Amendment A00002 - Replace Roof Project.docx

DOCX document 30 KB Posted

Attached to
Z1DA--CONS Building 1 and Clinical Addition Roof Replacement Project 540-07-103
Solicitation number
36C24523B0004
Issued by

View the file

Other files

File Type Posted
36C24523B0004 0009.docx DOCX document
E-3 Drawing.pdf PDF
36C24523B0004 0009_1.docx DOCX document
36C24523B0004 0008_1.docx DOCX document
36C24523B0004 0008 Amendment to Building 1 and Clinical Addition Roof Replacement.docx DOCX document
36C24523B0004 0007.docx DOCX document
36C24523B0004 0007_1.docx DOCX document
36C24523B0004 0006.docx DOCX document
36C24523B0004 0006_1.docx DOCX document
36C24523B0004 0005_1.docx DOCX document
36C24523B0004 0005.docx DOCX document
36C24523B0004 0004_1.docx DOCX document
36C24523B0004 0004.docx DOCX document
Wage Determination.pdf PDF
36C24523B0004 0003.docx DOCX document
36C24523B0004 0003_1.docx DOCX document
Record of Attendance - 2nd Site Visit 5-19-2023.pdf PDF
36C24523B0004 0002.docx DOCX document
36C24523B0004 0002_1.docx DOCX document
Pre-proposal site visit - Roof Replacement Project 3-30-2023.pdf PDF
36C24523B0004 0001_1.docx DOCX document
Wage Determination.docx DOCX document
36C24523B0004 - Replace Roofs Main Building and Clinical Addition.docx DOCX document
Contract Specifications.pdf PDF
Contract Drawings.pdf PDF
36C24523B0004.docx DOCX document
Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Amendment A00002 – Building One and Clinical Addition Roof Replacement Project

Clarification - HVAC coordination

The exact shutdown times for all HVAC equipment must be coordinated with the VAMC since virtually all areas serve active areas of the hospital. If acceptable shutdown windows cannot be achieved, temporary heating and ventilation will be the responsibility of the contractor. Air handling units serving inpatient care areas and all exhaust fans shall be interrupted for no more than 2 hours. Please note that the intent is for the contractors to coordinate their work so as to minimize complete removal of equipment – the intent would be to lift equipment with crane or roof jacks enough to perform the required roof flashing however, if this cannot be achieved the contractor may need to remove the units temporarily. Crane access will need to be coordinated with traffic around the hospital but may need to occur after hours or on weekends to accommodate VA schedule. Any units removed from the roof shall be protected from weather and other damage as well as roof openings and other terminations. The contractors will be responsible for reconnecting and restarting all ductwork, piping, controls, power, etc. No new controls or HVAC work is anticipated in the areas served. Note that the project specifications do require the contractor perform pre- and post-construction testing and balancing of all equipment. The VAMC has provided the following list of shutdown restriction requests: