Combined_Synopsis_Solicitation.pdf

PDF 205 KB Posted

Attached to
LANDSCAPING SERVICES, PXAO Federal contract opportunity
Solicitation number
140R3025Q0026
Issued by
Department of the Interior Bureau of Reclamation

About this file

This Combined Synopsis/Solicitation document describes a Request for Quote (RFQ) for landscaping services for the Bureau of Reclamation Phoenix Area Office (PXAO) located in Glendale, Arizona. The solicitation (No. 140R3025Q0026) is an Indian Small Business Economic Enterprise (ISBEE) set-aside under NAICS Code 561730, with a small business size standard of $9.5 Million. The landscaping services required include tree and shrub pruning and shaping, weed control, fertilizing, clean-up of improved areas, herbicide spraying, cleaning sidewalks and parking areas, and irrigation system maintenance and repair.

Key solicitation details include a site visit on August 5, 2025 at 8 AM MST, with all questions due by August 8, 2025 at 2:00 PM MST. Quotes are due August 15, 2025 at 2:00 PM MST and should be submitted via email to jgarcia@usbr.gov. The contract work is scheduled to begin on or about October 1, 2025, and will be performed at the Bureau of Reclamation PXAO facility at 6150 W. Thunderbird Road, Glendale, AZ 85306. Quoters must provide pricing on the attached price schedule, demonstrate technical capability, and provide past performance information as part of their submission.

View the file

Other files for this federal contract opportunity

Other files attached to LANDSCAPING SERVICES, PXAO, newest first.
File Type Posted
Sol_140R3025Q0026_Amd_0002.pdf PDF
Site_Visit_08-05-25_0001.pdf PDF
Sol_140R3025Q0026_Amd_0001.pdf PDF
Sol_140R3025Q0026.pdf PDF
Att_1_PXAO_Lanscaping_PWS__Final.pdf PDF
Att_1_PXAO_Map_(1)_(2).pdf PDF
Att_2_Price_Schedule.pdf PDF
Att_3_PXAO_Landscaping_PRS.pdf PDF
Att_4_Schedule_of_Rates.pdf PDF
Wage_Determination_2015-5469.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

140R3025Q0026 - PXAO Landscaping Services Combined Synopsis/Solicitation

(i) This is a combined synopsis/solicitation for commercial services prepared in accordance with the format in Subpart 12.6, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; proposals are being requested and a written solicitation will not be issued.

(ii) To facilitate electronic quote submissions through SAM.gov Contract Opportunities, a request for quote (RFQ No. 140R3025Q0026) is being issued subsequent to this combined synopsis/solicitation.

(iii) This solicitation document and incorporated provisions and clauses are those in effect through Federal Acquisition Circular number 2025-04.

(iv) This requirement is an Indian Small Business Economic Enterprise (ISBEE) set-aside. The North American Industry Classification System (NAICS) Code for this acquisition is: 561730 Landscaping Services. The small business size standard for NAICS Code 561730 is $9.5 Million.

(v) Please provide pricing on the attached price schedule and schedule of rates. The PWS provides more detailed information about the requirement and is attached to the RFQ.

(vi) The Bureau of Reclamation (BOR) Phoenix Area Office (PXAO) located in Glendale, AZ has a requirement for landscaping services to include, tree and shrub pruning and shaping, weed control, fertilizing, and clean up other improved areas. The work also includes spraying of herbicides, cleaning sidewalks and road/parking areas, and maintenance and repair of the irrigation system. Work shall be compatible with sound horticultural and commercial practices for the Phoenix area.

(vii) Work shall begin on or about October 1, 2025. Work shall be completed at BOR PXAO located at 6150 W. Thunderbird Road, Glendale 85306.

THE FOLLOWING CLAUSES AND PROVISIONS ARE APPLICABLE TO THIS COMMERCIAL

ITEM ACQUISITION:

(viii) FAR provision 52.212-1, Instructions to Offerors - Commercial Products and Commercial Services is applicable to this RFQ. The following addendum is also applicable to this RFQ.

a. Addendum to FAR 52.212-1 –Quote Submission Instructions

This addendum replaced the term “offer” with “quote” within the provision 52.212-1.

In addition to the requirements of the Instructions to Offerors - Competitive Acquisitions provision of this solicitation, each quoter shall submit a quote in accordance with the instructions contained in this provision.

(1) Quote shall complete and submit Attachment 2 – Price Schedule. Pricing must be submitted on Attachment 2. All documents are attached to the RFQ.

(2) Submit the following information:

(a) Unique Entity Identifier (UEI): ______________

(b) Contractor E-mail Address: ______________________________

(3) A comparative evaluation will be performed in accordance with FAR 13.106-2(b)(3). Quotes will be evaluated by performing a direct comparison of one quote to another in a uniform manner to determine which quote provides the Government’s need as identified in the RFQ. Each quote shall be evaluated based on Price, Technical Capability, and Past Performance.

(a) Price: Quoter shall complete and submit Attachment 2 – Price Schedule and Attachment 4 – Schedule of Rates. Price schedule and schedule of rates must include yearly pricing for the base and four option years.

(b) Technical: Quoter shall provide the information below in a written statement to explain their technical capability. At a minimum the quoter shall address the Government’s need identified in each task of the Performance Work Statement. Specifically, the quoter shall demonstrate/have/explain the following:

1) An understanding of horticultural and commercial landscaping practices for the Phoenix area.

