Contract Drawings.pdf
PDF 11 MB Posted
- Solicitation number
- 36C24523B0004
View the file
Other files
Show all 26
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
U :\1
3.
5.
- V A
C la rk sb ur g
R e
R oo f -
_a og rz ew al la .rv t
BID DOCUMENTS
CS-1
COVER SHEET
04-01-2022
ROOF REPLACEMENT
LOUIS A. JOHNSON
VA MEDICAL CENTER
REGION PLAN, CLARKSBURG WV. LOCATION PLAN
S.R. 98
C.R. 25
TO S.R. 19
4017 Washington Road #187 McMurray, PA 15317 p: 412.334.4091
Veterans Technical Services, LLC (VETS) Service Disable Verteran-Owned Small Business
Contact:
James V. Eckles
Registered Architect p: 412.448.4896 e: jeckles@vetstech.us
ARCHITECT
Drawing List Sheet Number Sheet Name
GENERAL
CS-1 COVER SHEET
LS-1 LIFE SAFETY ROOF PLAN, LEGENDS,
ABBREVIATIONS, AND NOTES
ARCHITECTURAL
A-1 ROOF PLAN - PHASING PLANLOUIS A. JOHNSON VA MEDICAL CENTER
ROOF REPLACEMENT
BID DOCUMENTS
APRIL 01, 2022
PROJECT NORTH
Drawing Title
Approved Project Director:
Project Title
Date
Location
Checked By:
Building Number
Project Number
Drawing Number
Drawn By:
Revisions: Date
LOUIS A. JOHNSON VAMC
D18-023 o n e e ig h th in c h o n e fo o t 1 th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
B
A
C
D
E
F
1 2 3 4 5 6 7 9
F
E
D
C
B
A
97 8654321
OFFICE OF
FACILITIES
MANAGEMENT
VA Project Number
VA 540-07-103
VAMC CLARKSBURG
1 MED CENTER DRIVE CLARKSBURG, WV 26301
ARCHITECT/ENGINEERS:
ELECTRICAL
MECHANICAL
A-2 PHASE 1 ROOF PLANS
A-3 PHASE 2 & 3 ROOF PLANS
A-4 PHASE 4 ROOF PLANS
A-5 PHASE 5 & 6 ROOF PLANS
A-6 TYPICAL DETAILS
A-7 TYPICAL DETAILS
A-1-a ROOF PLAN - SCHEMATIC PONDING
E-1
E-3 E-2
M-1 M-2
ELECTRICAL GENERAL NOTES, DETAILS, & SYMBOL
LEGEND
MECHANICAL GENERAL NOTES & SYMBOL LEGEND
DEMOLITION - ROOF PLAN - ELECTRICAL
NEW WORK - ROOF PLAN - ELECTRICAL
MECHANICAL - ROOF PLAN
TRUE
A-8 TYPICAL DETAILS
A-9 TYPICAL DETAILS
A-10 TYPICAL DETAILS
A-11 TYPICAL DETAILS
JVE TJD
100% CONSTRUCTION DOCUMENTS 06/17/2019
100% DOCUMENT RESUBMISSION 01/31/2020
100% BID DOCUMENTS 04/18/2019
PART OF CURRENT PACKAGE
NOTES:
REVIEW 03/13/2019
75% SUBMITTAL 02/15/2019
PROGRESS 11/20/2018
INCLUDED FOR INFORMATION (NO CHANGE)
BID DOCUMENTS 04/01/2022
Date
04-01-2022 04-01-2022
04-01-2022
04-01-2022 04-01-2022 04-01-2022 04-01-2022 04-01-2022 04-01-2022 04-01-2022 04-01-2022 04-01-2022 04-01-2022
412.334.4091
04-01-2022
04-01-2022 04-01-2022
04-01-2022 04-01-2022
ARCHITECTURAL ABBREVIATIONS
A/C AIR CONDITIONING
ADA AMERICANS WITH DISABILITIES ACT
A&E ARCHITECT AND ENGINEERS
AFG ABOVE FINISHED GRADE
AHU AIR HANDLING UNIT
ALT ALTERNATIVE
ALUM ALUMINUM
ANOD ANODIZED
APPROX APPROXIMATE
ARCH ARCHITECTURAL
BD BOARD
BLDG BUILDING
BLKG BLOCKING
BM BEAM
BO BOTTOM OF
BRG BEARING
CF CUBIC FEET
C & G CURB & GUTTER
CJ CONTROL JOINT
CL CENTERLINE
CMP CORRUGATED METAL PIPE
CMU CONCRETE MASONRY UNITS
CO CLEANOUT(S)
COL COLUMN
CONC CONCRETE
CONT CONTINUOUS
COORD COORDINATE
COR CONTRACTING OFFICER
REPRESENTATIVE
CRS COLD ROLLED STEEL
CS CAST STONE
CSB CONCRETE SPLASH BLOCK
CTR CENTER
CU FT CUBIC FEET
DEG DEGREE
DEMO DEMOLITION
DET DETAIL
DIA DIAMETER
DIAG DIAGONAL
DIV DIVISION
DN DOWN
DR DOOR
DS DOWNSPOUT
DWG DRAWING
E EAST
(E) EXISTING
EA EACH
EF EXHAUST FAN
EJ EXPANSION JOINT
ELEC ELECTRICAL
EPDM ETHYLENE PROPYLENE
DIENE MONOMER
EQ EQUAL
EQUIP EQUIPMENT
EST ESTIMATED
EXH EXHAUST
EXIST EXISTING
EXT EXTERIOR
FA FIRE ALARM
FCU FAN COIL UNIT
FD FLOOR DRAIN
FIXT FIXTURE
FL FLOW LINE
FR FIRE RATED
FSP FIRE STANDPIPE
FT FOOT / FEET
FV FIELD VERIFY
FVC FIRE VALVE CABINET
QA QUALITY ASSURANCE
R R-VALUE (INSULATION),
RADIUS, RISER
RD ROOF DRAIN
RE: REFERENCE
REBAR REINFORCING BAR
REINF REINFORCE
REQD REQUIRED
REV REVISION
RH ROOF HATCH
RO ROUGH OPENING
SB SPLASHBLOCK
SC SEALED CONCRETE, SOLID CORE
SCHED SCHEDULE
SCP SCUPPER
SEAL SEALER
SECT SECTION
SF SQUARE FOOT
SHT SHEET
SIM SIMILAR
SL SLOPE
SLV SHORT LEG VERTICAL
SPECS SPECIFICATIONS
SQ SQUARE
SS STAINLESS STEEL
STD STANDARD
STL STEEL
STRUC STRUCTURAL
SYM SYMMETRICAL
SYS SYSTEM
GALV GALVANIZED
GC GENERAL CONTRACTOR
GND GROUND
GT GROUT
GYP BD GYPSUM BOARD
HAZ MAT HAZARDOUS MATERIALS
HB HOSE BIB
HDR HEADER
HDW HARDWARE
HGT HEIGHT
HM HOLLOW METAL
HORIZ HORIZONTAL
HR HOUR, HANDRAIL
HT HEIGHT
HVAC HEATING, VENTILATING
& AIR CONDITIONING
IBC INTERNATIONAL BUILDING CODE
IN INCH
INCAN INCANDESCENT
INFO INFORMATION
INSUL INSULATION
INT INTERIOR
INV INVERT
ITG INSULATED TEMPERED GLASS
J-BOX JUNCTION BOX
JT JOINT
L LONG
LB(S) # POUND(S)
LF LINEAL FEET
LLV LONG LEG VERTICAL
LT LIGHT
LVR LOUVER
T&B TOP AND BOTTOM
T&G TONGUE AND GROOVE
TBD TO BE DETERMINED
TEMP TEMPERATURE
TG TEMPERED GLASS,
TRANSFER GRILLE
THRU THROUGH
TO TOP OF
TOC TOP OF CONCRETE
TOM TOP OF MASONRY
TOS TOP OF STEEL
TOW TOP OF WALL
TYP TYPICAL
UL UNDERWRITERS LABORATORY
UNFIN UNFINISHED
UNO UNLESS NOTED OTHERWISE
VERT VERTICAL
VIF VERIFY IN FIELD
VTR VENT THROUGH ROOF
W/ WITH
W/O WITHOUT
WD WOOD
WF WIDE FLANGE
WH WATER HEATER
WR WASTE RECEPTACLE,
WATER RESISTANT
WS WATER STOP
WT WEIGHT
WWF WELDED WIRE FABRIC
MAX MAXIMUM
MECH MECHANICAL
MFR MANUFACTURER
MIN MINIMUM
MISC MISCELLANEOUS
N NORTH
NA NOT APPLICABLE
NIC NOT IN CONTRACT
NO NUMBER
NOM NOMINAL
NTS NOT TO SCALE
OC ON CENTER
OD OUTSIDE DIAMETER
OFCI OWNER FURNISHED
CONTRACTOR INSTALLED
OFOI OWNER FURNISHED
OWNER INSTALLED
OH OPPOSITE HAND
OPP OPPOSITE
ORD OVERFLOW ROOF DRAIN
P PLASTIC
PL PLATE
PR PAIR
PREFAB PREFABRICATED
PROP PROPERTY
PSF POUNDS PER SQUARE FOOT
PSI POUNDS PER SQUARE INCH
PT CONC POST-TENSIONED CONCRETE
PTD PAPER TOWEL DISPENSER
PTL PORCELAIN TILE
PVC POLYVINYL CHLORIDE
XXX
XX
X X
X
XXXX
DOOR IDENTIFIER
EQUIPMENT IDENTIFIER
REVISION INDICATOR
BUILDING SECTION
REFERENCE
SECTION REFERENCE
INTERIOR ELEVATION
REFERENCE
ELEVATION INDICATION
ARCHITECTURAL DRAWING SYMBOLS
DRAWING NUMBER
SHEET WHERE DETAIL IS
LOCATED
DRAWING NUMBER
SHEET WHERE DETAIL IS
LOCATED
DRAWING NUMBER DETAIL
SHEET WHERE DETAIL IS
LOCATED
NORTH ARROW
ROOF IDENTIFIER
SHEET LOCATION
ROOF NUMBER
VIEW OR DRAWING
NUMBER
KEYNOTE
DETAIL REFERENCE
? EXISTING COLUMN GRID
IDENTIFIER
BUILDING
OBJECT
REFERENCED
FINISH FLOOR
EL. = 100'-0"
8'-0" AFF SPOT ELEVATION
INDICATION
SPECIALTIES AND
EQUIPMENT IDENTIFIERXX
OBJECT
REFERENCED
N
X X
BUILDING ELEVATION
REFERENCE
# DEDUCT
ALTERNATE AREA,
SYSTEM, OR NOTE
REFERENCE. SEE
THIS SHEET, GI100
FOR SCHEDULE.
