OVERALL PROJECT
GN-0 TRAIL LOCATIONS
GN-1 GENERAL NOTES 1
GN-2 GENERAL NOTES 2
GN-3 GENERAL NOTES 3
GN-4 STRUCTURAL NOTES 1
GN-5 STRUCTURAL NOTES 2
D-C1 VEGETATION REMOVAL, CLEARING AND DISPOSAL
D-C2 TYPICAL TRAIL SECTIONS
D-C3 TRAIL & PAVEMENT PROFILES
D-C4 CULVERT HEADWALLS
D-C5 DRAINAGE
D-C6 PUNCHEON TRAIL
D-C7 KIOSK TYPE I & MISCELLANEOUS DETAILS
D-C8 RAILING & STEPS
D-C9 SEDIMENT AND EROSION CONTROL DETAILS
D-C10 CURB RAMP & ACCESSIBLE PARKING
D-A1 KIOSK TYPE II PLANS, ELEVATIONS AND NOTES
D-S1 KIOSK TYPE II STRUCTURAL
D-S2 BOARDWALK
D-S3 RAMP
D-S4 RAILING SYSTEM
D-S5 HELICAL PIERS
PROJECT LOCATION
PROJECT
LOCATION
BASE BID: BUBBLING SPRINGS TRAIL
BS-C1 PROPOSED OVERALL TRAIL PLAN
BS-C2 ACCESS ROAD AND PARKING
BS-C3 TURNPIKE & BOARDWALK TRAIL
BS-C4 TRAIL & OBSERVATION DECK
BS-S1 HELICAL PILE LOCATIONS
BS-S2 OBSERVATION DECK
BASE BID: MIDDLE RUN CONNECTOR TRAIL
MRC-C1 PROPOSED SITE PLAN - STA. 50+00 - STA. 51+09
MRC-C2 PROPOSED SITE PLAN - STA. 60+00 - STA. 63+40
MRC-C3 PROPOSED SITE PLAN - STA. 63+40 - STA. 64+97
BASE BID: DEER RUN CONNECTOR TRAIL
DRC-C1 PROPOSED SITE PLAN - STA. 70+00 - STA. 71+53
DRC-C2 PROPOSED SITE PLAN - STA. 71+53 - STA. 75+21
DRC-C3 PROPOSED LANDSCAPE PLAN
DRC-C4 MODULAR RETAINING WALL
ALTERNATE #1: ABE RUN TRAIL REPAIRS
AR-C1 PROPOSED SITE PLAN - STA. 200+00 - STA. 220+20
AR-C2 PROPOSED SITE PLAN - STA. 220+20 - STA. 227+72
ALTERNATE #2: DEER RUN TRAIL REPAIRS
DR-C1 PROPOSED SITE PLAN - STA. 100+00 - STA. 112+44
DR-C2 PROPOSED SITE PLAN - STA. 112+44 - STA. 128+20
DR-C3 PROPOSED SITE PLAN - STA. 128+20 - STA. 148+25
DR-C4 PROPOSED SITE PLAN - STA. 148+25 - STA. 164+55
DR-C5 KIOSK PARKING AREA
G :\C
TG
\2
3\
6-
C an aa n
Tr ai ls \W or ki ng D ra w in gs
\A ut oC
AD
\2
-G
N -C
O
VE
R .d w g, /1
7/
:1 4:
A
M , L
Ac or d
AutoCAD SHX Text
REVISION
AutoCAD SHX Text
SHEET NO.
AutoCAD SHX Text
CHECKED BY:
AutoCAD SHX Text
DESIGNED BY:
AutoCAD SHX Text
DRAWN BY:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
JOB NUMBER:
AutoCAD SHX Text
SEAL
AutoCAD SHX Text Vicinity Map
AutoCAD SHX Text
WEBSTER
AutoCAD SHX Text
HARRISON
AutoCAD SHX Text
KANAWHA
AutoCAD SHX Text
MCDOWELL
AutoCAD SHX Text
WYOMING
AutoCAD SHX Text
LINCOLN
AutoCAD SHX Text
PUTNAM
AutoCAD SHX Text
CABELL
AutoCAD SHX Text
MINGO
AutoCAD SHX Text
WAYNE
AutoCAD SHX Text
MASON
AutoCAD SHX Text
BOONE
AutoCAD SHX Text
LOGAN
AutoCAD SHX Text
JACKSON
AutoCAD SHX Text
WOOD
AutoCAD SHX Text
SUMMERS
AutoCAD SHX Text
MERCER
AutoCAD SHX Text
MONROE
AutoCAD SHX Text
NICHOLAS
AutoCAD SHX Text
FAYETTE
AutoCAD SHX Text
RALEIGH
AutoCAD SHX Text
CLAY
AutoCAD SHX Text
CALHOUN
AutoCAD SHX Text
ROANE
AutoCAD SHX Text
WIRT
AutoCAD SHX Text
RITCHIE
AutoCAD SHX Text
GREENBRIER
AutoCAD SHX Text
DODDRIDGE
AutoCAD SHX Text
BRAXTON
AutoCAD SHX Text
GILMER
AutoCAD SHX Text
LEWIS
AutoCAD SHX Text
PLEASANTS
AutoCAD SHX Text
MARSHALL
AutoCAD SHX Text
WETZEL
AutoCAD SHX Text
TYLER
AutoCAD SHX Text
OHIO
AutoCAD SHX Text
BROOKE
AutoCAD SHX Text
HANCOCK
AutoCAD SHX Text
HAMPSHIRE
AutoCAD SHX Text
PENDLETON
AutoCAD SHX Text
GRANT
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
APPROXIMATE MILES
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
RANDOLPH
AutoCAD SHX Text
POCAHONTAS
AutoCAD SHX Text
UPSHUR
AutoCAD SHX Text
BARBOUR
AutoCAD SHX Text
TUCKER
AutoCAD SHX Text
AutoCAD SHX Text
HARDY
AutoCAD SHX Text
MONONGALIA
AutoCAD SHX Text
TAYLOR
AutoCAD SHX Text
MARION
AutoCAD SHX Text
PRESTON
AutoCAD SHX Text
MINERAL
AutoCAD SHX Text
MORGAN
AutoCAD SHX Text
BERKELEY
AutoCAD SHX Text
JEFFERSON
AutoCAD SHX Text
BY
AutoCAD SHX Text
DATE
AutoCAD SHX Text
REVISIONS
AutoCAD SHX Text
REVISION
AutoCAD SHX Text
NUMBER
AutoCAD SHX Text
DATE
AutoCAD SHX Text Buckhannon, West Virginia 26201
AutoCAD SHX Text St. Albans, West Virginia 25177
AutoCAD SHX Text (304)727-5501
AutoCAD SHX Text (304)472-8914
AutoCAD SHX Text 43 East Main Street
AutoCAD SHX Text 200 Sixth Avenue
AutoCAD SHX Text
AIRPORT PLANNING / DEVELOPMENT
AutoCAD SHX Text
ARCHITECTURE / INTERIOR DESIGN
AutoCAD SHX Text
CIVIL ENGINEERING / SITE DEVELOPMENT
AutoCAD SHX Text
ENVIRONMENTAL ENGINEERING
AutoCAD SHX Text
LANDSCAPE ARCHITECTURE
AutoCAD SHX Text
SURVEYING
AutoCAD SHX Text www.chaptech.com
AutoCAD SHX Text Chapman
AutoCAD SHX Text Technical
AutoCAD SHX Text Group
AutoCAD SHX Text
RJK
AutoCAD SHX Text
KLE
AutoCAD SHX Text
LDA
AutoCAD SHX Text
APRIL 2025
AutoCAD SHX Text
NONE
AutoCAD SHX Text 23036
AutoCAD SHX Text
COVER
AutoCAD SHX Text
AutoCAD SHX Text
TRAIL IMPROVEMENTS
AutoCAD SHX Text
STATE PARK PROJECT
AutoCAD SHX Text
CANAAN VALLEY RESORT
AutoCAD SHX Text
DAVIS, WEST VIRGINIA
AutoCAD SHX Text Kelly L. Estep, ASLA
DROP INLET
TOP=3354.17
ELECTRIC MH
IN CONC
DEER RUN TRAIL
TRAIL REPAIRS
DEER RUN CONNECTOR
NEW TRAIL
MIDDLE RUN CONNECTOR
NEW TRAIL
DEER RUN TRAIL
TRAIL REPAIRS
BUBBLING SPRINGS
NEW TRAIL
ABE RUN
TRAIL REPAIRS
DEER RUN TRAIL
TRAIL REPAIRS
AIRPORT PLANNING / DEVELOPMENT
ARCHITECTURE / INTERIOR DESIGN
CIVIL ENGINEERING / SITE DEVELOPMENT
ENVIRONMENTAL ENGINEERING
LANDSCAPE ARCHITECTURE
SURVEYING
St. Albans, WV
(304) 727-5501
Buckhannon, WV
(304) 472-8914 a division of
GRW
CANAAN VALLEY RESORT
STATE PARK PROJECT
TRAIL IMPROVEMENTS
G :\C
TG
\2
3\
6-
C an aa n
Tr ai ls \W or ki ng D ra w in gs
\A ut oC
AD
\2
-G
N 0.
dw g, /1
7/
:1 4:
A
M , L
Ac or d
AutoCAD SHX Text A
AutoCAD SHX Text Sign
AutoCAD SHX Text Sign
AutoCAD SHX Text Sign
AutoCAD SHX Text Sign
AutoCAD SHX Text Sign
AutoCAD SHX Text Sign
AutoCAD SHX Text Sign
AutoCAD SHX Text Sign
AutoCAD SHX Text
CONC
AutoCAD SHX Text
CONC
AutoCAD SHX Text
CONC
AutoCAD SHX Text
CONC
AutoCAD SHX Text
CONC
AutoCAD SHX Text
CONC
AutoCAD SHX Text
CONC
AutoCAD SHX Text
MB
AutoCAD SHX Text
DI
AutoCAD SHX Text
DI
AutoCAD SHX Text
DI
AutoCAD SHX Text Flagpole
AutoCAD SHX Text
AutoCAD SHX Text 3393.3
AutoCAD SHX Text
SP
AutoCAD SHX Text
GUY
AutoCAD SHX Text
GUY
AutoCAD SHX Text
MAIN PARK ROAD
AutoCAD SHX Text
MAIN PARK ROAD
AutoCAD SHX Text
REVISION
AutoCAD SHX Text
SHEET NO.
AutoCAD SHX Text
CHECKED BY:
AutoCAD SHX Text
DESIGNED BY:
AutoCAD SHX Text
DRAWN BY:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
JOB NUMBER:
AutoCAD SHX Text
SEAL
AutoCAD SHX Text
BY
AutoCAD SHX Text
DATE
AutoCAD SHX Text
REVISIONS
AutoCAD SHX Text
REVISION
AutoCAD SHX Text
NUMBER
AutoCAD SHX Text
PROJECT INFORMATION
AutoCAD SHX Text Chapman
AutoCAD SHX Text Technical
AutoCAD SHX Text Group
AutoCAD SHX Text www.chaptech.com
AutoCAD SHX Text
RJK
AutoCAD SHX Text 1" = 200'
AutoCAD SHX Text 23036
AutoCAD SHX Text
GN-0
AutoCAD SHX Text
OVERALL PROJECT
AutoCAD SHX Text
TRAIL LOCATIONS
AutoCAD SHX Text
NORTH
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
APRIL 2025
AIRPORT PLANNING / DEVELOPMENT
ARCHITECTURE / INTERIOR DESIGN
CIVIL ENGINEERING / SITE DEVELOPMENT
ENVIRONMENTAL ENGINEERING
LANDSCAPE ARCHITECTURE
SURVEYING
St. Albans, WV
(304) 727-5501
Buckhannon, WV
(304) 472-8914 a division of
GRW
CANAAN VALLEY RESORT
STATE PARK PROJECT
TRAIL IMPROVEMENTS
GENERAL INFORMATION
1. ALL INTERESTED CONTRACTORS SHOULD VERIFY EXISTING FIELD CONDITIONS PRIOR TO BIDDING.
2. THE CONTRACTOR SHALL COMPLY WITH ALL APPLICABLE FEDERAL, STATE AND LOCAL REGULATIONS, CODES AND ORDINANCES.
PLANS
1. COORDINATES SHOWN ON PLANS ARE BASED ON NAD83 WEST VIRGINIA STATE PLANE NORTH. ALL
ELEVATIONS SHOWN REFER TO NAVD 88.
2. THE CONTRACTOR SHALL VERIFY ALL CONDITIONS AND DIMENSIONS ON THE JOB SITE. IF EXISTING FIELD CONDITIONS DO NOT PERMIT INSTALLATION OF THE WORK IN ACCORDANCE WITH THE DRAWINGS AND SPECIFICATIONS, NOTIFY THE ENGINEER IMMEDIATELY AND PROVIDE A SKETCH OF THE CONDITION.
3. DETAILS SHOWN ARE INTENDED FOR SPECIFIC LOCATIONS AND CONDITIONS. MINOR MODIFICATIONS MAY
BE REQUIRED TO SUIT SIMILAR CONDITIONS AND SHALL BE CONSIDERED PART OF THE WORK.
4. UNLESS OTHERWISE INDICATED ON THE DRAWINGS OR IN THE SPECIFICATIONS AS BEING "N.I.C.", OR BY ANOTHER CONTRACTOR, ALL ITEMS, MATERIALS, ETC. AND INSTALLATION OF SAME ARE A PART OF THE
CONTRACT WORK.
5. DO NOT SCALE DRAWINGS.
6. WHERE NEW WORK JOINS EXISTING WORK AND WHERE ALTERATIONS TO EXISTING BUILDINGS CAUSE DAMAGE TO THE REMAINING EXISTING WORK, THE CONTRACTOR SHALL RESTORE SAID PLACE AND AREAS TO FINISHED CONDITION, CONSISTENT WITH NEW WORK USING IDENTICAL MATERIALS FOR PATCHING, PAINTING, REPAIRING, ETC.
ADJACENT PAVEMENTS & PROPERTIES
1. DAMAGE TO ADJACENT PROPERTIES AND PAVEMENTS, AS WELL AS ANY DAMAGE INCIDENTAL TO THE
CONSTRUCTION OF THE PROJECT, SHALL BE REPLACED, REPAIRED, OR OTHERWISE RESTORED TO
ORIGINAL CONDITIONS.
SITE CLEARING
1. THE CONTRACTOR SHALL PROVIDE TOPSOIL (IF NECESSARY), FERTILIZE, SEED, AND MULCH ALL DISTURBED
LAND AREAS.
2. PRUNE AND REMOVE OVERGROWN VEGETATION WITHIN 1 FOOT HORIZONTAL AND 8 FEET VERTICAL OF ANY
PROPOSED TRAIL OR WALKWAY.
UTILITIES
1. THE INFORMATION SHOWN ON THE DRAWINGS CONCERNING TYPE, SIZE, AND LOCATION OF UNDERGROUND
UTILITIES IS NOT GUARANTEED TO BE ACCURATE OR ALL INCLUSIVE. THE CONTRACTOR SHALL BE RESPONSIBLE FOR MAKING HIS OWN DETERMINATIONS AS TO THE TYPE, SIZE, AND LOCATION OF
UNDERGROUND UTILITIES AS MAY BE NECESSARY TO AVOID DAMAGE THERETO.
2. THE CONTRACTOR SHALL LOCATE UTILITIES ON SITE PRIOR TO EXCAVATING. THE CONTRACTOR SHALL NOTIFY THE APPROPRIATE UTILITY COMPANIES IN THE EVENT UTILITY LINES REQUIRE RELOCATION.
3. THE CONTRACTOR SHALL EXERCISE CARE SO AS NOT TO DAMAGE UTILITIES DURING CONSTRUCTION. THE CONTRACTOR SHALL REPAIR ANY UTILITY LINES DAMAGED BY THE CONTRACTOR IMMEDIATELY AND TO THE SATISFACTION OF THE UTILITY COMPANY. THE CONTRACTOR SHALL LEND ALL POSSIBLE ASSISTANCE IN RESTORING SERVICES AND SHALL ASSUME ALL COSTS, CHARGES, OR CLAIMS CONNECTED WITH THE
INTERRUPTION AND REPAIR OF SUCH SERVICES.
4. THE CONTRACTOR IS ADVISED THAT NOT ALL EXISTING UTILITIES ARE LOCATED ON THE PLANS. BY LAW, THE CONTRACTOR IS TO NOTIFY WEST VIRGINIA 811 [1-800-245-4848 OR 811], AND TO ACCURATELY LOCATE ALL UTILITIES WITHIN THE LIMITS OF THE PROJECT BEING PERFORMED. UTILITY COMPANIES WILL NORMALLY LOCATE AND MARK THEIR EXISTING FACILITIES ON THE GROUND WITHIN THREE (3) WORKING DAYS.
5. THE CONTRACTOR SHALL TAKE ALL REASONABLE PRECAUTIONS AGAINST DAMAGE TO EXISTING UTILITIES;
HOWEVER, IN THE EVENT OF DAMAGE OR DISRUPTION, THE CONTRACTOR SHALL IMMEDIATELY NOTIFY THE RESPONSIBLE OFFICIAL OF THE ORGANIZATION OPERATING THE UTILITY INTERRUPTED. THE CONTRACTOR SHALL LEND ALL POSSIBLE ASSISTANCE IN RESTORING SERVICE AND SHALL ASSUME ALL COSTS, CHARGES, OR CLAIMS CONNECTED WITH THE INTERRUPTION AND REPAIR OF SUCH SERVICES.
6. WRAP UTILITY POLES THAT FALL WITHIN THE NEW CONSTRUCTION WITH 1/2" EXPANSION MATERIAL PRIOR
TO PLACING CONCRETE.
7. RAISE/LOWER ANY UTILITY METER, VALVE COVER, DOH CONTROL BOX, HYDRANT, ETC. AS NEEDED TO
MATCH THE NEW CONSTRUCTION WORK. COORDINATE WORK WITH APPROPRIATE UTILITY.
8. THE CONTRACTOR SHALL COORDINATE ALL SLEEVING WORK.
TRAFFIC CONTROL
1. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO COORDINATE TRAFFIC CONTROL.
2. CONTRACTOR SHALL LIMIT LENGTH AND TIMING OF LANE CLOSURES TO PREVENT DELAYS TO MOTORISTS
OF MORE THAN TEN MINUTES.
SIDEWALK CURB RAMPS
1. WVDOH PVT 7 "SIDEWALK RAMPS," REVISED 10/1/2020, SHALL GOVERN INSTALLATION OF SIDEWALK RAMPS
AND ASSOCIATED COMPONENTS.
2. INSTALL CONCRETE REINFORCING TO CURB RAMPS PER SIDEWALK DETAILS.
3. MAXIMUMS & MINIMUMS INCLUDE CONSTRUCTION TOLERANCES AND ARE ABSOLUTE. REPLACEMENT OF
NON-COMPLIANT WORK WILL BE REQUIRED.
4. SIDEWALKS CROSS SLOPE SHALL DRAIN TOWARD ROADWAY.
5. RAMPS WITH LOWER SLOPES ARE PREFERRED.
6. TRANSITION BETWEEN SIDEWALK RAMPS AND ROADWAY/GUTTER MUST BE FLUSH WITHOUT RAISED OR
LOWERED EDGES. PROVIDE A SMOOTH AND ROLLABLE TRANSITION.
7. ENSURE WATER DOES NOT POND AT THE BOTTOM OF THE RAMP/LANDING.
8. A COURSE BROOM FINISH OR SIMILAR NON-SKID FINISH ON CONCRETE SURFACES.
STORMWATER PIPING
1. OUTLET PIPES SHOWN IN PLANS ARE INTENDED FOR GENERAL ILLUSTRATION ONLY. FIELD INSTALLMENTS
AND STATIONING MAY DIFFER SLIGHTLY IN LOCATION. THE CONTRACTOR SHALL PLACE THESE PIPES IN OR AROUND THE STATIONING PROPOSED AND WITH THE REQUIREMENTS GIVEN IN BOTH DETAIL DRAWINGS AND
SPECIFICATION AS STATED.
2. RIP RAP IN AND AROUND CULVERT ENDS DOES NOT HAVE TO BE PLACED PRECISELY AS SHOWN IN PLANS. IT IS THE INTENTION OF THE RIP RAP TO BE PLACED IN A MANNER THAT BEST DETERS EROSION OF THE EMBANKMENT. FINAL PLACEMENT OF RIP RAP SHALL BE LEFT TO THE DISCRETION OF THE PROJECT
SUPERVISOR IN A MANNER THAT IS CONSISTENT WITH THE PROPOSED EMBANKMENTS.
WASTE MATERIAL
1. CONTRACTOR SHALL COORDINATE WASTE MATERIAL DISPOSAL LOCATION WITH PARK SUPERINTENDENT, DISPOSING
OF TREE, BRUSH, AND SOIL AS DIRECTED. LUMBER SHALL BE REMOVED FROM THE PARK.
1. ALL EXCAVATED MATERIAL SHALL BECOME THE PROPERTY OF THE CONTRACTOR AND MUST BE DISPOSED OF IN AN APPROVED PERMITTED LOCATION. THE CONTRACTOR SHALL PROVIDE THIS DOCUMENTATION, IN WRITING, TO THE ENGINEER AND TO WVDNR PRIOR TO CONSTRUCTION. WHILE DISPOSING OF THE MATERIAL, THE CONTRACTOR SHALL DISTURB LESS THAN ONE ACRE OF LAND. IF THE ONE ACRE LIMIT IS EITHER MET OR EXCEEDED, THE CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING THE PROPER
PERMITS.
