This is a Statement of Work/Performance Work Statement for mechanical fabrication services established as a firm fixed price (FFP) Multiple-Award Blank Purchase Agreement (BPA) for the Naval Undersea Warfare Center Division, Newport (NUWCDIVNPT).
The contractor shall fabricate, produce, assemble, test, package, and deliver hardware according to government-provided drawings on a build-to-print basis. Manufacturing processes include CNC machining, welding, braising, milling, shearing, electrical discharge machining, grinding, plating, anodizing, coating, painting, sheet metal fabrication, non-destructive testing, quality inspection, additive manufacturing, and waterjet cutting. The government anticipates predominant use of mild steel, medium steel, high tensile steel, stainless steel, and aluminum, with less frequent use of high-yield steel, high-strength low-alloy steel, titanium, and nickel-based superalloys. All work shall be performed at the contractor's facility. Authorized users are NUWCDIVNPT Code 34 (Undersea Warfare Electromagnetic Systems) and Code 85 (Undersea Weapons and Defensive Systems), supporting electromagnetic warfare, imaging, communications, and special projects, as well as S&T research prototypes for unmanned undersea systems. Funding sources include Operation and Maintenance Navy, Other Procurement Navy, Ship Construction Navy, RDT&E, and Defense Working Capital Fund.
Deliverables include build-to-print hardware accompanied by Department of Defense Form 250, a Certificate of Compliance documenting source material and all in-process and inspection test data, and a Test/Inspection Report. The contractor must perform quality assurance testing per its standard procedures and comply with applicable technical standards including ASME engineering drawing practices, ISO/IEC testing and calibration requirements, MIL standards for packaging and testing, welding and brazing specifications, technical data packages, and anodic/chemical conversion coating specifications. Security requirements include adherence to NISPOM, controlled unclassified information handling per DoD Instruction 5200.48, operations security program development with annual training, and electronic spillage cost liability for contractor-caused incidents.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK (SOW)/PERFORMANCE WORK STATEMENT (PWS)
Mechanical Fabrication
1.0 Background
The Undersea Warfare Electromagnetic Systems Department (Code 34) of the Naval Undersea Warfare Center Division, Newport (NUWCDIVNPT) is tasked by Naval Systems Commands (SYSCOMs), Type Commanders (TYCOMs), Navy Cyber Warfare Development Group (NCWDG), Naval Research Lab (NRL), Office of Naval Intelligence (ONI), Office of Naval Research (ONR), Defense Logistics Agency (DLA), Naval Special Warfare Development Group (NWDG), Special Operations Command (SOCOM), Naval Cyber Warfare Command (NCWC), and Other Government Agencies to perform a wide range of programmatic, engineering and technical functions to support the research, design, development, production, fielding, maintenance and improvement of Electromagnetic Warfare systems, subsystems, and components.
The Undersea Weapons and Defensive Systems Department (Code 85) of the Naval Undersea Warfare Center Division, Newport (NUWCDIVNPT) is tasked by PEO UWS, PEO USC, PEO RAS, Office of Naval Research (ONR), and Other Government Agencies to perform a wide range of programmatic, engineering and technical functions to support the research, design, development, production, fielding, maintenance and improvement of Undersea Weapons and Defensive systems, subsystems, and components.
This SOW encompasses build-to-print, firm fixed price (FFP) hardware fabrication and certification.
1.1 Places of Performance
All work shall be performed at the contractor’s site.
1.2 Authorized Users
NUWCDIVNPT Code 34, Code 85.
1.3 Sponsors
SYSCOMs; TYCOMs; NRL; ONI; ONR; DLA; NWDG; SOCOM; NCWC; NAVSEA/PEOSUB PMS392, PMS394, PMS397, PMS435, PMS425, PMS 450, PMS4010; Space and Naval Warfare Systems Command (SPAWAR) PMWs 120, 130, 150, 160, 170, 770, and 790. NAVSEA/PEO, PEO UWS, PEO USC, PEO
RAS.
1.4 Types of Funding
Operation and Maintenance, Navy (OMN), Other Procurement, Navy (OPN), Ship Construction, Navy (SCN), Research, Development, Test & Evaluation, Defense Agencies (RDDA) and Research Development Test and Evaluation (RDT&E), Naval Sea Based Deterrent Fund (NSBDF), Defense Working Capital Fund (DWCF).
2.0 Scope
This FFP Multiple-Award Blank Purchase Agreement (BPA) is for mechanical fabrication of hardware. The Contractor shall fabricate, produce, assemble, test, package, and deliver hardware in accordance with drawings provided by the Government. Various manufacturing processes may be required in support of this effort, including but not limited to the following:
• Computer Numerical Control (CNC), Computer-Aided Design and Computer-Aided Manufacturing (CAD/CAM)
• Welding and Braising
• Milling, Planing, Machining
• Shearing, Shaping, Rolling, Bending
• Cutting, Drilling, Boring, Tapping, Threading, broaching and threaded insert installation
• Electrical Discharge Machining (EDM)
• Grinding, Honing, Polishing
• Plating, Anodizing, Coating, Painting
• Assembling multiple components into assemblies with bolts, screws, or other fasteners
• Sheet Metal Fabrication v4.10_DECEMBER2025
• Non-Destructive Testing (NTD) including Penetrant Testing (PT), Magnetic Particle
Testing (MT), Ultrasonic Testing (UT), and X-Ray Testing.
