Construction_Sections.pdf

PDF 355 KB Posted

Attached to
Moccasin Slough Boardwalk
Solicitation number
25/26-043
Issued by
Clay County, Harold CDP, Florida

About this file

This is a construction sections document prepared by GAI Consultants, Inc. for Clay County Board of County Commissioners' Public Works Engineering Department in Jacksonville, Florida, detailing the segmented layout of the Moccasin Slough Boardwalk project. The project encompasses approximately 7,642 linear feet of boardwalk construction segmented into five distinct sections: Segment 1 spans from Station 9+71.25 to Station 19+03.78 (932.53 linear feet), Segment 2 from Station 82+44.09 to Station 94+74.38 (1,230.29 linear feet), Segment 3 from Station 68+34.63 to Station 73+83.28 (548.65 linear feet), Segment 4 from Station 60+49.52 to Station 68+34.63 (785.11 linear feet), and Segment 5 from Station 19+03.78 to Station 60+49.52 (4,145.74 linear feet). The project is located within Moccasin Slough Park in Harold CDP along the St. Johns River shoreline, with the boardwalk extending through sensitive wetland areas near Raggedy Point Road and Westover Road. Electronic bids are due February 12, 2026, by 4:00 p.m. through Clay County's e-Procurement Portal, with an inquiry submission deadline of February 2, 2026, and a non-mandatory bid opening scheduled for February 13, 2026, at 9:00 a.m. Segment 1 requires substantial completion within 145 days from Notice to Proceed, with final completion within 30 calendar days after punch list delivery.

The project is funded through a Florida Recreation Development Assistance Program (FRDAP) grant from the State of Florida Department of Environmental Protection with total grant funding of $200,000 in state funds. Bidders must possess Florida licensure under Chapter 489, demonstrate a minimum of five years of experience performing similar work, and commit to 40% self-performance by their own workforce. Required surety and insurance include a 5% bid bond, performance and payment bonds at 100% of contract value, commercial general liability insurance of $1,000,000 per occurrence/$2,000,000 aggregate, workers' compensation coverage at statutory limits, and builder's risk insurance at 100% of project value. The base bid covers Segment 1, with alternate bids available for additional segments and the pavilion structure. Liquidated damages are assessed at $100.00 per day past the final completion date. No set-aside designations for disadvantaged enterprises, women-owned businesses, or minority-owned businesses are identified in this procurement. All contractors must comply with federal regulations including 2 CFR Part 200 and Florida's public entity crimes statute, and must coordinate with identified utilities including TECO Peoples Gas, Comcast, Clay Electric, Clay County Utility Authority, and AT&T.

View the file

Other files

File Type Posted
Moccasin_Slough_Boardwalk_(Addendum_#2_Revision).pdf PDF
Moccasin_Slough_Boardwalk_(Addendum_#2_Revision).pdf PDF
Moccasin_Slough_Boardwalk_Permiit_-_8646818.pdf PDF
Moccasin_Slough_Boardwalk_Permiit_-_8646818.pdf PDF
UESDOCS-#1994922-v2-RPTS_GEO_Moccasin_Slough_Boardwalk.pdf PDF
UESDOCS-#1994922-v2-RPTS_GEO_Moccasin_Slough_Boardwalk.pdf PDF
Moccasin_Slough_Boardwalk.pdf PDF
Moccasin_Slough_Structures_Final_Plans_(4).pdf PDF
Final_Moccasin_Slough_Boardwalk_Site_Plans.pdf PDF
Grant_Agreement_No._2023.2024.93.pdf PDF
Moccasin_Slough_Structures_Final_Plans_(4).pdf PDF
Construction_Sections.pdf PDF
Grant_Agreement_No._2023.2024.93.pdf PDF
Moccasin_Slough_Structures_Final_Plans_(4).pdf PDF
Final_Moccasin_Slough_Boardwalk_Site_Plans.pdf PDF
Grant_Agreement_No._2023.2024.93.pdf PDF
Construction_Sections.pdf PDF
Final_Moccasin_Slough_Boardwalk_Site_Plans.pdf PDF
Performance_&_Paymt_Bond.doc DOC document
Performance_&_Paymt_Bond.doc DOC document
Performance_&_Paymt_Bond.doc DOC document
Certificate_of_final_payment.pdf PDF
Certificate_of_final_payment.pdf PDF
Certificate_of_final_payment.pdf PDF
Certificate_of_partial_payment.pdf PDF
Chapter_8_Section_I.pdf PDF
EFT_FORM.pdf PDF
Chapter_8_Section_I.pdf PDF
Chapter_8_Section_I.pdf PDF
EFT_FORM.pdf PDF
Certificate_of_partial_payment.pdf PDF
EFT_FORM.pdf PDF
Certificate_of_partial_payment.pdf PDF
W-9_(2024).pdf PDF
W-9_(2024).pdf PDF
W-9_(2024).pdf PDF
Show all 36

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

P I S

T A .2

PI

S

TA.

+8 9.9

P I

S

T A .6

0PI STA. 40+00.00

P I

S

T A .0

P

A

.0

P I

S

T A .2

PI STA. 67+9

5.286

P I S

TA.

9+ .2

DATE DESCRIPTION

REVISIONS

DATE DESCRIPTION

NO.

SHEET

12574 FLAGLER CENTER BLVD - SUITE 202

JACKSONVILLE, FL 32258

ROBERT B. JAMIESON, P.E

P.E. LICENSE NUMBER 63980

GAI CONSULTANTS, INC.

T H

E

O F

F I

C I

A L

R

C O

D

O

E E

T

E C

T R

O N

C

G I

T A

L

Y

G N

A N

A L

U N

D

U

L E

G

A

C

CLAY COUNTY

AND PUBLIC WORKS

E H

T T

A E

R G

ADIROLF

Y T

N U

O C

L

A E

S

EHTF

O

EL

POEP

F

O

Y A

L C

PREPARED FOR

ENGINEERING DEPARTMENT

Z:\2021\R210955.03 - Clay Moccasin Slough Boar\CAD\Moccasin\roadway\sections.dgnJamieRB 5/13/2025 1:21:27 PM Default

N

0 100 500

Feet

BEGIN BOARDWALK

BEGIN BOARDWALK

U S

(S

R

MOCCASIN SLOUGH

MOCCASIN SLOUGH

ST JOHNS RIVER

W E S T O V E R R

D

RAGGEDY POINT RD

SLOUGH PARK

MOCCASIN

PARCEL BOUNDARY

PROPOSED OBSERVATION TOWER

PROPOSED BOARDWALK

CONSTRUCTION SECTIONS

APPROXIMATE MEAN HIGH WATER LINE

S E

G M

E N T 1S E

G M

E N T

S E

G M E

N T

S E

G M

E N

T

SEGMENT 5

SEGMENT 1 STA 9+71.25 TO STA 19+03.78 932.53 LF

SEGMENT 2 STA 82+44.09 TO STA 94+74.38 1230.29 LF

SEGMENT 3 STA 68+34.63 TO STA 73+83.28 548.65 LF

SEGMENT 4 STA 60+49.52 TO STA 68+34.63 785.11 LF

SEGMENT 5 STA 19+03.78 TO STA 60+49.52 4145.74 LF

RANGE LENGTHSEGMENT

File details come from the government source that posted it. Updated .