2. THE CONTRACTOR SHALL PROVIDE MEANS TO HANDLE SPILLS AND WASTE MATERIAL DISPOSAL. THIS
SHALL INCLUDE, BUT NOT BE LIMITED TO, THE FOLLOWING:
2.1. A CONTAINMENT DIKE SHALL BE PROVIDED AROUND ANY ON-SITE FUEL STORAGE TANKS. IT SHALL
HAVE A CAPACITY OF 110% OF THE SIZE OF THE STORAGE TANK.
2.2. ABSORBENT PADS SHALL BE AVAILABLE ON SITE FOR PETROLEUM SPILLS OR LEAKS ON GROUND.
ABSORBENT BOOMS SHALL BE PROVIDED FOR SPILLS IN STREAMS.
2.3. EXCESS CONCRETE SHALL NOT BE DISPOSED OF NEAR STREAMS.
3. THE CONTRACTOR SHALL REPORT ANY NONCOMPLIANCE WHICH MAY ENDANGER HEALTH OR THE
ENVIRONMENT IMMEDIATELY AFTER BECOMING AWARE OF THE CIRCUMSTANCES BY CALLING THE
DEPARTMENT OF ENVIRONMENTAL PROTECTION SPILL ALERT TELEPHONE NUMBER, 1-800-642-3074, AND ADVISING THE ENGINEER OF SUCH OCCURRENCE. CONTRACTOR SHALL PROVIDE THE ENGINEER WITH A
RECORD OF SUCH CALLS.
4. VERIFY THAT INSERTS AND EMBEDDED ITEMS REQUIRED BY ALL TRADES ARE INSTALLED PRIOR TO
POURING OF CONCRETE.
1. THE CONTRACTOR SHALL BE RESPONSIBLE FOR WATER QUALITY THROUGHOUT THE DURATION OF CONSTRUCTION IN ACCORDANCE WITH THE 2024 WEST VIRGINIA DEPARTMENT OF ENVIRONMENTAL PROTECTION (WVDEP) NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES) GENERAL PERMIT NUMBER WV0115924 FOR STORMWATER DISCHARGES ASSOCIATED WITH CONSTRUCTION (CSW), AND ANY MODIFICATION(S) THERETO. DETAILS AND/OR DESIGNS NOT SHOWN IN THE PLANS SHALL BE IN
ACCORDANCE WITH THE WVDEP EROSION AND SEDIMENT CONTROL BEST MANAGEMENT PRACTICE
MANUAL, AND THE CONDITIONS OF THE CSW.
2. THE FIRST ORDER OF WORK FOR THE CONTRACTOR SHALL BE INSTALLATION OF EROSION AND SEDIMENT CONTROL STRUCTURES AND/OR BMPs, INCLUDING BUT NOT LIMITED TO, SEDIMENT TRAPS, SILT FENCE, STABILIZED STORMWATER DIVERSION, OTHER TEMPORARY EROSION CONTROL FEATURES, ETC. INITIAL CLEARING AND GRUBBING SHALL BE LIMITED TO WHAT IS NECESSARY TO INSTALL THOSE STRUCTURES.
IF TEMPORARY EROSION AND POLLUTION CONTROL MEASURE ARE ORDERED BY THE ENGINEER DUE TO THE CONTRACTOR'S NEGLIGENCE, CARELESSNESS, OR FAILURE TO INSTALL PERMANENT CONTROLS AS PART OF THE WORK SCHEDULED, SUCH WORK SHALL BE PERFORMED BY THE CONTRACTOR AT THE CONTRACTOR'S OWN EXPENSE. UNLESS OTHERWISE NOTED, ALL EROSION AND SEDIMENT CONTROL
FEATURES WILL BE REMOVED UPON PROJECT COMPLETION.
3. A COPY OF NPDES REGISTRATION AND ANY MODIFICATION(S) THERETO, AS WELL AS THE APPROVED
SWPPP, GPP, EROSION AND SEDIMENT CONTROL PLAN, AND SPILL PREVENTION, CONTROL AND
COUNTERMEASURES PLAN, SHALL BE KEPT ON-SITE, AND AVAILABLE FOR REVIEW AT ALL TIMES BY
RESOURCE AGENCIES OR OTHER INTERESTED PARTIES UPON DEMAND.
4. THE CONTRACTOR SHALL BE RESPONSIBLE TO PAY FINES FOR ANY NOTICES OF VIOLATION AND/OR ENFORCEMENT ACTIONS, MODIFICATION FEES, ANNUAL AND RENEWAL FEES ASSOCIATED WITH NPDES
REGISTRATION.
5. THE CONTRACTOR SHALL ENSURE THAT ALL EROSION AND SEDIMENT CONTROLS ARE INSPECTED BY A QUALIFIED PERSON AT LEAST ONCE EVERY FOUR (4) DAYS (OR SEVEN (7) WHEN THE PROJECT IS LOCATED ON A TIER 1 STREAM) AND WITHIN 24 HOURS OF ALL PRECIPITATION EVENTS GREATER THAN
0.25 INCHES PER 24 PERIOD. THE CONTRACTOR SHALL REPLACE, CLEAN, AND/OR INSTALL ADDITIONAL EROSION AND SEDIMENT CONTROL FEATURES, AS NECESSARY, TO REMAIN IN COMPLIANCE WITH THE NPDES CSW PERMIT. AN INSPECTION REPORT MUST BE COMPLETED WITHIN 24 HOURS OF COMPLETION OF THE SITE INSPECTIONS BY THE QUALIFIED PERSON WHO CONDUCTED THE INSPECTION. THE INSPECTION REPORT REQUIREMENTS ARE FOUND IN SECTION III.B.2.F OF THE NPDES CSW GENERAL
PERMIT WV0011594.
6. A NOTICE OF TERMINATION OF THE NPDES REGISTRATION SHALL BE SUBMITTED TO WVDEP WITH
FOURTEEN (14) DAYS AFTER FINAL STABILIZATION OF ALL DISTURBED AREAS.
GENERAL NOTES GENERAL ENVIRONMENTAL
SEDIMENT & EROSION CONTROL
DONALD B. MCFARLAN
SUPERINTENDENT
CANAAN VALLEY RESORT STATE PARK
OFFICE 304-866-4121 X2693
CELL 304-940-2892
CASSIDY NORMAN
ASSISTANT SUPERINTENDENT
CANAAN VALLEY RESORT STATE PARK
OFFICE 304-866-4111
CELL 304-642-9244
DONALD BAILEY III, PE
PROJECT MANAGER
WV DIVISION OF NATURAL RESOURCES
PLANNING, ENGINEERING, & MAINTENANCE
OFFICE 304-558-2764
CELL 304-941-8661
PROJECT CONTACTS
1. A GEOTECHNICAL REPORT WAS CONDUCTED FOR THIS PROJECT BY AMERICAN GEOTECH, INC. DATED AUGUST 8, 2024. THE CONTRCTOR SHALL MAKE THEMSELVES FAMILIAR WITH THE CONTENTS OF THE
GEOTECHNICAL REPORT.
2. THE REPORT AREA COVERS WORK AT THE BUBBLING SPRINGS WOODLAND AND BOG AREA.
GEOTECHNICAL REPORT
1. THE CONTRACTOR SHALL MINIMIZE DISTURBANCE TO THE WOODLANDS AND BOG AS MUCH AS POSSIBLE.
2. THE CONTRACTOR SHALL WORK CLOSELY WITH THE PARK SUPERINTENDENT TO COORDINATE MATERIAL, EQUIPMENT, AND FUEL STORAGE AREAS AND SPOIL DISPOSAL AREAS.
3. ENVIRONMENTAL CONDITIONS IN THIS PROJECT:
3.1. DEVELOPED AREAS: THIS INCLUDES EXISTING TRAIL THAT WILL BE REPAIRED OR TRAILS NEXT TO
PARKING OR DRIVEWAYS. THE CONTRACTOR SHOULD BE ABLE TO MAKE REPAIRS FROM THE
EXISTING TRAIL OR PAVEMENTS.
3.2. UNDEVELOPED AREAS: THIS INCLUDES UPLAND AREAS WITHOUT AN EXISTING TRAIL.
CONSTRUCTION ACTIVITIES SHOULD BE HELD AS CLOSE TO THE PROPOSED TRAIL AS POSSIBLE.
CONSTRUCTION ACTIVITIES SHOULD BE CONDUCTED WITHIN A 10 FOOT WIDE ZONE ALONG THE
PERIMETER OF THE PROPOSED TRAIL OR AREA OF WORK. DAMAGE SHOULD BE MINIMIZED AS MUCH
AS POSSIBLE BY STORING MATERIAL AND EQUIPMENT ON CONSTRUCTED TRAIL OR OTHER
DEVELOPED AREAS WITHIN THE PARK.
3.3. SENSITIVE AREAS: THIS INCLUDES RAMP, OBSERVATION DECK, AND PUNCHEON TRAIL
CONSTRUCTED IN THE BOG AREA FOUND ON SHEET BS-C4. SEE SHEET GN-5, HELICAL PILE NOTE 11
FOR CONSTRUCTION IN THIS AREA.
ENVIRONMENTAL CONSIDERATION
G :\C
TG
\2
3\
6-
C an aa n
Tr ai ls \W or ki ng D ra w in gs
\A ut oC
AD
\2
-G
N
3.
dw g, /1
7/
:1 4:
A
M , L
Ac or d
AutoCAD SHX Text
REVISION
AutoCAD SHX Text
SHEET NO.
AutoCAD SHX Text
CHECKED BY:
AutoCAD SHX Text
DESIGNED BY:
AutoCAD SHX Text
DRAWN BY:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
JOB NUMBER:
AutoCAD SHX Text
SEAL
AutoCAD SHX Text
BY
AutoCAD SHX Text
DATE
AutoCAD SHX Text
REVISIONS
AutoCAD SHX Text
REVISION
AutoCAD SHX Text
NUMBER
AutoCAD SHX Text
PROJECT INFORMATION
AutoCAD SHX Text Chapman
AutoCAD SHX Text Technical
AutoCAD SHX Text Group
AutoCAD SHX Text www.chaptech.com
AutoCAD SHX Text
RJK
AutoCAD SHX Text
KLE
AutoCAD SHX Text
LDA
AutoCAD SHX Text
AS NOTED
AutoCAD SHX Text 23036
AutoCAD SHX Text
GN-1
AutoCAD SHX Text
GENERAL NOTES 1
CIVIL ENGINEERING / SITE DEVELOPMENT
ENVIRONMENTAL ENGINEERING
LANDSCAPE ARCHITECTURE
SURVEYING
St. Albans, WV
(304) 727-5501
Buckhannon, WV
(304) 472-8914 a division of
GRW
CANAAN VALLEY RESORT
STATE PARK PROJECT
TRAIL IMPROVEMENTS
BUBBLING SPRINGS TRAIL
1. THIS WILL BE AN ADA COMPLIANT TRAIL.
2. THIS TRAIL WILL INCLUDE A MEMORIAL ELEMENT, POSSIBLY A SIGN OR PLAQUE , WHICH IS NOT INCLUDED IN THE CONTRACT. THE CONTRACTOR MAY BE ASKED TO COORDINATE WITH OTHERS FOR
ITS INSTALLATION.
3. GENERALLY, THIS TRAIL WILL UTILIZE AN EXISTING ACCESS DRIVE AND TRAIL TO MINIMIZE WOODLAND
DISTURBANCE.
4. THE NEW ACCESS DRIVE, PARKING AREA, AND TRAILS SHOULD DISTURB THE WOODLAND AS LITTLE AS POSSIBLE. THE CONTRACTOR IS ENCOURAGED TO CONSTRUCT AROUND LARGER, HEALTHY TREES.
5. THE TRAIL WILL REMAIN AT GRADE AS MUCH AS POSSIBLE. WOOD RAMPS AND LANDINGS WILL PROVIDE
ROLLABLE ACCESS TO AN ELEVATED OBSERVATION DECK.
6. ALL RAMPS, LANDINGS, GUARDRAIL, AND HANDRAIL MUST BE ADA COMPLIANT. ADDITIONAL
INFORMATION CAN BE FOUND WITHIN THIS PROJECT PLAN SET.
DEER RUN CONNECTOR TRAIL
1. THIS NEW TRAIL WILL CONNECT THE LODGE MAIN ENTRANCE TO DEER RUN TRAIL.
2. TRAIL CONSTRUCTION: CONCRETE TRAIL, AGGREGATE TRAIL, AND "TIMBER" STEPS.
3. A MODULAR BLOCK RETAINING WALL WILL BE CONSTRUCTED NEAR THE PARKING AREA TO
ACCOMMODATE THE NEW TRAIL.
4. A NEW KIOSK WILL BE CONSTRUCTED NEAR THE LODGE.
5. THE TRAIL WILL BE CONSTRUCTED OVER A NEW CULVERT, PLACED IN A EXISTING WIDE RIP-RAP DITCH.
6. A SHORT SPUR TRAIL WILL PROVIDE A SCENIC SITTING AREA.
MIDDLE RUN CONNECTOR TRAIL
1. THIS NEW TRAIL WILL CONNECT A LODGE PARKING AREA TO THE BALSAM SWAMP OVERLOOK PARKING
LOT, BESIDE MAIN PARK ROAD.
2. TRAIL CONSTRUCTION: CONCRETE TRAIL, AGGREGATE TRAIL, ASPHALT TRAIL, AND "TIMBER" STEPS.
4. A NEW KIOSK WILL BE CONSTRUCTED NEAR THE LODGE.
5. THE CONTRACTOR IS ENCOURAGED TO CONSTRUCT THE TRAIL AROUND LARGER, HEALTHY TREES.
ABE RUN TRAIL REPAIR
1. EXISTING PUNCHEON AND BOARDWALK TRAILS WILL BE REPLACED.
2. SEVERAL AREAS OF THE AT-GRADE TRAIL WILL ALSO BE REPAIRED WITH AGGREGATE.
DEER RUN TRAIL REPAIR
1. EXISTING PUNCHEON AND BOARDWALK TRAILS WILL BE REPLACED.
2. SEVERAL AREAS OF THE AT-GRADE TRAIL WILL ALSO BE REPAIRED WITH AGGREGATE.
3. A NEW PARKING AREA WILL BE INSTALLED AT THE TRAILHEAD IN THE CAMP GROUND. EXISTING TRAIL REPAIR
1. WHERE THE CONTRACTOR FINDS EVIDENCE OF TRAIL EXPANSION (USERS HAVE REPEATEDLY
WALKED AROUND A DAMAGED AREA OF THE TRAIL), THE CONTRACTOR WILL RESTORE THE
ORIGINAL SECTION OF TRAIL AND OBLITERATE THE SECONDARY SECTION.
2. THE CONTRACTOR SHALL INSTALL SLASH MATERIAL FROM THE PROJECT (LOGS, LIMBS, BRUSH, AND ROCK) OVER THE EXPANDED TRAIL SECTION, SPREADING IT RANDOMLY.
3. ENSURE 80% OF THE SLASH IS MAKING CONTACT WITH THE GROUND.
BUBBLING SPRINGS TRAIL
1. THE CONTRACTOR SHALL INSTALL SLASH MATERIAL (LOGS, LIMBS, BRUSH, AND ROCK) OVER THE
TRAIL LEADING TO THE OLD OBSERVATION DECK AND THE SPRING HEADWATER.
DESIGN INTENT
TRAIL OBLITERATION
1. EXISTING TRAIL ALIGNMENTS WERE SURVEYED AND REPRESENT THE CENTER OF THE TRAIL.
2. EXISTING PUNCHEON AND BOARDWALK TRAIL EDGES WERE SURVEYED AND ARE NOTED ON THE
PLANS.
3. PROPOSED TRAIL ALIGNMENTS REPRESENT THE INTENDED ALIGNMENT TO ACCOMPLISH NEW WORK;
HOWEVER, THE CONTRACTOR IS ENCOURAGED TO CONSTRUCT NEW TRAILS AROUND EXISTING LARGE, HEALTHY TREES.
4. SHOULD THE CONTRACTOR ALTER THE TRAIL ALIGNMENT, THE TRAIL SHOULD BE CONSTRUCTED
WITHIN TRAIL SLOPE TOLERANCES.
TRAIL ALIGNMENT & GRADING PLAN
ELEVATED TRAILS
1. EXISTING PUNCHEON AND BOARDWALKS WILL BE REPLACED.
2. THE CONTRACTOR SHALL REMOVE EXISTING LUMBER, BAR-JOIST, ETC. FROM THE SITE.
3. THE CONTRACTOR SHALL MINIMIZE DISTURBANCE TO THE WOODLAND AND WETLAND AREAS.
4. WHENEVER POSSIBLE, THE CONTRACTOR SHALL UTILIZE EXISTING MUD SILL/FOUNDATION LOCATIONS
TO MINIMIZE ENVIRONMENTAL DISTURBANCE.
SIGNAGE
1. ACCESSIBLE PARKING SPACE DESIGNATION SIGN AND POST SHALL BE PROVIDED AND INSTALLED BY
THE CONTRACTOR.
2. THE CONTRACTOR SHALL SUPPLY THE DESIGNATED NUMBER OF POSTS PER TRAIL.
3. THE CONTRACTOR SHALL INSTALL THE POSTS IN THE LOCATIONS DESIGNATED BY THE OWNER.
4. THE CONTRACTOR SHALL INSTALL THE OWNER-SUPPLIED SIGNS ON THE CONTRACTOR-SUPPLIED
POSTS.
TRAIL SLOPES DEMOLITION
1. DISPOSAL OF VEGETATION AND ROCK VARIES WITH EACH TRAIL. CONSULT SHEET D-C1 FOR DISPOSAL
METHODS. THE PARK SUPERINTENDENT MAY ASSIST THE CONTRACTOR WITH OTHER IN-PARK
DISPOSAL SITES.
2. THE CONTRACTOR SHALL DISPOSE OF ALL LUMBER STRUCTURES (PUNCHEON, BOARDWALK, SMALL
BAR-JOIST BRIDGES) OUT OF THE PARK. DEMOLITION OF THESE STRUCTURES INCLUDES ALL
COMPONENTS, INCLUDING FOUNDATIONS, SHIMS, FASTENERS, ETC.
3. BULK EXCAVATION SHALL BE REMOVED FROM THE PARK.
AGGREGATE
TRAILS
MAXIMUM
PREFERRED
CROSS SLOPES
STEEPER THAN
1:20 (5.00%)
1:12 (8.33%)
1:10 (10.00%)
BUT NOT STEEPER THAN
1:12 (8.33%)
1:10 (10.00%)
1:8 (12.00%)
SIDEWALK/TRAIL
RUNNING SLOPE SEGMENT
MAXIMUM
LENGTH OF
SEGMENT
200 FEET
30 FEET
10 FEET
2.00%
1.50%
STANDARD AGGREGATE TRAILS
CONCRETE
SIDEWALKS,
STAIR TREAD &
LANDINGS
USE THE FOLLOWING SLOPE INFORMATION ON:
1. MIDDLE RUN CONNECTOR TRAIL
2. DEER RUN CONNECTOR TRAIL
3. ABE RUN TRAIL REPAIRS
4. DEER RUN TRAIL REPAIRS
MAXIMUM
PREFERRED
CROSS SLOPES
STEEPER THAN
0%
1:48 (2.00%)
1:20 (5.00%)
BUT NOT STEEPER THAN
1:48 (2.00%)
1:20 (5.00%)
1:12 (8.33%)
PUNCHEON,BOARDWALK, &
AGGREGATE TRAIL
RUNNING SLOPE SEGMENT
MAXIMUM
LENGTH OF
SEGMENT
UNLIMITED*
UNLIMITED*
30 FEET
2.00%
1.50%
ADA ACCESSIBLE TRAIL
ALL TRAIL
TYPES
USE THE FOLLOWING SLOPE INFORMATION ON:
1. BUBBLING SPRINGS TRAIL
WHEN CONSTRUCTING NEW TRAILS, THE CONTRACTOR IS ENCOURAGED TO MAINTAIN LARGE, HEALTHY
TREES. WHEN THE CONTRACTOR DEVIATES FROM THE PLANS TO AVOID TREES, THE FOLLOWING
GUIDELINES SHOULD BE FOLLOWED:
4.00%
1.50%
MAXIMUM
PREFERRED
*UNLIMITED LENGTH IF THE CLEAR ACCESSIBLE ROUTE IS
5'-0" OR GREATER.
G :\C
TG
\2
3\
6-
C an aa n
Tr ai ls \W or ki ng D ra w in gs
\A ut oC
AD
\2
-G
N
3.
dw g, /1
7/
:1 4:
A
M , L
Ac or d
AutoCAD SHX Text
REVISION
AutoCAD SHX Text
SHEET NO.