2) List experience with landscape vegetation and grounds maintenance services to include, tree and shrub pruning and shaping, weed control, fertilizing, clean up other improved areas, spraying of herbicides, cleaning sidewalks and road/parking areas, and maintenance and repair of the irrigation system/sprinkler system. (Ensure you address every task)

3) List experience with emergency maintenance and being on site within 24 hours of notification.

4) Address if contractor will be using a subcontractor.

5) Applicable licenses and certifications.

6) Submit a staffing plan along with your quote. Failure to submit a staffing plan with your quote may result in your quote not to be considered.

(c) Past Performance:

1) Quoter must demonstrate satisfactory or better past performance in successfully performing work that is similar in nature and complexity to the work described within this requirement. The quote shall provide the following:

The name, e-mail address, and current telephone number of companies it has performed this work for within the past 3 years.

2) Government may also use past performance information obtained from other than the sources identified by the quoter. Information obtained from the Contractor Performance Assessment Reporting System (CPARS) database located at http//www.cpars.gov is one of the sources that will be utilized.

NOTE: A quoter without relevant past performance, or for whom information on past performance is not available, will be given a Neutral rating, and will not be evaluated favorably or unfavorably. This rating is neither negative nor positive. Neutral is merely indicative of a lack of prior performance.

(ix) 52.212-2, Evaluation-Commercial Products and Commercial Services. A comparative evaluation will be performed in accordance with FAR 13.106-2(b)(3). Quotes will be evaluated by performing a direct comparison of one quote to another in a uniform manner to determine which quote provides the Government’s need as identified in the RFQ. Each quote shall be evaluated based on:

1. Technical Capability

2. Past Performance

3. Price (all proposed prices will be reviewed for price reasonableness and any instances of unbalanced pricing.

The total evaluated price will be calculated as the sum of the CLINs’ extended prices, including the base, all option CLINs, and the 52.217-8 Option to Extend Services. The Option to Extend Service’s price will be calculated by prorating the last option’s CLIN price for a period of 6 months.

(x) FAR provision 52.212-3 (MAY 2024) (DEVIATION FEB 2025), Offeror Representations and Certifications - Commercial Products and Commercial Services. Offerors must complete the annual representations and certifications online at https://www.sam.gov

(xi) FAR clause 52.212-4, Contract Terms and Conditions - Commercial Products and Commercial Services.

(xii) FAR clause 52.212-5 Contract Terms and Conditions Required to Implement Statutes or Executive Orders - Commercial Products and Commercial Services. (JAN 2025) (DEVIATION FEB 2025)

The following additional FAR clauses cited in this clause are applicable to the acquisition:

52.203-17, Contractor Employee Whistleblower Rights 52.204-10, Reporting Executive Compensation and First-Tier Subcontract Awards 52.204-27 Prohibition on a ByteDance Covered Application 52.209-6, Protecting the Government's Interest When Subcontracting With Contractors Debarred, Suspended, Proposed for Debarment, or Voluntarily Excluded 52.219-6, Notice of Total Small Business Set-Aside 52.219-28, Post Award Small Business Program Rerepresentation 52.222-3, Convict Labor 52.222-19, Child Labor—Cooperation with Authorities and Remedies 52.222-21, Prohibition of Segregated Facilities 52.222-26, Equal Opportunity 52.222-36, Equal Opportunity for Workers with Disabilities 52.222-50, Combating Trafficking in Persons 52.225-13, Restrictions on Certain Foreign Purchases 52.226-8, Encouraging Contractor Policies to Ban Text Messaging While Driving 52.232-33, Payment by Electronic Funds Transfer— System for Award Management 52.222-41, Service Contract Labor Standards, WAGE DETERMINATION 2015-5593, Revision Number 27, 12/23/2024 52.222-42, Statement of Equivalent Rates for Federal Hires – This Statement is for Information Only: It is not a Wage Determination

Employee Class Monetary Wage – Fringe Benefits Laborer WG-2 Step 2 $22.31 /hr plus 25% for Fringe Benefits

52.222-55, Minimum Wages for Contractor Workers Under Executive Order 14026 52.222-62, Paid Sick Leave Under Executive Order 13706 (Jan 2022) (E.O. 13706).

(xiii) Additional contract requirements include the following clauses and provisions:

52.204-7, System for Award Management 52.204-13, System for Award Management Maintenance 52.204-16, Commercial and Government Entity Code Reporting 52.204-18, Commercial and Government Entity Code Maintenance

52.204-24, Representation Regarding Certain Telecommunications and Video Surveillance Services or Equipment 52.217-8, Option to Extend Services The Government may require continued performance of any services within the limits and at the rates specified in the contract. These rates may be adjusted only as a result of revisions to prevailing labor rates provided by the Secretary of Labor. The option provision may be exercised more than once, but the total extension of performance hereunder shall not exceed 6 months. The Contracting Officer may exercise the option by written notice to the Contractor within 30 days.

52.217-9, Option to Extend the Term of the Contract

(a) The Government may extend the term of this contract by written notice to the Contractor within 30 days; provided that the Government gives the Contractor a preliminary written notice of its intent to extend at least 60 days before the contract expires. The preliminary notice does not commit the Government to an extension.

(b) If the Government exercises this option, the extended contract shall be considered to include this option clause.

(c) The total duration of this contract, including the exercise of any options under this clause, shall not exceed 5 years.

