Combined Synopsis Solicitation NORTHLAND DS.pdf
PDF 437 KB Posted
- Attached to
- Dock-Side (DS): USGCGC NORTHLAND WMEC 904 Federal contract opportunity
- Solicitation number
- 70Z080-20-Q-P4581600
About this file
This is a combined synopsis/solicitation for commercial items seeking quotations for dockside repair services for the USCGC NORTHLAND (WMEC 904). The solicitation is set aside for small businesses with less than 1,250 employees and issued by the US Coast Guard. Quotations are due by 12:00PM EST on April 8, 2020, with an anticipated award date of April 10, 2020. The period of performance is from May 20, 2020 to July 15, 2020. The place of performance is at 4000 Coast Guard Blvd in Portsmouth, Virginia. Contractors shall provide all labor and materials to meet the specification for dockside repairs to the vessel. Questions are due by April 1, 2020 and drawings can be requested through April 1, 2020 by contacting the contract specialist. The solicitation incorporates standard provisions and clauses.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| A00002 Pg 1 Solicitation Ext Answers to Questions.pdf | ||
| A00002 Pg 2-3.pdf | ||
| A02 Combined Synopsis Solicitation NORTHLAND DS.pdf | ||
| 70Z080-20-Q-P45816 - A00001 - Answers to Questions.pdf | ||
| Atachment I Schedule of Services.xls | XLS spreadsheet | |
| Attachment III Past_Perf_Quest (PPQ).pdf | ||
| Atachment I Schedule of Services.xls | XLS spreadsheet | |
| Attachment II NORTHLAND (WMEC 270A) DS FQ3 JKT 20R0.pdf | ||
| Attachment IV Notice For Filing Agency Protests.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
USCGC NORTHLAND (WMEC 904)
DOCKSIDE REPAIRS
70Z080-20-Q-P4581600
This is a combined synopsis/solicitation for commercial items prepared in accordance with Federal Acquisition Regulation (FAR) subpart 12.6 and subpart 13.5 as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; quotations are being requested and a written solicitation will not be issued.
Solicitation number 70Z080-20-Q-P4581600 is issued as a Request for Quotations (RFQ). This solicitation document and incorporated provisions and clauses are those in effect through Federal Acquisition Circular (FAC) 2020-04 effective January 15, 2020, Department of Homeland Security Acquisition Regulation (HSAR) effective February 2019, Homeland Security Acquisition Manual (HSAM) 2020-05 effective February 28, 2020, and Coast Guard Acquisition Procedures (CGAP) 2017-02 effective September 29, 2017.
The applicable North American Industry Classification Standard Code is 336611. The small business size standard is 1,250 employees. This solicitation is issued as a 100% Total Small Business Set Aside. All responsible small business sources may submit a quotation, which shall be considered by the agency.
It is anticipated that one (1) firm fixed price contract will be awarded as a result of this synopsis/solicitation.
SOLICITATION DOCUMENTS:
Attachment 1: Schedule of Services – Blank Price Schedule Attachment 2: Statement of Work – Specification Attachment 3: Past Performance Questionnaire Attachment 4: Notice for Filing Agency Protests
AGENCY INFORMATION:
Andrew Rhoades Contract Specialist
(757) 628-4754 Andrew.J.Rhoades@uscg.mil
Marc Massey Contracting Officer
(757) 628-4554 Marc.A.Massey@uscg.mil
LTJG Adam Cruz Contracting Officer’s Representative
(757) 628-4161 Adam.M.Cruz@uscg.mil
PERIOD OF PERFORMANCE: The period of performance for this contract is 20 May 2020 to 15 July 2020. Contractors that have this capability are invited to submit quotations in accordance with the requirements stipulated in this solicitation.
PLACE OF PERFORMANCE: The place of performance will be at the pier located at 4000 Coast Guard Blvd, Portsmouth, VA 23703.
REQUEST FOR DRAWINGS: The last day to request drawings regarding this solicitation is 1 April 2020. After this date, further requests may not be accepted due to time constraints. To request drawings, contact the Contract Specialist. All requests should identify the solicitation number 70Z080-20-Q-P4581600.
QUESTIONS: The last day for questions regarding this solicitation is 1 April 2020. Email questions to Contract Specialist and Contracting Officer. All questions need to identify the solicitation number 70Z080-20-Q-P4581600 and will be answered by an Amendment.
mailto:Andrew.J.Rhoades@uscg.mil mailto:Marc.A.Massey@uscg.mil mailto:Adam.M.Cruz@uscg.mil
SUBMISSION OF QUOTES: E-mail quotations shall be sent to the Contract Specialist. Please indicate 70Z080-20-Q-P4581600 in the subject line. Contractor must affirm that the pricing provided from the quote shall be valid up to the date of contract award. Quotes shall be submitted by 12:00PM EST, 8 April 2020. Anticipated award date is on or about 10 April 2020.
STATEMENT OF REQUIREMENT: The proposed contract to be awarded by the United States Coast Guard (USCG) shall be for Dockside repairs to the USCGC NORTHLAND (WMEC 904) as specified in Attachment 2 – Statement of Work - Specification. Contractor shall provide all labor, materials, necessary to meet the requirements of the specification.
CONTRACT ADMINISTRATION:
(a) Invoicing Instructions
(1) The contractor shall prepare a proper invoice IAW FAR 52.212-4, and in addition to the information required by FAR 52.212-4(g) as cited in the contract. All invoices shall be itemized to correlate to the Schedule of Supplies/Services. The invoice shall include:
• Vessel Name
• Name of the Contract Specialist, Contracting Officer, and COR
• Contractor DUNS Number
• Name, title, phone number and mailing address of Contractor point of contact for invoicing questions
• CLIN Number, CLIN description, quantity, unit price, and extended price.