AutoCAD SHX Text
CHECKED BY:
AutoCAD SHX Text
DESIGNED BY:
AutoCAD SHX Text
DRAWN BY:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
JOB NUMBER:
AutoCAD SHX Text
SEAL
AutoCAD SHX Text
BY
AutoCAD SHX Text
DATE
AutoCAD SHX Text
REVISIONS
AutoCAD SHX Text
REVISION
AutoCAD SHX Text
NUMBER
AutoCAD SHX Text
PROJECT INFORMATION
AutoCAD SHX Text Chapman
AutoCAD SHX Text Technical
AutoCAD SHX Text Group
AutoCAD SHX Text www.chaptech.com
AutoCAD SHX Text
RJK
AutoCAD SHX Text
KLE
AutoCAD SHX Text
LDA
AutoCAD SHX Text
AS NOTED
AutoCAD SHX Text 23036
AutoCAD SHX Text
GN-2
AutoCAD SHX Text
GENERAL NOTES 2
CIVIL ENGINEERING / SITE DEVELOPMENT
ENVIRONMENTAL ENGINEERING
LANDSCAPE ARCHITECTURE
SURVEYING
St. Albans, WV
(304) 727-5501
Buckhannon, WV
(304) 472-8914 a division of
GRW
CANAAN VALLEY RESORT
STATE PARK PROJECT
TRAIL IMPROVEMENTS
BASE BID - NEW TRAILS
THE BASE BID WILL INCLUDE ALL LABOR, MATERIAL, EQUIPMENT AND ASSOCIATED WORK TO
CONSTRUCT THE FOLLOWING TRAILS:
1. BUBBLING SPRINGS TRAIL
2. MIDDLE RUN CONNECTOR TRAIL
3. DEER RUN CONNECTOR TRAIL
ALTERNATE #1 - ABE RUN TRAIL REPAIRS
ALTERNATE ONE SHALL INCLUDE ALL LABOR, MATERIAL, EQUIPMENT AND ASSOCIATED WORK TO
CONSTRUCT THE ABE RUN TRAIL REPAIRS, FOUND ON SHEETS AR-C1 AND AR-C2.
ALTERNATE #2 - DEER RUN TRAIL REPAIRS
ALTERNATE TWO SHALL INCLUDE ALL LABOR, MATERIAL, EQUIPMENT AND ASSOCIATED WORK
TO CONSTRUCT THE DEER RUN TRAIL REPAIRS, FOUND ON SHEETS DR-C1 THROUGH DR-C5.
ARCHITECT'S DISCRETION
THE CONTRACTOR SHALL PROVIDE MATERIAL, EQUIPMENT AND LABOR N THEIR BID AND ALTERNATES FOR THE ITEMS OF WORK LISTED BELOW. THE CONTRACTOR SHALL INSTALL THESE ITEMS, PER
ASSOCIATED DETAILS, AS DIRECTED BY THE ARCHITECT.
USING UNIT PRICING PROVIDED WITH THE BID, A DEDUCTIVE CHANGE ORDER WILL BE ISSUED FOR
QUANTITIES NOT INSTALLED.
DESCRIPTION OF INSTALLED WORK:
PRECAST "TIMBER" STEP: (1) STEP CONSISTING OF (3) PRECAST "TIMBER" UNITS AND
AGGREGATE STEP FILL.
SIGN POST: (1) 8' P.T. 6X6 TIMBER
CULVERT: (1) 10' LONG, 12" HDPE PIPE WITH 1 CY OF AGGREGATE
AGGREGATE TRAIL #1: 4" OF AGGREGATE, FABRIC FOR SEPARATION, AND ROUGH
GRADING FOR ONE FOOT OF TRAIL, PER DETAIL.
AGGREGATE TRAIL #2: 6" OF AGGREGATE, FABRIC FOR SEPARATION, AND ROUGH
GRADING FOR ONE FOOT OF TRAIL, PER DETAIL.
AGGREGATE TRAIL #3: 12" OF AGGREGATE, FABRIC FOR SEPARATION, AND ROUGH
GRADING FOR ONE FOOT OF TRAIL, PER DETAIL.
TURNPIKE TRAIL: 8" OF AGGREGATE, FABRIC FOR SEPARATION, TIMBER, FASTENERS,
AND ROUGH GRADING FOR ONE FOOT OF TRAIL, PER DETAIL.
INCLUDE IN THE BASE BID OR ALTERNATE:
BUBBLING SPRINGS TRAIL
SIGN POSTS: 10 EA
TURNPIKE TRAIL: 50 LF
CULVERT: 2 EA
MIDDLE RUN CONNECTOR TRAIL
SIGN POSTS: 6 EA
PRECAST "TIMBER" STEPS: 5 EA
AGGREGATE TRAIL #1: 20 LF
CULVERT: 1 EA
DEER RUN CONNECTOR TRAIL
SIGN POSTS: 5 EA
PRECAST "TIMBER" STEPS: 5 EA
CULVERT: 1 EA
ABE RUN TRAIL REPAIRS
SIGN POSTS: 10 EA
AGGREGATE TRAIL #1: 50 LF
AGGREGATE TRAIL #2: 50 LF
AGGREGATE TRAIL #3: 25 LF
PUNCHEON TRAIL: 25 LF
CULVERT: 2 EA
DEER RUN TRAIL REPAIRS
SIGN POSTS: 15 EA
AGGREGATE TRAIL #1: 50 LF
AGGREGATE TRAIL #2: 50 LF
AGGREGATE TRAIL #3: 25 LF
PUNCHEON TRAIL: 25 LF
CULVERT: 2 EA
G :\C
TG
\2
3\
6-
C an aa n
Tr ai ls \W or ki ng D ra w in gs
\A ut oC
AD
\2
-G
N
3.
dw g, /1
7/
:1 4:
A
M , L
Ac or d
AutoCAD SHX Text
REVISION
AutoCAD SHX Text
SHEET NO.
AutoCAD SHX Text
CHECKED BY:
AutoCAD SHX Text
DESIGNED BY:
AutoCAD SHX Text
DRAWN BY:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
JOB NUMBER:
AutoCAD SHX Text
SEAL
AutoCAD SHX Text
BY
AutoCAD SHX Text
DATE
AutoCAD SHX Text
REVISIONS
AutoCAD SHX Text
REVISION
AutoCAD SHX Text
NUMBER
AutoCAD SHX Text
PROJECT INFORMATION
AutoCAD SHX Text Chapman
AutoCAD SHX Text Technical
AutoCAD SHX Text Group
AutoCAD SHX Text www.chaptech.com
AutoCAD SHX Text
RJK
AutoCAD SHX Text
KLE
AutoCAD SHX Text
LDA
AutoCAD SHX Text
AS NOTED
AutoCAD SHX Text 23036
AutoCAD SHX Text
GN-3
AutoCAD SHX Text
GENERAL NOTES 3
CIVIL ENGINEERING / SITE DEVELOPMENT
ENVIRONMENTAL ENGINEERING
LANDSCAPE ARCHITECTURE
SURVEYING
St. Albans, WV
(304) 727-5501
Buckhannon, WV
(304) 472-8914 a division of
GRW
CANAAN VALLEY RESORT
STATE PARK PROJECT
TRAIL IMPROVEMENTS
GENERAL STRUCTURAL NOTES
1. THESE STRUCTURAL DRAWINGS ARE TO BE USED IN CONJUNCTION WITH ALL OTHER DRAWINGS, SPECIFICATIONS & CONTRACT DOCUMENTS.
2. THE DESIGN, CONSTRUCTION, QUALITY CONTROL AND SAFETY OF ALL WORK PERFORMED ON THE PROJECT SHALL CONFORM TO THE REFERENCED CODES AND STANDARDS, INCLUDING ALL SPECIFICATIONS
REFERENCED WITH THE LATEST EDITIONS SHALL APPLY UNLESS NOTED.
3. BUILDING CODE - INTERNATIONAL BUILDING CODE - 2018
4. COUNTY/STATE: TUCKER / WEST VIRGINIA
5. RISK CATEGORY: II
6. DEAD LOADS PER STRUCTURE
7. DESIGN LIVE LOADS
SNOW LOAD 40 PSF
LIVE LOADS ON WALKWAYS 100 PSF
8. LATERAL LOADS - WIND
BASIC WIND SPEED 115 MPH
EXPOSURE CATEGORY B
9. LATERAL LOADS - SEISMIC
MAPPED SHORT PERIOD SPECTRAL RESPONSE ACCELERATION SS 0.48g MAPPED 1 SECOND SPECTRAL RESPONSE ACCELERATION S1 0.057g
DESIGN SHORT PERIOD SPECTRAL RESPONSE ACCELERATION SDS 0.126
DESIGN 1 SECOND SPECTRAL RESPONSE ACCELERATION SD1 0.092
SEISMIC IMPORTANCE FACTOR Ie 1.0
SEISMIC DESIGN CATEGORY E (FOR WALKWAYS/OBSERVATION
PLATFORM) AND
D (FOR KIOSKS AT LODGE)
SOIL SITE CLASS C (FOR WALKWAYS / OBSERVATION
PLATFORM) AND
B (FOR KIOSKS AT LODGE)
10. SHOP DRAWINGS, TEST REPORTS, AND CERTIFICATIONS ARE REQUIRED FOR THE FOLLOWING STRUCTURAL
ITEMS: (1) CONCRETE MIX DESIGNS
(2) CONCRETE CYLINDER TESTS
(3) REINFORCING STEEL SHOP DRAWINGS
(4) GROUT MIX DESIGNS
(5) MORTAR CERTIFICATION AND DATA
(6) CONCRETE MASONRY UNIT CERTIFICATION AND DATA
(7) MISCELLANEOUS STEEL SHOP DRAWINGS
(8) LUMBER CERTIFICATIONS AND FRAMING SHOP DRAWINGS
(9) GLULAM AND DECKING SHOP DRAWINGS AND CERTIFICATIONS
(10) HELICAL PIER DESIGNS AND SHOP DRAWINGS WITH WVPE STAMP AND SIGNATURE
11. CONSTRUCTION METHODS, PROCEDURES, AND SEQUENCES ARE THE RESPONSIBILITY OF THE CONTRACTOR.
THE CONTRACTOR SHALL TAKE ALL NECESSARY MEANS TO MAINTAIN AND PROTECT THE STRUCTURAL
INTEGRITY OF ALL CONSTRUCTION AT ALL STAGES.
12. IMPLEMENTING JOB SITE SAFETY AND CONSTRUCTION PROCEDURES ARE THE SOLE RESPONSIBILITY OF THE
CONTRACTOR.
13. IN CASE OF CONFLICT BETWEEN THE GENERAL NOTES, DETAILS AND SPECIFICATIONS, THE MOST RIGID
REQUIREMENTS SHALL GOVERN.
GENERAL FOUNDATION/GEOTECHNICAL NOTES (KIOSKS)
1. THE SOIL BEARING VALUE IS ASSUMED TO BE 2000 PSF FOR SHALLOW FOUNDATIONS SHOWN ON
THE PLANS. NO GEOTECHNICAL INVESTIGATION WAS DONE AT THIS LOCATION.
2. VERIFY LOCATIONS OF COLUMNS, UNDERGROUND UTILITIES, ETC., WITH ARCHITECTURAL,
MECHANICAL, ELECTRICAL, AND CIVIL DRAWINGS PRIOR TO PLACEMENT OF FOUNDATIONS.
3. UNLESS DETERMINED OTHERWISE BY GEOTECHNICAL EVALUATION, FILL MATERIAL FOR SLAB AND
FOOTING AREAS SHALL BE PLACED IN LAYERS NOT EXCEEDING 8 INCHES (UNCOMPACTED
THICKNESS) AND COMPACTED TO 98% OF MAXIMUM DRY DENSITY AS DETERMINED BY ASTM D698.
CRUSHED STONE BACKFILL SHALL BE COMPACTED WITH HAND EQUIPMENT TO THE SATISFACTION
OF THE GEOTECHNICAL ENGINEER.
4. THE CONTRACTOR SHALL TAKE ALL NECESSARY PRECAUTIONS TO BRACE FOUNDATION WALLS
WHEN BACK FILLING AND WHEN THERE IS A POSSIBILITY OF DAMAGE BY EXCESS WATER.
5. COMPACTION OF BACKFILL WITHIN 2 FEET OF FOUNDATION WALLS SHALL BE ACCOMPLISHED WITH HAND EQUIPMENT. WHERE FILL IS REQUIRED ON BOTH SIDES OF FOUNDATION WALL, BRING
THE FILL UP EACH SIDE SIMULTANEOUSLY AND UNIFORMLY.
6. THE SURFACE AREA ADJACENT TO THE FOUNDATION WALL SHALL BE PROVIDED WITH ADEQUATE
DRAINAGE AND SHALL BE GRADED AND SLOPED SO AS TO DRAIN SURFACE WATER AWAY FROM
FOUNDATION WALLS. A COHESIVE, CLAYEY SOIL MATERIAL SHALL BE USED AROUND THE
STRUCTURES TO LIMIT SURFACE WASTER INFILTRATION AND MINIMIZE THE POTENTIAL LOSS OF
GROUND BELOW THE STRUCTURES ASSOCIATED WITH SOIL PIPING.
7. IF FOOTING EXCAVATIONS ENCOUNTER ISOLATED AREAS OF RELATIVELY HARD ROCK AT OR
ABOVE THE PLANNED FOOTING ELEVATIONS, THE ROCK SHALL BE OVER EXCAVATED TO A DEPTH
OF APPROXIMATELY ONE FOOT BELOW THE FOUNDATION BEARING ELEVATION AND BACKFILLED
WITH STRUCTURAL FILL.
8. FOUNDATIONS SHALL NOT BE PLACED ON MUD OR MUCK, SOFT OR LOOSE SOIL, IN STANDING
WATER OR ON FROZEN GROUND.
9. IF ANY EXCAVATION IS LEFT OPEN OVERNIGHT, PLACE A 3" TO 4" MUD MAT OVER EXCAVATION.
CAST-IN-PLACE CONCRETE
1. ALL MATERIALS AND WORKMANSHIP SHALL COMPLY WITH THE REQUIREMENTS OF THE FOLLOWING CODES
AND STANDARDS:
"BUILDING CODE REQUIREMENTS FOR REINFORCED CONCRETE, ACI 318-14", AMERICAN CONCRETE
INSTITUTE
"ACI MANUAL OF CONCRETE PRACTICE - PARTS 1 THROUGH 5", LATEST EDITION
"MANUAL OF STANDARD PRACTICE", CONCRETE REINFORCING STEEL INSTITUTE
ACI 305 AND ACI 306 FOR HOT AND COLD WEATHER CONCRETE CONSTRUCTION
ACI 347 FOR SHORING AND RESHORING OF CONCRETE STRUCTURES
2. CONTRACTOR SHALL PROVIDE MATERIALS WHICH COMPLY WITH THE FOLLOWING ASTM REQUIREMENTS, AS REQD.:
CEMENT ASTM C150: TYPE I/II OR ASTM C595 TYPE IL
AGGREGATES ASTM C33
FLY ASH ASTM C618
PLAIN REINFORCING BARS ASTM A615, GRADE 60
WELDED WIRE FABRIC ASTM A1064
AIR-ENTRAINING ADMIXTURE: ASTM C260
3. CONCRETE PROTECTION FOR REINFORCEMENT SHALL BE IN ACCORDANCE WITH THE FOLLOWING
TABLE, U.N.O. ON THE CONSTRUCTION DRAWINGS:
APPLICATION COVER
- CONCRETE CAST AGAINST AND PERMANENTLY EXPOSED TO EARTH: 3"
- CONCRETE EXPOSED TO WEATHER (U.N.O.):
#6 THROUGH #18 BARS: 2"
#5 BAR, W31 OR D31 WIRE AND SMALLER: 1-1/2"
- CONCRETE NOT EXPOSED TO WEATHER OR IN CONTACT WITH GROUND SLABS,
WALLS, AND JOISTS:
#14 AND #18 BARS: 1-1/2"
#11 BAR AND SMALLER: 3/4"
4. CONCRETE MIXES SHALL BE AS FOLLOWS:
APPLICATION COMP. STRENGTH, AIR, W/C
- CONCRETE USED FOR FOUNDATION CONSTRUCTION (STRIP/SPREAD
FOOTINGS, GRADE BEAMS, FOUNDATION WALLS ETC.), OR CONCRETE 4,500 PSI, 6%, 0.45
EXPOSED TO CYCLES OF FREEZE THAW (SIDEWALKS, EXTERIOR SLAB
ON GRADE ETC.):
-GROUT CAP FOR HELICAL PIERS 4,000 PSI, 6%, 0.45
5. SHOP DRAWINGS SHOWING THE SIZE, LENGTH, QUANTITY, LOCATION AND MARK OF ALL REINFORCING BARS, SUPPORTS AND ACCESSORIES SHALL BE SUBMITTED FOR APPROVAL PRIOR TO FABRICATION.
6. MIX DESIGNS AND ADMIXTURE PRODUCT DATA SHALL BE SUBMITTED FOR APPROVAL PRIOR TO
ORDERING CONCRETE.
7. THE TYPICAL DETAILS, PLANS, AND SECTIONS ON THESE DRAWINGS CONTAIN ADDITIONAL GENERAL
CONCRETE CONSTRUCTION NOTES AND INFORMATION.
8. ALL CONCRETE SHALL BE REINFORCED UNLESS NOTED OTHERWISE.
9. REINFORCING STEEL SHALL BE CLEAN OF ALL DIRT AND OILS PRIOR TO CONCRETE POUR UNLESS
SPECIFIED OTHERWISE.
10. SUPPORTS TO ADEQUATELY POSITION REINFORCING BARS DURING CONSTRUCTION SHALL BE
INSTALLED.
11. FOUNDATION DOWELS OF THE SAME SIZE AND SPACING AS VERTICAL STEEL SHALL BE INSTALLED FOR
ALL WALLS, PIERS, AND COLUMNS.
12. ALL REINFORCING AT WALL AND FOOTING CORNERS AND INTERSECTIONS SHALL BE CONTINUOUS BY
THE USE OF BENT BARS OR CORNER BARS UNLESS INDICATED OTHERWISE.
13. CONSTRUCTION JOINTS SHALL BE POSITIONED SO AS NOT TO ADVERSELY AFFECT THE STRUCTURAL PERFORMANCE. CONSTRUCTION JOINT LOCATIONS NOT INDICATED ON THE STRUCTURAL DRAWINGS
SHALL BE APPROVED BY THE STRUCTURAL ENGINEER.
14. PIPE SLEEVES AND INSERTS SHALL BE INSTALLED IN CONCRETE WORK AT ALL PENETRATIONS.
PENETRATIONS OF BEAMS, JOISTS, COLUMNS OR STRUCTURAL SLABS NOT INDICATED ON THE
STRUCTURAL DRAWINGS SHALL BE APPROVED BY THE STRUCTURAL ENGINEER.
15. ONLY WELDABLE REINFORCING BARS MAY BE WELDED.
16. ADMIXTURES CONTAINING CHLORIDE OR OTHER CORROSIVE CHEMICALS SHALL NOT BE USED IN
CONCRETE.
17. AGGREGATES SHALL BE FREE OF DELETERIOUS OR NON-DURABLE MATERIALS SUCH AS CHERTS.
18. REINFORCING SHALL BE ADEQUATELY TIED AND SUPPORTED TO HOLD IT IN THE CORRECT POSITION
DURING CONSTRUCTION AND THE PLACEMENT OF CONCRETE.
19. CONCRETE SHALL BE CONSOLIDATED ADEQUATELY DURING PLACEMENT BY MECHANICAL VIBRATION IN
ACCORDANCE WITH PUBLISHED PRACTICES.
20. PLASTIC CHAIRS SHALL BE USED IN ALL CONCRETE THAT WILL BE EXPOSED TO VIEW IN THE
COMPLETED STRUCTURE.
21. EXPOSED CONCRETE CORNERS SHALL BE CHAMFERED MINIMUM 3/4", OR AS INDICATED ON THE
STRUCTURAL/ARCHITECTURAL DRAWINGS.
22. FILL POCKETS AROUND CONNECTIONS WITH CONCRETE FLUSH AND SMOOTH UNLESS INDICATED
OTHERWISE.
23. FORMED SURFACES SHALL HAVE A SMOOTH-FORM FINISH WHERE EXPOSED TO VIEW AND A
ROUGH-FORM FINISH WHERE NOT EXPOSED TO VIEW UNLESS INDICATED OTHERWISE.
24. UNFORMED SURFACES SHALL HAVE A TROWEL FINISH WHERE EXPOSED TO VIEW AND A FLOAT FINISH WHERE NOT EXPOSED TO VIEW U.N.O. EXCEPT THAT STAIRS AND EXTERIOR WALKING SURFACES SHALL
HAVE A BROOM FINISH U.N.O.
25. ALL COLD JOINTS SHALL BE ROUGHENED TO A FULL AMPLITUDE OF 1/4" AND A CONCRETE BONDING
AGENT SHALL BE APPLIED PRIOR TO THE PLACEMENT OF FRESH CONCRETE.
26. IN SLABS-ON-GRADE, LAP WELDED WIRE FABRIC TWO FULL MESH PANELS AND WIRE TOGETHER.
27. SPLICE LAP LENGTHS FOR REINFORCING SHALL BE IN ACCORDANCE WITH THE FOLLOWING TABLE, U.N.O. ON THE PLANS:
BAR SIZE LAP LENGTH
#3 24" #4 36" #5 48"
#6-#8 60"
28. PROVIDE ISOLATION JOINTS IN SLABS AS FOLLOWS:
A. BETWEEN SLABS-ON-GRADE AND FOUNDATION WALLS
B. BETWEEN SLABS AND INSERTS SUCH AS PIPES
STRUCTURAL
ENGINEERING, INC.
CAS Structural Engineering, Inc.
P.O. Box 469
Alum Creek, WV 25003-0469 304-756-2564 (v) / 304-756-2565 (f)
Email: calalane@aol.com www.casstruceng.com
CAS
G :\C
TG
\2
3\
6-
C an aa n
Tr ai ls \W or ki ng D ra w in gs
\A ut oC
AD
\2
-G
N
5.
dw g, /1
7/
:1 4:
A
M , L
Ac or d
AutoCAD SHX Text
REVISION
AutoCAD SHX Text
SHEET NO.
AutoCAD SHX Text
CHECKED BY:
AutoCAD SHX Text
DESIGNED BY:
AutoCAD SHX Text
DRAWN BY:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
JOB NUMBER:
AutoCAD SHX Text
SEAL
AutoCAD SHX Text
BY
AutoCAD SHX Text
DATE
AutoCAD SHX Text
REVISIONS
AutoCAD SHX Text
REVISION
AutoCAD SHX Text
NUMBER
AutoCAD SHX Text
PROJECT INFORMATION
AutoCAD SHX Text Chapman
AutoCAD SHX Text Technical
AutoCAD SHX Text Group
AutoCAD SHX Text www.chaptech.com
AutoCAD SHX Text
CAS
AutoCAD SHX Text
CAS
AutoCAD SHX Text
CAS
AutoCAD SHX Text
AS NOTED
AutoCAD SHX Text 23036
AutoCAD SHX Text
GN-4
AutoCAD SHX Text
STRUCTURAL NOTES 1
CIVIL ENGINEERING / SITE DEVELOPMENT
ENVIRONMENTAL ENGINEERING
LANDSCAPE ARCHITECTURE
SURVEYING
St. Albans, WV
(304) 727-5501
Buckhannon, WV
(304) 472-8914 a division of
GRW
CANAAN VALLEY RESORT
STATE PARK PROJECT
TRAIL IMPROVEMENTS
STRUCTURAL
ENGINEERING, INC.
CAS Structural Engineering, Inc.
P.O. Box 469
Alum Creek, WV 25003-0469 304-756-2564 (v) / 304-756-2565 (f)
Email: calalane@aol.com www.casstruceng.com
CAS
SPECIAL INSPECTIONS
1. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO COORDINATE AND SCHEDULE THE SPECIAL
INSPECTOR'S INSPECTIONS AND TESTING FOR THE WORK NOTED BELOW. THE FOLLOWING
INFORMATION IS PROVIDED FOR THE CONTRACTOR'S INFORMATION AND COORDINATION PURPOSES.
2. SPECIAL INSPECTIONS SHALL BE PERFORMED FOR THE FOLLOWING WORK AS REQUIRED IN THE 2018
INTERNATIONAL BUILDING CODE:
2.1. CONCRETE CONSTRUCTION IN ACCORDANCE WITH SECTION 1705.3
2.2. SOILS CONSTRUCTION IN ACCORDANCE WITH SECTION 1705.6
2.3. WOOD CONSTRUCTION IN ACCORDANCE WITH SECTION 1705.5.
2.4. HELICAL PILE FOUNDATION CONSTRUCTION IN ACCORDANCE WITH SECTION 1705.9.
3. THE TYPE AND EXTENT OF EACH TEST AND INSPECTION REQUIRED FOR EACH TYPE OF WORK SHALL BE
AS INDICATED IN THE BUILDING CODE AND THE REFERENCES INCORPORATED THEREIN.
4. SPECIAL INSPECTION SERVICES SHALL BE PAID FOR BY THE CONTRACTOR. THE CONTRACTOR SHALL INCLUDE AN ALLOWANCE OF THIS WORK IN THEIR BID. SEE SECTION 012100 ALLOWANCES FOR
ADDITIONAL INFORMATION.
5. TESTING AGENCY(IES) SHALL BE APPROVED BY THE ARCHITECT, PRIOR TO TESTING.
6. WORK REQUIRING SPECIAL INSPECTION SHALL BE INSPECTED BY THE SPECIAL INSPECTOR FOR
CONFORMANCE WITH THE APPROVED DRAWINGS AND SPECIFICATIONS. INSPECTION REPORTS
INDICATING THE RESULTS OF SPECIAL INSPECTIONS SHALL BE PROMPTLY SUBMITTED DIRECTLY TO
THE ARCHITECT, THE STRUCTURAL ENGINEER AND THE CONTRACTOR.
7. ALL SPECIAL INSPECTIONS INDICATING NON-CONFORMING WORK SHALL BE REPORTED IMMEDIATELY AND DIRECTLY TO THE ARCHITECT, THE STRUCTURAL ENGINEER AND THE CONTRACTOR. IMPENDING
CONSTRUCTION WORK THAT WOULD IMPEDE ECONOMICAL CORRECTION OF NON-CONFORMING WORK
SHALL NOT PROCEED WITHOUT WRITTEN APPROVAL.
8. A FINAL REPORT DOCUMENTING COMPLETION OF ALL REQUIRED SPECIAL INSPECTIONS AND
CORRECTION OF ANY NON-CONFORMING WORK NOTED IN THE INSPECTIONS SHALL BE SUBMITTED DIRECTLY TO THE ARCHITECT, THE STRUCTURAL ENGINEER AND THE CONTRACTOR BY THE SPECIAL
INSPECTOR AT THE COMPLETION OF THE PROJECT. FINAL REPORT SHALL IDENTIFY ALL
NON-CONFORMING WORK AND DISCUSS REMEDIATION THAT OCCURRED.
MASONRY
"BUILDING CODE REQUIREMENTS AND SPECIFICATION FOR MASONRY STRUCTURES", (TMS 402-16) AND
"SPECIFICATION FOR MASONRY STRUCTURES", (TMS 602-16).
1. ALL MATERIALS AND WORKMANSHIP SHALL COMPLY WITH THE REQUIREMENTS OF THE FOLLOWING
CODES AND STANDARDS:
LOAD BEARING CONCRETE
MASONRY UNITS
ASTM C90, TYPE I, GRADE N (MIN. COMPRESSIVE
STRENGTH ON NET AREA = 1900 PSI) NORMAL
WEIGHT
NON-LOAD BEARING CONCRETE
MASONRY UNITS
ASTM C129, TYPE II
MORTAR ASTM C270, TYPE S ABOVE GRADE:
TYPE S BELOW GRADE
CONCRETE BUILDING
BRICK
ASTM C55, GRADE N (MIN. COMPRESSIVE
STRENGTH ON NET AREA = 3500 PSI)
CMU GROUT ASTM C476, (MIN. COMPRESSIVE STRENGTH
AT 28 DAYS = 2000 PSI)
CMU PRISM STRENGTH F'm = 1500 PSI PER TMS 402 UNIT
STRENGTH METHOD
HORIZONTAL JOINT REINFORCING ASTM A82, 9 GA. GALVANIZED TRUSS TYPE U.N.O.
REINFORCING BARS ASTM A615, GRADE 60
STRUCTURAL GLUED LAMINATED TIMBER
1. PRE- ENGINEERED GLULAM MEMBERS/TRUSSES SHALL BE DESIGNED,AND FABRICATED, HANDLED
AND ERECTED IN ACCORDANCE WITH AITC STANDARDS.
2. PROVIDE GLULAM MEMBERS W/ SIZE AS INDICATED ON FRAMING PLAN W/ THE FOLLOWING
PROPERTIES:
SPECIES: SOUTHERN PINE
COMBINATION SYMBOL: 16F-V2
3. GLULAM MEMBERS SHALL BE PRESSURE TREATED. STAIN COLOR AND FINISH SHALL BE SELECTED
BY ARCHITECT.
1. SOLID WOOD DECKING FOR KIOSK ROOF AT LODGE SHALL BE KILN-DRIED AFTER TREATMENT, PRESSURE TREATED SOUTHERN PINE.
2. WOOD DECKING SHALL BE NOMINAL 2" x 6" T&G.
3. ATTACH WOOD DECKING TO SUPPORT MEMBERS WITH 8d COMMON NAILS WITH 1-3/8" PENETRATION.
4. REFER TO SPECIFICATIONS FOR ADDITIONAL INFORMATION.
T & G WOOD ROOF DECK HELICAL PIER FOUNDATION
(WALKWAY/OBSERVATION DECK)
1. THE SOILS REPORT, PREPARED BY AMERICAN GEOTECH, INC., DATED AUGUST 2024, IS ON FILE WITH
THE OWNER AND A COPY IS AVAILABLE FOR REVIEW AT THE OFFICE OF THE ARCHITECT. ALL
RECOMMENDATIONS IN THE REPORT SHALL BE CONSIDERED AS REQUIREMENTS AND SHALL BE
FOLLOWED.
2. DUE TO THE CONDITIONS PRESENT AT THE WALKWAY/OBSERVATION DECK LOCATION, HELICAL PILES ARE REQUIRED. PIERS SHALL EXTEND TO AN APPROPRIATE DEPTH OF 5 TO 6 FEET BELOW THE EXISTING SURFACE. THE HELICAL PIERS SHALL CONSIST OF MINIMUM 1.5-INCH DIAMETER ROUND-CORNER SQUARE SHAFTS WITH THREE (3) HELICAL BEARING PLATES (8", 10", AND 12"
DIAMETERS) AND AN UNCASED GROUT CAP OF 12-INCHES IN DIAMETER EXTENDED 18-INCHES
BELOW THE GROUND. GROUT STRENGTH SHALL BE 4,000 psi.
3. HELICAL PIERS SHALL BE A.B. CHANCE SS 150 (7,000 FT-LBS MINIMUM TORQUE RATING), OR
APPROVED EQUAL, AT A MINIMUM AND ALL PIER SECTIONS MUST BE HOT-DIP GALVANIZED. A
TYPICAL SS 150 HELICAL PIER WILL HAVE AN ALLOWABLE AXIAL CAPACITY OF 8 KIPS, TENSION (UPLIFT) OF 0.5 KIPS, AND LATERAL CAPACITY OF 1 KIP WITH THE SPECIFIED GROUT CAPS.
4. THE GROUT CAPS SHALL BE PRE-DRILLED AND FILLED WITH GROUT BEFORE HELICAL PIER
INSTALLATION AND THE PIERS MUST BE PRE-DRILLED THROUGH THE GROUT RESERVOIR. SEEPAGE
OF GROUT WATER INTO THE GROUT CAPS SHOULD BE EXPECTED AND THE CONTRACTOR MUST
HAVE PROVISIONS FOR HANDLING THE WATER.
5. THE HELICAL PIERS MUST PENETRATE AT LEAST 5 TO 6 FEET TO ACHIEVE THE NECESSARY MINIMAL
ALLOWABLE CAPACITY. THE UNDERLYING BEDROCK SURFACE WITHIN THE CONSTRUCTION AREA
SHOULD BE PRESENT AT APPROXIMATELY 15 FEET BELOW THE EXISTING SURFACE GRADES.
6. CONTRACTOR SHALL INSTALL A MINIMUM OF 2 TRIAL HELICAL PIERS AT EACH SITE LOCATION TO
DETERMINE DEPTH OF ROCK AT THOSE LOCATIONS. REPORT DEPTH TO ARCHITECT PRIOR TO
PROCEEDING WITH PRODUCTION HELICAL PIER INSTALLATION. TRIAL HELICAL PIERS MAY BE
REMOVED AND REUSED AS PRODUCTION PIERS AS LONG AS THEY HAVE NOT BEEN DAMAGED
DURING INSTALLATION.
7. HELICAL PIER SYSTEM SHALL BE DESIGNED BY A PROFESSIONAL ENGINEER, REGISTERED IN THE
STATE OF WEST VIRGINIA.