52.233-4, Applicable Law for Breach of Contract Claim 52.237-1, Site Visit 52.237-2, Protection of Government Buildings, Equipment, and Vegetation 52.242-15, Stop-Work Order

52.216-31 TIME-AND-MATERIALS/LABOR-HOUR PROPOSAL REQUIREMENTS—

COMMERCIAL ACQUISITION (NOV 2021)

(a)The Government contemplates award of a Time-and-Materials or Labor-Hour type of contract resulting from this solicitation.

(b)The offeror must specify fixed hourly rates in its offer that include wages, overhead, general and administrative expenses, and profit. The offeror must specify whether the fixed hourly rate for each labor category applies to labor performed by-

(1)The offeror;

(2)Subcontractors; and/or

(3)Divisions, subsidiaries, or affiliates of the offeror under a common control.

(End of provision)

52.222-55 MINIMUM WAGES FOR CONTRACTOR WORKERS UNDER EXECUTIVE ORDER

14026 (JAN 2022) (DEVIATION OCT 2023)

(a) Definitions. As used in this clause— United States means the 50 states, the District of Columbia, Puerto Rico, the Northern Mariana Islands, American Samoa, Guam, the U.S. Virgin Islands, Johnston Island, Wake Island, and the outer Continental Shelf as defined in the Outer Continental Shelf Lands Act (43 U.S.C. 1331, et seq.).

Worker –

(1)

(i) Means any person engaged in performing work on, or in connection with, a contract covered by Executive Order 14026, and–

(A) Whose wages under such contract are governed by the Fair Labor Standards Act (29 U.S.C. chapter 8), the Service Contract Labor Standards statute (41 U.S.C. chapter 67), or the Wage Rate Requirements (Construction) statute (40 U.S.C. chapter 31, subchapter IV);

(B) Other than individuals employed in a bona fide executive, administrative, or professional capacity, as those terms are defined in 29 CFR part 541; and

(C) Regardless of the contractual relationship alleged to exist between the individual and the employer.

(ii) Includes workers performing on, or in connection with, the contract whose wages are calculated pursuant to special certificates issued under 29 U.S.C. 214(c).

(iii) Also includes any person working on, or in connection with, the contract and individually registered in a bona fide apprenticeship or training program registered with the Department of Labor’s Employment and Training Administration, Office of Apprenticeship, or with a State Apprenticeship Agency recognized by the Office of Apprenticeship.

(2)

(i) A worker performs on a contract if the worker directly performs the specific services called for by the contract; and

(ii) A worker performs in connection with a contract if the worker's work activities are necessary to the performance of a contract but are not the specific services called for by the contract.

(b) Executive Order Minimum wage rate.

(1) The Contractor shall pay to workers, while performing in the United States, and performing on, or in connection with, this contract, a minimum hourly wage rate of $15.00 per hour beginning January 30, 2022.

(2) The Contractor shall adjust the minimum wage paid, if necessary, beginning January 1, 2023, and annually thereafter, to meet the applicable annual E.O. minimum wage. The Administrator of the Department of Labor’s Wage and Hour Division (the Administrator) will publish annual determinations in the Federal Register no later than 90 days before the effective date of the new E.O. minimum wage rate. The Administrator will also publish the applicable E.O. minimum wage on https://www.sam.gov (or any successor website), and a general notice on all wage determinations issued under the Service Contract Labor Standards statute or the Wage Rate Requirements (Construction) statute, that will provide information on the E.O. minimum wage and how to obtain annual updates. The applicable published E.O.

minimum wage is incorporated by reference into this contract.

(3)

(i) The Contractor may request a price adjustment only after the effective date of the new annual E.O.

minimum wage determination. Prices will be adjusted only for increased labor costs (including subcontractor labor costs) as a result of an increase in the annual E.O. minimum wage, and for associated labor costs (including those for subcontractors). Associated labor costs shall include increases or decreases that result from changes in social security and unemployment taxes and workers’ compensation insurance, but will not otherwise include any amount for general and administrative costs, overhead, or profit.

(ii) Subcontractors may be entitled to adjustments due to the new minimum wage, pursuant to paragraph (b)(2). Contractors shall consider any subcontractor requests for such price adjustment.

(iii) The Contracting Officer will not adjust the contract price under this clause for any costs other than those identified in paragraph (b)(3)(i) of this clause, and will not provide duplicate price adjustments with any price adjustment under clauses implementing the Service Contract Labor Standards statute or the Wage Rate Requirements (Construction) statute.

(4) The Contractor warrants that the prices in this contract do not include allowance for any contingency to cover increased costs for which adjustment is provided under this clause.

(5) A pay period under this clause may not be longer than semi-monthly, but may be shorter to comply with any applicable law or other requirement under this contract establishing a shorter pay period.

Workers shall be paid no later than one pay period following the end of the regular pay period in which such wages were earned or accrued.

(6) The Contractor shall pay, unconditionally to each worker, all wages due free and clear without subsequent rebate or kickback. The Contractor may make deductions that reduce a worker’s wages below the E.O. minimum wage rate only if done in accordance with 29 CFR 23.230, Deductions.

(7) The Contractor shall not discharge any part of its minimum wage obligation under this clause by furnishing fringe benefits or, with respect to workers whose wages are governed by the Service Contract Labor Standards statute, the cash equivalent thereof.

(8) Nothing in this clause shall excuse the Contractor from compliance with any applicable Federal or State prevailing wage law or any applicable law or municipal ordinance or any applicable contract establishing a minimum wage higher than the E.O. 14026 minimum wage. However, wage increases under such other laws or municipal ordinances are not subject to price adjustment under this subpart.

