36C24523B0004 0009.docx

DOCX document 96 KB Posted

Attached to
Z1DA--CONS Building 1 and Clinical Addition Roof Replacement Project 540-07-103
Solicitation number
36C24523B0004
Issued by

View the file

Other files

File Type Posted
E-3 Drawing.pdf PDF
36C24523B0004 0009_1.docx DOCX document
36C24523B0004 0008_1.docx DOCX document
36C24523B0004 0008 Amendment to Building 1 and Clinical Addition Roof Replacement.docx DOCX document
36C24523B0004 0007.docx DOCX document
36C24523B0004 0007_1.docx DOCX document
36C24523B0004 0006.docx DOCX document
36C24523B0004 0006_1.docx DOCX document
36C24523B0004 0005_1.docx DOCX document
36C24523B0004 0005.docx DOCX document
36C24523B0004 0004_1.docx DOCX document
36C24523B0004 0004.docx DOCX document
Wage Determination.pdf PDF
36C24523B0004 0003.docx DOCX document
36C24523B0004 0003_1.docx DOCX document
Record of Attendance - 2nd Site Visit 5-19-2023.pdf PDF
Amendment A00002 - Replace Roof Project.docx DOCX document
36C24523B0004 0002.docx DOCX document
36C24523B0004 0002_1.docx DOCX document
Pre-proposal site visit - Roof Replacement Project 3-30-2023.pdf PDF
36C24523B0004 0001_1.docx DOCX document
Wage Determination.docx DOCX document
36C24523B0004 - Replace Roofs Main Building and Clinical Addition.docx DOCX document
Contract Specifications.pdf PDF
Contract Drawings.pdf PDF
36C24523B0004.docx DOCX document
Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE

7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office.

is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer)

540-07-103

Department of Veterans Affairs Louis A Johnson, VAMC Contracting Office (90C) 1 Med Center DR Clarksburg WV 26301-4199

Department of Veterans Affairs Louis A Johnson, VAMC Contracting Office (90C) 1 Med Center DR Clarksburg WV 26301-4199 To all Offerors/Bidders

36C24523B0004 03-27-2023

X

X X

** HOUR & DATE for Receipt of Offers is EXTENDED to: 8-11-2023 at 3:00 P.M. EST

The purpose of this amendment to the Building 1 and Clinical Addition Roof Replacement Project is to provide updated direction for components of work contained in this project as well as an updated electrical drawing.

The bid due date has been extended to Friday August 11, 2023 at 3:00 p.m. A public bid opening will occur in the Contracting Offices at 513 Rosebud Plaza, Clarksburg, WV 26301.

All other terms and conditions remain unchanged.

Rebecca Besten Contracting Officer

VA-VHA-RPOE-2022-23571

1. Addenda 6, RFIs #1, #11 & #31 discuss roof decking (repairs and replacement concerns in the different RFIs). As stated in the VA’s responses, we will not know the extent of roof deck replacement until the roofing is removed. Can a quantity of roof deck replacement (repairs as mentioned in RFI #11) be provided for bidding purposes or are we to assume any roof deck replacement / repairs will be handled by change order?

VA RESPONSE: Necessary repairs will be handled via change order.

2. Addenda 6 RFIs #12, 25, and 34 were all similar questions regarding where the fluid applied roofing is being applied. The VA responded “The specified bituminous roof system does not allow for any water ponding therefore any such areas need to receive the fluid applied roof system.”Can the VA provide better direction as to where this water ponding is occurring?

VA RESPONSE: The VA cannot provide exact quantities. Estimates may be developed based on existing/proposed insulation and locations of drains.

3. Addenda 6, RFI #19 requested to remove the requirement for a counterpoise loop for the lightning protection. The VA responded that the requirement could be eliminated, however it’s also stated to “coordinate with owner for final decision.” As the original question stated, the counterpoise loop would be very expensive and non-beneficial. To be able to maintain continuity in the bidding process, can the VA confirm that the contractor is not required to include this in our bid?

VA RESPONSE: Confirmed

4. Addenda 6 RFI #18 stated: On Drawing E3, it calls for connections to the structural steel under Coded Notes #3. We feel this is impossible, for a number of reasons. Firstly, has the owner/Engineer verified/tested with a NIST rated megger, that the structural steel is indeed grounded. We doubt this. If it is possible to find the structural steel at the various points the System would have to be grounded in intervals not to exceed sixty (60’) feet. With an approximately twenty-six hundred (2,600’) foot perimeter forty-four (44) connections to structural steel are required. On Drawing E3 only nineteen connections were shown, so this is inadequate. I consider it virtually impossible to bond the structural steel below the roof line in numerous locations. This would be in patients’ rooms, operating rooms, facilities, etc. I would suggest that a complete new System with exposed down conductors is the only way possible for the portions of the Hospital to the south that have existing Lightning Protection. Is it acceptable to utilize exposed down cables?

ORIGINAL VA RESPONSE: The use of existing down cables for lighting protection, with the VAs permission and approval, will be acceptable.

The original question asked if it is acceptable to utilize exposed down cables as they would be new, not existing down cables. Can the VA clarify this response?

CLARIFIED VA RESPONSE:

New down cables may be used where required. New down cables shall be encased in PVC which shall be painted to match the building facade. Tie in points shall be determined by the AE. All new down cabling shall be installed down the east facade of the main hospital building (loading dock side). Lighting protection plans shall be submitted to the VA COR for approval prior to rough in.

See attached document: E-3 Drawing.

Amendment to solicitation 36C24523B0004