• Quality inspection of all manufactured parts
• Additive manufacturing
• Waterjet
The Government anticipates that the preponderance of BPA calls will require use of the following metals: mild steel, medium steel, high tensile steel, stainless steel and aluminum. The Government anticipates that High Yield Steel (HYS), High-Strength Low-Alloy (HSLA) steel, also known as microalloyed (MA) steel, super alloy and special metals such as Titanium and Nickel-based Superalloys may also be required; however, use of these metals is anticipated to be less frequent.
All items shall be fabricated and configured in accordance with the Government-provided drawings. Prior to award of BPA calls, the BPA holders shall document all discrepancies, objections, issues, problems, questions and concerns with the drawings or requirements, and all requests for variations, substitutions, or changes in their quotes. No modifications, variations, substitutions, or changes will be made to any drawing or product unless and only when approved in advance and in writing by the Government. The BPA holders shall provide all of the necessary resources including personnel, tools, equipment, computers, software, machinery, test equipment, consumables, and facilities necessary to successfully complete and deliver the hardware.
2.1 Program or Systems Supported
NUWCDIVNPT Code 34 Electromagnetic Systems divided into the following four major areas:
• Electronic Warfare
• Imaging
• Communications
• Special Projects
NUWCDIVNPT Code 851 S&T research and data collection prototypes or test samples for demonstration on various programs advancing unmanned undersea weapons and defensive systems.
3.0 Applicable Documents
The contractor shall perform the tasking required in Section 4.0 in accordance with (IAW) the below Applicable Documents (ADs).
NUMBER TITLE REVISION/
DATE
3.1 ASME Y14.100 Engineering Drawing Practices 2017
3.2 ASME Y14.35M Revision of Engineering Drawings and
Associated Documents
3.3 ASME Yl4.24 Types of Application of Engineering Drawings 2012
3.4 ASME Y14.34M Associated Lists 2013
3.5 ASME Y14.5M Dimensioning and Tolerancing Standard 2017
3.6 ISO/IEC 17025:2017 General requirements for the competence of testing and calibration laboratories
3.7 ANSI/ISO/ASQ Q9001-2008: Quality Management Systems -
Requirements
3.8 MIL-STD-1309D Definitions of Terms for Testing, Measurement and Diagnostics
12 February
3.9 MIL-STD-2073-1D Standard Practice for Military Packaging 23 May 2008
3.10 MIL-HDBK-831, Notice 1 Preparation of Test Reports 23 April
3.11 T9074-AQ-GIB-010/248 Requirements for Welding and Brazing
Procedure and Performance Qualification 1 August
3.12 S9074-AR-GIB-010A/278 Requirements for Fabrication Welding and Inspection, and Casting Inspection and Repair for Machinery, piping, and Pressure Vessels
14 February
3.13 MIL-STD-31000 Technical Data Packages 26 February
3.14 Technical Data Packages (Level II or Level III Drawings) TBD at BPA Call Level
3.15 MIL-PRF-8625 Anodic Coatings for Aluminum and Aluminum
Alloy
23 November
3.16 MIL-DTL-5541 Chemical Conversion Coatings on Aluminum
and Aluminum Alloys
11 July 2006
4.0 Technical Requirements
4.1 Hardware Fabrication (CLIN 0001)
In accordance with the Applicable Documents in Section 3.0 and using GFI in Section 6.0, the contractor shall fabricate, test, inspect, package, and deliver hardware as specified in the BPA call. Along with the delivery of the manufactured units, the contractor shall deliver a Certificate of Compliance, which shall include source material, in-process test data recorded, and all inspection data recorded by the contractor. The contractor shall perform Quality Assurance (QA) testing in accordance with the contractor’s standard QA procedures current at the time of testing to demonstrate that the manufactured units conform to the requirements of the TDP.
Deliverables:
The Contractor shall deliver build-to-print hardware. Each delivery shall include a Department of Defense (DD) Form 250.
A001: CDRL A001 Certificate of Compliance (COC)
A002: Test/Inspection Report
5.0 Progress Reports
RESERVED
6.0 Government Furnished Information
The Government will make available GFI as it applies to the requirements set forth in the BPA calls.
7.0 Government Furnished Property
The Government may provide Government Furnished Property (GFP) as it applies to the requirements set forth in the BPA calls. The contractor shall adhere to DFARS Clause 252.245– 7005 for the management and reporting of Government Property and shall use the GFP Module of the Procurement Integrated Enterprise Environment (PIEE) as specified in the clause. In addition, the Contractor shall prepare and submit a Government Property (GP) Inventory Report to capture GFP status IAW CDRL A003.