8. LATERAL LOADS SHALL CONSIDER RAILING SYSTEM AS A SOLID AREA AS IS LIKELY TO OCCUR
DURING THE WINTER.
9. REFER TO SPECIFICATIONS FOR LOAD TESTING REQUIREMENTS.
10. THE CONTRACTOR SHALL MINIMIZE DISTURBANCE TO THE AREA OF WORK BY:
10.1. CONDUCTING A PRE-INSTALLATION MEETING WITH WITH THE OWNER, ENGINEER, AND
INSTALLATION PERSONNEL.
10.2. PROVIDING TEMPORARY SNOW FENCING AROUND THE AREA OF WORK WHICH IS 10'
BEYOND THE PERIMETER OF THE BOARDWALK, RAMP OR DECK.
10.2. CONTAINING ALL EQUIPMENT, MATERIAL, AND PERSONNEL WITHIN THE AREA OF WORK.
10.3. MAINTAINING THE SNOW FENCING UNTIL HELICAL PIER AND WOOD CONSTRUCTION IS
COMPLETED IN THE WORK AREA.
10.4. UTILIZING FLEXIBLE MATTING IN LIEU OF RIGID MATTING.
10.5. REMOVING ALL SPOILS FROM THE AREA OF WORK AND DISPOSING OF THEM OUT OF THE
PARK OR AS DESIGNATED BY THE PARK SUPERINTENDENT.
10.6. STORING MATERIALS AND EQUIPMENT OUT OF THE AREA OF WORK AND OTHER
UNDEVELOPED AREAS.
1. ALL DIMENSIONAL LUMBER SHALL BE KILN-DRIED AFTER TREATMENT, PRESSURE TREATED SOUTHERN PINE, NO. 1 GRADE.
2. AWPA STANDARD UC4C SHALL BE INSTALLED AT THESE LOCATIONS:
2.1.1. ALL COMPONENTS OF PUNCHEON TRAIL CONSTRUCTION.
2.1.2. BEAMS AND STRINGERS OF RAMPS, BOARDWALKS, AND THE OBSERVATION DECK.
3. AWPA STANDARD UC4B SHALL BE INSTALLED AT THESE LOCATIONS:
3.1.1. WOOD COMPONENTS AT KIOSKS.
3.1.2. RAIL SYSTEMS
3.1.3. DECK BOARDS OF RAMPS, BOARDWALKS, AND THE OBSERVATION DECK.
3.1.4. TIMBER GUARDRAIL
3.1.5. TIMBER FENCING
4. MAXIMUM MOISTURE CONTENT FOR DIMENSIONAL LUMBER AS FOLLOWS:
4.1. 12% TO 19% AFTER KILN DRYING, AFTER TREATMENT.
4.2. KILN-DRIED PRESSURE TREATED LUMBER SHALL BE PROTECTED FROM MOISTURE PRIOR TO
FINISHING AND INSTALLATION.
5. ALL CONNECTION HARDWARE SHALL BE GALVANIZED.
6. ALL STAINS AND SEALERS SHALL BE COMPATIBLE WITH TREATED LUMBER AND SHALL BE APPROVED BY THE
ARCHITECT.
DIMENSIONAL LUMBER
2. PROVIDE GALVANIZED HORIZONTAL JOINT REINFORCING IN ALL WALLS AT 16" O.C.. PROVIDE ONE-PIECE PREFABRICATED "T" AND "L" SHAPED UNITS AT 8" O.C. AT ALL WALL CORNERS AND INTERSECTIONS.
3. IN GROUTED AND/OR REINFORCED MASONRY WALLS, USE MASONRY UNITS WITH CORES THAT ALIGN VERTICALLY. PROVIDE CONTINUOUS UNOBSTRUCTED CELLS FOR REINFORCEMENT PLACEMENT AND
GROUTING.
4. ALL REINFORCING STEEL SHALL BE PLACED AND TIED IN THE PROPER POSITION AS THE WALLS ARE CONSTRUCTED. LOWERING THE BARS IN FROM THE TOP OF A COMPLETED WALL OR SECTION OF WALL IS
NOT ALLOWED.
5. LAP SPLICES FOR REINFORCING BARS SHALL BE 50 BAR DIAMETERS UNLESS NOTED OTHERWISE.
6. CONTRACTOR SHALL PROVIDE BRACING AND SUPPORT FOR ALL MASONRY WORK UNTIL PERMANENT ROOF
FRAMING IS IN PLACE.
7. DO NOT APPLY UNIFORM FLOOR OR ROOF LOADS FOR AT LEAST 12 HOURS AND CONCENTRATED LOADS
FOR AT LEAST 3 DAYS AFTER BUILDING MASONRY WALLS OR COLUMNS.
8. WATERPROOFING OF THE FOUNDATION WALLS SHALL BE IN ACCORDANCE WITH ARCHITECTURAL DWG.'S
AND OR SPECIFICATIONS.
G :\C
TG
\2
3\
6-
C an aa n
Tr ai ls \W or ki ng D ra w in gs
\A ut oC
AD
\2
-G
N
5.
dw g, /1
7/
:1 4:
A
M , L
Ac or d
AutoCAD SHX Text
REVISION
AutoCAD SHX Text
SHEET NO.
AutoCAD SHX Text
CHECKED BY:
AutoCAD SHX Text
DESIGNED BY:
AutoCAD SHX Text
DRAWN BY:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
JOB NUMBER:
AutoCAD SHX Text
SEAL
AutoCAD SHX Text
BY
AutoCAD SHX Text
DATE
AutoCAD SHX Text
REVISIONS
AutoCAD SHX Text
REVISION
AutoCAD SHX Text
NUMBER
AutoCAD SHX Text
PROJECT INFORMATION
AutoCAD SHX Text Chapman
AutoCAD SHX Text Technical
AutoCAD SHX Text Group
AutoCAD SHX Text www.chaptech.com
AutoCAD SHX Text
CAS
AutoCAD SHX Text
CAS
AutoCAD SHX Text
CAS
AutoCAD SHX Text
AS NOTED
AutoCAD SHX Text 23036
AutoCAD SHX Text
GN-5
AutoCAD SHX Text
STRUCTURAL NOTES 2
REVISIONSHEET NO.
CHECKED BY:
DESIGNED BY:
DRAWN BY:
DATE:
SCALE:
JOB NUMBER:SEAL
BYDATEREVISIONSREVISION
NUMBER
PROJECT INFORMATIONAIRPORT PLANNING / DEVELOPMENT
ARCHITECTURE / INTERIOR DESIGN
CIVIL ENGINEERING / SITE DEVELOPMENT
ENVIRONMENTAL ENGINEERING
LANDSCAPE ARCHITECTURE
SURVEYING
St. Albans, WV
(304) 727-5501
Buckhannon, WV
(304) 472-8914 a division of
GRW
RJK
KLE
LDA
3/8"=1'-0" 23036
℄ CONSTRUCTION
STABILIZE OR REMOVE
UPHILL DEBRIS HAZARDS
TRIM EXPOSED ROOTS
FLUSH WITH GROUND
TRIM BRANCHES IN
FRONT OF GROWTH
COLLAR (TYP.)
TRIM BRANCHES IN
FRONT OF GROWTH
COLLAR (TYP.)
REMOVE
HAZARDOUS TREES
REMOVE BOULDERS
EXTENDING INTO
CLEAR ZONE
BRUSH
CLEARING
HAZARD TREE REMOVAL WIDTH HAZARD TREE REMOVAL WIDTH
CLEARING LIMIT
UPHILL WIDTH
SHLDR TREAD WIDTH SHLDR
D
IT
C
HNOTES:
1. VEGETATION TRIMMING & CLEARING SHALL ONLY TAKE PLACE
BETWEEN NOVEMBER 15 AND MARCH 31.
2. LEAVE TREE STUMP MAXIMUM HEIGHT: INCLUDES EXISTING
STUMPS AND STUMPS LEFT FROM TREES CUT TO CONSTRUCT
THE TRAIL
TRAIL NAME
CLEARING
METHOD
CLEAR ZONETREE CLEARING LIMITS LEAVE TREES
STUMP
MAXIMUM
HEIGHT
UPHILL
WIDTH
C
DOWNHILL
WIDTH
D
CLEAR
HEIGHT
E
WIDTH
F
DISTANCE
H
MINIMUM
DIAMETER
HAZARD
TREE
REMOVAL
WIDTH
DISPOSAL
METHOD
MIDDLE RIDGE CONNECTOR TRAIL
DEER RUN CONNECTOR TRAIL
BUBBLING SPRINGS TRAIL
DEER RUN TRAIL REPAIR
ABE RUN TRAIL REPAIR
TRAILBED
WIDTH
A
TRAIL
SHOULDER
WIDTH
B
4'
4'
6'
4'
4'
6"
6"
NONE
6"
6"
C3
C1
C1
C2
C2
10'
16'
20'
10'
10'
20'
15'
15'
15'
8'
6'
6'
5'
5'
5'
8"
8"
8"
LEAVE TREES: LEAVE TREES SHOULD BE LIVE, SOUND AND UNDAMAGED WITH
UNCOMPROMISED ROOT SYSTEMS.
HAZARD TREES: HAZARD TREES ARE TREES THAT ARE STANDING OR LEANING DEAD TREES
LARGER THAN 8" IN DIAMETER.
2'
2'
2'
20'
20'
20'
D1
D2
D1
D3
D3
C1 TREES, PRUNING, BRUSH, ROOT REMOVAL,
LOOSE ROCK REMOVAL
C2 ROOT & LARGE ROCK REMOVAL AT REPAIR
LOCATIONS
C3 HAZARD TREES, PRUNING, BRUSH, ROOT
REMOVAL, LOOSE ROCK REMOVAL
CLEARING
TYPE
DESCRIPTION OF WORK
D1 HAUL TREES TO DISPOSAL SITE. LOP AND
SCATTER BRANCHES, BRUSH, & ROCK
OUTSIDE TRAILWAY ON DOWNHILL SIDE OF
TRAIL OR ON AREAS OF TRAIL OBLITERATION
D2 HAUL ALL TREES AND TRIMMINGS TO
DISPOSAL SITE
D3 SCATTER ROOTS AND ROCK OUT OF
TRAILWAY ON THE DOWNHILL SIDE OF THE
TRAIL OR ON AREAS OF TRAIL OBLITERATION
DISPOSAL
TYPE
DESCRIPTION OF WORK
CLEARING LIMITS - TREES, LOGS & BRUSH CLEARING METHOD DISPOSAL METHOD
EMBEDDED
ROCK
LOOSE
ROCK
CLEARING LIMIT
DOWNHILL WIDTH
CLEAR ZONE F CLEAR ZONE F
C
LE
AR
IN
G H
EI
G
H T
LEAVE TREES
DISTANCE H
LEAVE TREES
DISTANCE H
CANAAN VALLEY RESORT
STATE PARK PROJECT
TRAIL IMPROVEMENTS
G :\C
TG
\2
3\
6-
C an aa n
Tr ai ls \W or ki ng D ra w…