This is a Special Provisions document for the City of DeBary's Rob Sullivan Park West Parking Lot Expansion Project (Bid No. 03-19), which establishes supplemental terms and conditions governing the construction contract. The project scope includes clearing and grubbing, stormwater piping, drainage inlet structures, grading, soil stabilization, concrete sidewalk, concrete curb, signs, and sod installation. A Pre-Construction Meeting must be held within seven calendar days after contract execution to review schedules, testing requirements, and establish the Notice-to-Proceed date, which will be mutually agreed upon by the Contractor and City. The contract requires the Contractor to present an anticipated monthly payment schedule at the Pre-Construction Meeting. No time extensions will be granted for inclement weather unless rainfall during contract performance exceeds normal historical levels as confirmed by the Engineer. Applications for Payment will be processed once every thirty days and must reference contract Pay Items with original quantities, units, and percent completion.
The contract specifies that all costs for work are included in the unit prices and total bid amount submitted by the Contractor, with no additional direct payment for other necessary work. The Contractor is responsible for all testing expenses through an approved testing laboratory and must maintain proper drainage, protect utilities, and coordinate with City representatives and emergency services regarding traffic maintenance. Liquidated damages of five hundred dollars per calendar day apply for work remaining uncompleted after the contractual completion date. The contract is not assignable and must be performed by the successful bidder as a prime contractor. The City of DeBary shall be listed as additionally insured, and the Contractor must hold the City harmless from claims related to endangered or threatened species encountered during construction. Payment disputes will be resolved in Volusia County, Florida courts, and no arbitration process is available.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Rob Sullivan Park – West Parking Lot Expansion Project Bid No. 03-19 Bid No. 02-13
Special Provisions SP - 1
SPECIAL PROVISIONS
City of DeBary - Bid No. 03-19
These Special Provisions modify, clarify, delete, or supplement the Standard General Conditions of the Contract. The Technical Specifications and the latest edition of the Florida Department of Transportation Standard Specifications for Road & Bridge Construction, and Design Standards shall govern the work under this Contract and are included by reference. Refer to Article 16 below for the Order of Precedence of the Contract Documents.
Article 1 - Description of Work
Work included in the Contract as Bid Items are shown on the Bid Form Sheets and is shown on the plans. No direct payment will be made for any other work necessary to complete the planned work, but the cost therefore shall be included in the unit prices bid for pay items. All costs to perform the work called for in the Contract Documents are included in the unit prices and the Total Bid Amount in the Proposal submitted by the Contractor.
Any commission or omission shown or implied shall not be cause for deviating from the intent of the Contract Documents. If any modifications of the Contract Documents are deemed necessary by the Contractor, details of such modifications and the reasons therefore shall be submitted in writing to the Engineer for written approval prior to beginning such modified work.
Article 2 - Insurance
Insurance coverage, limits and other requirements will be in accordance with Section 7-13 of Florida Department of Transportation Specifications for Road and Bridge Construction, latest edition, and as specified in Article 5 of the City of DeBary’s Standard General Conditions. Any discrepancy between the FDOT and the City specifications, the City’s specifications will govern.
City of DeBary shall be listed as an additionally insured.
Article 3 - Contract Bonds – NOT APPLICABLE
Bid No. 03-19 Bid No. 02-13
Special Provisions SP - 2
Article 4 - Construction Procedure
The Contractor shall at all times conduct the work in such manner and in such sequence as will insure the least practicable interference with traffic. The Contractor's vehicles and other equipment shall be operated in such manner that they will not be a hazard or hindrance to the traveling public. The Contractor shall not open up work to the prejudice of work already started, and the Engineer may require the Contractor to finish a section on which work is in progress before work is started on any additional section.
The Contractor shall arrange the work and dispose of materials in accordance with the spirit of the Contract Documents and perform the work in proper sequence all as may be approved by the Engineer.
The Contractor is responsible for maintaining proper drainage during construction.
Existing functioning gutters, pipes, and ditches shall not be obstructed and adjacent premises must be given access as far as practicable. Materials or equipment stored along the roadway shall be placed so as to cause no obstruction to the traveling public.
Article 5 - Barricades, Warnings, and Detour Signs – NOT APPLICABLE
Article 6 - Maintenance of Traffic
The Contractor shall coordinate all construction that may impede traffic with appropriate City representatives and emergency services. The Contractor shall provide public notice, detours, roadways, and crossings to minimize traffic impedance along all public highways.
Payment for Maintenance of Traffic will be made under the Pay Item 102-1.
Article 7 - Contract Assignment
The successful Bidder will be required to perform the work as a prime contractor. No assignment of the contract will be allowed.
Article 8 - Layout of Work and Surveys
The Engineer will furnish the Contractor with all necessary information relating to lines, grades and locations of the work. The Contractor shall furnish all stakes and necessary labor and shall be responsible for the layout of the work and the establishing of all lines and grades. All layout work may be checked and verified by the Engineer; and the Contractor shall furnish all such necessary materials, equipment, labor and assistance as the Engineer may require. The Contractor is responsible for the safeguarding of survey references and any offset thereto which he might require in the process of his work. The damage, moving or loss of references caused by carelessness of the Contractor will be replaced at the Contractor's expense.
Bid No. 03-19 Bid No. 02-13
Special Provisions SP - 3
Article 9 - Escalation and/or Adjustment
No claim for escalation or adjustment for any price or rate increases will be considered.
Article 10 - One-Year Correction Period
The Contractor shall at his expense maintain his Contract Bond in effect through the guaranty period and such additional time as the Contractor may be performing work pursuant to his obligations under the guaranty.
Article 11 – Testing
The Contractor will employ, at its expense, a testing laboratory for all testing required under this contract. Sample or locations are to be approved by the Engineer.
Article 12 – Specifications
The Florida Department of Transportation Standard Specifications for Road and Bridge Construction, latest edition in its entirety will apply to this project, with the exception of the following and other changes, modifications and/or amendments that are included in the Contract Documents.
A. IN GENERAL: Where the word "Department" and "Director" occurs substitute the word "City"; delete all references to "Secretary"; delete all references to "Holiday" and "Working Days"; delete all references to "Value Engineering Incentive".
All references to "Engineer" shall mean the City of DeBary‘s Consulting Engineer.
B. Method of Payment/Basis of Payment; The units of measurement and the contract unit prices are those indicated in the Bid Schedule portion of the proposal form. Such prices and payments shall be full compensation for performing all work necessary to complete the entire project.
Article 13 - "Or Equal" Clause
Direct reference in specifications to any item of material or equipment with or without the words "or equal", shall be interpreted as determining a standard of quality and shall not be construed as limiting competition.
Bid No. 03-19 Bid No. 02-13
Special Provisions SP - 4
Article 14 - Time of Completion
The time of completion for this project is the date set forth in the Notice-to-Proceed. The date for such Notice-to-Proceed shall be mutually agreed to by the Contractor and City and specifically established for each location the Contractor is directed to work.
No time extensions will be given for inclement weather unless the Contractor can show that rainfall experienced during the contract times is above normal for the same months in previous years as determined by reliable measurement and confirmed by the Engineer's measurements at the site. The number of days of time extension granted under this Article shall be at the sole discretion of the Engineer.
Article 15 - Liquidated Damages
The amount of liquidated damages shall be five hundred dollars ($500.00) per Calendar Day that any work remains uncompleted after the contractual Completion Date. .
Liquidated damages in an amount determined in accordance with the above will be deducted from monies due the Contractor. In the event that no monies are due the Contractor or that the monies due are insufficient, his surety will be held liable for the difference between the amount of the liquidated damages and monies due the Contractor.
Article 16 - Contract Documents - Order of Precedence
A. Addenda B. Special Provisions C. Construction Drawings D. Instruction to Bidders E General Conditions of the Construction Contract F. Florida Department of Transportation Specifications (latest edition)
Article 17 – Utilities
It shall be the Contractor's responsibility to notify all utility owners prior to any excavation or grading under this contract, giving sufficient notice to enable the utility owners to locate their utilities in the vicinity of the proposed excavation or grading. It shall be the sole responsibility of the Contractor to perform his work in such manner to protect the utilities from damage. The Contractor shall use all possible care in excavating on this project so as not to disturb any existing utilities whether shown on the plans or not shown on the plans.
Locations of existing utilities are approximate only and may not be complete. Contractor shall contact all Utility Companies, which may have facilities in the construction area prior to commencing any operations relative to this project. Any utilities disturbed or damaged by the Contractor through accident or carelessness during his construction shall be replaced by the Contractor at no extra cost to the Owner.
Bid No. 03-19 Bid No. 02-13
Special Provisions SP - 5
Article 18 – Arbitration
There shall be no arbitration process in connection with this project. All claims, disputes and other matters in question between City and Contractor shall be decided by a Court with proper jurisdiction in Volusia County, Florida.
Article 19 – Stored Materials - Payment
No payment will be made for stored materials.
Article 20 - Alternate Bids
No alternate bids are required.
Article 21 - Endangered, Threatened or Listed Species
The Contractor is obligated to assure that its employees and agents notify the City immediately upon encountering any endangered, threatened, or listed species such as the gopher tortoise, scrub jay, or indigo snake. No such protected species or its nesting area shall be disturbed without compliance with the procedures of the Florida Game and Fresh Water Fish Commission and the U.S. Fish and Wildlife Service. The Contractor shall hold the City harmless from any claims, damages, attorney’s fees, litigation expenses, costs and fines for the actions of the contractor, its employees or agents in violation of applicable procedures.