(9) The Contractor shall pay the E.O. minimum wage rate whenever it is higher than any applicable collective bargaining agreement(s) wage rate.

(10) The Contractor shall follow the policies and procedures in 29 CFR 23.240(b) and 23.280 for treatment of workers engaged in an occupation in which they customarily and regularly receive more than $30 a month in tips.

(c)

(1) This clause applies to workers as defined in paragraph (a). As provided in that definition–

(i) Workers are covered regardless of the contractual relationship alleged to exist between the contractor or subcontractor and the worker;

(ii) Workers with disabilities whose wages are calculated pursuant to special certificates issued under 29 U.S.C. 214(c) are covered; and

(iii) Workers who are registered in a bona fide apprenticeship program or training program registered with the Department of Labor’s Employment and Training Administration, Office of Apprenticeship, or with a State Apprenticeship Agency recognized by the Office of Apprenticeship, are covered.

(2) This clause does not apply to–

(i) Contracts or subcontracts to which the States of Texas, Louisiana, or Mississippi, including their agencies, are a party;

(ii) Fair Labor Standards Act (FLSA)-covered individuals performing in connection with contracts covered by the E.O., i.e. those individuals who perform duties necessary to the performance of the contract, but who are not directly engaged in performing the specific work called for by the contract, and who spend less than 20 percent of their hours worked in a particular workweek performing in connection with such contracts;

(iii) Individuals exempted from the minimum wage requirements of the FLSA under 29 U.S.C. 213(a) and 214(a) and (b), unless otherwise covered by the Service Contract Labor Standards statute, or the Wage Rate Requirements (Construction) statute. These individuals include but are not limited to-

(A) Learners, apprentices, or messengers whose wages are calculated pursuant to special certificates issued under 29 U.S.C. 214(a) ;

(B) Students whose wages are calculated pursuant to special certificates issued under 29 U.S.C. 214(b) ;

and

(C) Those employed in a bona fide executive, administrative, or professional capacity (29 U.S.C.

213(a)(1) and 29 CFR part 541).

(d) Notice. The Contractor shall notify all workers performing work on, or in connection with, this contract of the applicable E.O. minimum wage rate under this clause. With respect to workers covered by the Service Contract Labor Standards statute or the Wage Rate Requirements (Construction) statute, the Contractor may meet this requirement by posting, in a prominent and accessible place at the worksite, the applicable wage determination under those statutes. With respect to workers whose wages are governed by the FLSA, the Contractor shall post notice, utilizing the poster provided by the Administrator, which can be obtained at www.dol.gov/agencies/whd/government-contracts, in a prominent and accessible place at the worksite. Contractors that customarily post notices to workers electronically may post the notice electronically provided the electronic posting is displayed prominently on any Web site that is maintained by the contractor, whether external or internal, and customarily used for notices to workers about terms and conditions of employment.

(e) Payroll Records.

(1) The Contractor shall make and maintain records, for three years after completion of the work, containing the following information for each worker:

(i) Name, address, and social security number;

(ii) The worker’s occupation(s) or classification(s);

(iii) The rate or rates of wages paid;

(iv) The number of daily and weekly hours worked by each worker;

(v) Any deductions made; and

(vi) Total wages paid.

(2) The Contractor shall make records pursuant to paragraph (e)(1) of this clause available for inspection and transcription by authorized representatives of the Administrator. The Contractor shall also make such records available upon request of the Contracting Officer.

(3) The Contractor shall make a copy of the contract available, as applicable, for inspection or transcription by authorized representatives of the Administrator.

(4) Failure to comply with this paragraph (e) shall be a violation of 29 CFR 23.260 and this contract.

Upon direction of the Administrator or upon the Contracting Officer's own action, payment shall be withheld until such time as the noncompliance is corrected.

(5) Nothing in this clause limits or otherwise modifies the Contractor’s payroll and recordkeeping obligations, if any, under the Service Contract Labor Standards statute, the Wage Rate Requirements (Construction) statute, the Fair Labor Standards Act, or any other applicable law.

(f) Access. The Contractor shall permit authorized representatives of the Administrator to conduct investigations, including interviewing workers at the worksite during normal working hours.

(g) Withholding. The Contracting Officer, upon his or her own action or upon written request of the Administrator, will withhold funds or cause funds to be withheld, from the Contractor under this or any other Federal contract with the same Contractor, sufficient to pay workers the full amount of wages required by this clause.

(h) Disputes. Department of Labor has set forth in 29 CFR 23.510, Disputes concerning contractor compliance, the procedures for resolving disputes concerning a contractor’s compliance with Department of Labor regulations at 29 CFR part 23. Such disputes shall be resolved in accordance with those procedures and not the Disputes clause of this contract. These disputes include disputes between the Contractor (or any of its subcontractors) and the contracting agency, the Department of Labor, or the workers or their representatives.

(i) Antiretaliation. The Contractor shall not discharge or in any other manner discriminate against any worker because such worker has filed any complaint or instituted or caused to be instituted any proceeding under or related to compliance with the E.O. or this clause, or has testified or is about to testify in any such proceeding.

(j) Subcontractor compliance. The Contractor is responsible for subcontractor compliance with the requirements of this clause and may be held liable for unpaid wages due subcontractor workers.

(k) Subcontracts. The Contractor shall include the substance of this clause, including this paragraph (k) in all subcontracts, regardless of dollar value, that are subject to the Service Contract Labor Standards statute or the Wage Rate Requirements (Construction) statute, and are to be performed in whole or in part in the United States.

(End of clause)

52.232-7 PAYMENTS UNDER TIME-AND-MATERIALS AND LABOR-HOUR CONTRACTS.

(NOV 2021)

The Government will pay the Contractor as follows upon the submission of vouchers approved by the Contracting Officer or the authorized representative:

(a)Hourly rate. (1)Hourly rate means the rate(s) prescribed in the contract for payment for labor that meets the labor category qualifications of a labor category specified in the contract that are- (i)Performed by the Contractor;

(ii)Performed by the subcontractors; or

(iii)Transferred between divisions, subsidiaries, or affiliates of the Contractor under a common control.

(2)The amounts shall be computed by multiplying the appropriate hourly rates prescribed in the Schedule by the number of direct labor hours performed.

(3)The hourly rates shall be paid for all labor performed on the contract that meets the labor qualifications specified in the contract. Labor hours incurred to perform tasks for which labor qualifications were specified in the contract will not be paid to the extent the work is performed by employees that do not meet the qualifications specified in the contract, unless specifically authorized by the Contracting Officer.

(4)The hourly rates shall include wages, indirect costs, general and administrative expense, and profit.

Fractional parts of an hour shall be payable on a prorated basis.

(5)Vouchers may be submitted not more than once every two weeks, to the Contracting Officer or authorized representative. A small business concern may receive more frequent payments than every two weeks. The Contractor shall substantiate vouchers (including any subcontractor hours reimbursed at the hourly rate in the schedule) by evidence of actual payment and by-

(i)Individual daily job timekeeping records;

(ii)Records that verify the employees meet the qualifications for the labor categories specified in the contract; or

(iii)Other substantiation approved by the Contracting Officer.

(6)Promptly after receipt of each substantiated voucher, the Government shall, except as otherwise provided in this contract, and subject to the terms of paragraph (e) of this clause, pay the voucher as approved by the Contracting Officer or authorized representative.

(7)Unless otherwise prescribed in the Schedule, the Contracting Officer may unilaterally issue a contract modification requiring the Contractor to withhold amounts from its billings until a reserve is set aside in an amount that the Contracting Officer considers necessary to protect the Government's interests. The Contracting Officer may require a withhold of 5 percent of the amounts due under paragraph (a) of this clause, but the total amount withheld for the contract shall not exceed $50,000. The amounts withheld shall be retained until the Contractor executes and delivers the release required by paragraph (g) of this clause.

(8)Unless the Schedule prescribes otherwise, the hourly rates in the Schedule shall not be varied by virtue of the Contractor having performed work on an overtime basis. If no overtime rates are provided in the Schedule and overtime work is approved in advance by the Contracting Officer, overtime rates shall be negotiated. Failure to agree upon these overtime rates shall be treated as a dispute under the Disputes clause of this contract. If the Schedule provides rates for overtime, the premium portion of those rates will be reimbursable only to the extent the overtime is approved by the Contracting Officer.

(b)Materials. (1)For the purposes of this clause- (i)Direct materials means those materials that enter directly into the end product, or that are used or consumed directly in connection with the furnishing of the end product or service.

(ii)Materials means-

(A)Direct materials, including supplies transferred between divisions, subsidiaries, or affiliates of the Contractor under a common control;

(B)Subcontracts for supplies and incidental services for which there is not a labor category specified in the contract;

(C)Other direct costs (e.g., incidental services for which there is not a labor category specified in the contract, travel, computer usage charges, etc.); and

(D)Applicable indirect costs.

(2)If the Contractor furnishes its own materials that meet the definition of a commercial product or commercial service in Federal Acquisition Regulation (FAR) 2.101, the price to be paid for such materials shall not exceed the Contractor's established catalog or market price, adjusted to reflect the-

(i)Quantities being acquired; and

(ii)Actual cost of any modifications necessary because of contract requirements.

(3)Except as provided for in paragraph (b)(2) of this clause, the Government will reimburse the Contractor for allowable cost of materials provided the Contractor-

(i)Has made payments for materials in accordance with the terms and conditions of the agreement or invoice; or

(ii)Ordinarily makes these payments within 30 days of the submission of the Contractor's payment request to the Government and such payment is in accordance with the terms and conditions of the agreement or invoice.

(4)Payment for materials is subject to the Allowable Cost and Payment clause of this contract. The Contracting Officer will determine allowable costs of materials in accordance with FAR subpart 31.2 in effect on the date of this contract.

(5)The Contractor may include allocable indirect costs and other direct costs to the extent they are-

(i)Comprised only of costs that are clearly excluded from the hourly rate;

(ii)Allocated in accordance with the Contractor's written or established accounting practices; and

(iii)Indirect costs are not applied to subcontracts that are paid at the hourly rates.

(6)To the extent able, the Contractor shall-

(i)Obtain materials at the most advantageous prices available with due regard to securing prompt delivery of satisfactory materials; and

(ii)Take all cash and trade discounts, rebates, allowances, credits, salvage, commissions, and other benefits. When unable to take advantage of the benefits, the Contractor shall promptly notify the Contracting Officer and give the reasons. The Contractor shall give credit to the Government for cash and trade discounts, rebates, scrap, commissions, and other amounts that have accrued to the benefit of the Contractor, or would have accrued except for the fault or neglect of the Contractor. The Contractor shall not deduct from gross costs the benefits lost without fault or neglect on the part of the Contractor, or lost through fault of the Government.

