This file appears to be a draft document for a UPS Annual Service Contract for the Air Force Research Laboratory (AFRL). The contract opportunity (Solicitation Number COMBO-AFRL-PZLEQ-2026-0001) is seeking an annual service agreement for UPS services, issued by the Department of the Air Force Materiel Command Research Laboratory. While specific details about the exact scope of services are not fully clear from the provided information, the document suggests this is a standard annual service contract for shipping and logistics support for the AFRL. Additional specific requirements or precise service details would require review of the full attachment or solicitation documents.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Document Date: 16 December 2025 Background & Scope:

AFRL/RQ has Uninterruptable Power Supplies (UPS) in F\21604, F\21601, F\21622, and F\20146 that require Preventative Maintenance. Additionally, this service agreement will cover troubleshooting and support on an ongoing basis. These UPS’s condition and provide backup power for critical research equipment. Regular maintenance is required to ensure the reliability of the power output, and the health of the batteries.

Requirements/Salient Characteristics:

The Service agreement will include specifically trained technicians to perform any work and supply OEM (Vertiv approved) parts for repair/replacement. Parts considered consumable maintenance items will be included in the service agreement. The service agreement will make support available twenty-four hours a day and seven days a week with a four (4) hour maximum response time to calls for onsite service and last for a one (1) year period of performance.

The Preventative maintenance shall also include one (1) annual inspection of all components of the UPS including:

· Environmental inspection

· UPS Mechanical inspection

· UPS Power Circuits inspection

· UPS control inspection

· DC Source mechanical inspection

· DC Source Output inspection

· Voltage Regulation Component Inspection

· Measurement and operational testing of the UPS

· Inspection of each battery in the string(s) including wet cells

The electrical loads served by the UPS must not lose power during test, and the system shall be brought back online and provide and condition power as required in normal operation at the end of the inspections and testing.

Facility
Model
Serial Number
Site ID
Tag Number
Capacity
Batteries
Battery Strings
F\21604
Liebert NXb
38-0231
93211
1315712
15 kVA
48
2
F\21601
Liebert EXM
M22J003565
93211
40523682
75 kVA
36
1
F\21622
Liebert NX480
2101200300213B050004
36495
1673767
100 kVA
80
1*
F\20146
Liebert Npower
37-2527
88158
1293056
80 kVA
40
1

*contains wet cell batteries