X
XXXX
X
XXXX
X
XXXX
EXIT ACCESS
EX
IT
A C
C
ES
S
EXIT
ACCESS
EXIT ACCESS
HATCH
EX
IT
AC
C
ES
S
EXIT
ACCESS
EX
IT
A C
C
ES
S
LADDER
LADDER
LADDER
LADDER
LADDER
LA
D
D
ER
SPRINKLER PIPE
SPRINKLER PIPE
LA
D
D
ER
H
AT
C H
LADDER
HATCH
LA
D
D
ER
HATCH
LADDER
GUARDRAIL, TYP.
GUARDRAIL, TYP.
GUARDRAIL, TYP.
GUARDRAIL, TYP.
SPRINKLER PIPE
Drawing Title
Approved Project Director:
Project Title
Date
Location
Checked By:
Building Number
Project Number
Drawing Number
Drawn By:
Revisions: Date
LOUIS A. JOHNSON VAMC
o n e e ig h th in c h o n e fo o t 1 th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
B
A
C
D
E
F
1 2 3 4 5 6 7 9
F
E
D
C
B
A
97 8654321
OFFICE OF
FACILITIES
MANAGEMENT
VA Project Number
VA 540-07-103
VAMC CLARKSBURG
1 MED CENTER DRIVE CLARKSBURG, WV 26301
ARCHITECT/ENGINEERS: D18-023
U :\1
3.
5.
- V A
C la rk sb ur g
R e
R oo f -
_a og rz ew al la .rv t
BID DOCUMENTS
LS-1
LIFE SAFETY ROOF PLANS, LEGENDS,
ABBREVIATIONS, AND NOTES
ROOF REPLACEMENT
SCALE: 1/32" = 1'-0"GI100
1 LIFE SAFETY ROOF PLAN
N
JVE TJD04-01-2022
100% CONSTRUCTION DOCUMENTS 06/17/2019
100% DOCUMENT RESUBMISSION 01/31/2020
100% BID DOCUMENTS 04/18/2019
REVIEW 03/13/2019
75% SUBMITTAL 02/15/2019
PROGRESS 11/20/2018
LIFE SAFETY NOTES
1. ALL ROOFS IN SCOPE OF PROJECT ARE UNOCCUPIED
ACCORDING TO NFPA 101.
2. SPRINKLER PIPES SHOWN ARE EXISTING TO REMAIN
AND SUPPLY THE PENTHOUSES ONLY. ROOFS ARE NOT
SPRINKLERED.
3. EXIT SIGNS ARE NOT REQUIRED ACCORDING TO IBC,
SECTION 1011.
4. ALL EXIT ACCESS, LADDERS AND HATCHES ARE
EXISTING TO REMAIN.
LIFE SAFETY LEGEND
- NEW FALL PROTECTION GUARDRAIL
REQUIRED (SEE DETAIL 8 ON SHEET
A-8 AND DETAIL 5 ON SHEET A-7)
1. THE CONTRACTOR SHALL VISIT THE SITE AND BECOME FAMILIAR WITH SITE
CONDITIONS AS THEY MAY AFFECT CARRYING OUT THE WORK AS DESCRIBED
IN THESE CONTRACT DOCUMENTS. THE CONTRACTOR SHALL INVESTIGATE,
VERIFY, AND BE RESPONSIBLE FOR ALL CONDITIONS OF THE PROJECT, AND
NOTIFY THE ARCHITECT & VA OF ANY CONDITIONS THAT REQUIRE
MODIFICATION BEFORE PROCEEDING WITH THE WORK.
2. DIMENSIONS AND ITEMS SHOWN ARE APPROXIMATE ONLY. CONTRACTOR IS TO
VERIFY ALL DIMENSIONS AND CONDITIONS AND PROVIDE A COMPLETELY
FINISHED AND WARRANTED ROOFING SYSTEM.
3. DAILY ROOF ACCESS SHALL BE OBTAINED FROM THE EXTERIOR OF THE
HOSPITAL.
4. NO MATERIALS, SUPPLIES, OR PERSONNEL ARE TO BE MOVED THROUGH THE
HOSPITAL.
5. NO LAY-DOWN SPACE PROVIDED. MATERIALS MUST BE OFFLOADED TO THE
ROOF IN A MANNER TO MAINTAIN THE INTEGRITY OF THE ROOF.
6. CONTRACTOR TO PROVIDE ALL WORK TO ACHIEVE ENTIRE ROOF WARRANTY
AS SPECIFIED.
7. ALL WORK PERFORMED SHALL BE IN ACCORDANCE WITH ALL APPLICABLE
BUILDING CODES.
8. CONTRACTOR IS PERMITTED TO WORK NORMAL BUSINESS HOURS, HOWEVER,
WHEN WORKING NEAR SENSITIVE AREAS SUCH AS AIR INTAKES OR WHERE
CONDITIONS MAKE THE AREA SENSITIVE, CONTRACTOR SHOULD EXPECT TO
WORK OFF-HOURS.
9. CONTRACTOR MUST PREVENT FUMES AND ODORS FROM ENTERING THE
BUILDING THROUGH INTAKES AND OPENINGS. ANY WORK NEAR INTAKES OR
OPENINGS MAY NEED TO BE PERFORMED OFF PEAK HOURS AND SHOULD BE
COORDINATED WITH THE OWNER.
10. ALL DISPOSABLE AND EXISTING ROOF MATERIALS ARE TO BECOME THE
PROPERTY OF THE CONTRACTOR AND MUST BE DISPOSED OF IN ACCORDANCE
WITH ALL LOCAL, STATE, AND FEDERAL REGULATIONS.
11. CONTRACTOR IS RESPONSIBLE FOR AN ORDERLY AND CONSIDERATE
REMOVAL OF ALL WASTE AND DEBRIS BY USE OF CHUTES OR OTHER
CONFINED METHODS. NOTHING IS TO BE THROWN LOOSELY OFF OF A ROOF.
12. ROOF TEAR-OFF SHALL BE LIMITED TO WHAT CAN BE REPLACED WITHIN A 48
HOUR WINDOW AND ROOF MUST REMAIN WATERTIGHT. TYPICAL FOR ALL
ROOFS AND PHASES.
13. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL TEMPORARY BRACING AND
SHORING REQUIRED DURING CONSTRUCTION.
14. CONTRACTOR IS RESPONSIBLE FOR THE STORAGE, INSTALLATION, AND
REMOVAL OF TEMPORARY FALL PROTECTION ON EACH ROOF TO BE
REPLACED. MATERIALS SHOULD BE STORED SAFELY AND SECURE.
15. CONTRACTOR SHALL MAINTAIN EXISTING FIRE PROTECTION SYSTEMS.
REPLACE FIRE-PROOFING AND SEALANTS WHERE DISTURBED BY
CONSTRUCTION AND WHERE CONNECTIONS OF NEW CONSTRUCTION MUST
INTERFACE WITH EXISTING PROTECTED STRUCTURAL MEMBERS OR BUILDING
COMPONENTS.
16. REMOVE ALL EXISTING WALKWAY PADS AS REQUIRED FOR NEW
CONSTRUCTION. UPON COMPLETION OF ROOF REPLACEMENT, INSTALL NEW
WALKWAY PADS IN THE SAME PREVIOUS LOCATIONS.
17. ALL EXISTING ROOFING MATERIALS INCLUDING BLOCKING AND FLASHING TO BE
COMPLETELY REMOVED DOWN TO CONCRETE OR METAL DECK. ALL REMOVED
FLASHING TO BE REPLACED WITH NEW.
18. ALL VOIDS, CRACKS, AND SEPARATIONS IN EXISTING DECK ARE TO BE
PATCHED AND REPAIRED BEFORE APPLYING NEW ROOFING.
19. SCRAPE AND OTHERWISE PROPERLY PREPARE,THEN PAINT ALL EXPOSED
STEEL INSTALLED THROUGH THE NEW ROOF SYSTEM TO A DISTANCE OF 12"
ABOVE NEW ROOFING.
20. CONTRACTOR SHALL INSTALL NEW ROOFING AND INSULATION; 4" THICK FOR 30
R-VALUE MIN. INCREASE THICKNESS OF INSULATION TO MEET 1/8" MIN. SLOPE
TO DRAINS AS REQUIRED. INSTALL NEW COVERBOARD AND NEW MEMBRANE.
PROVIDE NEW FLASHING AT WALLS, ROOF TOP UNITS, AND ROOF
PENETRATIONS AS REQUIRED.
21. ALL PENETRATIONS AT SMOKE AND FIRE RATED WALLS, ROOFS, FLOORS, OR
CEILINGS, SHALL BE PROTECTED, SEALED OR DAMPERED USING ONLY U.L.
AND/OR I.C.B.O. APPROVED METHODS, SYSTEMS, MATERIALS, AND
INSTALLATION.
22. PROVIDE SEALANT AT ALL JOINTS OR CRACKS THAT OCCUR WHERE
DISSIMILAR MATERIALS INTERSECT PERPENDICULAR TO EACH OTHER, AND
THE INTERSECTION IS EXPOSED TO VIEW.
23. ALL EXISTING METAL COPING COVERS ARE TO BE RE-CAULKED AND RESEALED.
24. ALL EXISTING STONE COPING IS TO BE COVERED WITH NEW METAL COVERS
SIMILAR IN COLOR AND APPEARANCE TO EXISTING COPING COVERS. SEE
DETAIL A8-7.
25. ALL DETAILS SHOWN AND CONSTRUCTED ARE TO COMPLY WITH
MANUFACTURES PRINTED REQUIREMENTS TO MAINTAIN WARRANTY.
26. ALL DETAILS SHOWN ARE TYPICAL THROUGHOUT THE PROJECT. CONTRACTOR
TO APPLY APPROPRIATE DETAILS TO ACCOMPLISH A COMPLETE AND
WARRANTED PROJECT.
27. ALL WOOD USED IN CONSTRUCTION TO BE TREATED.
9. Fire Suppression:
Sprinkler system: Medical Center building is required to be sprinkled throughout in accordance with
NFPA 13.
The sprinkler system is hydraulically designed and anticipated to perform accordance with applicable edition of NFPA. Any modifications must comply with NFPA 13 2013 and the Sixth Edition of the Department of Veterans Affairs Fire Protection Design Manual and NFPA 45 shall regulate design area and density.
Minimum Design Requirements:
All areas shall be protected as:
Light Hazard Occupancy: 0.10 gpm/ft2 over 1,500 ft2.
Hose stream allowance: 100 GPM
Portable Fire extinguishers: Fire Extinguishers are required in accordance with NFPA 101 and NFPA 10.
Fire alarm system:
A combined manual and automatic Fire Alarm System exists and shall not be impacted, disabled or modified by the project work.
CODE ANALYSIS
The 2015 edition of the Life Safety Code, NFPA 101 and the Sixth Edition of the Department of Veterans Affairs Fire Protection Design Manual have been used to review the above referenced project for compliance with the fire and life safety requirements. For features not addressed by NFPA 101 and the referenced National Fire Codes, the 2015 edition of the International Building Code has been used and shall be met by the contractor.
The existing building has a Health Care Occupancy.
Corridor Continuity and separation, Section 407.3: Smoke Partitions. Doors smoke rated with positive latching unless required to be Fire Rated (Section 509.4, Below) Exceptions by 407.2.1 through 407.2.4: Waiting areas and lobbies (1-4), Care providers’ stations constructed as corridors, psychiatric treatment areas (1-6), and Gift Shops less than 500 sqft.
Doors tested to UL 1784, installed per NFPA 105 Ducts or air transfer opening shall limit the passage of smoke and be equipment with a Smoke Damper.
8.2.1 Construction
For Construction I(442):
Exterior Bearing walls: 4-hr FRR, Interior Bearing: 4-hr FRR (3-hr FRR if supporting only roof or one floor), Floor: 2-hr FRR, Roof: 2-hr FRR Assumed Assembly = UL DESIGN NO. K917
Occupancy Separations: Not Required with other Health Care Occupancies.
Special Requirements: Corridors in occupancies in Group I-2 shall be continuous to the exits and shall be separated from other areas. Corridors are a minimum of 96 Inches wide. During construction, these corridors shall maintain code. Any new corridor walls shall be constructed as smoke partitions .Smoke Barriers to separate stories into 50 occupants, an area of 22,500 or smaller square feet, but at least 2 areas per floor.
Refuge Areas are assumed in each smoke compartment and will not be altered or obstructed by the project work.
Automatic sprinkler system: existing, altered components shall comply with NFPA 101 9.7.1.1 Sprinkler systems required to comply with NFPA 13.
Fire alarm system: existing, altered components shall comply with NFPA 13, according to NFPA 101.
Fire rated partitions are required to separate the following:
Elevator hoistway is constructed as a 2 hr Shaft enclosure, which shall be maintained and continuous (have continuity) per IBC2012 1009 Vertical Shafts, including enclosed exit stairways shall be 2 hr rated walls or partitions as required by IBC 709, with 90 min doors, IBC 715, Allowable Area: Based upon non combustible, unprotected construction.
Basic Allowable Area: Unlimited (IBC,Table 503, I-2)
Allowable Height: Unlimited
Hazardous Room Separation
1.
2.
3.
4.
5.
6.
7.
8.
10.
11.
NOTE: CONTRACTOR TO COMPLY WITH ALL OF THE FOLLOWING.
GENERAL REQUIREMENTS & NOTES
GENERAL CODES: Contractor to comply with all of the following. VA has adopted the latest edition of the following codes and standards as a minimum for all projects performed in the modernization, alteration, addition, or improvement of its real property and construction. VA design Manuals and Master Specifications specify other codes and standards that VA follows on its projects:
· VA Directives, Design Manuals, Master Specifications, VA National CAD Standard Application Guide, and other Guidance on the Technical Information Library (TIL) (http://www.cfm.va.gov/til/).
· International Building Code (IBC) (Except when specifically referenced in VA Design Documents, see notes below)
· NFPA 101 Life Safety Code (see notes below)
· NFPA National Fire Codes with the exception of NFPA 5000 and NFPA 900
· Occupational, Safety and Health Administration (OSHA) Standards.
· VA Seismic Design Requirements, H-18-8
· National Electrical Code (NEC)
· International Plumbing Code (IPC)
· Architectural Barriers Act Accessibility Standards (ABAAS) including VA supplement, Barrier Free Design Guide (PG-18-13)
· Energy policy Act of 2005 (EPAct)
· Executive Order 13423: Strengthening Federal Environmental, Energy, and Transportation Management.
· Ventilation for Acceptable Indoor Air Quality – ASHRAE Standard 62.1- 2004.
· Safety Standard for Refrigeration Systems – ASHRAE Standard 15 – 2007.
Local Codes: As an agency of the federal government, VA is not subject to local imposition of code enforcement procedures (drawing reviews, building permits, inspections, fees, etc.). VA must function as the Authority Having Jurisdiction (AHJ) and thus has the responsibility to guard public health and safety through enforcing its adopted codes. However, local authorities should be notified about planned projects and given opportunity to review drawings provided that VA does not pay for review or inspection fees.
EQUIPMENT/PIPE CURB
GOOSENECK VENT
EXHAUST VENT
ROOF DRAIN
PLUMBING VENT
ROOF DRAWING SYMBOLS
ITEMS ABOVE ROOF DECK
ITEMS ON ROOF DECK
LIGHTNING PROTECTION
SCUPPER/OVERFLOW DRAIN
SUPPLY/RETURN DUCTS
AREAS TREATED WITH FLUID
APPLIED RESTORATION
COATING. CLEAR DEBRIS &
CLEAN PRIOR TO INSTALL.
ROOF WALKWAY PADS
DRAINAGE CRICKET. SLOPE
AS NEEDED. TO MAINTAIN
POSITIVE SLOPE TO DRAIN.
EXISTING FALL PROTECTION
GUARDRAIL
LADDER W/ CAGE AND
CROSSOVER PLATFORM
LADDER W/ CAGE AND
CROSSOVER PLATFORM
(NO CAGE)
WINDOW CLEANING
ANCHORAGE POINT
LOCATION
ALTERNATE: SEE LS-1 AND
SPECIFICATIONS FOR MORE
INFO.
SPRINKLER SYSTEM; DRY PIPE
APPROXIMATE ROOF
ELEVATION
NEW FALL PROTECTION
GUARDRAIL
REVISION CLOUD
INDICATING ADDITION
REVISION CLOUD
INDICATING OMISSION
BID DOCUMENTS 04/01/2022
412.334.4091
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
CLINICAL
ADDITION
41 43
3 N.I.C
1 N.I.C
55 5
N.I.C.
N.I.C.
29 N.I.C.
N.I.C
N.I.C
N.I.C
N.I.C.
N.I.C.
PHASE 2
PHASE 3
PHASE 1
PHASE 6
PHASE 3
PHASE 3
PHASE 5
PHASE 4
PHASE 3
PHASE 6
PHASE 6
APPROXIMATE LIMIT
ROOFING WORK
ROOF PLAN LEGEND
DO NOT OBSTRUCT -
EMERGENCY ACCESS
PHASE 1
PHASE 2
PHASE 3
PHASE 4
PHASE 5
PHASE 6
Drawing Title
Approved Project Director:
Project Title
Date
Location
Checked By:
Building Number
Project Number
Drawing Number
Drawn By:
Revisions: Date
ARCHITECT/ENGINEERS:
LOUIS A. JOHNSON VAMC
o n e e ig h th in c h o n e fo o t 1 th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
B
A
C
D
E
F
1 2 3 4 5 6 7 9
F
E
D
C
B
A
97 8654321
OFFICE OF
FACILITIES
MANAGEMENT
VA Project Number
VA 540-07-103
VAMC CLARKSBURG
1 MED CENTER DRIVE CLARKSBURG, WV 26301
D18-023
U :\1
3.
5.
- V A
C la rk sb ur g
R e
R oo f -
_a og rz ew al la .rv t
BID DOCUMENTS
A-1
ROOF PLAN - PHASING PLAN ROOF REPLACEMENT
SCALE: 1" = 20'-0"1ROOF PLAN
N
NO SCUPPERS, NEW REQUIRED
NEW COPING REQUIRED
COVER EXISTING COPING
EXISTING ROOF HATCH TO BE REMOVED
EXISTING CONCRETE PAD TO BE REMOVED
EXISTING DRAIN THROUGH EXTERIOR WALL INTO BUILDING
EXISTING ROOF HATCH TO REMAIN
MAXIMIZE DIAMETER OF EXISTING DRAINS
REMOVE EXISTING PITCH POCKETS
NEW FALL PROTECTION GUARDRAILS REQUIRED (SEE SHEETS LS-1 & A-8)
DO NOT LIFT UNITS
METAL DECKING
2 3 3
JVE TJD04-01-2022
100% CONSTRUCTION DOCUMENTS 06/17/2019
100% DOCUMENT RESUBMISSION 01/31/2020
100% BID DOCUMENTS 04/18/2019
REVIEW 03/13/2019
75% SUBMITTAL 02/15/2019
PROGRESS 11/20/2018
10 10
PHASING NOTE
1. AN ALTERNATE PHASING PLAN WILL BE CONSIDERED BY
THE OWNER AFTER BID IS AWARDED. ANY ALTERNATE
PHASING PLAN MUST BE APPROVED BY THE OWNER
EQUIPMENT/PIPE CURB
GOOSENECK VENT
EXHAUST VENT
ROOF DRAIN
PLUMBING VENT
ROOF DRAWING SYMBOLS
ITEMS ABOVE ROOF DECK
ITEMS ON ROOF DECK
LIGHTNING PROTECTION
SCUPPER/OVERFLOW DRAIN
SUPPLY/RETURN DUCTS
AREAS TREATED WITH FLUID
APPLIED RESTORATION
COATING. CLEAR DEBRIS &
CLEAN PRIOR TO INSTALL.
ROOF WALKWAY PADS
DRAINAGE CRICKET. SLOPE
AS NEEDED. TO MAINTAIN
POSITIVE SLOPE TO DRAIN.
EXISTING FALL PROTECTION
GUARDRAIL
LADDER W/ CAGE AND
CROSSOVER PLATFORM
LADDER W/ CAGE AND
CROSSOVER PLATFORM
(NO CAGE)
WINDOW CLEANING
ANCHORAGE POINT
LOCATION
ALTERNATE: SEE LS-1 AND
SPECIFICATIONS FOR MORE
INFO.
SPRINKLER SYSTEM; DRY PIPE
APPROXIMATE ROOF
ELEVATION
NEW FALL PROTECTION
GUARDRAIL
X X X
REVISION CLOUD
INDICATING ADDITION
REVISION CLOUD
INDICATING OMISSION
BID DOCUMENTS 04/01/2022
412.334.4091
AutoCAD SHX Text
INDIVIDUAL ROOF KEYNOTES
AutoCAD SHX Text X
8' - 8" 24' - 4"
'-8
'-0
1' - 1 1/4" 16' - 6" 10' - 0" 17' - 0" 20' - 0" 19' - 0" 21' - 6" 15' - 0" 13' - 0" 15' - 0" 21' - 0" 19' - 0" 22' - 2" 14' - 4" 10' - 0" 17' - 0" 3' - 3"
8' - 0"
ROOF 22
¹C
¹D
¹E
¹F
¹G
¹H
¹H'
¹K
¹K'
¹3 ¹4 ¹5 ¹6 ¹7 ¹8 ¹9 ¹10 ¹11 ¹12 ¹13 ¹14 ¹15 ¹16 ¹17 ¹18
EXIST. AHU-10
EXIST.
AHU-12SUPPLY
SUPPLY
RETURN
RETURN
EXIST. FIRE PROTECTION PIPE
EXIST CONDENSING UNIT
90' - 6"
EJ
EJ
ABANDONDED HATCH
EXIST. CHILLED WATER SUPPLY/RETURN
EXIST. CHILLED WATER SUPPLY/RETURN
EXIST. STEAM AND CONDENSATE
EXIST. FIRE
PROTECTION PIPE
EXIST. 15" METAL
COPING ON 6"
PARAPET
EXIST. 15" METAL
COPING ON 6"
PARAPET
RETURN
RETURN
SUPPLY
SUPPLY
EXIST. AHU-11
EXIST. AHU-13
ABANDONED CURBABANDONED CURB
ABANDONED CURB
EXIST. WALL LOUVERS
EXIST. METAL COPING ON 7"
PARAPET. THIS SIDE
EXIST. METAL COPING
ON 1'-4". THIS SIDE
ROOF 22
ROOF 42
ROOF 20
EXIST. 30" ROOF PADS
EXISTING
TERMINATION
BAR @ 7"
EXIST.
EXPANSION
CURB. 5" THIS
SIDE.
EXIST. EXPANSION
CURB. 7" THIS SIDE.
EXISTING
TERMINATION
BAR @ 7"
EXISTING TO REMAIN
ETR
8 8
ROOF
8 8
ROOF 50
9 9
ROOF 51
ROOF 45
ROOF 44
ROOF 46
ROOF 19
1 1 1
A-2
PHASE 1
Drawing Title Project Title
Date
Location
Checked By:
Building Number
Project Number
Drawing Number
Drawn By:
Revisions: Date
LOUIS A. JOHNSON VAMC
o n e e ig h th in c h o n e fo o t 1 th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
B
A
C
D
E
F
1 2 3 4 5 6 7 9
F
E
D
C
B
A
97 8654321
OFFICE OF
FACILITIES
MANAGEMENT
VA Project Number
VA 540-07-103
VAMC CLARKSBURG
1 MED CENTER DRIVE CLARKSBURG, WV 26301
Approved Project Director:
ARCHITECT/ENGINEERS: D18-023
U :\1
3.
5.
- V A
C la rk sb ur g
R e
R oo f -
_a og rz ew al la .rv t
BID DOCUMENTS
A-2
PHASE 1 ROOF PLANS ROOF REPLACEMENT
SCALE: 1/8" = 1'-0"1PHASE 1 ENLARGED ROOF PLAN - ROOFS 18, 19, 20, 22, 42, 44, 45, 46, 50, & 51 N
SCALE: 1/64" = 1'-0"
KEY PLAN TRUE
JVE TJD04-01-2022
100% CONSTRUCTION DOCUMENTS 06/17/2019
100% DOCUMENT RESUBMISSION 01/31/2020
100% BID DOCUMENTS 04/18/2019
REVIEW 03/13/2019
75% SUBMITTAL 02/15/2019
PROGRESS 11/20/2018
GENERAL PLAN NOTES
SPECIFIC PLAN NOTES #
NOTE: NOT ALL SPECIFIC PLAN NOTES APPEAR
ON EVERY SHEET. THIS LIST INCLUDES ALL
SPECIFIC PLAN NOTES FOR ALL DRAWINGS
ACROSS THE ENTIRE PROJECT. SEE "E" AND "M"
DRAWINGS FOR ADDITIONAL REQUIREMENTS.
1. CLEAN ROOF DRAIN AND PIPE. VIDEO PIPE
FOR CLEAR PASSAGE UNTIL STORM DRAIN
LATERALS BELOW GRADE.
2. EXISTING LADDER. MODIFY LOOSE END
LENGTH TO BE NO LESS THAN 8" ABOVE
ROOF.
3. REMOVE EXISTING ROOF DRAIN AND
REPLACE WITH NEW ROOF DRAIN.
MAXIMIZE DIAMETER OF NEW DRAINS AS
FIELD CONDITIONS ALLOW.
4. EXISTING ROOF HATCH TO BE REMOVED.
5. EXISTING CONCRETE PAD TO BE REMOVED.
6. CLEAN EXISTING DRAIN THROUGH
EXTERIOR WALL INTO BUILDING.
7. PROVIDE NEW ROOF SCUPPER PER DETAIL
UTILIZING EXISTING PARAPET
PENETRATION.
8. PROVIDE NEW ROOF SCUPPER OPENING
THROUGH NEW PARAPET PENETRATION
AND PROVIDE NEW SCUPPER PER DETAIL.
9. PROVIDE NEW SECONDARY SCUPPER
THROUGH EXISTING PARAPET
PENETRATION TO MATCH EXISTING.
ENSURE THAT NEW SECONDARY SCUPPER
PROJECTS AT LEAST 2" BEYOND FACE OF
BUILDING.
10. ROUTE DOWNSPOUT TO THIS LOCATION
AND DISCHARGE ON ROOF BELOW.
PROVIDE WALL BRACKETS 5'-0" O.C. MAX.
11. ROUTE DOWNSPOUT HORIZONTALLY AND
ENSURE A 1/4" PER FOOT SLOPE, MINIMUM.
12. DOWNSPOUT FROM ROOF 59 ENDS AT
ROOF LEVEL OF ROOF 61. EXTEND TO
GROUND.
13. REMOVE EXISTING PITCH POCKETS.
14. NEW METAL COPING REQUIRED.
15. COVER EXISTING STONE COPING WITH NEW
METAL COPING COVERS TO MATCH
EXISTING COPING COVERS ON SITE.
1. SEE GENERAL NOTES ON LS-1.
2. PROVIDE ROOF MANUFACTURER'S
STANDARD DETAILS WHERE MECHANICAL
AND ELECTRICAL EQUIPMENT AND ALL
PENETRATIONS OCCUR.
3. CUT OUT & REMOVE ALL EXISTING ROOF
SYSTEM TO DECK. INSTALL NEW ROOFING
AND INSULATION; 7-1/2" THICK FOR 30
R-VALUE MIN. INCREASE THICKNESS OF
INSULATION TO MEET 1/8" MIN. SLOPE TO
DRAINS AS REQUIRED. INSTALL NEW
COVERBOARD AND NEW ROOFING.
PROVIDE NEW FLASHING AT WALLS, ROOF
TOP UNITS, AND ROOF PENETRATIONS AS
REQUIRED.
4. REMOVE ALL UNUSED OR ABANDONED
ROOF CURBS, HATCHES, AND
PENETRATIONS ON ROOF SURFACES
WITHIN THE SCOPE OF WORK. RESTORE
ROOF DECK AND PROVIDE NEW
INSULATION & ROOFING SYSTEM.
5. PROVIDE A BREAK IN DOWNSPOUTS OVER
40 FEET LONG. PROVIDE A CONDUCTOR
HEAD AT START OF NEW RUN. ALL
DOWNSPOUTS SHALL TERMINATE WITH 60
DEGREE ELBOW MIN. AND SPLASHBLOCK.
6. CONTRACTOR IS RESPONSIBLE FOR
VERIFYING ALL DIMENSIONS AND
ELEVATIONS IN FIELD. ALL DIMENSIONS AND
ELEVATIONS INDICATED ON DRAWINGS ARE
APPROXIMATE.
7. CONTRACTOR IS RESPONSIBLE FOR
PROVIDING ALL ROOFING AND FLASHING
AROUND ALL EXISTING WALLS, ROOF
PENETRATIONS, AND ITEMS WHETHER
SHOWN OR NOT SHOWN.
8. ALL EXISTING LIGHTNING PROTECTION TO
BE REMOVED AND REPLACED WITH NEW
PROTECTION SYSTEM. SEE ELECTRICAL
DRAWINGS.
9. CONTRACTOR TO COORDINATE WITH COR
BEFORE PERFORMING ANY AND ALL WORK
IN THE VICINITY OF DESIGNATED EXISTING
BIO-HAZARDOUS AND LAB EXHAUST VENTS.
10. CONTRACTOR MUST TAKE CARE TO
PREVENT FUMES AND ODORS FROM
ENTERING THE BUILDING THROUGH
INTAKES AND OPENINGS. ANY WORK NEAR
INTAKES OR OPENINGS MAY NEED TO BE
PERFORMED OFF PEAK HOURS AND
SHOULD BE COORDINATED WITH THE
OWNER.
11. REMOVE ALL EXISTING WALKWAY PADS AS
REQUIRED FOR NEW CONSTRUCTION.
UPON COMPLETION OF ROOF
REPLACEMENT, INSTALL NEW WALKWAY
PADS IN THE SAME LOCATIONS TO MATCH
EXISTING.
EQUIPMENT/PIPE CURB
GOOSENECK VENT
EXHAUST VENT
ROOF DRAIN
PLUMBING VENT
ROOF DRAWING SYMBOLS
ITEMS ABOVE ROOF DECK
ITEMS ON ROOF DECK
LIGHTNING PROTECTION
SCUPPER/OVERFLOW DRAIN
SUPPLY/RETURN DUCTS
AREAS TREATED WITH FLUID
APPLIED RESTORATION
COATING. CLEAR DEBRIS &
CLEAN PRIOR TO INSTALL.
ROOF WALKWAY PADS
DRAINAGE CRICKET. SLOPE
AS NEEDED. TO MAINTAIN
POSITIVE SLOPE TO DRAIN.
EXISTING FALL PROTECTION
GUARDRAIL
LADDER W/ CAGE AND
CROSSOVER PLATFORM
LADDER W/ CAGE AND
CROSSOVER PLATFORM
(NO CAGE)
WINDOW CLEANING
ANCHORAGE POINT
LOCATION
ALTERNATE: SEE LS-1 AND
SPECIFICATIONS FOR MORE
INFO.
SPRINKLER SYSTEM; DRY PIPE
APPROXIMATE ROOF
ELEVATION
NEW FALL PROTECTION
GUARDRAIL
REVISION CLOUD
INDICATING ADDITION
REVISION CLOUD
INDICATING OMISSION
NEW SECONDARY SCUPPER PENETRATION
@ THIS LOCATION (1 OF 2). CONSTRUCT
SIMILAR TO THOSE FOUND ON ROOF 42.
NEW SECONDARY SCUPPER PENETRATION
@ THIS LOCATION (1 OF 2). CONSTRUCT
SIMILAR TO THOSE FOUND ON ROOF 42.
BID DOCUMENTS 04/01/2022
412.334.4091
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
A-3
A-3 3 A-3
PHASE 3 PHASE 3
PHASE 2
44'-8"
'-8
ROOF 47
¹B
¹B'
¹9 ¹10 ¹11 ¹12
15' - 6"
EXIST. AIR
HANDLING UNIT
ROOF 48
31'-8"
'-0
ROOF 55
¹B'
¹C
¹1 ¹2 ¹3
15' - 6"
ROOF
ROOF 52
ROOF 53
ROOF 56
ROOF 58
ROOF 60
ROOF 61
ROOF 57
9 9
50'-0"
44'-8"
'-6
'-0
'-6
ROOF 40
¹L
¹M
¹N'
¹P
¹N
¹9 ¹10 ¹11 ¹12
59' - 10"
ABANDONED VENT
EXIST. 15" METAL
COPING ON 24"
PARAPET
1 1
ROOF 41
ROOF 43
ROOF 34
ROOF 35
ROOF
ROOF
ROOF
ROOF
ROOF
ROOF
ROOF 30
ROOF 39
1 1
Drawing Title
Approved Project Director:
Project Title
Date
Location
Checked By:
Building Number
Project Number
Drawing Number
Drawn By:
Revisions: Date
LOUIS A. JOHNSON VAMC
o n e e ig h th in c h o n e fo o t 1 th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
B
A
C
D
E
F
1 2 3 4 5 6 7 9
F
E
D
C
B
A
97 8654321
OFFICE OF
FACILITIES
MANAGEMENT
VA Project Number
VA 540-07-103
VAMC CLARKSBURG
1 MED CENTER DRIVE CLARKSBURG, WV 26301
ARCHITECT/ENGINEERS:
U :\1
3.
5.
- V A
C la rk sb ur g
R e
R oo f -
_a og rz ew al la .rv t
BID DOCUMENTS
A-3
PHASE 2 & 3 ROOF PLANS ROOF REPLACEMENT
SCALE: 1/64" = 1'-0"
KEY PLAN TRUE
SCALE: 1/8" = 1'-0"2PHASE 3 ENLARGED ROOF PLAN - ROOF 47 & 48
SCALE: 1/8" = 1'-0"3PHASE 3 ENLARGED ROOF PLAN - ROOF 52, 53, 55, 56, 57, 58, 60 & 61
N
N
D18-023
SCALE: 1/8" = 1'-0"1PHASE 2 ENLARGED ROOF PLAN - ROOF 30, 31, 32, 33, 34, 35, 36, 37, 38, 39, 40, 41 & 43 N
JVE TJD04-01-2022
100% CONSTRUCTION DOCUMENTS 06/17/2019
100% DOCUMENT RESUBMISSION 01/31/2020
100% BID DOCUMENTS 04/18/2019
REVIEW 03/13/2019
75% SUBMITTAL 02/15/2019
PROGRESS 11/20/2018
GENERAL PLAN NOTESSPECIFIC PLAN NOTES #
EQUIPMENT/PIPE CURB
GOOSENECK VENT
EXHAUST VENT
ROOF DRAIN
PLUMBING VENT
ROOF DRAWING SYMBOLS
ITEMS ABOVE ROOF DECK
ITEMS ON ROOF DECK
LIGHTNING PROTECTION
SCUPPER/OVERFLOW DRAIN
SUPPLY/RETURN DUCTS
AREAS TREATED WITH FLUID
APPLIED RESTORATION
COATING. CLEAR DEBRIS &
CLEAN PRIOR TO INSTALL.
ROOF WALKWAY PADS
DRAINAGE CRICKET. SLOPE
AS NEEDED. TO MAINTAIN
POSITIVE SLOPE TO DRAIN.
EXISTING FALL PROTECTION
GUARDRAIL
LADDER W/ CAGE AND
CROSSOVER PLATFORM
LADDER W/ CAGE AND
CROSSOVER PLATFORM
(NO CAGE)
WINDOW CLEANING
ANCHORAGE POINT
LOCATION
ALTERNATE: SEE LS-1 AND
SPECIFICATIONS FOR MORE
INFO.
SPRINKLER SYSTEM; DRY PIPE
APPROXIMATE ROOF
ELEVATION
NEW FALL PROTECTION
GUARDRAIL
REVISION CLOUD
INDICATING ADDITION
REVISION CLOUD
INDICATING OMISSION
BID DOCUMENTS 04/01/2022
1. SEE GENERAL NOTES ON LS-1.
2. PROVIDE ROOF MANUFACTURER'S
STANDARD DETAILS WHERE MECHANICAL
AND ELECTRICAL EQUIPMENT AND ALL
PENETRATIONS OCCUR.
3. CUT OUT & REMOVE ALL EXISTING ROOF
SYSTEM TO DECK. INSTALL NEW ROOFING
AND INSULATION; 7-1/2" THICK FOR 30
R-VALUE MIN. INCREASE THICKNESS OF
INSULATION TO MEET 1/8" MIN. SLOPE TO
DRAINS AS REQUIRED. INSTALL NEW
COVERBOARD AND NEW ROOFING.
PROVIDE NEW FLASHING AT WALLS, ROOF
TOP UNITS, AND ROOF PENETRATIONS AS
REQUIRED.
4. REMOVE ALL UNUSED OR ABANDONED
ROOF CURBS, HATCHES, AND
PENETRATIONS ON ROOF SURFACES
WITHIN THE SCOPE OF WORK. RESTORE
ROOF DECK AND PROVIDE NEW
INSULATION & ROOFING SYSTEM.
5. PROVIDE A BREAK IN DOWNSPOUTS OVER
40 FEET LONG. PROVIDE A CONDUCTOR
HEAD AT START OF NEW RUN. ALL
DOWNSPOUTS SHALL TERMINATE WITH 60
DEGREE ELBOW MIN. AND SPLASHBLOCK.
6. CONTRACTOR IS RESPONSIBLE FOR
VERIFYING ALL DIMENSIONS AND
ELEVATIONS IN FIELD. ALL DIMENSIONS AND
ELEVATIONS INDICATED ON DRAWINGS ARE
APPROXIMATE.
7. CONTRACTOR IS RESPONSIBLE FOR
PROVIDING ALL ROOFING AND FLASHING
AROUND ALL EXISTING WALLS, ROOF
PENETRATIONS, AND ITEMS WHETHER
SHOWN OR NOT SHOWN.
8. ALL EXISTING LIGHTNING PROTECTION TO
BE REMOVED AND REPLACED WITH NEW
PROTECTION SYSTEM. SEE ELECTRICAL
DRAWINGS.