(7)Except as provided for in 31.205-26(e) and (f), the Government will not pay profit or fee to the prime Contractor on materials.

(c)If the Contractor enters into any subcontract that requires consent under the clause at 52.244-2, Subcontracts, without obtaining such consent, the Government is not required to reimburse the Contractor for any costs incurred under the subcontract prior to the date the Contractor obtains the required consent.

Any reimbursement of subcontract costs incurred prior to the date the consent was obtained shall be at the sole discretion of the Government.

(d)Total cost. It is estimated that the total cost to the Government for the performance of this contract shall not exceed the ceiling price set forth in the Schedule, and the Contractor agrees to use its best efforts to perform the work specified in the Schedule and all obligations under this contract within such ceiling price. If at any time the Contractor has reason to believe that the hourly rate payments and material costs that will accrue in performing this contract in the next succeeding 30 days, if added to all other payments and costs previously accrued, will exceed 85 percent of the ceiling price in the Schedule, the Contractor shall notify the Contracting Officer giving a revised estimate of the total price to the Government for performing this contract with supporting reasons and documentation. If at any time during performing this contract, the Contractor has reason to believe that the total price to the Government for performing this contract will be substantially greater or less than the then stated ceiling price, the Contractor shall so notify the Contracting Officer, giving a revised estimate of the total price for performing this contract, with supporting reasons and documentation. If at any time during performing this contract, the Government has reason to believe that the work to be required in performing this contract will be substantially greater or less than the stated ceiling price, the Contracting Officer will so advise the Contractor, giving the then revised estimate of the total amount of effort to be required under the contract.

(e)Ceiling price. The Government will not be obligated to pay the Contractor any amount in excess of the ceiling price in the Schedule, and the Contractor shall not be obligated to continue performance if to do so would exceed the ceiling price set forth in the Schedule, unless and until the Contracting Officer notifies the Contractor in writing that the ceiling price has been increased and specifies in the notice a revised ceiling that shall constitute the ceiling price for performance under this contract. When and to the extent that the ceiling price set forth in the Schedule has been increased, any hours expended and material costs incurred by the Contractor in excess of the ceiling price before the increase shall be allowable to the same extent as if the hours expended and material costs had been incurred after the increase in the ceiling price.

(f)Audit. At any time before final payment under this contract, the Contracting Officer may request audit of the vouchers and supporting documentation. Each payment previously made shall be subject to reduction to the extent of amounts, on preceding vouchers, that are found by the Contracting Officer or authorized representative not to have been properly payable and shall also be subject to reduction for overpayments or to increase for underpayments. Upon receipt and approval of the voucher designated by the Contractor as the "completion voucher" and supporting documentation, and upon compliance by the Contractor with all terms of this contract (including, without limitation, terms relating to patents and the terms of paragraph (g) of this clause), the Government shall promptly pay any balance due the Contractor.

The completion voucher, and supporting documentation, shall be submitted by the Contractor as promptly as practicable following completion of the work under this contract, but in no event later than 120 days (or such longer period as the Contracting Officer may approve in writing) from the date of completion.

(g)Assignment and Release of Claims. The Contractor, and each assignee under an assignment entered into under this contract and in effect at the time of final payment under this contract, shall execute and deliver, at the time of and as a condition precedent to final payment under this contract, a release discharging the Government, its officers, agents, and employees of and from all liabilities, obligations, and claims arising out of or under this contract, subject only to the following exceptions:

(1)Specified claims in stated amounts, or in estimated amounts if the amounts are not susceptible of exact statement by the Contractor.

(2)Claims, together with reasonable incidental expenses, based upon the liabilities of the Contractor to third parties arising out of performing this contract, that are not known to the Contractor on the date of the execution of the release, and of which the Contractor gives notice in writing to the Contracting Officer not more than 6 years after the date of the release or the date of any notice to the Contractor that the Government is prepared to make final payment, whichever is earlier.

(3)Claims for reimbursement of costs (other than expenses of the Contractor by reason of its indemnification of the Government against patent liability), including reasonable incidental expenses, incurred by the Contractor under the terms of this contract relating to patents.

(h)Interim payments on contracts for other than services. (1)Interim payments made prior to the final payment under the contract are contract financing payments. Contract financing payments are not subject to the interest penalty provisions of the Prompt Payment Act.

(2)The designated payment office will make interim payments for contract financing on the _________ [Contracting Officer insert day as prescribed by agency head; if not prescribed, insert "30th ] day after the designated billing office receives a proper payment request. In the event that the Government requires an audit or other review of a specific payment request to ensure compliance with the terms and conditions of the contract, the designated payment office is not compelled to make payment by the specified due date.

(i)Interim payments on contracts for services. For interim payments made prior to the final payment under this contract, the Government will make payment in accordance with the Prompt Payment Act ( 31 U.S.C.

3903) and prompt payment regulations at 5 CFR part 1315.

DOI-AAAP-0028 V4 ELECTRONIC INVOICING AND PAYMENT REQUIREMENTS - INVOICE

PROCESSING PLATFORM (IPP) (FEBRUARY 2021)

Payment requests must be submitted electronically through the U. S. Department of the Treasury's Invoice Processing Platform System (IPP).

"Payment request" means any request for contract financing payment or invoice payment by the Contractor. To constitute a proper invoice, the payment request must comply with the requirements identified in the applicable Prompt Payment clause included in the contract, or the clause 52.212-4 Contract Terms and Conditions - Commercial Items included in commercial item contracts. The IPP website address is: https://www.ipp.gov.