• Percentage completion of each CLIN being invoiced
• Description of any invoice deductions.
• 10% of the total contract price will be withheld until all deliverables are received and accepted.
• The Contractor’s final invoice submitted under the contract shall be marked as follows: ″THIS INVOICE CONSTITUTES THE FINAL
INVOICE – UPON PAYMENT OF THIS INVOICE NO OTHER
MONIES ARE DUE UNDER CONTRACT NUMBER (to be assigned upon contract award).
(2) Invoices shall be submitted electronically as follows:
• Invoices shall be submitted to the USCG Finance Center Website at http://www.fincen.uscg.mil/electron_cg24.htm
• The web submission requires the Contractor to complete the Invoice Receipt Cover Form, select the Invoice Routing Code, and attach a PDF file of the invoice and any other supporting documentation.
• The Contractor must select the correct Invoice Routing Code for timely invoice processing. The Invoice Routing Code for this contract is SFLC-1.
Failure to do so will delay invoice payment.
• The Contractor shall attach a single PDF file no larger than 1MB as the official invoice.
http://www.fincen.uscg.mil/electron_cg24.htm
• The Contractor shall email a copy of the invoice and supporting documentation to the Contract Specialist and the Contracting Officer’s Representative (COR).
• A CLIN may not be invoiced until a minimum of 25% completion. This percentage minimum may be waived on a case-by-case basis by the Contracting Officer for large dollar CLINS. In addition, 10% of the total contract price will be withheld until all deliverables are received and accepted.
• A sample of the Invoice Receipt Cover Form is provided below. Mandatory information to be completed is highlighted in red on the website.
https://www.fincen.uscg.mil/centralinv/central_inv_contr.cfm
Contractor Invoice Submission Form
Directions: Please complete as much information as possible. All blocks in red text are required entries.
Note: Web-Invoices are accepted only for Coast Guard Contracts over the Simplified Acquisition Threshold (Document Type 24).
THIS WEB FORM IS NOT AN OFFICIAL INVOICE. THE OFFICIAL INVOICE MUST BE ATTACHED
Invoice Information
Invoice Routing Code:
SFLC-1 (help) Invoice Number: (help)
Contract Number: (help) Invoice Date: MM/DD/YY (help)
BPA Number: (help) Invoice Amount: 0.00 (help)
Delivery/Task Order Number:
(help) Discount Terms: 00.00%
Discount Days: 0 Net Days: 30 (help)
Company Information Attachment of Official Invoice
Company Name: (help)
DUNS: Plus 4: (help)
Point of Contact Name: (help)
Point of Contact Email: (help)
Phone: (help) Fax: (help)
Please verify your entry on the next page. Attach invoice and any supporting documentation after verification.
• Attachment must be a single PDF file no larger than 3 MB. Grey-scale PDFs are not compatible. This will be our official invoice. Supporting documentation must be combined in the single PDF file or submitted to your contracting office separately via email.
• Need help creating a PDF file? Click here for instructions.
Verify
Reset https://www.fincen.uscg.mil/centralinv/central_inv_contr.cfm http://www.fincen.uscg.mil/centralinv/central_inv_PDF_notice.htm http://www.fincen.uscg.mil/centralinv/central_inv_PDF_notice.htm
(b) Contractor Performance Assessment Report (CPAR)
(1) GENERAL: The U.S. Coast Guard Surface Forces Logistic Center (SFLC) will monitor and evaluate the successful contractors past performance of this contract and prepare a Contractor Performance Assessment Report (CPAR) in accordance with FAR Part
42.1502. All information contained in this assessment may be used, within the limitations of FAR 42.1502, by the government for future source selections and in accordance with FAR 15.304, when past performance is an evaluation factor for award.
(2) NOTIFICATION: Upon completion of the contract, the contractor will be notified of the assessment. The contractor will be allowed 60 days to respond to the SFLC’s assessment of its performance entered into CPARS. The contractor’s response, if any, will be made part of the CPAR system.
(3) INFORMATION: Information included in the CPAR may include, but is not limited to, the contractor’s record of conforming to contract requirements and to standards of good workmanship; the contractor’s record of forecasting and controlling costs; the contractor’s adherence to contract schedules, including the administrative aspects of performance; the contractor’s history of reasonable and cooperative behavior and commitment to customer satisfaction; the contractor’s record of integrity and business ethics, and generally, the contractor’s business-like concern for the interest of the customer.
(4) RELEASE OF DATA: CPARS information is considered business sensitive and will not be released except: (1) to other Federal procurement activities which request it; (2) when SFLC must release pursuant to a Freedom of Information Act (FOIA) request; or (3) when prior written consent is requested and obtained from the contractor.
SECTION C – Contract Clauses
The following clauses are included:
52.252-2 Clauses Incorporated by Reference
This solicitation incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also the full text of the clause may be accessed electronically at Internet address http://acquisition.gov/far/index.html.
52.204-9 Personal Identity Verification of Contractor Personnel 52.228-5 Insurance – Work on a Government Installation 52.232-40 Providing Accelerated Payments to Small Business
Subcontractors 52.237-2 Protection of Government Buildings, Equipment, and Vegetation 52.245-1 w/ Alt I Government Property
52.245-9 Uses and Charges HSAR 3052.211-70 Index for Specifications HSAR 3052.222-70 Strikes or Picketing Affecting Timely Completion of the
HSAR 3052.222-71 Strikes or Picketing Affecting Access to a DHS Facility
HSAR 3052.223-90 Accident and Fire Reporting
Full Text Clauses
52.212-4 Contract Terms and Conditions – Commercial Items (Tailored)
The paragraphs below are tailored as follows:
(c) Changes – ship repair
(1) The Contracting Officer may, at any time, by written order, and without notice to the sureties, if any, make changes within the general scope of this contract, in any one or more of the following:
(a) Drawings, designs, or specifications, when the supplies to be furnished are to be specially manufactured for the Government in accordance with the drawings, designs, or specifications;
(b) Method of shipment or packing;
(c) Place of performance of the work;
http://acquisition.gov/far/index.html
(d) Time of commencement or completion of the work; and
(e) Other requirements within the general scope of the contract.
(2) If any such change causes an increase or decrease in the cost of, or the time required for, performance of any part of the work under this contract, whether changed or not changed by the order, the Contracting Officer shall make an equitable adjustment in the contract price, the delivery schedule, or both, and shall modify the contract accordingly.
(3) The contractor must submit any proposal for adjustment under this clause within 5 days from the date of receipt of the written order. At the Contracting Officer's discretion, the 5-day period may be shortened. However, if the Contracting Officer decides that the facts justify it, the Contracting Officer may receive and act upon a proposal submitted before final payment of the contract.
(4) If the contractor's proposal includes the cost of property rendered obsolete or excess by the change, the Contracting Officer shall have the right to prescribe the manner of the disposition of the property.
(5) Failure to agree to any adjustment shall be a dispute under the Disputes clause. However, nothing in this clause shall excuse the contractor from proceeding with the contract as changed.
(w) Required Insurance Prior to start of performance, the Contractor shall, at its own expense, procure and maintain the following kinds of insurance with respect to performance under the contract. In accordance with HSAR 3052.217-95, Liability and Insurance, and 3052.228-70, Insurance the Contractor shall furnish the Contracting Officer with proof of insurance for the duration of the contract, including:
(1) Ship Repairer's Liability - $500,000 per occurrence.
(2) Comprehensive General Liability - $500,000 per occurrence.
(3) Full insurance coverage in accordance with the United States’ Longshoremen's and Harbor
Worker's Act.
(4) Full insurance coverage in accordance with the State's Workmen's Compensation Law (or its equivalent) for all places of performance under this contract.
The insurance certificate must provide the name of the US Coast Guard vessel and the contract number as specifically insured.
(x) Change Request (CR) – Growth Work
(1) The Contractor shall not perform growth work without the Contracting Officer's authorization. This clause applies to Change Requests (CR), also known as growth and emergent work ordered by the Contracting Officer pursuant to the Changes clause. The Contractor shall perform the CR at the labor billing rates designated in the Schedule, as described in paragraph (2) of this clause. All growth work shall be paid at the prices stated in the Schedule.
(2) The CR composite labor rate is a flat, hourly rate used to price direct production labor hours. Contractors shall provide a detailed breakdown that fully supports the quoted CR composite labor rate. The CR composite labor rate shall be burdened to include the cost of direct production labor, all associated indirect costs, and profit/fee as described below:
a. Direct production labor is defined as work that is directly related to the alteration, modification, and repair tasks performed directly on, or in direct support of, components or systems identified in the CR or elsewhere in the contract. Examples of direct production labor include the following: abrasive cleaning/water blasting, tank cleaning, welding, burning, brazing, blacksmithing, machining (inside and outside), carpentry, electrical/electronic work, crane operation, shipfitting, lagging/insulating, painting, boilermaking, pipe fitting, engineering (production), sheetmetal work, installation and removal of staging/scaffolding, rigging, material handling (shop to ship and within the worksite in support of labor task), set-up (moving tools and equipment from shop to ship to perform a task), fire watch, general labor (including general support of journeyman tasks), cleaning (including debris pickup and removal), and pattern making.
b. Indirect costs are defined as all non-direct production costs and support functions, defined as functions that do not directly contribute to the alteration, modification, or repair of the item or system identified. Examples of indirect costs include the following: planning, estimating, supervision, management, ship superintendent functions, clerical, surveying, security, transportation, supervision, labor costs, worker-compensation, taxes, inventory control, warehousing, licensing, insurance, all other support items and functions, fixed asset costs, rentals on items normally owned as fixed assets such as tools and hand operated power tools, electrical generators and compressors for operating tools (for drydocks), jigs and fixtures fabricated and used in shop to support production functions, security, contractor facility upkeep and utilities, workman’s compensation, taxes, office supplies, etc.
c. Direct consumables and expendables: supply items, manufactured or procured by the Contractor that are consumed or expended in conjunction with direct production (e.g. rags, gloves, respirators/masks, etc.)
(3) Detailed pricing for the following shall be priced and itemized separately to include all costs and profit/fee as described below and shall not be included in the CR composite labor rate:
a. Direct materials: supply items, manufactured or procured by the Contractor, that are installed in conjunction with direct production, or are otherwise turned over to the Coast Guard (e.g. plate, angle iron, welding rods, paint, pumps, motors, engine and gearbox oil, engine jacket water, etc.)
b. Direct subcontracted services: direct production service items and procured by the Contractor to support the contract (e.g. gas-free engineering services, rented crane services, rented temporary air conditioning units and other rented tools not normally owned as fixed assets, etc.)
(4) CRs do not include replacement work performed pursuant to HSAR 3052.217- 92 Inspection and Manner of Doing Work clause or HSAR 3052.217-100 Guarantees clause.
(5) It is the Government's intention to award any growth work identified during the contract performance period to the contractor, if a fair and reasonable price can be negotiated for such work, based on Schedule rates. If a fair and reasonable price cannot be negotiated, the Government may, at its discretion obtain services outside of the contract. Such services may be performed while the ship is undergoing repair in the contractor's facility pursuant to the Access to Vessels clause.