Deliverable:
A003: Government Property (GP) Inventory Report
8.0 Quality Surveillance and Performance Standards
The Government will conduct quality surveillance via various methods including formal and informal meetings and review of deliverables. Contractor performance will be evaluated in the areas of technical quality, responsiveness, schedule/timeliness, cost, and regulatory compliance.
9.0 Information and Communication Technology (ICT) Accessibility Requirements
The Government has determined that this procurement is [not Information and Communication Technology (ICT).
10.0 Security Compliance
10.1 Program Protection
SECURITY: All Contractor personnel shall adhere to the Security provisions of 32 CFR Part 117
– National Industrial Security Program Operating Manual (NISPOM). While performing work at a Government Facility, Contractor personnel shall comply with the security regulations of the host facility. Applicable FAR, DFARS, NMCARS clauses, and NAVSEA text shall be adhered to in the performance of this contract. Security incidents shall be promptly reported through the companies Facility Security Officer (FSO), to the Contracting Officer’s Representative (COR), Technical Point of Contact (TPOC), and the Cognizant Security Office to NUWCDIVNPT Security.
Controlled Unclassified Information (CUI) including Legacy FOUO and Covered Defense Information (meeting the definition of 48 CFR 252.204–7012(a)) generated and/or provided under this contract shall be marked and safeguarded as specified in DoD Instruction 5200.48, CUI available at:
https://www.esd.whs.mil/Portals/54/Documents/DD/issuances/dodi/520048p.PDF. Any product containing Covered Defense Information shall be assigned a distribution statement (distribution statements B through F) in accordance with DoDI 5230.24 (Distribution Statements on Technical Documents); and DoDI 5230.24, Enclosure 3 Procedures, available at https://www.esd.whs.mil/Portals/54/Documents/DD/issuances/dodi/523024p.pdf
INFORMATION SECURITY: If the work is performed at the Contractor's facility, the Contractor shall implement and maintain security procedures and controls to prevent unauthorized disclosure of classified information and controlled unclassified information (CUI) and to control distribution of CUI in accordance with National Industrial Security Program Operating Manual (NISPOM) codifying 32 CFR Part 117, NISPOM Rule, and SECNAV M- 5510.36B. If the work is performed at the Government's facility, the Contractor shall comply with facility policy.
CUI INCIDENT REPORTING AND RESPONSE: The Contractor shall promptly report any unauthorized, inadvertent, or illegal release or disclosure of CUI to the Contracting Officer’s Representative / Technical Point of Contact (TPOC), Procuring Contracting Officer, and the Security Office. Contractor personnel shall coordinate this effort through the relevant industry site FSO.
PUBLIC RELEASE: Any controlled unclassified information pertaining to this contract shall not be released for public dissemination, including posting to any social media sites such as Facebook or Twitter, unless it has been approved for public release by appropriate U.S.
Government authority. Proposed public releases shall be submitted for approval prior to release through the appropriate U.S. Government Office.
10.2 Operations Security (OPSEC)
OPSEC is a process that identifies critical information to determine if friendly actions can be observed by adversary intelligence systems, determines if information obtained by adversaries could be interpreted to be useful to them, and then executes selected measures that eliminate or reduce adversary exploitation of friendly critical information.
The Contractor shall develop and implement, and update and maintain an OPSEC program to protect controlled unclassified and classified activities, information, equipment, and material used or developed by the Contractor and any subcontractor during performance of the contract.
The Contractor shall be responsible for the subcontractor implementation of the OPSEC requirements. The Contractor developed OPSEC program may include Information Assurance and Communications Security (COMSEC). The OPSEC program shall be in accordance with National Security Presidential Memorandum (NSPM) 28, and at a minimum shall include:
1) Assignment of responsibility for OPSEC direction and implementation.
2) Issuance of procedures and planning guidance for the use of OPSEC techniques to identify vulnerabilities and apply applicable countermeasures.
3) Establishment of OPSEC education and awareness training. To include initial and annual OPSEC training.
4) Provisions for management, annual review, and evaluation of OPSEC programs.
5) Flow down of OPSEC requirements to subcontractors when applicable.
While performing aboard Government sites, the contractor shall: comply with all OPSEC instructions and policies; include OPSEC as part of its ongoing security awareness program and take all required Agency training; Be responsive to the Supporting OPSEC Manager on a non-interference basis; and Protect sensitive unclassified information and activities, which could compromise classified information or operations, or degrade the planning and execution of operations performed by the Requiring Organization and contractor in support of the mission.
10.3 Electronic Spillage
Electronic Spillage (ES) is defined as a situation where information of higher classification than a system is authorized to process is introduced into that system, intentionally or otherwise. If a Contractor is determined to be responsible for an ES, all direct and indirect costs incurred by the Government for ES remediation will be charged to the Contractor.
File details come from the government source that posted it. Updated .