9. CONTRACTOR TO COORDINATE WITH COR
BEFORE PERFORMING ANY AND ALL WORK
IN THE VICINITY OF DESIGNATED EXISTING
BIO-HAZARDOUS AND LAB EXHAUST VENTS.
10. CONTRACTOR MUST TAKE CARE TO
PREVENT FUMES AND ODORS FROM
ENTERING THE BUILDING THROUGH
INTAKES AND OPENINGS. ANY WORK NEAR
INTAKES OR OPENINGS MAY NEED TO BE
PERFORMED OFF PEAK HOURS AND
SHOULD BE COORDINATED WITH THE
OWNER.
11. REMOVE ALL EXISTING WALKWAY PADS AS
REQUIRED FOR NEW CONSTRUCTION.
UPON COMPLETION OF ROOF
REPLACEMENT, INSTALL NEW WALKWAY
PADS IN THE SAME LOCATIONS TO MATCH
EXISTING.
NOTE: NOT ALL SPECIFIC PLAN NOTES APPEAR
ON EVERY SHEET. THIS LIST INCLUDES ALL
SPECIFIC PLAN NOTES FOR ALL DRAWINGS
ACROSS THE ENTIRE PROJECT. SEE "E" AND "M"
DRAWINGS FOR ADDITIONAL REQUIREMENTS.
1. CLEAN ROOF DRAIN AND PIPE. VIDEO PIPE
FOR CLEAR PASSAGE UNTIL STORM DRAIN
LATERALS BELOW GRADE.
2. EXISTING LADDER. MODIFY LOOSE END
LENGTH TO BE NO LESS THAN 8" ABOVE
ROOF.
3. REMOVE EXISTING ROOF DRAIN AND
REPLACE WITH NEW ROOF DRAIN.
MAXIMIZE DIAMETER OF NEW DRAINS AS
FIELD CONDITIONS ALLOW.
4. EXISTING ROOF HATCH TO BE REMOVED.
5. EXISTING CONCRETE PAD TO BE REMOVED.
6. CLEAN EXISTING DRAIN THROUGH
EXTERIOR WALL INTO BUILDING.
7. PROVIDE NEW ROOF SCUPPER PER DETAIL
UTILIZING EXISTING PARAPET
PENETRATION.
8. PROVIDE NEW ROOF SCUPPER OPENING
THROUGH NEW PARAPET PENETRATION
AND PROVIDE NEW SCUPPER PER DETAIL.
9. PROVIDE NEW SECONDARY SCUPPER
THROUGH EXISTING PARAPET
PENETRATION TO MATCH EXISTING.
ENSURE THAT NEW SECONDARY SCUPPER
PROJECTS AT LEAST 2" BEYOND FACE OF
BUILDING.
10. ROUTE DOWNSPOUT TO THIS LOCATION
AND DISCHARGE ON ROOF BELOW.
PROVIDE WALL BRACKETS 5'-0" O.C. MAX.
11. ROUTE DOWNSPOUT HORIZONTALLY AND
ENSURE A 1/4" PER FOOT SLOPE, MINIMUM.
12. DOWNSPOUT FROM ROOF 59 ENDS AT
ROOF LEVEL OF ROOF 61. EXTEND TO
GROUND.
13. REMOVE EXISTING PITCH POCKETS.
14. NEW METAL COPING REQUIRED.
15. COVER EXISTING STONE COPING WITH NEW
METAL COPING COVERS TO MATCH
EXISTING COPING COVERS ON SITE.
412.334.4091
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
A-4
PHASE 4
30' - 6"
EXIST. SKYLIGHT
'-0
'-0
37'-5"1'-4"
ROOF 9
²15
²16
²17
²18
¹19 ¹20
AHU
EXIST. SQUARE DUCT
EXIST. VENT FANS
15' - 6"
EXIST.
CONDENSING UNIT
1 1
14'-8 3/4"
'-0
ROOF 8
EJ
18" STONE CAP
'-0
44'-0"
ROOF 17
¹B'
¹C
75' - 6"
EXIST. VENTILATOR UNIT
EXIST. 15" METAL COPING
ON 24" PARAPET
42'-8"15 '-4
ROOF 16
¹A
¹B
¹15 ¹16 ¹17 ¹18
60' - 6"
EXIST. 15" METAL COPING
1 1
14'-6"
'-3
/4
9' -2
'-1
/4
40'-8"
'-0
ROOF 11
¹D
¹E
¹F
¹G
²8
²11
²13
²E ²F ²J ²L
EXIST.
GOOSE
NECK
VENT
EJ
90' - 6"
EXIST. 15" STONE CAP
38'-8"
'-1
/4
ROOF 7
ROOF HATCH
105' - 6"
18" STONE CAP ON 8" PARAPET
ROOF 10
ROOF 13
ROOF 12
ROOF 14
ROOF 15
1 1
15 15
Drawing Title
Approved Project Director:
Project Title
Date
Location
Checked By:
Building Number
Project Number
Drawing Number
Drawn By:
Revisions: Date
LOUIS A. JOHNSON VAMC
o n e e ig h th in c h o n e fo o t 1 th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
B
A
C
D
E
F
1 2 3 4 5 6 7 9
F
E
D
C
B
A
97 8654321
OFFICE OF
FACILITIES
MANAGEMENT
VA Project Number
VA 540-07-103
VAMC CLARKSBURG
1 MED CENTER DRIVE CLARKSBURG, WV 26301
ARCHITECT/ENGINEERS:
U :\1
3.
5.
- V A
C la rk sb ur g
R e
R oo f -
_a og rz ew al la .rv t
BID DOCUMENTS
A-4
PHASE 4 ROOF PLANS ROOF REPLACEMENT
SCALE: 1/64" = 1'-0"
KEY PLAN
TRUE
SCALE: 1/8" = 1'-0"1PHASE 4 ENLARGED ROOF PLAN - ROOF 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, & 17 N
D18-023
JVE TJD04-01-2022
100% CONSTRUCTION DOCUMENTS 06/17/2019
100% DOCUMENT RESUBMISSION 01/31/2020
100% BID DOCUMENTS 04/18/2019
REVIEW 03/13/2019
75% SUBMITTAL 02/15/2019
PROGRESS 11/20/2018
GENERAL PLAN NOTESSPECIFIC PLAN NOTES #
NOTE: NOT ALL SPECIFIC PLAN NOTES APPEAR
ON EVERY SHEET. THIS LIST INCLUDES ALL
SPECIFIC PLAN NOTES FOR ALL DRAWINGS
ACROSS THE ENTIRE PROJECT.
1. CLEAN ROOF DRAIN AND PIPE. VIDEO PIPE
FOR CLEAR PASSAGE UNTIL STORM DRAIN
LATERALS BELOW GRADE.
2. EXISTING LADDER. MODIFY LOOSE END
LENGTH TO BE NO LESS THAN 8" ABOVE
ROOF.
3. REMOVE EXISTING ROOF DRAIN AND
REPLACE WITH NEW ROOF DRAIN.
MAXIMIZE DIAMETER OF NEW DRAINS AS
FIELD CONDITIONS ALLOW.
4. EXISTING ROOF HATCH TO BE REMOVED.
5. EXISTING CONCRETE PAD TO BE
REMOVED.
6. CLEAN EXISTING DRAIN THROUGH
EXTERIOR WALL INTO BUILDING.
7. PROVIDE NEW ROOF SCUPPER PER DETAIL
UTILIZING EXISTING PARAPET
PENETRATION.
8. PROVIDE NEW ROOF SCUPPER OPENING
THROUGH NEW PARAPET PENETRATION
AND PROVIDE NEW SCUPPER PER DETAIL.
9. PROVIDE NEW SECONDARY SCUPPER
THROUGH EXISTING PARAPET
PENETRATION TO MATCH EXISTING.
ENSURE THAT NEW SECONDARY SCUPPER
PROJECTS AT LEAST 2" BEYOND FACE OF
BUILDING.
10. ROUTE DOWNSPOUT TO THIS LOCATION
AND DISCHARGE ON ROOF BELOW.
PROVIDE WALL BRACKETS 5'-0" O.C. MAX.
11. ROUTE DOWNSPOUT HORIZONTALLY AND
ENSURE A 1/4" PER FOOT SLOPE, MINIMUM.
12. DOWNSPOUT FROM ROOF 59 ENDS AT
ROOF LEVEL OF ROOF 61. EXTEND TO
GROUND.
13. REMOVE EXISTING PITCH POCKETS.
14. NEW METAL COPING REQUIRED.
15. COVER EXISTING STONE COPING WITH
NEW METAL COPING COVERS TO MATCH
EXISTING COPING COVERS ON SITE.
EQUIPMENT/PIPE CURB
GOOSENECK VENT
EXHAUST VENT
ROOF DRAIN
PLUMBING VENT
ROOF DRAWING SYMBOLS
ITEMS ABOVE ROOF DECK
ITEMS ON ROOF DECK
LIGHTNING PROTECTION
SCUPPER/OVERFLOW DRAIN
SUPPLY/RETURN DUCTS
AREAS TREATED WITH FLUID
APPLIED RESTORATION
COATING. CLEAR DEBRIS &
CLEAN PRIOR TO INSTALL.
ROOF WALKWAY PADS
DRAINAGE CRICKET. SLOPE
AS NEEDED. TO MAINTAIN
POSITIVE SLOPE TO DRAIN.
EXISTING FALL PROTECTION
GUARDRAIL
LADDER W/ CAGE AND
CROSSOVER PLATFORM
LADDER W/ CAGE AND
CROSSOVER PLATFORM
(NO CAGE)
WINDOW CLEANING
ANCHORAGE POINT
LOCATION
ALTERNATE: SEE LS-1 AND
SPECIFICATIONS FOR MORE
INFO.
SPRINKLER SYSTEM; DRY PIPE
APPROXIMATE ROOF
ELEVATION
NEW FALL PROTECTION
GUARDRAIL
REVISION CLOUD
INDICATING ADDITION
REVISION CLOUD
INDICATING OMISSION
BID DOCUMENTS 04/01/2022
1. SEE GENERAL NOTES ON LS-1.
2. PROVIDE ROOF MANUFACTURER'S
STANDARD DETAILS WHERE MECHANICAL
AND ELECTRICAL EQUIPMENT AND ALL
PENETRATIONS OCCUR.
3. CUT OUT & REMOVE ALL EXISTING ROOF
SYSTEM TO DECK. INSTALL NEW ROOFING
AND INSULATION; 7-1/2" THICK FOR 30
R-VALUE MIN. INCREASE THICKNESS OF
INSULATION TO MEET 1/8" MIN. SLOPE TO
DRAINS AS REQUIRED. INSTALL NEW
COVERBOARD AND NEW ROOFING.
PROVIDE NEW FLASHING AT WALLS, ROOF
TOP UNITS, AND ROOF PENETRATIONS AS
REQUIRED.
4. REMOVE ALL UNUSED OR ABANDONED
ROOF CURBS, HATCHES, AND
PENETRATIONS ON ROOF SURFACES
WITHIN THE SCOPE OF WORK. RESTORE
ROOF DECK AND PROVIDE NEW
INSULATION & ROOFING SYSTEM.
5. PROVIDE A BREAK IN DOWNSPOUTS OVER
40 FEET LONG. PROVIDE A CONDUCTOR
HEAD AT START OF NEW RUN. ALL
DOWNSPOUTS SHALL TERMINATE WITH 60
DEGREE ELBOW MIN. AND SPLASHBLOCK.
6. CONTRACTOR IS RESPONSIBLE FOR
VERIFYING ALL DIMENSIONS AND
ELEVATIONS IN FIELD. ALL DIMENSIONS AND
ELEVATIONS INDICATED ON DRAWINGS ARE
APPROXIMATE.
7. CONTRACTOR IS RESPONSIBLE FOR
PROVIDING ALL ROOFING AND FLASHING
AROUND ALL EXISTING WALLS, ROOF
PENETRATIONS, AND ITEMS WHETHER
SHOWN OR NOT SHOWN.
8. ALL EXISTING LIGHTNING PROTECTION TO
BE REMOVED AND REPLACED WITH NEW
PROTECTION SYSTEM. SEE ELECTRICAL
DRAWINGS.
9. CONTRACTOR TO COORDINATE WITH COR
BEFORE PERFORMING ANY AND ALL WORK
IN THE VICINITY OF DESIGNATED EXISTING
BIO-HAZARDOUS AND LAB EXHAUST VENTS.
10. CONTRACTOR MUST TAKE CARE TO
PREVENT FUMES AND ODORS FROM
ENTERING THE BUILDING THROUGH
INTAKES AND OPENINGS. ANY WORK NEAR
INTAKES OR OPENINGS MAY NEED TO BE
PERFORMED OFF PEAK HOURS AND
SHOULD BE COORDINATED WITH THE
OWNER.
11. REMOVE ALL EXISTING WALKWAY PADS AS
REQUIRED FOR NEW CONSTRUCTION.
UPON COMPLETION OF ROOF
REPLACEMENT, INSTALL NEW WALKWAY
PADS IN THE SAME LOCATIONS TO MATCH
EXISTING.
412.334.4091
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
A-5
A-5
A-5
A-5
PHASE 5
PHASE 6
PHASE 6
PHASE 6
125' - 3"
" ROOF 6
²6
²7
²8
²E ²F ²J ²L ²M ²N ²O
EXIST. CONDENSING UNIT
EXIST. UNIT VENTILATOR
EXIST. 30" ROOF PAVERS
REPLACE WITH NEW
PAVERS.
EXIST. VENTILATOR UNIT
30' - 6"
EXIST. 7' MEDICAL
VACUUMS
DISCHARGE
EXIST. STEAM VENT
EXIST. WALL VENTS
12" STONE CAP ON 4" PARAPET
EXIST. 7' MEDICAL
VACUUMS
DISCHARGE
42'-8"
'-0
ROOF 21
¹K
¹L
¹M
¹N'
¹K'
¹N
¹15 ¹16 ¹17 ¹18
EXIST. AHU
DN
60' - 6"
EXIST. 15" METAL COPING
CLEAN AND
REMOVE DEBRIS
ROOF 23
ROOF 26
NEW AHU
ROOF 5
ROOF 4
ROOF 2
Drawing Title
Approved Project Director:
Project Title
Date
Location
Checked By:
Building Number
Project Number
Drawing Number
Drawn By:
Revisions: Date
LOUIS A. JOHNSON VAMC
o n e e ig h th in c h o n e fo o t 1 th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
B
A
C
D
E
F
1 2 3 4 5 6 7 9
F
E
D
C
B
A
97 8654321
OFFICE OF
FACILITIES
MANAGEMENT
VA Project Number
VA 540-07-103
VAMC CLARKSBURG
1 MED CENTER DRIVE CLARKSBURG, WV 26301
ARCHITECT/ENGINEERS:
U :\1
3.
5.
- V A
C la rk sb ur g
R e
R oo f -
_a og rz ew al la .rv t
BID DOCUMENTS
A-5
PHASE 5 & 6 ROOF PLANS ROOF REPLACEMENT
SCALE: 1/64" = 1'-0"
KEY PLAN TRUE
SCALE: 1/8" = 1'-0"2PHASE 6 ENLARGED ROOF PLAN - ROOF 6
D18-023
SCALE: 1/8" = 1'-0"1PHASE 5 ENLARGED ROOF PLAN - ROOF 21, 23 & 26N
SCALE: 1/8" = 1'-0"3PHASE 6 ENLARGED ROOF PLAN - ROOF 4 & 5
SCALE: 1/8" = 1'-0"4PHASE 6 ENLARGED ROOF PLAN - ROOF 2
JVE TJD04-01-2022
100% CONSTRUCTION DOCUMENTS 06/17/2019
100% DOCUMENT RESUBMISSION 01/31/2020
100% BID DOCUMENTS 04/18/2019
REVIEW 03/13/2019
75% SUBMITTAL 02/15/2019
PROGRESS 11/20/2018
GENERAL PLAN NOTESSPECIFIC PLAN NOTES #
EQUIPMENT/PIPE CURB
GOOSENECK VENT
EXHAUST VENT
ROOF DRAIN
PLUMBING VENT
ROOF DRAWING SYMBOLS
ITEMS ABOVE ROOF DECK
ITEMS ON ROOF DECK
LIGHTNING PROTECTION
SCUPPER/OVERFLOW DRAIN
SUPPLY/RETURN DUCTS
AREAS TREATED WITH FLUID
APPLIED RESTORATION
COATING. CLEAR DEBRIS &
CLEAN PRIOR TO INSTALL.
ROOF WALKWAY PADS
DRAINAGE CRICKET. SLOPE
AS NEEDED. TO MAINTAIN
POSITIVE SLOPE TO DRAIN.
EXISTING FALL PROTECTION
GUARDRAIL
LADDER W/ CAGE AND
CROSSOVER PLATFORM
LADDER W/ CAGE AND
CROSSOVER PLATFORM
(NO CAGE)
WINDOW CLEANING
ANCHORAGE POINT
LOCATION
ALTERNATE: SEE LS-1 AND
SPECIFICATIONS FOR MORE
INFO.
SPRINKLER SYSTEM; DRY PIPE
APPROXIMATE ROOF
ELEVATION
NEW FALL PROTECTION
GUARDRAIL
REVISION CLOUD
INDICATING ADDITION
REVISION CLOUD
INDICATING OMISSION
BID DOCUMENTS 04/01/2022
1. SEE GENERAL NOTES ON LS-1.
2. PROVIDE ROOF MANUFACTURER'S
STANDARD DETAILS WHERE MECHANICAL
AND ELECTRICAL EQUIPMENT AND ALL
PENETRATIONS OCCUR.
3. CUT OUT & REMOVE ALL EXISTING ROOF
SYSTEM TO DECK. INSTALL NEW ROOFING
AND INSULATION; 7-1/2" THICK FOR 30
R-VALUE MIN. INCREASE THICKNESS OF
INSULATION TO MEET 1/8" MIN. SLOPE TO
DRAINS AS REQUIRED. INSTALL NEW
COVERBOARD AND NEW ROOFING.
PROVIDE NEW FLASHING AT WALLS, ROOF
TOP UNITS, AND ROOF PENETRATIONS AS
REQUIRED.
4. REMOVE ALL UNUSED OR ABANDONED
ROOF CURBS, HATCHES, AND
PENETRATIONS ON ROOF SURFACES
WITHIN THE SCOPE OF WORK. RESTORE
ROOF DECK AND PROVIDE NEW
INSULATION & ROOFING SYSTEM.
5. PROVIDE A BREAK IN DOWNSPOUTS OVER
40 FEET LONG. PROVIDE A CONDUCTOR
HEAD AT START OF NEW RUN. ALL
DOWNSPOUTS SHALL TERMINATE WITH 60
DEGREE ELBOW MIN. AND SPLASHBLOCK.
6. CONTRACTOR IS RESPONSIBLE FOR
VERIFYING ALL DIMENSIONS AND
ELEVATIONS IN FIELD. ALL DIMENSIONS AND
ELEVATIONS INDICATED ON DRAWINGS ARE
APPROXIMATE.
7. CONTRACTOR IS RESPONSIBLE FOR
PROVIDING ALL ROOFING AND FLASHING
AROUND ALL EXISTING WALLS, ROOF
PENETRATIONS, AND ITEMS WHETHER
SHOWN OR NOT SHOWN.
8. ALL EXISTING LIGHTNING PROTECTION TO
BE REMOVED AND REPLACED WITH NEW
PROTECTION SYSTEM. SEE ELECTRICAL
DRAWINGS.
9. CONTRACTOR TO COORDINATE WITH COR
BEFORE PERFORMING ANY AND ALL WORK
IN THE VICINITY OF DESIGNATED EXISTING
BIO-HAZARDOUS AND LAB EXHAUST VENTS.
10. CONTRACTOR MUST TAKE CARE TO
PREVENT FUMES AND ODORS FROM
ENTERING THE BUILDING THROUGH
INTAKES AND OPENINGS. ANY WORK NEAR
INTAKES OR OPENINGS MAY NEED TO BE
PERFORMED OFF PEAK HOURS AND
SHOULD BE COORDINATED WITH THE
OWNER.
11. REMOVE ALL EXISTING WALKWAY PADS AS
REQUIRED FOR NEW CONSTRUCTION.
UPON COMPLETION OF ROOF
REPLACEMENT, INSTALL NEW WALKWAY
PADS IN THE SAME LOCATIONS TO MATCH
EXISTING.
NOTE: NOT ALL SPECIFIC PLAN NOTES APPEAR
ON EVERY SHEET. THIS LIST INCLUDES ALL
SPECIFIC PLAN NOTES FOR ALL DRAWINGS
ACROSS THE ENTIRE PROJECT. SEE "E" AND "M"
DRAWINGS FOR ADDITIONAL REQUIREMENTS.
1. CLEAN ROOF DRAIN AND PIPE. VIDEO PIPE
FOR CLEAR PASSAGE UNTIL STORM DRAIN
LATERALS BELOW GRADE.
2. EXISTING LADDER. MODIFY LOOSE END
LENGTH TO BE NO LESS THAN 8" ABOVE
ROOF.
3. REMOVE EXISTING ROOF DRAIN AND
REPLACE WITH NEW ROOF DRAIN.
MAXIMIZE DIAMETER OF NEW DRAINS AS
FIELD CONDITIONS ALLOW.
4. EXISTING ROOF HATCH TO BE REMOVED.
5. EXISTING CONCRETE PAD TO BE REMOVED.
6. CLEAN EXISTING DRAIN THROUGH
EXTERIOR WALL INTO BUILDING.
7. PROVIDE NEW ROOF SCUPPER PER DETAIL
UTILIZING EXISTING PARAPET
PENETRATION.
8. PROVIDE NEW ROOF SCUPPER OPENING
THROUGH NEW PARAPET PENETRATION
AND PROVIDE NEW SCUPPER PER DETAIL.
9. PROVIDE NEW SECONDARY SCUPPER
THROUGH EXISTING PARAPET
PENETRATION TO MATCH EXISTING.
ENSURE THAT NEW SECONDARY SCUPPER
PROJECTS AT LEAST 2" BEYOND FACE OF
BUILDING.
10. ROUTE DOWNSPOUT TO THIS LOCATION
AND DISCHARGE ON ROOF BELOW.
PROVIDE WALL BRACKETS 5'-0" O.C. MAX.
11. ROUTE DOWNSPOUT HORIZONTALLY AND
ENSURE A 1/4" PER FOOT SLOPE, MINIMUM.
12. DOWNSPOUT FROM ROOF 59 ENDS AT
ROOF LEVEL OF ROOF 61. EXTEND TO
GROUND.
13. REMOVE EXISTING PITCH POCKETS.
14. NEW METAL COPING REQUIRED.
15. COVER EXISTING STONE COPING WITH NEW
METAL COPING COVERS TO MATCH
EXISTING COPING COVERS ON SITE.
412.334.4091
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
NOTES
1. PRIME ALL METAL SURFACES PRIOR TO CONTACT WITH ADHESIVES.
NEW OR REUSE AIR
TERMINAL
NEW CONDUCTOR
FLAT SURFACE BASE ADHERE TO
ROOF MEMBRANE WITH BITUMINOUS
URETHANE ADHESIVE
CABLE PLATE ADHESIVE ADHERE
TO ROOF MEMBRANE WITH
BITUMINOUS URETHANE ADHESIVE
NOTES
W = NOMINAL WIDTH OF PARAPET
MATCH CONDUCTOR HEAD PROFILE AND SIZE
FABRICATE AND INSTALL COMPONENTS IN ACCORDANCE WITH PROJECT SPECIFICATIONS AND SMACNA
REQUIREMENTS AND STANDARDS
DOWNSPOUT
CONDUCTOR HEAD
SCUPPER LINER
CANT
METAL FLANGE
ROOF DECK
SECURE CONDUIT/ PIPING WITH CLAMP
TO WOOD BLOCKING
WOOD BLOCKING SPACED EVERY 5 FEET
SPECIFIED INSULATION
MULTI-PLY MODIFIED
WALK PAD
PROTECTION
BITUMEN ROOFING
8' ' M
IN
SEALANT TAPE
16 GA. MIN. FRAME
WOOD CURB
FASTENER 8'' O.C.
FASTENED 18'' O.C.
COUNTERFLASHING
BASE FLASHING
ADHERED
TWO-PLY STRIPPING
MULTI-PLY MODIFIED
SPECIFIED INSULATION
WOOD NAILER SECURED
TO DECK w/
FASTENERS, 2 ROWS
STAGGERED EACH ROW
24'' O.C.
WITH GASKETED
FASTENERS MINIMUM
TWO PER SIDE
NAIL WOOD CANT TO
BLOCKING, 2 ROWS
STAGGERED EACH
ROW 12'' O.C.
BITUMEN ROOFING
EXISTING ROOF
DECK
INSULATION FILLER
ADHESIVE
12'' AND 18'' PLY
IN SPECIFIED
SHEETS ADHERED
GRAVEL / DEBRIS
REMOVE EMBEDDED
SEAL EDGE WITH
REINFORCING MESH
EXTEND NEW
PREPARED AREA
ROOFING 12'' ONTO
ROOFING
ROOF DECK
NOTES
1. BEFORE NEXT DAYS WORK, REMOVE TEMPORARY TIE-IN
AND INSULATION FILLER BOARDS
NEW ROOFING
BOARD
AND ROOFING CEMENT
MINIMUM 18'' IF
NECESSARY
REUSE
THRESHOLD PLATE
ADHESIVE
TWO-PLY
STRIPPING
ADHERED
BASE FLASHING
WITH SPECIFIED
SPECIFIED INSULATION
NEW SURFACE MOUNTED
METAL COUNTERFLASHING
DOOR
ROOF DECK
NAIL WOOD CANT TO
BLOCKING, 2 ROWS
ROW 12'' O.C.
STAGGERED EACH
MULTI-PLY MODIFIED
BITUMEN ROOFING
WOOD NAILER SECURED TO
DECK WITH FASTENERS, 2 ROWS
STAGGERED EACH ROW 24'' O.C.
WOOD NAILER SECURED
MULTI-PLY MODIFIED
SPECIFIED INSULATION
ROOF DECK
TO DECK w/
FASTENERS, 2 ROWS
STAGGERED EACH
ROW 24'' O.C.
NAIL WOOD CANT TO
BLOCKING, 2 ROWS
STAGGERED EACH
ROW 12'' O.C.
LE
G
4'
' M
IN
8' ' M
IN
FASTENERS 8'' O.C.
ONE-PIECE
COUNTERFLASHING
GASKETED
NEOPRENE PAD
SET BOLT IN
ELASTOMERIC
SEALANT, CAULK
PERIMETER OF LEG
AND FASTENER
TWO-PLY
BASE FLASHING
FASTENERS 24'' O.C.
STRIPPING
BITUMEN ROOFING
UMBRELLA ATTACHED
SPECIFIED INSULATION
MULTI-PLY MODIFIED
TWO-PLY STRIPPING
ROOF DECK
CAULK w/ SPECIFIED
ELASTOMERIC SEALANT
w/ DRAWBAND
MASTIC SEAL AT
PERIMETER
NAIL FLANGE OF METAL
SLEEVE TO WOOD NAILER,
3'' ON CENTER STAGGERED
FLANGE SET IN MASTIC
OVER ROOFING, PRIME
COMPRESSIBLE
INSULATION
FLANGE BEFORE STRIPPING
BITUMEN ROOFING
SECONDARY FLASHING
ADHERED TO NEW ROOFING
NOTES
1. WHERE PENETRATIONS IN NEW ROOFING FOR PIPE STANDS OCCUR, DOUBLE
FLASHING SHALL BE USED. PRIMARY FLASHING SHALL ADHERE TO ROOF DECK OR
BLOCKING AND PIPE. SECONDARY FLASHING SHALL ADHERE TO NEW ROOFING AND
PIPE. ENSURE THAT SECONDARY FLASHING EXTENDS BEYOND PRIMARY FLASHING
ADHESION POINT ON PIPE.
STRUCTURAL FRAME
(PRIMED & PAINTED)
PIPE COLUMN (PRIMED
& PAINTED)
STRUCTURAL FRAME
(PRIMED & PAINTED)
CHAMFER EACH
SIDE OF WOOD
FASTENERS 8'' O.C.
SPECIFIED INSULATION
FLEXIBLE IMPERVIOUS
FASTEN 18'' O.C. w/
NEOPRENE GASKETED
MEMBRANE ADHERED TO
SEALANT
ROOF DECK
VAPOR RETARDER
RETARDER TO SERVE
AS INSULATION RETAINER
FLEXIBLE VAPOR
CURB TO DRAIN
BOTH SIDES
FASTENERS
COMPRESSIBLE
INSULATION
BASE FLASHING
TWO-PLY
NAIL WOOD CANT TO
BLOCKING, 2 ROWS
STAGGERED EACH
ROW 12'' O.C.
STRIPPING
SECTION A-A
45 ANGLE
TURN ENDS DOWN
MULTI-PLY MODIFIED
BITUMEN ROOFING
WOOD NAILER SECURED TO
DECK w/ FASTENERS 2 ROWS
STAGGERED EACH ROW 24'' O.C.
GALVANIZED STEEL
10'' TO 15'' FACE
8'' TO…
This is the start of the file's text. The full file is on GovTribe.