Under this contract, the following documents are required to be submitted as an attachment to the IPP invoice: None

Concurrent to submitting an invoice in IPP, the contractor may submit any supporting documentation to the contract specialist at jgarcia@usbr.gov. Contractors are cautioned that supporting documentation e-mailed to the contracting officer must not conflict with the IPP submission. Conflicts between the IPP submission and supporting documentation may result in a delay in approval and/or rejection of submitted invoices.

When e-mailing supporting documentation to the contracting officer, the subject line of the email shall be formatted as follows: Contract Number, Invoice Number, Contracting Officer's last name (e.g., 140R2018R00000_Invoice No. 1_Smith). The invoice shall be attached to the email and named using the following format: Contract Number, Contractor Name, Invoice Number, Invoice Amount (e.g., 140R2022R00000_World Test, Inc. - Inv. No. 1 - $5,678).

Invoices shall not include information that would compromise Personally Identifiable Information, such as full social security numbers, dates of birth, etc. The final invoice shall be submitted and will be approved in accordance with payment terms and conditions contained in the contract, after all, if any, settlement actions are complete. The contractor must clearly identify the last payment as the “Final Invoice.”

The Contractor must use the IPP website to register access and use IPP for submitting requests for payment. The Contractor Government Business Point of Contact (as listed in SAM) will receive enrollment instructions via email from the Federal Reserve Bank of St. Louis (FRBSTL) within 3 - 5 business days of the contract award date. Contractor assistance with enrollment can be obtained by contacting the IPP Production Helpdesk via email IPPCustomerSupport@fiscal.treasury.gov or phone

(866) 973-3131.

If the Contractor is unable to comply with the requirement to use IPP for submitting invoices for payment, the Contractor must submit a waiver request in writing to the Contracting Officer with its proposal or quotation.

(End of Local Clause)

1452.201-70 AUTHORITIES AND DELEGATIONS (SEP 2011)

(a) The Contracting Officer is the only individual authorized to enter into or terminate this contract, modify any term or condition of this contract, waive any requirement of this contract, or accept nonconforming work.

(b) The Contracting Officer will designate a Contracting Officer's Representative (COR) at time of award.

The COR will be responsible for technical monitoring of the contractor's performance and deliveries. The COR will be appointed in writing, and a copy of the appointment will be furnished to the Contractor.

Changes to this delegation will be made by written changes to the existing appointment or by issuance of a new appointment.

(c) The COR is not authorized to perform, formally or informally, any of the following actions:

(1) Promise, award, agree to award, or execute any contract, contract modification, or notice of intent that changes or may change this contract;

(2) Waive or agree to modification of the delivery schedule;

(3) Make any final decision on any contract matter subject to the Disputes Clause;

(4) Terminate, for any reason, the Contractor's right to proceed;

(5) Obligate in any way, the payment of money by the Government.

(d) The Contractor shall comply with the written or oral direction of the Contracting Officer or authorized representative(s) acting within the scope and authority of the appointment memorandum. The Contractor need not proceed with direction that it considers to have been issued without proper authority. The Contractor shall notify the Contracting Officer in writing, with as much detail as possible, when the COR has taken an action or has issued direction (written or oral) that the Contractor considers to exceed the COR's appointment, within 3 days of the occurrence. Unless otherwise provided in this contract, the Contractor assumes all costs, risks, liabilities, and consequences of performing any work it is directed to perform that falls within any of the categories defined in paragraph (c) prior to receipt of the Contracting Officer's response issued under paragraph (e) of this clause.

(e) The Contracting Officer shall respond in writing within 30 days to any notice made under paragraph

(d) of this clause. A failure of the parties to agree upon the nature of a direction, or upon the contract action to be taken with respect thereto, shall be subject to the provisions of the Disputes clause of this contract.

(f) The Contractor shall provide copies of all correspondence to the Contracting Officer and the COR.

(g) Any action(s) taken by the Contractor, in response to any direction given by any person acting on behalf of the Government or any Government official other than the Contracting Officer or the COR acting within his or her appointment, shall be at the Contractor's risk.

WBR 1452.201-80 CONTRACTING OFFICER’S REPRESENTATIVE’S AUTHORITIES AND

LIMITATIONS -- BUREAU OF RECLAMATION (MAY 2018)

a) Performance of the work under this contract shall be subject to the technical direction of the Reclamation Contracting Officer's Representative (COR). The term “technical direction” is defined to include, without limitation:

(1) Inspecting and accepting or rejecting work performed under the contract.

(2) Representing the Government in technical phases of the work. The COR is responsible for the technical administration of the contract and will provide instructions and interpretations to the Contractor on all technical matters relating to the contract. The COR will supervise or oversee all Government technical and administrative personnel assigned to assist the COR.

(3) Reviewing and, where required by the contract, approving submittals of technical data, shop drawings, samples, literature, plans, or other data required to be delivered by the Contractor to the Government.

(b) The Contractor will receive a copy of the written COR designation from the Contracting Officer. It will specify the extent of the COR's authority to act on behalf of the Contracting Officer.

(c) Technical direction must be within the scope of work stated in the contract. Only the Contracting Officer is authorized to determine if a change is within the scope of the contract; therefore, the COR does not have the authority to, and may not, issue any technical direction that -

(1) Constitutes a direction of additional work outside the Contract requirements;

(2) Constitutes a change as defined in the contract clause entitled “Changes;”

(3) In any manner causes an increase or decrease in the total contract cost, or the time required for contract performance;

(4) Changes any of the expressed terms, conditions or specifications of the contract; or

(5) Interferes with the Contractor's right to perform the terms and conditions of the contract.

(d) All technical direction shall be issued in writing by the COR.

(e) The Contractor must proceed promptly with the performance of technical direction duly issued by the COR in the manner prescribed by this clause and within its authority under the provisions of this clause.

If, in the opinion of the Contractor, any instruction or direction by the COR falls within one of the categories defined in (c)(1) through (c)(5) of this clause, the Contractor must not proceed and must notify the Contracting Officer in writing within five (5) working days after receipt of any such instruction or direction and must request the Contracting Officer to modify the contract accordingly. Upon receiving the notification from the Contractor, the Contracting Officer must -

(1) Advise the Contractor in writing after receipt of the Contractor's letter that the technical direction is within the scope of the contract effort and does not constitute a change under the Changes clause of the contract; or

(2) Advise the Contractor that the Government will issue a written change order.

(f) A failure of the Contractor and Contracting Officer either to agree that the technical direction is within the scope of the contract or to agree upon the contract action to be taken with respect to the technical direction will be subject to the provisions of the clause entitled “Disputes.”

1452.223-81 SAFETY AND HEALTH -- BUREAU OF RECLAMATION (OCT 2022)

(a) The Contractor shall not require any person employed in the performance of this contract (including subcontracts) to work under conditions which are unsanitary, hazardous, or dangerous to an employee’s health or safety.

(b) Contractor shall comply with the most current version of the Bureau of Reclamation’s Reclamation Safety and Health Standards (RSHS) and, if incorporated, 52.236-13 Accident Prevention.

The RSHS manual shall be obtained at:

http://www.usbr.gov/safety/rshs/index.html

(c) Comply with the standards (29 CFR) issued by the Occupational Safety and Health Administration (OSHA), U.S. Department of Labor, www.osha.gov.

(d) In the event there is a conflict between the requirements contained in paragraphs (b) and (c) referenced herein, or in the Statement of Work (SOW) or Performance Work Statement (PWS), the more stringent requirement shall prevail.

(e) If required in the SOW or PWS, the Contractor shall submit a written proposed safety program as prescribed in the RSHS and the written specifications.

(f) The Contractor shall maintain an accurate record of and shall report to the Contracting Officer (or authorized representative) in the manner prescribed by the Contracting Officer, all cases of death, occupational diseases, or traumatic injury to employees or the public involved, and property damage in accordance with the RSHS and OSHA guidelines.

(g) If the contractor deems that an updated version of the RSHS constitutes a substantive change to the contract, affecting price or time (or both), the contractor may request a contract modification in accordance with the terms of the contract.

1452.223-82, ENSURING ADEQUATE COVID-19 SAFETY PROTOCOLS IN FEDERAL

BUILDINGS AND FEDERALLY CONTROLLED FACILITIES -- BUREAU OF RECLAMATION

(NOV 2022)

When accessing Federal buildings and federally controlled facilities under this contract, contractor employees shall comply with the Safer Federal Workforce Task Force’s current guidance for COVID-19 workplace safety protocols for Federal agencies at https://www.saferfederalworkforce.gov/.

1452.237-80, SECURITY REQUIREMENTS, INFORMATION TECHNOLOGY/COMPULSORY

PROTECTION OF SENSITIVE INFORMATION AND SECURITY ACCESS REQUIREMENTS

(MAR 2022)

(a) General Security Requirements:

(1) This clause addresses security requirements, including general procedural requirements, information security requirements, contractor employee suitability requirements, identification card requirements, site security requirements, vessel exclusion barriers, and information technology security requirements.

Within this clause, COR means Contracting Officer's Representative. If there is no COR appointed and identified to the Contractor, the term instead will mean the Program Manager or any other authorized individual responsible for technical oversight under the contract. “Work site” means the Government facility, office, construction site, and any other area within the Government office or facility that the Contractor must access to accomplish work under this contract.

(2) The work performed under this contract shall only be accomplished by individuals (in the employment of the Contractor or any subcontractors) whose conduct and behavior is consistent with the efficiency of the Federal Service and the requirements of this contract, and who are acceptable to the contracting officer. If Reclamation finds a Contractor employee to be unsuitable or unfit for his or her assigned duties, the contracting officer will direct the Contractor to remove the individual from the contract and access to the Federal facility at which the contract activities are occurring.

(3) The Contractor’s employees governed by this contract may need access to sensitive information and/or sensitive areas. The Federal Government (Government) reserves the right, in its sole discretion, to determine suitability of Contractor personnel and deny access to any sensitive information or project specific area to any personnel for any cause.

(4) The Contractor is responsible for informing and ensuring compliance by its employees with any applicable security procedures of the Government facility where work may be performed under this contract.

(5) Any Contractor employee that will have access to a Federally-controlled facility or information system will be required to have a Government-issued identification card, consisting of a Personal Identity Verification (PIV) Card, a temporary identification card, or a visitor badge. (Note: within the Department of the Interior this card is known as a DOI Access Card.) During performance of the contract, the Contractor shall keep the COR apprised of any changes in personnel, or changes in personnel access or duration, to ensure that performance is not delayed by compliance with credentialing processes.

(6) A Contractor employee will not be provided access to a Government facility or information system until a Government PIV Card, temporary identification card, or visitor identification badge has been issued to the…