Construction Drawings.pdf
PDF 1 MB Posted
- Attached to
- NDSU - UPSO Suite 150 Remodel
- Solicitation number
- SRC000494
- Issued by
- Cass County, North Dakota
About this file
This document is a set of construction drawings prepared by North Dakota State University's Facilities Management Planning Department for the remodel of the University Police & Safety Office (UPSO) Suite 150. The project involves partial first-floor renovation of an auxiliary enterprises facility, with drawings dated October 20, 2026. The construction drawings provide comprehensive specifications across multiple disciplines, including demolition, flooring, electrical systems, HVAC, and plumbing work. Key demolition tasks include removal of all flooring, ceiling, and lighting; selective wall removal; relocation of the electrical panel and attic access ladder; and disposal of door slabs while reusing frames where possible. The new floor plan incorporates new doors with half-glass construction (except for bathrooms and data closets), relocated windows, an exterior ramp with railing, and modifications to accommodate owner-supplied equipment including wall-mounted televisions and kitchen appliances. A mandatory site visit is scheduled for November 17, 2026, at 11:00 AM Central Time, with all communications directed to Procurement Officer Casie Ewalt at casie.ewalt@ndsu.edu.
The drawings detail extensive interior finishes including carpet selection (two types specified), sealed concrete flooring, rubber base trim, and tile wall treatment to five feet above finished floor in bathroom areas. Electrical and power plans specify task lighting, emergency lighting with 24/7 operation, vacancy sensors, dedicated circuits for kitchen appliances, and comprehensive data and power infrastructure including provisions for owner-supplied televisions and an SOS button. HVAC work includes replacement of diffusers and return air components, cleaning of existing coils, and potential removal of the existing air handling unit as an alternate bid item. Plumbing modifications involve new toilet and sink installation with drain and vent connections to the existing adjacent bathroom system. Two alternate bids are identified: one for window replacement with bronze storefront and operating awning sash, and another for removal of the old air handling unit with associated catwalk railing extension if the unit is removed.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| NDSU CSA - Business_DRAFT.pdf | ||
| Cost Proposal Form.docx | DOCX document | |
| IFB - Scope of Work.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
188D
150A
150B
199U
152A
150C
-1
-13
-1
-3
-3
-1
-3--2
-4
-5
-6-7
-8 -9
-10
-11
-12
FACILITIES MANAGEMENT
PLANNING DEPARTMENT A075 PARTIAL FIRST FLOOR - DEMOLITION PLAN
AUXILIARY ENTERPRISES
20 Oct 2026
N
DEMOLITION NOTES
DOOR FRAMES TO BE REUSED WHERE POSSIBLE. DOOR
SLABS TO BE DISCARDED.
ALL FLOORING, CEILING AND LIGHTS SHALL BE REMOVED.
WALL TO BE REMOVED IN ITS ENTIRETY.
ATTIC ACCESS LADDER TO BE RELOCATED. SEE NEW FLOOR
PLAN FOR NEW LOCATION.
RELOCATE ELECTRICAL PANEL. SEE ELECTRICAL PLAN FOR
NEW LOCATION.
REMOVE ELECTRICAL ITEMS ON THIS WALL BACK TO
SOURCE.
REPLACE 3-WAY SWITCH WITH SINGLE POLE.
REMOVE LIGHT SWITCH.
REMOVE CABINET, COUNTERTOP AND SINK. DRAIN AND
WATER SUPPLY TO BE REUSED. SEE NEW PLUMBING PLAN.
DATA JACK AND WIREMOLD TO BE REMOVED.
LIGHT SWITCH TO BE MOVED TO EMPTY JUNCTION BOX BY
DOOR. CONDUIT AND SWITCH BOX TO BE REMOVED.
FRAME TO REMAIN, DOOR TO BE REMOVED AND DISCARDED.
REMOVE OVERHEAD DOOR IN ITS ENTIRETY AND TURNED
OVER TO OWNER.
AutoCAD SHX Text 36"
AutoCAD SHX Text J
AutoCAD SHX Text 36"
AutoCAD SHX Text 36"
AutoCAD SHX Text J
AutoCAD SHX Text 36"
AutoCAD SHX Text 36"
EXIST
BATH
SLOPE
-2
-1
-4
-3
-5
-5
-7
-9
-10
-4
-11
-6-12
-13
-11 14
-8
FACILITIES MANAGEMENT
PLANNING DEPARTMENT A075 PARTIAL FIRST FLOOR - NEW FLOORPLAN
AUXILIARY ENTERPRISES
20 Oct 2026
N
NOTES
RELOCATED ATTIC ACCESS LADDER. COORDINATE WITH NEW CEILING GRID.
OUTLINE OF EXISTING MECHANICAL CATWALK.
PROPOSED EXTENSION OF CATWALK. FIELD VERIFY.
PROVIDE NEW HALF-GLASS DOOR SLAB WITH CIPHER LOCK AND DOOR
CLOSERS. REUSE EXISTING FRAME.
PROVIDE 48" WIDE BY 42" TALL LOCKABLE SLIDING WINDOW WITH 1/4"
THICK TEMPERED GLASS.
PROVIDE RAILING FOR EXTERIOR RAMP PER ENGINEER DRAWINGS.
EXTERIOR DOOR TO BE REPLACED WITH ALUMINUM STOREFRONT DOOR
WITH BRONZE FINISH. CARD ACCESS TO REMAIN.
PROVIDE NEW DOOR SLAB AND PAINT EXISTING FRAME. VERIFY
REQUIREMENTS FOR OWNER FURNISHED DOOR HARDWARE.
BOX AROUND PIPES. PROVIDE ACCESS PANEL AT THE BOTTOM.
PROVIDE NEW DOOR SLAB. REUSE EXISTING FRAME. VERIFY REQUIREMENTS
FOR OWNER FURNISHED DOOR HARDWARE.
FUR OUT WALL FOR PLUMBING.
REPAIR AND PAINT EFIS ON EAST SIDE OF BUILDING. VERIFY EXTENTS OF
WORK.
PROVIDE 48" x 60" STATIONARY WINDOW.
PROVIDE NEW HALF-GLASS DOOR AND FRAME WITH SIDELIGHT. VERIFY
REQUIREMENTS FOR OWNER FURNISHED DOOR HARDWARE.
NOTES
ALL NEW AND REUSED DOOR FRAMES TO BE REPAINTED. ALL DOOR SLABS
TO BE NEW.
EXCLUDING THE BATHROOM AND DATA CLOSET, ALL DOORS TO HAVE HALF
GLASS.
ALTERNATE BIDS
ALTERNATE BID 1 - REPLACE WINDOW WITH BRONZE STOREFRONT WINDOW
WITH OPERATING AWNING SASH.
ALTERNATE BID 2 - IF OLD AHU IS REMOVED, EXTEND RAILING ON SOUTH
SIDE OF CATWALK AS REQUIRED.
CRAIG
CRAIG
SLOPE
FACILITIES MANAGEMENT
PLANNING DEPARTMENT A075 PARTIAL FIRST FLOOR - DIMENSIONS
AUXILIARY ENTERPRISES
20 Oct 2026
N
AutoCAD SHX Text 13'-1 "14"
AutoCAD SHX Text 11'-3 "12"
AutoCAD SHX Text 4'
AutoCAD SHX Text 9'-1 "38"
AutoCAD SHX Text 9'-1 "38"
AutoCAD SHX Text 10'
AutoCAD SHX Text 12'-3 "38"
AutoCAD SHX Text 23'-11 "34"
AutoCAD SHX Text 16'-8 "78"
AutoCAD SHX Text 8'-2 "38"
AutoCAD SHX Text 9'
AutoCAD SHX Text 21'-8"
AutoCAD SHX Text 26'-1 "18"
18'-4 "34"
CARPET 2
SEALED CONCRETE
SEALED
CONCRETE
CARPET 2
CARPET 2
CARPET 2
CARPET 1
CARPET 2
-5
-1
FRIDGE
-4
-2
FACILITIES MANAGEMENT
PLANNING DEPARTMENT A075 PARTIAL FIRST FLOOR - FINISH PLAN
AUXILIARY ENTERPRISES
20 Oct 2026
N
NOTES
PROVIDE 12" DEEP CORIAN COUNTER WITH RADIUSED CORNERS MOUNTED
AT 36" ABOVE FINISHED FLOOR. EXTEND PAST OUTSIDE OF WINDOWS 12".
FURNISH AND INSTALL ADA GRAB BARS AND MIRROR. INSTALL OWNER
FURNISHED PAPER TOWEL, TOILET PAPER AND SOAP DISPENSERS. PROVIDE
WOOD BACKING AS REQUIRED.
INSTALL OWNER APPROVED WALL TILE TO 5'-0" AFF ON ALL WALLS. PROVIDE
METAL TRANSITION STRIP.
PROVIDE 15'-0" OF BASE CABINETS WITH CORIAN COUNTERTOP.
PROVIDE SINGLE SINK AND GOOSE NECK WATER FAUCET SUITABLE FOR
FILLING COFFEE POT.
CARPET 1 - ENTRY WALK-OFF
PC - STEP ON IT OR SUCCESSION II
CARPET 2 - OFFICES/CONFERENCE ROOM
MANNINGTON EXCHANGE 2 COLLECTION
SEALED/POLISHED CONCRETE
RUBBER BASE, BURNT UMBER IN COLOR
NOTES
FURNITURE PROVIDED BY OTHERS.
D
D
D
3D
3D
-1
-2
-2
-2
FRIDGE
FACILITIES MANAGEMENT
PLANNING DEPARTMENT A075 PARTIAL FIRST FLOOR - ELECTRICAL PLAN
AUXILIARY ENTERPRISES
20 Oct 2026
N
NOTES
PROVIDE TASK LIGHT FOR 8' WORK BENCH. VERIFY LOCATION WITH OWNER.
EMERGENCY LIGHTS TO BE ON 24/7.
PROVIDE VACANCY SENSOR IN CONFERENCE ROOM.
-2
-3
-4FRIDGE
-5
-6
FRIDGE
-5
-7
-8
-1
-1
FACILITIES MANAGEMENT
PLANNING DEPARTMENT A075 PARTIAL FIRST FLOOR - POWER & DATA PLAN
AUXILIARY ENTERPRISES
20 Oct 2026
N
NOTES
PROVIDE SOS BUTTON UNDER DESK. VERILFY LOCATION WITH OWNER.
PROVIDE POWER, DATA AND CABLE CONNECTION TO OWNER SUPPLIED 85"
WALL MOUNTED TELEVISIONS. ENSURE PROPER CLEARANCE BETWEEN TV
AND ELECTRICAL PANEL.
PROVIDE POWER, DATA AND CABLE CONNECTIONS TO TWO OWNER
SUPPLIED 32" WALL MOUNTED TELEVISIONS. TVS TO BE STACKED
VERTICALLY.
RELOCATED ELECTRICAL PANEL.
PROVIDE DEDICATED CIRCUITS FOR KITCHEN APPLIANCES.
PROVIDE STEEL WIREMOLD 4000 WITH 1" FEED IN BACK. PROVIDE 20
RECEPTACLES ON 2 CIRCUITS. COORDINATE WITH MODULAR FURNITURE.
RECEPTACLE TO BE IN SAME 4-GANG BOX AS LIGHT SWITCH.
PROVIDE UNDER CARPET POWER AND DATA KIT TO CONFERENCE ROOM
TABLE.
AutoCAD SHX Text G
AutoCAD SHX Text
TV
AutoCAD SHX Text
TV
AutoCAD SHX Text 36"
AutoCAD SHX Text 36"
AutoCAD SHX Text 36"
AutoCAD SHX Text 36"
AutoCAD SHX Text 36"
AutoCAD SHX Text
AC
AutoCAD SHX Text
MICRO
WAP
D
D
D
3D
3D
FRIDGE
-1
FACILITIES MANAGEMENT
PLANNING DEPARTMENT A075 PARTIAL FIRST FLOOR - HVAC PLAN
AUXILIARY ENTERPRISES
20 Oct 2026
N
NOTES
PROVIDE BATHROOM EXHAUST FAN WITH PROPER VENTING. FAN SHALL BE
TIED TO LIGHT SWITCH.
EXISTING FLEX DUCT TO BE REPLACED WITH RIGID DUCTWORK SUITABLE
FOR 1200 CFM. FLEX MAY BE USED FOR FINAL CONNECTIONS. CLEAN
EVAPORATOR AND HEATING COILS IN AHU.
GENERAL NOTES
REPLACE ALL EXISTING SA DIFFUSERS WITH NEW PLAQUE STYLE DIFFUSERS.
REPLACE ALL EXISTING RETURN AIR EGG CRATES.
ALTERNATE BID
ALTERNATE BID 2 - REMOVE OLD AHU ABOVE CEILING IN ITS ENTIRETY BACK
TO SOURCE AND TURN OVER TO OWNER. IF ALTERNATE IS ACCEPTED,
OWNER WILL REMOVE REFRIGERANT FROM CONDENSER BEFORE WORK
STARTS.
FRIDGE
-1
-2
FACILITIES MANAGEMENT
PLANNING DEPARTMENT A075 PARTIAL FIRST FLOOR - PLUMBING PLAN
AUXILIARY ENTERPRISES
20 Oct 2026
N
NOTES
CUT AND PATCH CONCRETE AS NECESSARY TO TIE NEW TOILET AND SINK
DRAINS TO EXISTING ADJACENT BATHROOM. CONTRACTOR TO PROVIDE
NEW TOILET AND SINK.
EXISTING SINK SUPPLY AND DRAIN TO BE REUSED. NEW VENTING TO RUN
ABOVE CEILING AND TIE INTO NEW BATHROOM SINK VENT.
SEE CURRENT PLUMBING AND FOOTING PLANS FOR EXISTING CONDITIONS.
CURRENT PLUMBING
CURRENT FOOTING
| Parking Office - UPSO-Demolition |
| Sheets and Views |
| Demolition |
| Parking Office - UPSO-New Floorplan |
| Sheets and Views |
| New Floorplan |
| Parking Office - UPSO-Dimensions |
| Sheets and Views |
| Dimensions |
| Parking Office - UPSO-Finish Floorplan |
| Sheets and Views |
| Finish Floorplan |
| Parking Office - UPSO-Lighting |
| Sheets and Views |
| Lighting |
| Parking Office - UPSO-Power |
| Sheets and Views |
| Power |
| Parking Office - UPSO-HVAC |
| Sheets and Views |
| HVAC |
| Parking Office - UPSO-Plumbing |
| Sheets and Views |
| Plumbing |
File details come from the government source that posted it. Updated .