(6) Change Requests shall be transmitted electronically via email. The bullets below display the process of how change requests are to be followed during the availability:
CR Process will occur in the following order:
a. Condition Found Report (CFR)-Generated by the Contractor and provided to COR
b. Condition Report Reply(CRR)-Generated by the COR and provided to Contractor
c. Change Request- CR and IGE are generated by the COR and forwarded to KO
d. COR provides copy of Change Request to the Contractor.
e. Contractor’s Proposal- Provided to the KO for the identified tasking on CR
f. Negotiations- If needed, take place to establish pricing
g. Approved Work Request- Forwarded to Contractor and COR by the KO
h. Modification to Contract- the KS/KO will issue a modification covering all CR’s.
(7) The contractor shall submit to the Contracting Officer the following information in all CR quotes:
a. The number of direct production labor hours that will be used to accomplish the tasks specified in the CR.
b. A list of each direct material, direct subcontracted service, and direct consumable and expendable item that will be used to accomplished the CR, and a corresponding price for each item. The Contracting Officer may request evidence in support of the offered prices such as material receipts and quotes received from subcontractor.
c. Any proposed changes to the Schedule of Work.
(8) The contractor shall not be entitled to payment for any hours ordered pursuant to this clause until a written contract modification is executed.
(y) Schedule of work
(1) Notwithstanding other requirements specified in this contract, the contractor shall provide to the Contracting Officer and COR the following documents within three (3) working days of the vessel's arrival at the contractor's facility for dry-dock availabilities and at the arrival conference for dockside availabilities:
a. Production Schedule.
b. Work Package Network.
c. Total Manpower Loading Curve.
d. Trade Manning Curves.
e. Subcontracting List.
(2) The Production Schedule shall list the earliest, latest, and scheduled start and completion date for each work item awarded and shall identify the critical path. The Work Package Network shall show the work items, milestones, key events, and activities and shall clearly identify the critical path. The Total Manpower Loading Curve shall show the required manning for the duration of the contract. The Trade Manning Curves shall show the required manning for each trade for the duration of the contract. The Subcontracting List shall show work items, milestones, key events, and activities to be accomplished by subcontractors.
(3) Additional Item Requirements ordered and agreed upon, whether or not yet formalized via a change order (contract modification), shall be added to the Production Schedule, Trade Manning Curves, and Subcontracting List and submitted to the Contracting Officer and COR at each weekly Progress Meeting. Any anticipated or unanticipated deviation (greater than two (2) calendar days) from the Production Schedule shall be immediately brought to the attention of the Contracting Officer and COR.
(4) Any deviation in the Production Schedule which results in a delay in the completion of work on a vessel past the established performance period completion date may entitle the Government to remedies for late performance under subparagraph (f) of this clause titled Excusable delays.
(z) Access to the Vessel
(1) As authorized by the Contracting Officer, a reasonable number of officers, employees and personnel designated by the Government, or representatives of other contractors and their subcontractors shall have admission to the facility and access to the vessel at all reasonable times to perform and fulfill their respective obligations to the Government on a noninterference basis.
The contractor shall make reasonable arrangements to provide access for these personnel to office space, work areas, storage or shop areas, and other facilities and services reasonable and necessary to perform their duties. All such personnel shall comply with contractor rules and regulations governing personnel at its shipyard, including those regarding safety and security.
(2) The contractor further agrees to allow a reasonable number of officers, employees, and designated personnel of contractors on other contemplated work, the same privileges of admission to the contractor's facility and access to the vessel(s) on a noninterference basis, subject to contractor rules and regulations governing personnel in its shipyard, including those regarding safety and security.
(aa) Temporary Services
(1) Temporary services are services incidental to the performance of work, which are required in the schedule or specifications to be provided by the contractor. Temporary services may include the furnishing of water, electricity, telephone service, toilet facilities, garbage removal, office space, parking places or similar facilities.
(2) If performance time is extended due to Government-caused delay, the contractor may request an equitable adjustment for providing temporary services at the rate stated in the Schedule.
(ab) Contract Deficiency Report The Contracting Officer or Contracting Officer’s Representative (COR) may issue a Contract Deficiency Report (CDR), SFLC Form 005. The Contractor shall respond in writing within 24 hours of receipt, unless otherwise approved by the Contracting Officer, to the COR. The COR will comment on the Contractor's response and will forward the Deficiency Report and comments to the Contracting Officer, with a copy to the Contractor and Availability Program Manager. The Contracting Officer will render a final determination and provide it to the Contractor and COR in writing.
(ac) Option for Increased Quantity – Separately Priced Line Item The Government may require the performance of the numbered line items, identified in the Schedule as option items, at the unit prices stated in the Schedule. The option quantities shown in the Schedule are estimates only. The Government has the right to require performance of these items at the quantities deemed necessary. Therefore, the Government may exercise an option item on more than one occasion during the contract performance period. The Contracting Officer will provide initial notification of the exercise of an option either verbally, by facsimile, or both. When time is of essence initial notification will be provided verbally followed within 24 hours by a facsimile of confirmation. A contract modification will be executed shortly thereafter to include those options wherein exercise notification was provided. Such options may be exercised at any phase during the contract performance period as stated herein, or any extension of the performance period. To maintain the contract performance period the Contractor shall commence performance of an option item immediately upon receiving initial notification; but, not later than 24 hours thereafter, unless proper sequencing of the work requires a delay in beginning performance of the option. In that case, the option item shall be commenced as soon as proper sequencing permits. The exercise of any option item listed in the Schedule will not normally extend the contract performance period. However, the Contracting Officer may consider a request by the Contractor for contract extension if an option is exercised after 50% of the contract performance period has expired.
(End of FAR 52.212-4 Addendum)
52.212-5 Contract Terms and Conditions Required To Implement
Statutes or Executive Orders—Commercial Items.
(a) The Contractor shall comply with the following Federal Acquisition Regulation (FAR) clauses, which are incorporated in this contract by reference, to implement provisions of law or Executive orders applicable to acquisitions of commercial items:
(1) 52.203-19, Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements (JAN 2017) (section 743 of Division E, Title VII, of the Consolidated and Further Continuing Appropriations Act, 2015 (Pub. L. 113-235) and its successor provisions in subsequent appropriations acts (and as extended in continuing resolutions)).
(2) 52.204-23, Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky Lab and Other Covered Entities (JUL 2018) (Section 1634 of Pub. L.
115-91).
(3) 52.204-25, Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment. (Aug 2019) (Section 889(a)(1)(A) of Pub. L. 115-232).
(4) 52.209-10, Prohibition on Contracting with Inverted Domestic Corporations (Nov 2015).
(5) 52.233-3, Protest After Award (AUG 1996) (31 U.S.C. 3553).
(6) 52.233-4, Applicable Law for Breach of Contract Claim (OCT 2004)(Public Laws 108-
77 and 108-78 (19 U.S.C. 3805 note)).
(b) The Contractor shall comply with the FAR clauses in this paragraph (b) that the
Contracting Officer has indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial items:
(2) 52.203-6, Restrictions on Subcontractor Sales to the Government (Sept 2006), with Alternate I (Oct 1995) (41 U.S.C. 4704 and 10 U.S.C. 2402).
(4) 52.204-10, Reporting Executive Compensation and First-Tier Subcontract Awards (Oct
2018) (Pub. L. 109-282) (31 U.S.C. 6101 note).
(6) 52.204-14, Service Contract Reporting Requirements (Oct 2016) (Pub. L. 111-117, section 743 of Div. C).
(9) 52.209-9, Updates of Publicly Available Information Regarding Responsibility Matters (Oct 2018) (41 U.S.C. 2313).
(18) 52.219-13, Notice of Set-Aside of Orders (Nov 2011) (15 U.S.C. 644(r)).
(22) 52.219-28, Post Award Small Business Program Representation (Jul 2013) (15 U.S.C.
632(a)(2)).
(25) 52.222-3, Convict Labor (June 2003) (E.O. 11755).
(27) 52.222-21, Prohibition of Segregated Facilities (Apr 2015).
(28) (i) 52.222-26, Equal Opportunity (Sept 2016) (E.O. 11246).
(29) 52.222-35, Equal Opportunity for Veterans (Oct 2015)(38 U.S.C. 4212).
(30) 52.222-36, Equal Opportunity for Workers with Disabilities (Jul 2014) (29 U.S.C.
793).
(33)(i) 52.222-50, Combating Trafficking in Persons (Jan 2019) (22 U.S.C. chapter 78 and E.O. 13627).
(31) 52.222-37, Employment Reports on Veterans (FEB 2016) (38 U.S.C. 4212).
(32) 52.222-40, Notification of Employee Rights Under the National Labor Relations Act (Dec 2010) (E.O. 13496).
(33)(i) 52.222-50, Combating Trafficking in Persons (Jan 2019) (22 U.S.C. chapter 78 and
E.O. 13627).
(36) 52.223-11, Ozone-Depleting Substances and High Global Warming Potential
Hydrofluorocarbons (Jun 2016) (E.O. 13693).
(37) 52.223-12, Maintenance, Service, Repair, or Disposal of Refrigeration Equipment and
Air Conditioners (Jun2016) (E.O. 13693).
(42) 52.223-18, Encouraging Contractor Policies to Ban Text Messaging While Driving (AUG 2011) (E.O. 13513).
(46) 52.225-1, Buy American - Supplies (MAY 2014) (41 U.S.C. chapter 83).
(49) 52.225-13, Restrictions on Certain Foreign Purchases (June 2008) (E.O.’s, proclamations, and statutes administered by the Office of Foreign Assets Control of the Department of the Treasury).
(55) 52.232-33, Payment by Electronic Funds Transfer.System for Award Management (Oct 2018) (31 U.S.C. 3332).
(c) The Contractor shall comply with the FAR clauses in this paragraph (c), applicable to commercial services, that the Contracting Officer has indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial items:
(d) Comptroller General Examination of Record. The Contractor shall comply with the provisions of this paragraph (d) if this contract was awarded using other than sealed bid, is in https://www.acquisition.gov/sites/default/files/current/far/html/52_217_221.html#wp1136174 http://uscode.house.gov/ https://www.acquisition.gov/content/part-52-solicitation-provisions-and-contract-clauses#i1053180 https://www.acquisition.gov/content/part-52-solicitation-provisions-and-contract-clauses#i1053196 https://www.law.cornell.edu/cfr/text/48/52.225-1 https://www.law.cornell.edu/definitions/index.php?width=840&height=800&iframe=true&def_id=4bcb6f2f2be5dbc175fd9e8734a41145&term_occur=999&term_src=Title:48:Chapter:1:Subchapter:H:Part:52:Subpart:52.2:52.212-5 https://www.law.cornell.edu/uscode/text/41/chapter-83 excess of the simplified acquisition threshold, and does not contain the clause at 52.215-2, Audit and Records Negotiation.
(1) The Comptroller General of the United States, or an authorized representative of the Comptroller General, shall have access to and right to examine any of the Contractor’s directly pertinent records involving transactions related to this contract.