Article 22- Pavement Markings – NOT APPLICABLE
Article 23 - Pre-Construction Meeting
Prior to the beginning of work, a Pre-Construction Meeting will be held between the Contractor and Engineer to review contract forms, schedules, testing; and other pertinent data related to the job. The meeting date and time will be mutually agreed upon, but shall, no case, be later than seven (7) calendar days after execution of the contract by all parties thereto. The Contractor shall present the Engineer with a schedule, showing anticipated monthly payments from date of Notice-to-Proceed to Final Completion, at the Pre- Construction Meeting. The date of Notice-to-Proceed with the work will be determined and agreed to at this meeting.
Article 24 - Mailbox Relocation or Replacement – NOT APPLICABLE
Article 25 - Beginning and Ending Joints – NOT APPLICABLE
Article 26 – Application for Payment
Bid No. 03-19 Bid No. 02-13
Special Provisions SP - 6
Applications for Payment shall be referenced to the Contract Pay Items as noted on the Bid Form. Applications for Payment shall include the original contract quantity and unit for each Pay Item and the percent completed. Prior to the initial pay application, the Contractor shall submit a draft format of the Application for Payment to the City for approval. Applications for Payment shall include satisfactory documentation to support the payment. Payment to the Contractor shall be made once for each thirty (30) day period of the contract.
Article 27 – Measurements and Payment
Method of Measurement and Payment for all bid items will be as measured in-place upon acceptance of the Work by the City. Payment for all unit price items will be made for the actual quantities placed and measured.
Article 28 – Public Records
The Contractor shall allow public access to all documents, papers, letters, or other material subject to the provisions of Chapter 119, Florida Statutes, and those made or received by the City in conjunction with this Project.
Article 29 – Storage of Equipment and Materials
Storage of construction materials including pipe and structures must be within the
Contractor’s designated Work area or as directed by the City’s Designated
Representative.
Article 30 – Existing Irrigation Systems
The Contractor shall repair or replace any element of any irrigation system that is damaged or disturbed as a result of the construction.
Article 32 - Sod
The Contractor shall restore all disturbed grassed areas by backfilling, compaction, re-grading to match surrounding ground elevations. In residential areas, the Contractor shall match existing sod and install the sod within thirty (30) days after installation of the associated stormwater piping or structures.
Sod shall be placed, fertilized and watered according to FDOT Specification 575 and as directed by the City’s Designated Representative.
ARTICLE 33 – PAY ITEM NOTES – refer to Bid Form
Pay Item Note 1. Pay Item 425-1521 Inlet (Ditch Bottom Type C) (<10’) – The City of DeBary will procure and deliver to the site the FDOT Standard Pre-Cast Concrete inlet structures; S-200, S-210, S-202, S-203, S-204, S-205, and S-206.
Bid No. 03-19 Bid No. 02-13
Special Provisions SP - 7
Procurement of the Pre-Cast concrete inlet structures by the City will be from an FDOT approved pre-cast concrete manufacturer in the Central Florida region.
The Contractor shall utilize the pre-cast concrete structures that are procured and delivered at the Rob Sullivan Park – West Parking Lot Expansion Project site by the City.
The Contractor shall relocate the seven pre-cast concrete inlet structures stored at the Rob Sullivan Park West Parking Lot Expansion Project site and shall install the structures as shown on the Contract Construction Drawings.
Pay Item Note 2. Pay Item No. 900-1 – Modify Existing Inlet – Station 205+70 Right - The Contractor shall sawcut the existing drainage inlet and remove sufficient wall area to provide access for connection of the new 18 inch diameter RCP. After placement of the new RCP into the existing inlet the Contractor shall place concrete, cast in place, to form a reinforced concrete collar surrounding the new RCP penetration into the inlet. The Concrete collar shall extend a minimum of 12 inches width around the circumference of the 18 inch RCP, and shall extend a minimum of 8 inches thickness from the outside face of the inlet wall. Two #3 rebars will be required to be placed in the cast in place concrete and bent around the circumference of the new RCP.
The 18 inch RCP shall be cut to match the skew of the inside face of the inlet and the end of the RCP shall be flush with the inside face of the inlet and annular space shall be grout filled to provide a smooth finish on the inside face of the inlet.
Pay Item Note 3. Pay Item 110-1-1 Clearing and Grubbing – includes but is not limited to;
tree removal as shown on the Construction Drawings, and all trees within the proposed limits of the parking area expansion and the proposed access road as delineated on the Construction Drawings. Trees in the access road area at approximate Station 200+80 shall be removed.