Amendment 0001 - Site Visit Q and A.pdf
PDF 989 KB Posted
- Attached to
- Paint Building 840 Atrium
- Solicitation number
- COMBO-AFRL-PZLEQ-2025-0019
About this file
This document is a Question and Answers (Q&A) amendment for a painting contract (Solicitation: COMBO-AFRL-PZLEQ-2025-0019) for Building 840 Atrium at Wright-Patterson Air Force Base. The contract involves comprehensive painting of interior surfaces within a multi-story atrium, including architectural wall sections, door and window frames, stair assemblies, and various attached items like signage, corner guards, and vinyl cove base. The government will pre-remove specific items such as portraits, heritage items, televisions, and LED signage prior to work commencement.
The project is scheduled for contract award before 30 September 2025, with a 180-day performance period. Contractors must have U.S. citizenship, pass a Security Forces criminal background check, and possess a current REAL Driver's License. The painting scope includes replacing the existing brown/orange accent wall with a deep blue hue, changing the stair assembly to a dark shade (possibly black), and applying a neutral tone to other light-colored surfaces. Contractors will be responsible for removing, protecting, and reinstalling various wall-mounted items, with specific painting boundaries clearly defined in the provided documentation.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Solicitation: COMBO-AFRL-PZLEQ-2025-0019 Amendment: 0001
Contract: Paint Building 840 Atrium
Date: 21 Aug 2025 Time: 1300-1400hrs
Event: Contractor Site Visit Question and Answers
1. Question: Are the finished, connecting architectural wall sections (sometimes referred to as fascia) located at the second, third and fourth floor levels (in both the north lobby and atrium) part of the contract?
Answer: Yes, all existing, field applied paint surfaces located withing the multi-story atrium space are part of the contract.
2. Question: What portions of the doors in the atrium are included in the contract?
Answer: The entire door panel (both sides) and frame (both sides) are included for all doors connecting adjacent areas to the atrium.
3. Question: Are room number, wayfinding, and other signage to be removed, protected, and replaced by the contractor?
Answer: Yes, removing, protecting, and reinstalling all removable items affixed to the walls (signage, etc) is included in the contract. Other examples of items which the contractor will remove, protect, and reinstall are hand sanitizer stations, pop up safety cone holders, information displays, bulletin boards, phones, and framed artwork. This list is not all-inclusive.
4. Question: Is replacement of vinyl cove base part of the project?
Answer: Yes, refer to the statement of work for details.
5. Question: In the north lobby, the vestibule has a roof section – which portions are part of the project?
Answer: All interior currently painted surfaces, including the ceiling and top portion of the roof will be in the scope of the contract. The exterior portion of the entry portion is not part of the project.
6. Question: Will corner guards be removed by the government?
Answer: No, the contractor will be responsible for removing, protecting, and re-installing the corner guards.
7. Question: What articles within the atrium will be removed by the government prior to the commencement of work?
Answer: The following items will be removed by the government prior to the project:
- portraits
- heritage items
- televisions (note: television mounts will remain, be removed by the contractor and reinstalled)
- signage with LED lights
- black organizational sign located in north lobby
- organizational shields
8. Question: Will the painted surfaces on the north end of the third and fourth floor level (within the atrium), including the horizontal surfaces, be part of the contract?
Answer: Yes, all existing, field applied paint surfaces located withing the multi-story atrium space are part of the contract.
9. Question: What portion of the stair assembly are to be painted?
Answer: All currently painted surfaces that are part of the central stair assembly are to be painted as part of this project to include, but not limited to risers, stringers, soffits, and supporting vertical painted surfaces.
10. Question: Are painted window frames in scope?
Answer: Yes, however only the portions of the frame facing the atrium. The side of the window frame on the other side of the wall are not part of the project.
11. Question: The scope requires painting the entire door frame (both inside and outside the atrium space). The door and window frames are an integrated assembly.
Where do we stop painting the integrated assembly for the window frame sections outside the atrium?
Answer: Photo in Figure 1 shows a typical assembly, taken from the perspective standing outside the atrium. Notes on the photo provide the lines of demarcation for frame painting to be included.
Figure 1: View from adjacent area (outside atrium) of integrated door/window assembly with notes (in red) indicating paint areas which are not in contract.
12. Question: Will interior elevation drawings be made available?
Answer: Yes, see attachments A430S and A431S.
13. Question: Is the smoke curtain (located in the main atrium) housing cover (curtain fascia) included in the scope of the contract?
Answer: No, however the adjacent existing drywall surfaces are part of the painting work.
14. Question: When will the project take place?
Answer: Contract award is anticipated prior to 30 September 2025. Notice to proceed is expected within weeks of award and the total period of performance is 180 days.
15. Question: What are citizenship and background check requirements?
Answer: U.S. citizenship is required for all contractor employees associated with this contract requiring entrance to Wright-Patterson Air Force Base. In addition, they must pass a Security Forces criminal background check and possess current REAL Driver’s License / State Issued ID.
16. Question: Is the labor rate for “general laborer” correct?
Answer: The appropriate labor category for this project should be “Painter”; either “roll and brush” or “spray”.
17. Question: How dark are the paint colors being considered?
Answer: All color palettes being considered all contain a similar color selection approach: 1. Replace the existing brown/orange accent wall with a deep blue hue accent color; 2. Replace the existing stair assembly paint color with a deep shade (dark-colored, possibly black) complimentary accent color; 3. Replace all the other light-colored surfaces with a single, neutral tone color.
Attachments:
1. A430S Drawings
2. A431S Drawings
A431S- east atrium elev.dgn 8/12/2011 11:18:47 AM
D
C
A
B
S O
L
IC
IT
T
IO
N
F
IL
E
M
W
Y
K
IG
R
IP
P
U
IZ
SHEET
IDENTIFICATION
SHEET OF 497
fi
US Army Corps of Engineers
2 3 4 5 6
.S
G
IN
IS
V
H
/B
Q
-0
-R
-C rc h e r s te rn u tt o n s tr u c ti o
J in t n tu re n
I
/1
/0
"REVISED AS-BUILT"
IU
A431S
LEVEL S1
100’-0" (941.00)
LEVEL S2
115’-0" (956.00)
LEVEL S3
130’-0" (971.00)
LEVEL S4
145’-0" (986.00)
.d g
BB CC DD EE FF GG HH HH.1 II JJ
X
OPEN
CJ CJ CJ CJ CJCJ CJ CJ CJ CJ CJ
CJ
CJ CJCJCJCJCJ
STL. TUBE COL. - REF.
STRUCT. DWGS.- PNT.- TYP.
EXPANSION JOINTEXPANSION JOINT
4" BASE
(REF FIN SCHED)
EXPANSION JOINT
JJ KK LL MM.9 NN OO PP QQMM
OPEN OPEN
INTERIOR EAST ELEVATION @ ATRIUM
SCALE: 1/8" = 1’-0"
0 8’8’ 4’
CJ CJ
CJ CJ CJ CJ CJ CJ CJ
STL. TUBE COL. - REF.
STRUCT. DWGS.- PNT.- TYP.
EXPANSION JOINTEXPANSION JOINT
A430S- west atrium elev.dgn 8/12/2011 11:18:44 AM
IU
A430S
GLAZING SCHEDULE
1 INSULATED GLAZING UNIT � VISION GLASS
2 INSULATED GLAZING UNIT � SPANDREL GLASS
3 …� CLEAR
4 TEMPERED GLASS, …� CLEAR
5 LAMINATED GLASS, …� CLEAR
6 FIRE / SAFETY RATED GLASS
7 ONE WAY GLASS, …�
8 SPANDREL GLASS, …�
INTERIOR WEST ELEVATION @ ATRIUM
INTERIOR WEST ELEVATION @ ATRIUM
INTERIOR WEST ELEVATION @ CORRIDOR 400
INTERIOR WEST ELEVATION @ CORRIDOR 400
IZ
SHEET
IDENTIFICATION
SHEET OF 497
fi
US Army Corps of Engineers
2 3 4 5 6
.S
/B
-R
-C rc h r s te rn tt s tr u c ti o in t n tu re n
I
/1
/0
"REVISED AS-BUILT"
.d g
MNOPQRSS.1TUVWXY
CJCJCJCJCJCJCJCJ
CJ CJ CJ CJ
CJCJ CJ
CJ CJ CJ CJ CJ
A520S
CENTER CONTROL JOINT
ON MULLION - TYP.
33 3
CL
A525S
CL ELEV.
(REF FIN SCHED) EXPANSION JOINT
D C BFGHIJJ.1KLM
CJCJCJCJCJCJCJCJCJ
CJ CJ CJ CJ CJ CJ CJ CJ CJ
CENTER CONTROL JOINT
ON MULLION - TYP. A
33 3 3
MATCH GLASS
SPACING @ BRIDE
TO MAIN ATRIUM
SPACE GLASS RAILING
PANELS EQUALLY BETWEEN
CONTROL JOINTS, TYP.
,T
MATCH GLASS
SPACING @ BRIDE
TO MAIN ATRIUM
13’-1" A
IF
11’-0"6’-6" CL CL CL CL
EE.1
A525S
11’-0"CL11’-0"
PROVIDE FAKE
DIFFUSER AT THIS
LOCATION TO MATCH
OPENOPENOPEN
MNOPQRSS.1TUVWX
E D CFGHIJJ.1KLM
File details come from the government source that posted it. Updated .