(2) The Contractor shall make available at its offices at all reasonable times the records, materials, and other evidence for examination, audit, or reproduction, until 3 years after final payment under this contract or for any shorter period specified in FAR subpart 4.7, Contractor Records Retention, of the other clauses of this contract. If this contract is completely or partially terminated, the records relating to the work terminated shall be made available for 3 years after any resulting final termination settlement. Records relating to appeals under the disputes clause or to litigation or the settlement of claims arising under or relating to this contract shall be made available until such appeals, litigation, or claims are finally resolved.
(3) As used in this clause, records include books, documents, accounting procedures and practices, and other data, regardless of type and regardless of form. This does not require the Contractor to create or maintain any record that the Contractor does not maintain in the ordinary course of business or pursuant to a provision of law.
(e)(1) Notwithstanding the requirements of the clauses in paragraphs (a), (b), (c), and (d) of this clause, the Contractor is not required to flow down any FAR clause, other than those in this paragraph (e)(1) in a subcontract for commercial items. Unless otherwise indicated below, the extent of the flow down shall be as required by the clause.
(i) 52.203-13, Contractor Code of Business Ethics and Conduct (Oct 2015) (41 U.S.C.
3509).
(ii) 52.203-19, Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements (Jan 2017) (section 743 of Division E, Title VII, of the Consolidated and Further Continuing Appropriations Act, 2015 (Pub. L. 113-235) and its successor provisions in subsequent appropriations acts (and as extended in continuing resolutions)).
(iii) 52.204-23, Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky Lab and Other Covered Entities (JUL 2018) (Section 1634 of Pub. L. 115-91).
(iv) 52.204-25, Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment. (Aug 2019) (Section 889(a)(1)(A) of Pub. L. 115-232).
(v) 52.219-8, Utilization of Small Business Concerns (Oct 2018) (15 U.S.C. 637(d)(2) and (3)), in all subcontracts that offer further subcontracting opportunities. If the subcontract (except subcontracts to small business concerns) exceeds $700,000 ($1.5 million for construction of any public facility), the subcontractor must include 52.219-8 in lower tier subcontracts that offer subcontracting opportunities.
(vi) 52.222-17, Nondisplacement of Qualified Workers (May 2014) (E.O. 13495). Flow down required in accordance with paragraph (l) of FAR clause 52.222-17.
(vii) 52.222-21, Prohibition of Segregated Facilities (Apr 2015)
(viii) 52.222-26, Equal Opportunity (Sept 2016) (E.O. 11246).
(ix) 52.222-35, Equal Opportunity for Veterans (Oct 2015) (38 U.S.C. 4212).
(x) 52.222-36, Equal Opportunity for Workers with Disabilities (Jul 2014) (29 U.S.C.
793).
(xi) 52.222-37, Employment Reports on Veterans (Feb 2016) (38 U.S.C. 4212)
(xii) 52.222-40, Notification of Employee Rights Under the National Labor Relations Act
(Dec 2010) (E.O. 13496). Flow down required in accordance with paragraph (f) of FAR clause 52.222-40.
(xiii) 52.222-41, Service Contract Labor Standards (Aug 2018) (41 U.S.C. chapter 67).
(Aug 2018)
(xiv) (a) 52.222-50, Combating Trafficking in Persons (Mar 2015) (22 U.S.C. chapter 78 and E.O 13627).
(xv) 52.222-51, Exemption from Application of the Service Contract Labor Standards to Contracts for Maintenance, Calibration, or Repair of Certain Equipment-Requirements (May 2014) (41 U.S.C. chapter 67).
(xvi) 52.222-53, Exemption from Application of the Service Contract Labor Standards to Contracts for Certain Services-Requirements (May 2014) (41 U.S.C. chapter 67).
(xvii) 52.222-54, Employment Eligibility Verification (OCT 2015) (E.O. 12989).
(xviii) 52.222-55, Minimum Wages Under Executive Order 13658 (Dec 2015).
(xix) 52.222-62, Paid Sick Leave Under Executive Order 13706 (JAN 2017) (E.O.
13706).
(xx)(A) 52.224-3, Privacy Training (JAN 2017) (5 U.S.C. 552a).
(B) Alternate I (JAN 2017) of 52.224-3.
(xxi) 52.225-26, Contractors Performing Private Security Functions Outside the United
States (Oct 2016) (Section 862, as amended, of the National Defense Authorization Act for Fiscal Year 2008; 10 U.S.C. 2302 Note).
(xxii) 52.226-6, Promoting Excess Food Donation to Nonprofit Organizations (May 2014) (42 U.S.C. 1792). Flow down required in accordance with paragraph (e) of FAR clause 52.226-6.
(xxiii) 52.247-64, Preference for Privately Owned U.S.-Flag Commercial Vessels (Feb 2006) (46 U.S.C. Appx. 1241(b) and 10 U.S.C. 2631). Flow down required in accordance with paragraph (d) of FAR clause 52.247-64.
(2) While not required, the Contractor may include in its subcontracts for commercial items a minimal number of additional clauses necessary to satisfy its contractual obligations.
(End of clause)
52.204-21 Basic Safeguarding of Covered Contractor Information Systems.
(a) Definitions. As used in this clause– “Covered contractor information system” means an information system that is owned or operated by a contractor that processes, stores, or transmits Federal contract information.
“Federal contract information” means information, not intended for public release, that is provided by or generated for the Government under a contract to develop or deliver a product or service to the Government, but not including information provided by the Government to the public (such as on public websites) or simple transactional information, such as necessary to process payments.
“Information” means any communication or representation of knowledge such as facts, data, or opinions, in any medium or form, including textual, numerical, graphic, cartographic, narrative, or audiovisual (Committee on National Security Systems Instruction (CNSSI) 4009).
“Information system” means a discrete set of information resources organized for the collection, processing, maintenance, use, sharing, dissemination, or disposition of information
(44 U.S.C. 3502).
“Safeguarding” means measures or controls that are prescribed to protect information systems.
(b) Safeguarding requirements and procedures.
(1) The Contractor shall apply the following basic safeguarding requirements and procedures to protect covered contractor information systems. Requirements and procedures for basic safeguarding of covered contractor information systems shall include, at a minimum, the following security controls:
(i) Limit information system access to authorized users, processes acting on behalf of authorized users, or devices (including other information systems).
(ii) Limit information system access to the types of transactions and functions that authorized users are permitted to execute.
(iii) Verify and control/limit connections to and use of external information systems.
(iv) Control information posted or processed on publicly accessible information systems.
(v) Identify information system users, processes acting on behalf of users, or devices.
(vi) Authenticate (or verify) the identities of those users, processes, or devices, as a prerequisite to allowing access to organizational information systems.
(vii) Sanitize or destroy information system media containing Federal Contract
Information before disposal or release for reuse.
(viii) Limit physical access to organizational information systems, equipment, and the respective operating environments to authorized individuals.
(ix) Escort visitors and monitor visitor activity; maintain audit logs of physical access; and control and manage physical access devices.
(x) Monitor, control, and protect organizational communications (i.e., information transmitted or received by organizational information systems) at the external boundaries and key internal boundaries of the information systems.
(xi) Implement subnetworks for publicly accessible system components that are physically or logically separated from internal networks.
(xii) Identify, report, and correct information and information system flaws in a timely manner.
(xiii) Provide protection from malicious code at appropriate locations within organizational information systems.
(xiv) Update malicious code protection mechanisms when new releases are available.
(xv) Perform periodic scans of the information system and real-time scans of files from external sources as files are downloaded, opened, or executed.
(2) Other requirements. This clause does not relieve the Contractor of any other specific safeguarding requirements specified by Federal agencies and departments relating to covered contractor information systems generally or other Federal safeguarding requirements for controlled unclassified information (CUI) as established by Executive Order 13556.
(c) Subcontracts. The Contractor shall include the substance of this clause, including this paragraph (c), in subcontracts under this contract (including subcontracts for the acquisition of commercial items, other than commercially available off-the-shelf items), in which the subcontractor may have Federal contract information residing in or transiting through its information system.
(End of Clause)
52.219-6 Notice of Total Small Business Set-Aside (DEVIATION 2019-01)
(a) Definition. Small business concern, as used in this clause, means a concern, including its affiliates that is independently owned and operated, not dominant in the field of operation in which it is bidding on Government contracts, and qualified as a small business under the size standards in this solicitation.
(b) Applicability. This clause applies only to—
(1) Contracts that have been totally set aside or reserved for small business concerns; and
(2) Orders set aside for small business concerns under multiple-award contracts as described in 8.405-5 and 16.505(b)(2)(i)(F).
(c) General.
(1) Offers are solicited only from small business concerns. Offers received from concerns that are not small business concerns shall be considered nonresponsive and will be rejected.
(2) Any award resulting from this solicitation will be made to a small business concern.
(d) Agreement.
(1) For a contract at or below the simplified acquisition threshold, a small business concern may provide the end item of any firm. For a contract exceeding the simplified acquisition threshold, a small business concern that provides an end item it did not manufacture, process, or produce, shall—
(i) Provide an end item that a small business has manufactured, processed, or produced in the United States or its outlying areas;
(ii) Be primarily engaged in the retail or wholesale trade and normally sell the type of item being supplied; and
(iii) Take ownership or possession of the item(s) with its personnel, equipment, or facilities in a manner consistent with industry practice; for example, providing storage, transportation, or delivery.
(2) Paragraph (d)(1) of this clause does not apply to construction or service contracts.
(End of Clause)
52.219-14 Limitations on Subcontracting (DEVIATION 2019-01)
(a) This clause does not apply to the unrestricted portion of a partial set-aside.
(b) Definition. As used in this clause— “Similarly situated entity” means a first-tier subcontractor, including an independent contractor, that has the same small business program status as that which qualified the prime contractor for the award, and that is considered small for the NAICS code the prime contractor assigned to the subcontract the subcontractor will perform. An example of a similarly situated entity is a first-tier subcontractor that is a HUBZone small business concern for a HUBZone set- aside or sole source award under the HUBZone Program.
(c) Applicability. This clause applies only to—
(1) Contracts that have been set aside or reserved any of the small business concerns identified in 19.000(a)(3);
(2) Part or parts of a multiple-award contract that have been set aside for any of the small business concerns identified in 19.000(a)(3);
(3) Contracts that have been awarded on a sole-source basis in accordance with subparts 19.8, 19.13, 19.14, and 19.15; and
(4) Orders set aside for any of the small business concerns identified in 19.000(a)(3) under multiple-award contracts as described in 8.405-5 and 16.505(b)(2)(i)(F).
(d) Independent contractors. An independent contractor shall be considered a subcontractor.
(e) Agreement. By submission of an offer and execution of a contract, the Offeror/Contractor agrees in performance of the contract in the case of a contract for—
(1) Services (except construction), it will not pay more than 50 percent of the amount paid by the Government for contract performance to subcontractors that are not similarly situated entities.
Any work that a similarly situated entity further subcontracts will count toward the 50 percent subcontract amount that cannot be exceeded;
(2) Supplies (other than procurement from a nonmanufacturer of such supplies), it will not pay more than 50 percent of the amount paid by the Government for contract performance, excluding the cost of materials, to subcontractors that are not similarly situated entities. Any work that a similarly situated entity further subcontracts will count toward the 50 percent subcontract amount that cannot be exceeded;
(3) General construction, it will not pay more than 85 percent of the amount paid by the Government for contract performance, excluding the cost of materials, to subcontractors that are not similarly situated entities. Any work that a similarly situated entity further subcontracts will count toward the 85 percent subcontract amount that cannot be exceeded; or
(4) Construction by special trade contractors, it will not pay more than 75 percent of the amount paid by the Government for contract performance, excluding the cost of materials, to subcontractors that are not similarly situated entities. Any work that a similarly situated entity further subcontracts will count toward the 75 percent subcontract amount that cannot be exceeded.
(f) A joint venture agrees that, in the performance of the contract, the applicable percentage specified in paragraph (e) of this clause will be performed by the aggregate of the joint venture participants.]
52.252-6 Authorized Deviations in Clauses
(a) The use in this solicitation or contract of any Federal Acquisition Regulation (48 CFR Chapter
1) clause with an authorized deviation is indicated by the addition of “(DEVIATION)” after the date of the clause.
(b) The use in this solicitation or contract of any Homeland Security Acquisition Regulation (48 CFR 30) clause with an authorized deviation is indicated by the addition of “(DEVIATION)” after the name of the regulation.
Homeland Security Acquisition Regulation (HSAR) Clauses
HSAR 3052.212-70 Contract Terms and Conditions Applicable To DHS Acquisition of Commercial Items.
The Contractor agrees to comply with any provision or clause that is incorporated herein by reference to implement agency policy applicable to acquisition of commercial items or components. The provision or clause in effect based on the applicable regulation cited on the date the solicitation is issued applies unless otherwise stated herein. The following provisions and clauses are incorporated by reference:
Clauses.
3052.204-71 Contractor Employee Access 3052.205-70 Advertisement, Publicizing Awards, and Releases 3052.217-91 Performance 3052.217-92 Inspection and Manner of Doing Work 3052.217-93 Subcontracts 3052.217-95 Liability and Insurance 3052.217-96 Title 3052.217-97 Discharge of Liens 3052.217-98 Delays 3052.217-99 Department of Labor Safety and Health Regulations for Ship Repair 3052.217-100 Guarantee (USCG) 3052.228-70 Insurance 3052.242-72 Contracting Officer’s Technical Representative
HSAR 3052.217-100 Guarantee (USCG).
(a) In the event any work performed or materials furnished by the contractor prove defective or deficient within 60 days from the date of redelivery of the vessel(s), the Contractor, as directed by the Contracting Officer and at its own expense, shall correct and repair the deficiency to the satisfaction of the Contracting Officer.
(b) If the Contractor or any subcontractor has a guarantee for work performed or materials furnished that exceeds the 60 day period, the Government shall be entitled to rely upon the longer guarantee until its expiration.
(c) With respect to any individual work item identified as incomplete at the time of redelivery of the vessel(s), the guarantee period shall run from the date the item is completed.
(d) If practicable, the Government shall give the Contractor an opportunity to correct the deficiency.
(1) If the Contracting Officer determines it is not practicable or is otherwise not advisable to return the vessel(s) to the Contractor, or the Contractor fails to proceed with the repairs promptly, the Contracting Officer may direct that the repairs be performed elsewhere, at the Contractor's expense.
(2) If correction and repairs are performed by other than the Contractor, the Contracting Officer may discharge the Contractor's liability by making an equitable deduction in the price of the contract.
(e) The Contractor's liability shall extend for an additional 60-day guarantee period on those defects or deficiencies that the Contractor corrected.
(f) At the option of the Contracting officer, defects and deficiencies may be left uncorrected. In that event, the Contractor and Contracting Officer shall negotiate an equitable reduction in the contract price. Failure to agree upon an equitable reduction shall constitute a dispute under the Disputes clause of this contract.
SECTION D – Any contract documents, exhibits or attachments
Attachment I Schedule of Services – Blank Price Schedule
Attachment II
Statement of Work – Specification
Attachment III Past Performance Questionnaire
Attachment IV
Notice for Filing Agency Protests
SECTION E – Solicitation provisions Solicitation Provisions Incorporated by Reference
52.252-1 Solicitation Provisions Incorporated by Reference
This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The contractor is cautioned that the listed provisions may include blocks that must be completed by the contractor and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the contractor may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this address:
http://acquisition.gov/far/index.html.
(End of Provision)
Full Text Provisions
52.211-3 Availability of Specifications Not Listed in the GSA Index of Federal Specifications, Standards and Commercial Item Descriptions.
U.S. Coast Guard standard specifications can be downloaded at https://www.dcms.uscg.mil/Our- Organization/Assistant-Commandant-for-Engineering-Logistics-CG-4-/Logistic-Centers/Surface- Forces-Logistics-Center/Contracting-Links/Standard-Specifications/. Orders for reference drawings must be placed by 1 April 2020. To request drawings, contact the Contract Specialist. All requests should identify the solicitation number 70Z080-20-Q-P4581600. U.S. Coast Guard specification reference drawings are available in CD-ROM format and are provided free of charge.
The CD-ROM(s) contain WINDOWS compliant raster/vector formats (e.g. *.TIF, *.TIF (group4), *.DWG, and *.DWF, etc.). Drawing measurements should be verified by the Contractor prior to ordering materials.
(End of Provision)
52.212-1 Instructions to Offerors - Commercial Items- (Tailored) Clause 52.212-1 is tailored as follows:
(a) North American Industry Classification System (NAICS) code and small business size standard. The NAICS code and small business size standard for this acquisition appear in Block 10 of the solicitation cover sheet…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .