenance dredging of Bartlett Lake, located in St. Petersburg, Florida, with an estimated 22,806 cubic yards of primarily muck/mud sediment to be removed from a 2.62-acre area. The dredging will be performed to a maximum depth of -5 feet Mean Low Water (MLW), with an additional overdredge allowance to -6 feet MLW. The project allows for two potential dredging methods: mechanical or hydraulic, and bidders are required to provide estimates for a base bid and two alternates, with the City planning to authorize only one alternate as part of the contract award.
The project is funded by the City of St. Petersburg and has received necessary permits from the Florida Department of Environmental Protection, U.S. Army Corps of Engineers, and Pinellas County Water and Navigation Department. The total project budget and specific funding sources are not explicitly detailed in the documents. The contract includes provisions for site restoration, environmental protection, manatee observation, turbidity monitoring, and strict adherence to water quality standards. Dredged material will be dewatered at a designated temporary workspace and subsequently transported to the Pinellas County Solid Waste Disposal Complex. The project includes comprehensive requirements for sediment testing, disposal, and environmental compliance, with specific conditions regarding work hours, safety protocols, and potential impacts to the surrounding ecosystem.
View the file
Other files for this state and local contract opportunity
| File | Type | Posted |
|---|---|---|
| CITY_OF_ST_PETE_PURCHASING_48736-1_PROOF_1.pdf | ||
| CITY_OF_ST_PETE_PURCHASING_48736-1_RECEIPT.pdf | ||
| Bartlett_Lake_Improvements_(Project_No._20066-110).pdf | ||
| SAM.gov_DB_Heavy_Construction_Brevard_County.pdf | ||
| APPENDIX_II_TO_PART_200_MBE-WBE_and_FL_Section_3_3.8.24.docx | DOCX document | |
| Base_Agreement.pdf | ||
| Public_Construction_Bond.pdf | ||
| Florida_Trench_Safety_Act.pdf | ||
| Bid_Plans.pdf | ||
| Bidder_Security_Information.pdf | ||
| Pay_Items-Price_Page_MULTI-TABBED.xlsx | XLSX spreadsheet | |
| Insurance_Requirements_-_INTERNAL_USE_ONLY.pdf | ||
| Solicitation_Development_Form_-_INTERNAL_USE_ONLY.pdf |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CITY OF ST. PETERSBURG
ENGINEERING & CAPITAL IMPROVEMENTS DEPARTMENT
Bartlett Lake Improvements
ST. PETERSBURG, FLORIDA
PROJECT NO. 20066-110
Plans, specifications and details governing the Work to be accomplished under Project No.
20066-110 have been prepared for the City of St. Petersburg by Engineering & Capital Improvements Department, One Fourth Street North, St. Petersburg, Florida, 33701, and Stantec Consulting Services, Inc., 777 S. Harbour Island Blvd., Suite 600 Tampa, FL 33602, and consist of Drawing Nos. C-000.
All communication pertaining to this project shall carry the reference, “CITY PROJECT NO. 20066-110”
Brejesh Prayman, P.E., Director
Engineering & Capital Improvements http://www.stpete.org/logo/images/city_logo_color.gif
TABLE OF CONTENTS
Project No. 20066-110
Rev: 08/09/23 TOC-1
REQUIRED BIDDER DOCUMENTS* (Attached, PDF and Excel Documents)
* Draft Agreement, Bid Bond, Public Construction Bond, and additional Compliance forms will be provided by Procurement.
Bidder Security and Bidder Information Florida Trench Safety Act Pay Items - Price Page Bidder’s Supplemental Questionnaire
CONTRACT SPECIFICATIONS
CONTRACT STANDARDS
Instructions to Bidders General Conditions Supplemental General Conditions
TECHNICAL SPECIFICATIONS
Section 1 - General
1.01 Location of the Work Site and Access
1.02 Scope of Work
1.03 Estimated Quantities
1.04 Plans and Specifications
1.05 Permits
1.06 Project Sign and/or Plaque
1.07 Project Work Hours/Field Supervision
1.08 Project Schedule Documentation
1.09 Storm Preparedness Plan
1.10 Maintenance of Storm Drainage System
1.11 Prevention, Control, and Abatement of Erosion and Water Pollution
1.12 Contaminants Containment/Disposition
1.13 Field Engineering
1.14 Inspection Authority
1.15 Sequence of Operation
1.16 Mobilization
1.17 Temporary Traffic Control
1.18 Materials and Equipment
1.19 Manufacturer
1.20 Samples
1.21 Equivalent Quality
1.22 Service of Manufacturer’s Representative
1.23 Material and Equipment Delivery and Storage
1.24 Water Purchase
Rev: 08/09/23 TOC-2
1.25 Special Considerations for Work
1.26 Field Office and Appurtenant Structures
1.27 Truck Haul Routes
1.28 Work in Streets and Highways
1.29 Work on Private Property
1.30 Neighborhood Notification
1.31 Utilities
1.32 Coordination of Service Interruptions
1.33 Safeguarding Survey Marks
1.34 Tree Protection
1.35 Tree Removal, Replacement or Relocation
1.36 Salvaged Materials
1.37 Shop, Field and Laboratory Testing
1.38 Soils Density Tests
1.39 As-Built Drawings
1.40 Substantial Completion
Section 2 - Excavation and Backfill
2.01 General
2.02 Trench Safety
2.03 Work in Wetlands, Mangroves and Preservation Areas
2.04 Clearing and Grubbing
2.05 Roadway Excavation
2.06 Trench Excavation
2.07 Structure Excavation
2.08 Excavation of Unsuitable Material
2.09 Sheeting, Shielding and Sloping
2.10 Dewatering
2.11 Borrow Material
2.12 Bedding Material
2.13 Structural Slab Bedding
2.14 Backfill Compaction
2.15 Backfilling of Trench
2.16 Backfilling Structures
2.17 Backfilling under Roadways
2.18 Disposing of Leftover Material
2.19 Adjacent Facilities
2.20 Temporary Supports
2.21 Flowable Fill
Section 3 - Concrete, Masonry, and Reinforcing Steel
Rev: 08/09/23 TOC-3
3.01 General
3.02 Portland Cement Concrete
3.03 Reinforcing Steel
3.04 Fibrous Concrete Reinforcement
3.05 Placement of Reinforcement
3.06 Placement of Concrete
3.07 Curing of Concrete
3.08 Finishing of Concrete
3.09 Concrete Brick
3.10 Clay Brick
3.11 Masonry Block
3.12 Mortar
3.13 Grout
Section 4 - Piping Materials: Ductile Iron Pipe
4.01 General
4.02 Pipe
4.03 Fittings
4.04 Joint – Buried Pipe and Fittings
4.05 Joints – Exposed Pipe and Fittings
Section 5 - Piping Materials: Concrete Gravity Pipe
5.01 General
5.02 Pipe
5.03 Joints
Section 6 - Piping Materials: PVC Pressure Pipe
6.01 General
6.02 Pipe
6.03 Fittings
6.04 Joints
6.05 Markings and Color Coding
6.06 Harnessing
Section 7 - Piping Materials: Miscellaneous
7.01 General
7.02 Vitrified Clay Pipe
7.03 Corrugated Metal Pipe
7.04 Corrugated Aluminum Pipe
7.05 Roadway Underdrain Pipe
7.06 Corrugated High Density Polyethylene (CHDPE) Drainage Pipe and Fittings, Smooth Interior
Rev: 08/09/23 TOC-4
7.07 High Density Polyethylene (HDPE) Profile Wall Drainage Pipe and Fittings, Smooth Interiors
7.08 High Density Polyethylene (HDPE) Pressure Pipe and Fittings
7.09 Fiberglass Reinforced Polymer Mortar Pipe (FRPMP)
Section 8 - Paving Materials
8.01 General
8.02 Subgrade Stabilizing Material
8.03 Roadway Base
8.04 Prime and Tack Coats
8.05 Leveling Course
8.06 Asphaltic Concrete Surface Course and Binder Course
8.07 Reclaimed Asphalt Pavements
8.08 Surface Shell
Section 9 - Roadway Construction
9.01 General
9.02 Data to Be Submitted
9.03 Stabilized Subgrade
9.04 Roadway Base
9.05 Prime and Tack Coats
9.06 Leveling Course (Asphaltic Concrete Overbuild Course)
9.07 Asphaltic Concrete Pavement
9.08 Concrete Sidewalks and Driveways
9.09 Curbs, Gutters and Valley Gutters
9.10 Shallow Pipes
9.11 Adjustment of Existing Manhole Covers and Valve Boxes
Section 10 - Sanitary Sewer Construction
10.01 General
10.02 Data to Be Submitted
10.03 Materials
10.04 Connections to Existing Sanitary Sewers
10.05 Construction Operations
10.06 Laying and Jointing Pipelines
10.07 Manhole Construction
10.08 Testing of Sewer Pipelines
Section 11 - Storm Drainage Construction
11.01 General
11.02 Data to Be Submitted
11.03 Materials
Rev: 08/09/23 TOC-5
11.04 Inlets and Manholes
11.05 Other Structures
11.06 Laying Pipe
11.07 Water Quality Protection and Treatment
11.08 Surface Restoration and Miscellaneous
Section 12 - Pressure Pipe Construction
12.01 General
12.02 Data to Be Submitted
12.03 Materials
12.04 Connections to Existing Mains
12.05 Construction Operations
12.06 Laying and Jointing Pressure Pipelines
12.07 Testing and Disinfection of Pressure Pipelines
12.08 Surface Restoration and Miscellaneous
Section 13 - Surface Restoration
13.01 General
13.02 Roadway Restoration
13.03 Temporary Pavement
13.04 Shell Base
13.05 Limerock Base
13.06 Crushed (Reclaimed) Concrete Base
13.07 Asphaltic Concrete Pavement
13.08 Brick Pavement
13.09 Curb and Gutter
13.10 Concrete Sidewalk
13.11 Hexagon Block Sidewalk
13.12 Driveway and Parking Lot
13.13 Driveway – Asphalt
13.14 Driveway – Concrete
13.15 Driveway – Peagravel
13.16 Driveway – Shell
13.17 Grass
13.18 Expansion Joint Material
Section 14 - Miscellaneous Work
14.01 General
14.02 Riprap
14.03 Sanitary Sewer Replacement
14.04 Concrete Encasement of Existing Utilities
14.05 Guardrail
Rev: 08/09/23 TOC-6
14.06 Chain-Link Fence
14.07 Aluminum Handrail
Section 15 - Precast Concrete Box Culvert Construction
15.01 General
15.02 Data to Be Submitted
15.03 Fabrication
15.04 Trench, Placement and Backfilling
15.05 Joints
Section 16 - Horizontal Directional Drilling
16.01 General
16.02 Data to Be Submitted
16.03 Equipment and Materials
16.04 Pipe Installation
16.05 Marking the Installation
16.06 Hydrostatic Testing and Disinfection of HDPE Pipe
Section 17 – Not Used
Section 18 - Milling and Resurfacing
18.01 General
18.02 Data to be Submitted
18.03 Work Schedule
18.04 Roadway Base
18.05 Prime and Tack Coats
18.06 Asphaltic Concrete Surface Course
18.07 Street Resurfacing Work
18.08 Cold Milling Work
Section 19 - Finish Coating
19.01 Description
19.02 Materials
19.03 Surface Preparation
19.04 Acceptance
Section 20 - Pay Item Descriptions
20.01 Introduction
20.02 General – G
20.03 Surface Restoration – C
20.04 Miscellaneous – M
SUPPLEMENTAL TECHNICAL SPECIFICATIONS
Rev: 08/09/23 TOC-7
TS-1.0 Scope Of Work TS-2.0 Pre-Construction Meeting And Submittals.
TS-3.0 Order Of Work TS-4.0 Layout Of The Work TS-5.0 Record Drawings And As-Built Surveys TS-6.0 Site Conditions TS-7.0 Site Restoration TS-8.0 General Materials TS-9.0 Environmental Protection.
TS-10.0 Permits TS-11.0 General Construction Notes TS-12.0 Safety Notes TS-13.0 Dewatering Site Notes TS-14.0 Dredge Construction Notes TS-15.0 Standard Manatee Construction Conditions
ATTACHMENTS
A Florida Department Of Environmental Protection Permit Exemption Letter B United States Army Corps Of Engineers Permit C Pinellas County Water And Navigation Department Permit D Sediment Quality Report
INSTRUCTIONS TO BIDDERS & GENERAL CONDITIONS
City of St. Petersburg, Florida
Engineering & Capital Improvements Department
Contract Standards:
Instructions to Bidders v.00753149
General Conditions v.00752973
July 2024 http://www.stpete.org/logo/images/city_logo_color.gif
INSTRUCTIONS TO BIDDERS
ARTICLE I-1 GENERAL INFORMATION
ARTICLE I-2 DEFINITIONS OF TERMS
ARTICLE I-3 EXAMINATION OF BID PACKAGE DOCUMENTS
3.1 – Completeness of Bid Package
3.2 – Bidder’s Responsibility to the Project
3.3 – Contract Documents: Conflicts, Ambiguities, or Exceptions
3.4 – Contract Completion Time
ARTICLE I-4 BID GUARANTY
4.1 – Certified Check or Bid Bond
4.2 – Return of Checks
ARTICLE I-5 SUBMISSION OF BIDS
5.1 – Submission of Bids
5.2 – Bid Form
5.3 – Basis of Bid Prices
5.4 – Bid Preparation
5.5 – Addenda
5.6 – Bid for Alternates
5.7 – Period Bid Remains in Effect
ARTICLE I-6 EXAMINATION OF THE SITE
6.1 – Familiarity with Site Conditions
6.2 – Extents and Locations of Subsurface Conditions
ARTICLE I-7 TABULATION OF THE BIDS
7.1 – Correction of Mathematical Errors
7.2 – Preparation and Distribution of Bid Tabulation
ARTICLE I-8 REJECTION OF THE BIDS OR AWARD WITHIN BUDGET AMOUNT
8.1 – Rejection of Bids
8.2 – City Budget
ARTICLE I-9 WAIVER OF IRREGULARITIES
ARTICLE I-10 DISQUALIFICATION OF BIDDERS
ARTICLE I-11 DISPUTES AND COMPLAINTS
ARTICLE I-12 RECOMMENDATION OF AWARD OF CONTRACT
12.1 – Standard for Award
12.2 – Factors Determining Whether a Bidder is Responsible
12.3 – Factors Rendering Bidders Non-Responsive
12.4 – Recommendation of Award
ARTICLE I-13 SPECIAL PROVISIONS DUE TO FEDERAL FINANCING
ARTICLE I-14 SUBCONTRACTORS
14.1 – Prior Approval
14.2 – Subletting of Contract
ARTICLE I-15 NONDISCRIMINATION
ARTICLE I-16 WITHDRAWAL OF BIDS
ARTICLE I-17 PUBLIC ENTITY CRIMES
ARTICLE I-18 SMALL BUSINESS ENTERPRISE PROGRAM
18.1– Participation by SBE Contractors and Subcontractors
18.2 - Acknowledgment with Bid
ARTICLE I-19 CONSIDERATION OF SEA LEVEL RISE AND RESILIENCY
ARTICLE I-20 ENVIROMENTALLY PREFERABLE PURCHASING
ARTICLE I-21 AMERICANS WITH DISABILITIES ACT (ADA) PUBLIC NOTICE
ARTICLE I-22 HEALTH IN ALL POLICIES AND PROJECTS
ARTICLE I-23 INFORMATION DESIGNATED A TRADE SECRET AND/OR CONFIDENTIAL
AND/OR PROPRIETARY
GENERAL CONDITIONS
ARTICLE G-1 DEFINITION OF TERMS
ARTICLE G-2 REPRESENTATIONS AND WARRANTIES
ARTICLE G-3 PROJECT SCHEDULE
ARTICLE G-4 PROGRESS CHARTS
ARTICLE G-5 INTENT AND USE OF THE CONTRACT
5.1 – Relationship Between Documents
5.2 – References to Other Documents
5.3 – Contract Document Ownership
5.4 – Intent of the Plans
5.5 – Intent of the Specifications
5.6 – Intent of the Contract
5.7 – Record Documents
5.8 – Records Retention
ARTICLE G-6 OMISSIONS OR ERRORS IN THE CONTRACT
ARTICLE G-7 INTERPRETATIONS
ARTICLE G-8 APPLICABLE LAWS AND REGULATIONS
ARTICLE G-9 ROYALTIES AND PATENTS
ARTICLE G-10 ACCIDENT PREVENTION
ARTICLE G-11 PUBLIC CONVENIENCE AND SAFETY
11.1 – Requirements for the Protection of the Work, Personnel and Property
11.2 – Public Convenience
ARTICLE G-12 NOISE ABATEMENT
ARTICLE G-13 WORK DAYS
ARTICLE G-14 NO WAIVER OF RIGHTS
ARTICLE G-15 SEPARATE CONTRACTS
ARTICLE G-16 COORDINATION OF THE WORK
ARTICLE G-17 CONFERENCES AND CORRESPONDENCE
17.1 – Pre-construction Conference
17.2 – Correspondence to the Contractor
17.3 – Correspondence to the City
ARTICLE G-18 CONSTRUCTION MEANS AND METHODS
ARTICLE G-19 CONTRACTOR’S OBLIGATION TO PERFORM
ARTICLE G-20 RESPONSIBILITY OF THE CITY
20.1 – Contractual Representative
20.2 – Issuance of Change Orders and Field Orders
20.3 – Preparation of Additional Drawings
ARTICLE G-21 CITY’S RIGHT TO DO WORK
ARTICLE G-22 CITY’S RIGHT TO STOP OR SUSPEND WORK
ARTICLE G-23 MATERIAL AND EQUIPMENT DELIVERY
ARTICLE G-24 STORAGE OF MATERIALS
24.1 – Proper Storage
24.2 – Use of Premises
24.3 – Use of Chemicals
ARTICLE G-25 QUALITY OF MATERIALS AND WORKMANSHIP
ARTICLE G-26 SANITARY FACILITIES FOR CONSTRUCTION PERSONNEL
ARTICLE G-27 SUBCONTRACTORS
27.1 – Division of the Work for Contractors
27.2 – Contractor’s Responsibility for Subcontractors
27.3 – City’s Responsibility to Subcontractors and Material Suppliers
27.4 – Agreement with Subcontractors
ARTICLE G-28 SMALL BUSINESS ENTERPRISE PROGRAM
ARTICLE G-29 CONTRACTOR’S EMPLOYEES
ARTICLE G-30 CONTRACTOR TO BE REPRESENTED
30.1 – Office Supervision
30.2 – Field Supervision
ARTICLE G-31 TESTS AND INSPECTIONS
31.1 – Tests of Materials
31.2 – Inspections
31.3 – Defective Work
ARTICLE G-32 UNCOVERING OF WORK
32.1 – Uncovering Work Requiring Prior Inspection
32.2 – Uncovering Work Not Requiring Prior Inspection
ARTICLE G-33 UNFORESEEN SUBSURFACE CONDITIONS
ARTICLE G-34 SUBSTITUTIONS DURING CONSTRUCTION
ARTICLE G-35 CHANGES IN THE WORK
35.1 – City’s Right to Request Change Orders
35.2 – Recognition of Extra Work
35.3 – Determining Change Order Prices
35.4 – Disputes Regarding Change Order Prices
35.5 – Contractor’s Right to Request Change Orders
35.6 – Monetary Compensation for Delays
35.7 – Unauthorized Work/Emergency Work
35.8 – Preparation of Change Orders
35.9 – Changes in Contract Time
ARTICLE G-36 SHOP DRAWINGS AND SUBMITTALS
36.1 – Shop Drawings – General
36.2 – Requirements
36.3 – Contractor’s Responsibility
36.4 – Engineer’s Review of Submittals
ARTICLE G-37 CHANGES IN SHIPPED MATERIAL
37.1 – Materials Requiring Submittal Approval Prior to Shipment
37.2 – Materials Not Requiring Submittal Approval Prior to Shipment
ARTICLE G-38 WORK IN INCLEMENT WEATHER
ARTICLE G-39 QUANTITIES OF WORK
39.1 – Unit Price Items
39.2 – Lump Sum Items
ARTICLE G-40 AS-BUILT DRAWINGS
ARTICLE G-41 OPERATION AND MAINTENANCE MANUALS
ARTICLE G-42 CLEAN UP
ARTICLE G-43 SUBSTANTIAL COMPLETION
ARTICLE G-44 FINAL INSPECTION
ARTICLE G-45 PAYMENTS
45.1 – Partial Payment
45.2 – Payment for Materials Stored On- and Off-Site
45.3 – The City’s Right to Decline, Reduce or Delay Payments
45.4 – Final Payment
ARTICLE G-46 GUARANTEE PERIOD
ARTICLE G-47 LIENS
ARTICLE G-48 CLAIMS AND DISPUTES
48.1 – Initial Referral to the Engineer
48.2 – Protesting the Engineer’s Decision
ARTICLE G-49 TERMINATION OF THE CONTRACT
49.1 – Reasons for Termination
49.2 – Settlement of Payment
ARICTLE G-50 PUBLIC RECORDS
ARTICLE G-51 SCRUTINIZED COMPANIES
ARTICLE G-52 DISCHARGES BY CONTRACTOR AND CORRECTIVE ACTION PLANS
ARTICLE G-53 INDEMNIFICATION
ARTICLE G-54 INSURANCE
54.1 – Workers’ Compensation Insurance
54.2 – U.S. Longshore and Harbor Worker’s Act Insurance
54.3 – Commercial General Liability Insurance
54.4 – Commercial Automobile Insurance
54.5 – Builder’s Risk Insurance
54.6 – Pollution/Environmental Liability Insurance
54.7 – Professional Liability Insurance
ARTICLE G-55 PUBLIC CONSTRUCTION BOND
ARTICLE G-56 SUSTAINABILITY & RESILIENCY
Contract Standards Instructions to Bidders
July 2024
INSTRUCTIONS TO BIDDERS
ARTICLE I-1 GENERAL INFORMATION
The construction work called for within this bidding package involves work for the City of St.
Petersburg as Owner. Bidders are cautioned to carefully follow the instructions of this section to help ensure that their Bids are responsive to the requirements as presented herein.
ARTICLE I-2 DEFINITIONS OF TERMS
In addition to the definition of terms provided in this Instructions to Bidders section, the definitions set forth in the Agreement and the General Conditions apply to this Instructions to Bidders section.
ADDENDA/ADDENDUM – Written or graphic instruments issued prior to receipt of Bids which modify or interpret the Contract Documents, Plans and/or Specifications by additions, deletions, clarifications and/or corrections.
BASE BID PRICE – The total price for the Bid, excluding Alternates.
BID DOCUMENTS – Bid forms and Bid bond forms making up the Solicitation issued by the City for this Project.
BIDDER – Individuals or entities submitting Bids for the Project.
BID OPENING – The stage in the solicitation process in which the Bids are publicly opened by the City and read aloud.
NOTICE OF CONTRACT AWARD – Written notice by the City to the apparent successful Bidder stating award of the Project.
RECORDED BIDDERS – All Bidders to which the City has sent the Solicitation and all Bidders that attended the pre-Bid conference.
TOTAL BID PRICE – The total price for the Bid, which includes the Base Bid Price and Alternates.
ARTICLE I-3 EXAMINATION OF BID PACKAGE DOCUMENTS
3.1 Completeness of Bid Package
The physical makeup and content of the Contract Documents are designed to be complete for the preparation and submittal of Bids. However, the Bidder shall verify to its own satisfaction that all material issued to the Bidder including Addenda, is complete. Should the Bidder discover that a page, sheet, or other item is missing, it shall so notify the City and the City will forward the missing item(s) to the Bidder. After Bids have been submitted, no claims of ignorance of the requirements of bidding or of construction, due to such missing material, including Addenda, will be recognized.
3.2 Bidder’s Responsibility to the Project
The submission of a Bid will constitute an incontrovertible representation by the Bidder that it has or will comply with all provisions of the Contract Documents, and that the Contract Documents are sufficient in scope and detail to indicate and convey understanding of all terms and conditions for the performance of the Work, and that the Bidder has thoroughly reviewed the Plans and Specifications and has included all required labor and material in its Bid.
Inasmuch as it is not standard practice to detail all controls, wiring, piping and appurtenances, etc. required to render each piece of equipment functional on the Plans, the Bidder is cautioned to ensure that its Bid includes all such items necessary to permit the equipment to function as intended in a manner that meets all applicable codes, is free from defects and abnormal conditions, and provides a complete and operational system.
3.3 Contract Documents: Conflicts, Ambiguities, or Exceptions
Should any particular requirement in the Plans and/or Specifications for the Project appear to a Bidder to be in disagreement with other requirements in the Contract Documents, if a Bidder is unsure of the intent or meaning of any particular requirement of the Contract Documents, or if the Bidder takes exception to any terms and conditions of the Solicitation, the Bidder shall immediately notify the City via email to the procurement analyst listed in the Solicitation documents at least seven (7) calendar days prior to bid closing.
If such notifications are received by the City prior to the deadline for questions indicated in the Solicitation, the City will, if deemed by the City to be warranted, issue a written clarification or an Addendum to all Recorded Bidders. A Bid submitted with exceptions may be rejected as being non-responsive.
Explanations or instructions shall not materially alter the Contract Documents unless they are in writing. Oral explanations or instructions given before the award of a contract will not be binding.
3.4 Contract Completion Time
The City will require that Work under this Contract be completed within the time limit stipulated in the Contract Documents, and Bidders must consider this requirement when submitting Bids. If a Bidder is of the opinion that more time should be allowed for accomplishing the Work, a request for such extra time may be made in writing to the Procurement and Supply Management Director.
For consideration, said request must be received by this office prior to the deadline for questions indicated in the Solicitation. If the Procurement and Supply Management Director deems it to be in the best interest of the City to revise the time requirement, an Addendum will be issued and furnished to all Bidders.
ARTICLE I-4 BID GUARANTY
4.1 Certified Check or Bid Bond
Bids shall be accompanied by a certified check, cashier’s check or Bid Bond in the amount of not less than 5% of the Base Bid Price. The certified check or Bid Bond, and the monies payable thereon, shall be paid into the funds of the City of St. Petersburg, Florida, as liquidated damages, if the Bidder fails to execute the written Contract and furnish the required Public Construction Bond within ten (10) calendar days following Notice of Contract Award. The Bid Bond shall be furnished by a Surety company duly authorized to do business in the State of Florida. The Surety company shall have a rating classification of “A” and a financial category of Class VII as evaluated in the current Best’s Key Rating Guide, Property – Liability.
4.2 Return of Checks
Bid securities submitted by Bidders in the form of a certified check or cashier’s check will be held or deposited into the funds of the City of St. Petersburg and will be refunded or returned to the parties submitting same not later than thirty (30) days after execution of the Contract. In the event that all Bids are rejected, checks will be refunded to all Bidders within fifteen (15) calendar days after date of rejection.
ARTICLE I-5 SUBMISSION OF BIDS
5.1 Submission of Bids
The Bidder shall submit a complete Bid electronically through the City’s iSupplier portal. Bids will be received as stipulated in the Solicitation until the time and date specified in the Solicitation.
5.2 Bid Form
Bids shall be made upon the forms supplied within the iSupplier Solicitation. Each Bidder must state in its Bid the price for which the Bidder will perform the Work as required by the Bid Documents.
5.3 Basis of Bid Prices
The Bid Documents, together with any Addenda, which are furnished to prospective Bidders during the advertising period shall become the basis of the Contract.
Unless otherwise provided in the Bid Documents, the Contractor shall provide and pay for all labor, materials, equipment, tools, construction equipment and machinery, water, heat, utilities, transportation and other facilities and services necessary for the proper execution and completion of the Work, whether temporary or permanent and whether or not incorporated or to be incorporated in the Work including the costs incurred by the Contractor in complying with all the provisions and requirements of the Contract Documents.
Each unit price will be deemed to include an amount considered by the Bidder to be adequate to cover the Bidder’s overhead and profit for each separately identified item.
5.4 Bid Preparation
All applicable pages of the Bid shall be completed and all required attachments must be provided.
All prices for lump sum or unit price work shall be given in numerals. Bid prices must be entered on the Bid for all items, unless directed otherwise on the Bid.
Failure to complete the Bid price and questionnaire sections and to provide completed required attachments will render the Bid non-responsive.
5.5 Addenda
If, in the judgment of the Procurement and Supply Management Director, an Addendum is required, a copy of such will be posted on the Procurement and Supply Management Department’s web page. All Recorded Bidders will be notified of the Addendum and will be provided with the electronic link to the web page. All Addenda shall become part of the Contract Documents. No other interpretations or clarifications issued prior to the Bid Opening will have legal effect.
The sole obligation of the Procurement and Supply Management Director with respect to distribution of Addenda is to ensure that a copy of each Addendum is posted on the City’s procurement web page and to notify all Recorded Bidders. Each Bidder bears the responsibility to review and/or download the Addenda and to satisfy itself prior to submitting its Bid that its Bid is responsive to all Addenda issued.
5.6 Bid for Alternates
To be responsive, all Bids shall include costs for Alternates. Unless otherwise specified, any Bid which does not include the Base Bid Price plus each and every Alternate may be rejected as being non-responsive. The City may select any combination or reject any or all Alternates as best serves the interest of the City.
5.7 Period Bid Remains in Effect
Bids for the Work covered by this Contract may be held by the City for a period of one hundred twenty (120) days after Bid Opening and shall continue in full effect and not be subject to withdrawal during that period until a Contract has been executed with a Bidder. If no Contract has been executed within the one hundred twenty-day period, any Bid may be withdrawn or nullified by either party or be deemed to be confirmed and extended in time for as long as permitted by the Bidder submitting each such Bid.
ARTICLE I-6 EXAMINATION OF THE SITE
6.1 Familiarity with Site Conditions
It shall be the responsibility of Bidder to examine the site of the proposed Work. Before submitting a Bid, Bidders shall inform themselves fully of the conditions relating to the cost of construction materials and labor under which the Work will be prosecuted, and shall make whatever site investigations or site tests they deem necessary. Should a Bid be accepted, the Bidder will be responsible for any and all errors in its Bid resulting from its failure to perform such examinations, inform itself of such conditions, or do such investigations and tests.
6.2 Extents and Locations of Subsurface Conditions
The Plans show the existing surface and other underground structures likely to affect the prosecution of the Work insofar as they have been determined, but the information shown is not guaranteed as being correct or complete. Bidders are expected to examine the Plans, and the location of the Work upon the ground, and consult various utility companies if deemed necessary, in order to judge for themselves the potential circumstances affecting the cost of the Work or the time required for its completion.
ARTICLE I-7 TABULATION OF THE BIDS
7.1 Correction of Mathematical Errors
Discrepancies between the multiplication of units of Work and unit prices will be resolved in favor of the unit prices. Discrepancies between the indicated sum of any column of figures and the correct sum thereof will be resolved in favor of the correct sum. Discrepancies between words and figures will be resolved in favor of the words.
7.2 Preparation and Distribution of Bid Tabulation
All Bids received in conformity with the Contract Documents will, as soon as practicable, be tabulated and the tabulation shall be posted in iSupplier.
ARTICLE I-8 REJECTION OF BIDS OR AWARD WITHIN BUDGET AMOUNT
8.1 Rejection of Bids
The City reserves the right to reject any or all Bids, in whole or in part, when the City determines it is in the City’s best interest to do so.
8.2 City Budget
The City reserves the right to award the Contract to the lowest responsible Bidder for an amount equal to the City’s budget for the Work.
ARTICLE I-9 WAIVER OF IRREGULARITIES
In evaluating the Bids, the City reserves the right to waive any and all minor irregularities.
ARTICLE I-10 DISQUALIFICATION OF BIDDERS
Each Bidder, by submitting its Bid, states that neither Bidder nor Bidder’s agents, nor any other party acting on Bidder’s behalf, has paid or agreed to pay, directly or indirectly, to any person, firm, corporation, or employee of the City, any money or valuable consideration for assistance in procuring or attempting to procure the Contract herein referred to, and further agrees that no such money or reward will be hereafter paid.
Any or all Bids will be rejected if there is any reason for believing that collusion exists among the Bidders, and participants in such collusion will not be considered in future Bids for the same Work.
Bidder and its employees, agents, contractors and representatives are prohibited from lobbying City Council, the Mayor, City staff, selection committee members and City project consultants relative to Bidder’s Bid or the Solicitation until the Solicitation selection and award processes have been completed. A bidder’s non-compliance with this provision may result in disqualification from consideration. Notwithstanding the foregoing, this provision shall not prohibit Bidder from (i) providing public comment in accordance with applicable Laws and City policies at public meetings where public comment is permitted, (ii) communicating with the assigned procurement analyst, or
(iii) submitting a dispute or complaint in accordance with the requirements set forth in this Solicitation.
ARTICLE I-11 DISPUTES AND COMPLAINTS
All complaints or grievances should be first submitted orally or in writing to the Director of Procurement & Supply Management, who will take prompt remedial action. The Director of Procurement & Supply Management shall investigate the validity of the complaint and present the findings in writing to the Bidder. If the Bidder is dissatisfied with the Director of Procurement & Supply Management's remedies, Bidder may then make an appeal to the Mayor’s office. Bidder’s appeal will be heard by either the Mayor or City Administrator. All complaints, grievances or appeals must be made no later than seven calendar (7) days preceding the date of the City Council meeting approving the contract or no later than seven calendar (7) days following the selecting of the successful bidder if the contract does not need to be approved by City Council.
ARTICLE I-12 RECOMMENDATION OF AWARD OF CONTRACT
12.1 Standard for Award
Contracts will be awarded to the lowest responsible and responsive Bidder whose Bid meets the requirements and criteria set forth in the Solicitation. In awarding any Contract, the City Council may reject any Bid determined by the City Council not to be in the best interest of the City.
Pursuant to Florida Statute sec. 287.05701, the City will not request documentation of a Bidder’s social, political or ideological interests, consider such interests, or give preference to a Bidder based on such interests.
12.2 Factors Determining Whether a Bidder is Responsible
In making the determination of whether a Bidder is responsible, the City reserves the right to take into account and give reasonable weight to:
A. Whether the Bidder has the necessary personnel, facilities, equipment, ability, experience, financial resources and special qualifications to perform the Work in a satisfactory manner within the time specified;
B. Whether the Bidder or any Subcontractor possesses any City-, County-, or State-approved license(s) and/or certification(s) required to perform the Work;
C. Whether the Bidder’s references confirm the Bidder’s experience qualifications;
D. Whether the Bidder’s references confirm the Bidder has the required resources to do the Work;
E. The Bidder’s default under, or failure to complete, other contracts;
F. The Bidder’s non-compliance with applicable Laws, including any citations from the Occupational Safety and Health Administration (OSHA) in the last three years;
G. Whether the Bidder has had claims made against it alleging wage violations and/or discrimination in the last three years;
H. The Bidder’s involvement in ongoing litigation, including any final judgments that have not been satisfied;
I. The Bidder’s performance of previous satisfactory work for the City, including fulfillment of warranties;
J. Evidence that the Bidder provides a drug-free workplace; and
K. Evidence that all employees who will work on the Project have completed or will complete the OSHA 10-hour training course prior to performing any work on the Project.
12.3 Factors Rendering Bidders Non-Responsive
Any Bidder that submits a Bid that does not conform in all material respects to the requirements set forth in the Solicitation, including but not limited to any requirements to submit documentation, will be rendered non-responsive.
12.4 Recommendation of Award
Upon review and consideration of the relevant factors, the Procurement and Supply Management Director, the Engineering & Capital Improvements Director, the funding agency (if applicable), and the Design Professional will determine the lowest responsible and responsive Bidder, and a recommendation for City Council award will be made by the Procurement and Supply Management Director.
The City reserves the right to award the Contract to the lowest responsible Bidder for an amount equal to the City’s available budget for the Work, which may be greater or less than the lowest responsible Bidder’s Contract total(s) in the Proposal. The City reserves the right to reject any or all Bids, or to delete any part of the Work.
ARTICLE I-13 SPECIAL PROVISIONS DUE TO FEDERAL FINANCING
If this Project is to be financed, in whole or in part, by the Federal Government, all applicable requirements of the Davis Bacon Act as amended shall be complied with by Contractor.
The Davis Bacon Act, as amended, includes the provisions of the President’s Executive Orders #11246 and #11375, Titles VI and VII of the Civil Rights Act of 1964, and sets forth criteria for the following: (a) Labor Standards, (b) Procedures for compliance with the Davis Bacon Act, (c) Mandatory clauses which shall be included in all contracts which are subject to provisions of the Davis Bacon Act, (d) Apprentice and trainee employment requirements in all contracts in excess of $10,000 where the Davis Bacon Act applies, (e) Instructions for completing Payroll Form WH347, and (f) Contractor responsibilities under the Davis Bacon Act.
If Federal or State funds are partially or fully funding this Project, the Contractor will be required to submit a Payment and Performance Bond for 100% of the cost of construction.
If the City utilizes or may utilize a federal grant for the work or products covered under this Solicitation, then, pursuant to CFR Chapter II Part 200, the City prefers that Bidder purchase, acquire, or use goods, products, or materials that are produced in the United States.
ARTICLE I-14 SUBCONTRACTORS
14.1 Prior Approval
No part of the Contract shall be sublet without the prior written approval of the Owner. If the Contractor should sublet any part of this Contract, the Contractor shall be as fully responsible to the Owner for acts and omissions of its Subcontractor and of the persons either directly or indirectly employed by its Subcontractor, as it is for the acts and omissions of persons directly employed by the Contractor.
14.2 Subletting of Contract
The Contractor must complete at least 25% of the Total Bid Price with its own organization based on unit Bid prices, unless otherwise specified in the contract documents or approved in writing by the Engineer. The contract amount upon which the 25% requirement is computed includes the cost of materials and manufactured products which are to be purchased or produced by the Contractor under the contract provisions.
In order to meet this 25%, the Contractor shall not purchase any materials for a subcontracted item nor shall Contractor place other contractor’s employees on Contractor’s payroll. The term “own organization” shall be construed to include: i. workers employed and paid directly by the Contractor, ii. workers employed and paid directly by a Professional Employer Organization ("PEO") that meets the conditions for the use of PEO employees as set forth in the Qualification Requirements section of the Solicitation, or iii. equipment owned or rented by Contractor, with or without operators.
Each Bid shall include the name and place of business of each intended Subcontractor who will perform work or render services to the Contractor along with the portion of Work and cost of that Work to be completed by each Subcontractor.
The Contractor who is awarded the Project may not change or substitute Small Business Enterprise (“SBE”) Subcontractors except upon written approval of the Engineer for the following situations:
A. SBE Subcontractor fails or refuses to execute a written contract for the scope of work specified at the price specified;
B. SBE Subcontractor is not appropriately licensed to perform the scope of work;
C. SBE Subcontractor becomes bankrupt or insolvent;
D. SBE Subcontractor is ineligible to perform the work on the Project;
E. SBE Subcontractor fails or refuses to perform its subcontract;
F. Engineer determines the work performed by the SBE Subcontractor is substantially unsatisfactory and not in substantial accordance with the Plans and Specifications;
G. SBE Subcontractor is substantially delaying or disrupting the progress of the Work.
ARTICLE I-15 NONDISCRIMINATION
In carrying out the Contract, the Contractor shall not discriminate against any employee or applicant for employment because of race, color, religion, gender, national origin, marital status, age, disability, sexual orientation, genetic information, or other protected category in violation of applicable Laws; provided, however, that the City may not enforce this provision to prohibit or discriminate against religious exercise in a manner that would be proscribed by the United States Constitution or other applicable Laws.
ARTICLE I-16 WITHDRAWAL OF BIDS
Bids may be modified or withdrawn by an appropriate document duly executed (in the manner that a Bid must be executed) and delivered to the place where Bids are to be submitted at any time prior to the deadline for submitting Bids. A request for withdrawal or a modification must be in writing and signed by a person duly authorized to do so; and, in case signed by a deputy or subordinate, the principals’ proper written authority to such deputy or subordinate must accompany the request for withdrawal or modifications.
Withdrawal of a Bid will not prejudice the rights of a Bidder to submit a new Bid prior to the Bid date and time.
If, within twenty-four (24) hours after Bids are opened, any Bidder files a duly signed, written notice with the City and within five (5) calendar days thereafter demonstrates to the reasonable satisfaction of the City that there was a material and substantial mistake in the preparation of its Bid, that Bidder may withdraw its Bid, and the Bid and the Bid security will be returned. Thereafter, the Bidder will be disqualified from further bidding on the Work to be provided under the Contract Documents.
ARTICLE I-17 PUBLIC ENTITY CRIMES
Contractor is hereby notified of the provisions of Section 287.133(2)(a), Florida Statutes, related to prohibitions on persons or affiliates who have been placed on the convicted vendor list following a conviction for a public entity crime.
ARTICLE I-18 SMALL BUSINESS ENTERPRISE PROGRAM
18.1 Participation by SBE Contractors and Subcontractors
Unless otherwise prohibited, all Contractors entering into a construction contract with the City agree to be subject to and comply with the requirements for designating a percentage of the Work for small business enterprises (as defined in Section 2-232), or demonstrating and documenting a good faith effort to do so, as those requirements are set forth in Chapter 2, Article V, Division 4, of the St. Petersburg City Code, as may be amended from time to time (collectively, “SBE Requirements”). The ability of a Contractor to perform the Work with its own workforce will not excuse the Contractor from complying with the SBE Requirements. The designated Small Business Enterprise percentage requirement for the Work is set forth in the Qualification Requirements section of the Solicitation.
18.2 Acknowledgment with Bid
All Bidders shall respond in the Qualification Requirements section of the Solicitation that they have read, understand, and will comply with the SBE Requirements. A Bidder's failure to submit a response in the Qualification Requirements section of the Solicitation renders the Bid non-responsive.
ARTICLE I-19 CONSIDERATION OF SEA LEVEL RISE AND RESILIENCY
It is the policy of the City to apply the consideration of sea level rise and resiliency to the City's decision-making, including in the procurement of City construction projects. Bidders are encouraged to provide documentation addressing the following:
A. Whether the Project considers the latest regional best available science regarding the effects of sea level rise, climate-related vulnerability and resiliency in St. Petersburg;
B. Whether the Project affects an area that is vulnerable to the impacts of sea level rise;
C. Whether the Project will increase the resiliency of the City with respect to sea level rise;
D. Whether the Project is compatible with the City's sea level rise mitigation and resiliency efforts.
ARTICLE I-20 ENVIRONMENTALLY PREFERABLE PURCHASING
It is the policy of the City to purchase recycled and environmentally preferable goods. This includes products that contain recycled material, reduce toxicity and pollution, conserve energy, conserve water and prevent waste. This policy will be carried out consistent with the City’s obligations and purpose, and with an overall intent to obtain competitive prices to provide value to the taxpayers.
Bidders are encouraged to submit items in their Bids that meet the City’s Environmentally Preferable Purchasing (“EPP”) program standards. When submitting EPP items for consideration, Bidders must submit documentation that substantiates their claims.
ARTICLE I-21 AMERICANS WITH DISABILITIES ACT (ADA) PUBLIC NOTICE
In accordance with the requirements of Title II of the Americans with Disabilities Act 1990, the City of St. Petersburg will not discriminate against qualified individuals with disabilities on the basis of disability in the City's services, programs, or activities. If Bidder requires an auxiliary aid or service for effective communication, or a modification of policies or procedures to adequately respond to this Solicitation, Bidder should contact ADA Coordinator at (727) 893-7229 or email:
lendel.bright@stpete.org as soon as possible but no later than 72 hours before the applicable deadline, meeting, or event.
ARTICLE I-22 HEALTH IN ALL POLICIES AND PROJECTS
Pursuant to Executive Order EO-2018-04, it is the policy of the City to apply the consideration of health, health impacts, and the social determinants of health to the City’s decision–making, including policy development and implementation, budgeting, and the delivery of services.
Bidders are encouraged to propose services, supplies, and construction that promote health to the greatest extent practicable in their responses to City Solicitations. Bidders are further encouraged to provide workplaces that promote the health and well-being of their employees.
ARTICLE I-23 INFORMATION DESIGNATED A TRADE SECRET AND/OR CONFIDENTIAL
AND/OR PROPRIETARY
All Bids (including all documentation and materials attached thereto or provided in connection with this Solicitation) submitted to the City are subject to Florida’s public records laws (i.e., Chapter 119, Florida Statutes), which requires disclosure of public records, unless exempt, if a public records request is made. Bids (including all documentation and materials attached to bids or provided in connection with this Solicitation (even if in a separate electronic file)) submitted to the City cannot be returned. DO NOT LIST YOUR ENTIRE BID AS TRADE SECRET AND/OR CONFIDENTIAL. The City will not consider Bids if the entire bid is labeled a Trade Secret and/or Confidential and/or Proprietary.
If Bidder believes that its Bid contains information that is a trade secret (as defined by Florida law) and/or information that is confidential and/or proprietary and therefore exempt from disclosure then such information must be submitted in a separate electronic file and comply with the following requirements. In addition to submitting the information in a separate or electronic file, bidder must include a general description of the information designated as a trade secret and/or confidential and/or proprietary and provide reference to the Florida statute or other law which exempts such designated information from disclosure in the event a public records request.
The City does not warrant or guarantee that information designated by Bidder as a trade secret and/or confidential and/or proprietary is a trade secret and/or confidential and/or proprietary and exempt from disclosure. The City offers no opinion as to whether the reference to the Florida statute or other law by Bidder is/are correct and/or accurate. Please be aware that the designation of information as a trade secret and/or confidential and/or proprietary may be challenged in court by any person or entity. By designation of information as a trade secret and/or confidential and/or proprietary Bidder agrees to defend and indemnify the City, its employees, agents and elected and appointed officials (“Indemnified Parties”) against any and all claims, demands and actions (whether or not a lawsuit is commenced) arising out of or in connection with Bidder’s designation of information as a trade secret and/or confidential and/or proprietary and to hold harmless the Indemnified Parties for any award to a plaintiff for damages, costs and attorneys’ fees, and for costs and attorneys’ fees (including those of the City Attorney’s office) incurred by the City by reason of any claim, demand or action arising out of or related to Bidder’s designation of information as a trade secret and/or confidential and/or proprietary.
Failure to comply with the requirements above shall be deemed as a waiver by Bidder to claim that all additional information in its Bid is a trade secret and/or confidential and/or proprietary regardless of whether such information is labeled trade secret and/or confidential and/or proprietary. Bidder acknowledges, understands, and agrees that all information in its Bid (not including information submitted in a separate electronic file and designated trade secret and/or confidential and/or proprietary in accordance with the requirements in this Article) will be disclosed, without any notice to Bidder, if a public records request is made for such information and the City shall not be liable to bidder for such disclosure.
Bidder acknowledges and understands that its Bid will be opened publicly at the time, date and place designated in the Solicitation. The entire contents of Bidder’s Bid may be discussed at meetings that are open to the public, subject to the requirements set forth in Chapter 286, Florida Statutes.
00753149 July 2024
GENERAL CONDITIONS
ARTICLE G-1 DEFINITION OF TERMS
In addition to the terms set forth in the Agreement, the following terms as used in the Contract are respectively defined as follows:
ALTERNATES – Bid price for additive or deductive items to the Base Bid in the Proposal.
BID – The solicitation response the Contractor submitted on the prescribed proposal form setting forth the prices for the Work to be performed.
BUSINESS DAYS – Every day other than Saturdays, Sundays, or City-designated holidays.
CHANGE ORDER – A written order to the Contractor prepared by the City, executed as required by the Contract, describing, authorizing and recognizing a change in the Work, an adjustment in the prices for the Work set forth in the Bid, and, if applicable, an adjustment to the Contract Time.
A Change Order may be utilized to substitute work at no cost, to authorize additional (extra) work or to authorize the deduction of work. A Change Order signed by the Contractor indicates its agreement therewith.
CITY INSPECTOR – Duly authorized project representative assigned by the Manager, Engineering Construction. The City Inspector may be a City employee or an employee of a Design Professional employed by the City.
DESIGN PROFESSIONAL – The person or entity under separate contract with the City to provide Engineering/Architectural services, and, if noted at the pre-construction conference, may provide construction administration, construction inspection, or other project-related services for the Project.
ENGINEER – The Director of the City Engineering & Capital Improvements Department, or an authorized representative.
FIELD ORDER – A written instrument, on a form utilized by the City and delivered to the Contractor, that interprets and/or provides the Contractor with information clarifying a particular requirement of the Contract or authorizes changes in the Work with an agreed upon cost so Work may proceed without delay until an official Change Order can be issued.
FINAL PAYMENT – The final payment made by the City after Final Completion has been achieved by the Contractor. Final Payment releases all moneys due to the Contractor, including any retainage withheld.
FINAL COMPLETION – Completion of all work required under the Contract to the satisfaction of the City. Completion includes not only construction of Work but also the completion of the Punch List items, which may include submittal of as-built drawings approved by the City, warranty documents, Operation and Maintenance Manuals, and all other documentation required by the Contract.
LAWS – All federal, state, and local statutes, rules, regulations and ordinances, the federal and state constitutions, and the orders and decrees of lawful authorities having jurisdiction over the matter at issue.
MANAGER, ENGINEERING CONSTRUCTION – Duly authorized representative of the Engineer.
NOTICE TO PROCEED – Official written notice provided by the City to the Contractor, the date of which the Contract Time commences to run, and upon which the Contractor shall be prepared to initiate commencement of the Work under the Contract within the following ten (10) calendar days.
PLANS/CONTRACT PLANS – All tracings, drawings, or reproductions thereof furnished by the City pertaining to the Project and such detailed supplemental drawings as may be issued by the City as the Work proceeds.
PUNCH LIST – a final comprehensive list of items to be completed or corrected after Substantial Completion and prior to final payment, including the estimated cost to complete each item on the list. Said estimated cost shall be in accordance with the approved schedule of values.
SAMPLES – Physical examples which illustrate materials, equipment, or workmanship and established standards by which the Work will be judged.
SHOP DRAWINGS – All drawings, diagrams, illustrations, brochures, schedules, and other data which are prepared by the Contractor, a Subcontractor, manufacturer, supplier, or distributor and which illustrate the equipment, material, or some portion of the Work required by the Contract.
SOLICITATION – All documents included in the solicitation issued by the City for the Work, including but not limited to the Notice to Bidders, Invitation to Bid, and Instructions to Bidders, and any addenda thereto.
SPECIFI…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .