Combined Signed Dwgs.pdf
PDF 20 MB Posted
- Solicitation number
- 36C25921R0105
About this file
This document provides details for a federal contract opportunity to provide plumbing and HVAC construction services. The George E. Wahlen VA Medical Center in Salt Lake City, Utah seeks these services for its Chilled Water and HVAC Upgrade Project B.14. The contract value is estimated between $500,000 and $1,000,000. The NAICS code for this procurement is 238220, with a small business size standard of $16.5 million. The opportunity is a 100% set-aside for Service-Disabled Veteran-Owned Small Businesses. Offerors must be verified and listed in the Vendor Information Pages database to be considered. The point of contact for questions is Ilze Karklins-Powers, who can be reached at 307-433-3727 or ilze.karklins-powers@va.gov. The solicitation number for this opportunity is 36C25921R0105.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFI 1 attachment.pdf | ||
| 221100Summ.pdf | ||
| 36C25921R0105 0003.pdf | ||
| 36C25921R0105 0002.docx | DOCX document | |
| 36C25921R0105 0001.docx | DOCX document | |
| Site Visit Attendance.pdf | ||
| 36C25921R0105_1.docx | DOCX document | |
| Combined Specs.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
S
TAT E O F N E VA
D A
T H
E O
D
ORE JOHN MOW
EN
JRR
EG
ISTERED
No. 7867
A R C H I T E C
T
A
LA
R
E GI H,NC
S
G O 52644
P E
N
CO
LU IT
E
NG
RG
U O
A
P ,P
R E
G I
S T
E R
E D
A R
C H I T E C T U R
A L
C O
R P
O T
I O
N
N O
R T H C A R O L
I N A
A R
MEDICAL CENTER ASSOC. DIRECTOR
CHIEF OF STAFF
ASSOC. DIRECTOR OF PATIENT CARE
CHIEF FES
PROJECT SECTION SUPV.
PROJECT MANAGER
GENERAL UTILITIES FOREMAN
PATIENT CARE FOREMAN
MEDICAL CENTER DIRECTOR GENERAL PROPERTIES FOREMAN
FIRE CHIEF
SUPERVISOR BIO-MED SERVICE
CHIEF LOGISTICS
PATIENTSAFETY MANAGER
SAFETY OFFICE
CIO OFFICER
INFECTION PREVENTION
CONTRACTING OFFICER
VA APPROVAL
Revisions: Date
Drawing Title:
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER:
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
PROJECT SITE MAP PROJECT LOCATION MAP
PROJECT IMAGE
RYAN UNG
/9
/2
:4 :1
P
M
G-001
COVER
1 7TJM EGS/JJG
CHILLED WATER AND HVAC
UPGRADE
VA MEDICAL CENTER - BUILDING 14
500 FOOTHILL DRIVE
SALT LAKE CITY, UT 84148 05/10/2019
100% CONSTRUCTION DOCUMENTS
660-15-10818-247
CHILLED WATER AND HVAC UPGRADE
VA MEDICAL CENTER - BUILDING 14
500 FOOTHILL DRIVE
SALT LAKE CITY, UT 84148
VA PROJECT #: 660-15-108 APOGEE PROJECT #: 18-247
SALT LAKE CITY
MEDICAL CENTER
SALT LAKE CITY
MEDICAL CENTER
DRAWING LIST
No. Description Dwg of Dwg
GENERAL
G-001 COVER 1 7
G-002 GENERAL INFORMATION 2 7
G-003 INTERIM LIFE SAFETY MEASURES ASSESMENT FOR SCHEDULES CONSTRUCTION ACTIVITIES 3 7
G-004 CONSTRUCTION SAFETY RISK ASSESMENT CHECKLIST 4 7
G-005 CONSTRUCTION SAFETY RISK ASSESMENT CHECKLIST 5 7
GL100 BASEMENT LIFE SAFETY PLAN 6 7
GL104 THIRD FLOOR LIFE SAFETY PLAN 7 7
ARCHITECTURAL
AG001 ARCHITECTURAL SYMBOLS, ABBREVIATIONS AND NOTES 1 10
AE100 BASEMENT PLAN 2 10
AE104 THIRD FLOOR PLAN 3 10
AE105 ROOF PLAN 4 10
AE110 BASEMENT REFLECTED CEILING PLAN 5 10
AE114 THIRD FLOOR REFLECTED CEILING PLAN 6 10
AE201 EXTERIOR ELEVATIONS 7 10
AE301 BUILDING SECTIONS 8 10
AE501 PLAN DETAILS 9 10
AE502 SHAFT SECTION/DETAILS 10 10
MECHANICAL
M-001 MECHANICAL GENERAL INFORMATION 1 9
MD100 BASEMENT MECHANICAL DEMOLITION PLAN 2 9
MP100 BASEMENT MECHANICAL PIPING PLAN 3 9
MP101 THIRD FLOOR MECHANICAL PIPING PLAN 4 9
MP102 ROOF MECHANICAL PIPING PLAN 5 9
M-501 MECHANICAL DETAILS 6 9
M-502 MECHANICAL SCHEMATICS 7 9
M-503 MECHANICAL CONTROLS 8 9
M-601 MECHANICAL SCHEDULES 9 9
ELECTRICAL
E-001 ELECTRICAL GENERAL NOTES, LEGEND, AND ABBREVIATIONS 1 5
ED101 BASEMENT MECHANICAL EQUIPMENT DEMOLITION PLAN 2 5
EM101 BASEMENT MECHANICAL CONNECTIONS PLAN 3 5
EM102 ROOF MECHANICAL POWER PLAN 4 5
E-601 PANEL SCHEDULES AND EQUIPMENT CONDUCTOR SCHEDULE 5 5
DocuSign Envelope ID: 900DD08B-0058-4415-A7C6-D046B2C2935E
5/9/2019
D A
T H
E O
D
ORE JOHN MOW
EN
JRR
EGISTERED
No. 7867
A R C H I T E C
T
A
LA
R
E GI H,NC
S
G O 52644
P E
N
CO
LU IT
E
NG
RG
U O
A
P ,P
R E
G I
S T
E R
E D
A R
C H I T E C T U R
A L
C O
R P
O T
I O
N
N O
R T H C A R O L
I N A
A R
WALL SECTION
SYMBOL
INTERIOR ELEVATION
SYMBOL
COLUMN GRID
ELEVATION SYMBOL
REVISION NOTE
ENLARGED DETAIL CALLOUT
ROOM DESIGNATION
SYMBOL
BREAK LINE
ROOF SLOPE
DIRECTION SYMBOL
TYPICAL GRAPHIC SCALE
DETAIL #
PAGE #
DETAIL #
PAGE #
TRUE NORTH ARROW
PROJECT NORTH ARROW
A8.1
EXTERIOR ELEVATION
SYMBOL
DETAIL #
PAGE #
A8.1
A8.1
A8.1
BUILDING SECTION
SYMBOL
DETAIL #
PAGE #
A8.1
A8.1
DETAIL SECTION
SYMBOL
DETAIL #
PAGE #
A8.1
WALL GRID
(REPRESENTS
FACE OF EXISTING
WALL)
XX.X
XX.X
ELEVATION
0'-0"
ROOM
NAME
101A
NORTH
PLAN
NORTH
TRUE
0 4 8 16
THE FOLLOWING SYSTEMS ARE A DESIGN/BUILD RESPONSIBILITY OF THE CONTRACTOR
OR PRODUCT MANUFACTURER AND WILL REQUIRE THE DEFERRED SUBMITTAL OF
DESIGN WORK TO SALT LAKE CITY FOR PLAN REVIEW AND PERMITTING:
1. FIRE SPRINKLER SYSTEMS
2. FIRE ALARM SYSTEMS
CLOCK
NURSE
CALL
DOME
LIGHT
CLOCK OUTLET
CLOCK & NURSE CALL DEVICES
4'-0" MAX TO
HIGHEST OPERABLE
POINT - IF FIRE
EXTINGUISHER
OVER 40 LBS
3'-6" MAX HT.
FIRE EXTINGUISHER
CABINET
ELECTRICAL CABINET
DUPLEX
OUTLET
SWITCH
THERMOSTAT
TELEPHONE
OR DATA
OUTLET
FIRE ALARM
PULL
INTERCOM
STATION
DUPLEX
OUTLET
COMPUTER
TERMINAL
FIRE ALARM
CHIME WITH
VISUAL
ALARM LIGHT
FIRE ALARM
PULL STATION
FIRE ALARM
ANNUNCIATOR
FIRE ALARM
WALL PROTECTION
BUMPERGUARD
HANDRAIL
OR DOOR FRAME
3" TO CORNERGUARD
CORNERGUARD
MISC. WALL DEVICES
GENERAL SYMBOL LEGEND
DEFERRED SUBMITTALS
BID ALTERNATES
STANDARD MOUNTING HEIGHTS
Revisions: Date
Drawing Title:
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER:
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
RYAN UNG
/9
/2
:4 :1
P
M
G-002
GENERAL INFORMATION
2 7TJM JJG/EGS
CHILLED WATER AND HVAC
UPGRADE
VA MEDICAL CENTER - BUILDING 14
500 FOOTHILL DRIVE
SALT LAKE CITY, UT 84148 05/10/2019
100% CONSTRUCTION DOCUMENTS
660-15-10818-247
D A
T H
E O
D
ORE JOHN MOW
EN
JRR
EG
ISTERED
No. 7867
A R C H I T E C
T
A
LA
R
E GI H,NC
S
G O 52644
P E
N
CO
LU IT
E
NG
RG
U O
A
P ,P
R E
G I
S T
E R
E D
A R
C H I T E C T U R
A L
C O
R P
O T
I O
N
N O
R T H C A R O L
I N A
A R
Revisions: Date
Drawing Title:
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER:
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
RYAN UNG
/9
/2
:4 :1
P
M
G-003
INTERIM LIFE SAFETY MEASURES
ASSESMENT FOR SCHEDULES
CONSTRUCTION ACTIVITIES
3 7TJM EGS/JJG
CHILLED WATER AND HVAC
UPGRADE
VA MEDICAL CENTER - BUILDING 14
500 FOOTHILL DRIVE
SALT LAKE CITY, UT 84148 05/10/2019
100% CONSTRUCTION DOCUMENTS
660-15-10818-247
D A
T H
E O
D
ORE JOHN MOW
EN
JRR
EGISTERED
No. 7867
A R C H I T E C
T
A
LA
R
E GI H,NC
S
G O 52644
P E
N
CO
LU IT
E
NG
RG
U O
A
P ,P
R E
G I
S T
E R
E D
A R
C H I T E C T U R
A L
C O
R P
O T
I O
N
N O
R T H C A R O L
I N A
A R
Revisions: Date
Drawing Title:
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER:
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
RYAN UNG
/9
/2
:4 :1
P
M
G-004
CONSTRUCTION SAFETY RISK
ASSESMENT CHECKLIST
4 7TJM JJG
CHILLED WATER AND HVAC
UPGRADE
VA MEDICAL CENTER - BUILDING 14
500 FOOTHILL DRIVE
SALT LAKE CITY, UT 84148 05/10/2019
100% CONSTRUCTION DOCUMENTS
660-15-10818-247
D A
T H
E O
D
ORE JOHN MOW
EN
JRR
EGISTERED
No. 7867
A R C H I T E C
T
A
LA
R
E GI H,NC
S
G O 52644
P E
N
CO
LU IT
E
NG
RG
U O
A
P ,P
R E
G I
S T
E R
E D
A R
C H I T E C T U R
A L
C O
R P
O T
I O
N
N O
R T H C A R O L
I N A
A R
Revisions: Date
Drawing Title:
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER:
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
RYAN UNG
/9
/2
:4 :1
P
M
G-005
CONSTRUCTION SAFETY RISK
ASSESMENT CHECKLIST
5 7TJM JJG
CHILLED WATER AND HVAC
UPGRADE
VA MEDICAL CENTER - BUILDING 14
500 FOOTHILL DRIVE
SALT LAKE CITY, UT 84148 05/10/2019
100% CONSTRUCTION DOCUMENTS
660-15-10818-247
D A
T H
E O
D
ORE JOHN MOW
EN
JRR
EGISTERED
No. 7867
A R C H I T E C
T
A
LA
R
E GI H,NC
S
G O 52644
P E
N
CO
LU IT
E
NG
RG
U O
A
P ,P
R E
G I
S T
E R
E D
A R
C H I T E C T U R
A L
C O
R P
O T
I O
N
N O
R T H C A R O L
I N A
A R
LEVELER
LEVELER
DOCK
MORGUE
DOCK
UTILITY
TUNNEL
BELOW
ELEVATOR
# P-5 P-5
ELEVATOR
ELEVATOR
# P-1 # P-2
ELEVATOR PIT
ELECTRICAL
BC08B
ELECTRICAL (EMERGENCY GEN)
BC08A
ELECTRICAL
BC08
CORRIDOR (TO LOADING DOCK)
BCOOC
STORAGE (138E)
BC09
CHUTE (TRASH)
BC02
MECHANICAL
BC03
CORRIDOR (TO LOADING DOCK)
BC00B
S T
O R
A G
E
P H
A R
M A
C Y
R E
C E
IV
IN
G
B C
TEL/DATA
BC07
TOILET (UNISEX)
BC10
EXTRASTITIAL (MECH/ELECT)
BC11
MECHANICAL ROOM
BB15
MECHANICAL (WATER TREATMENT)
BB14
CLOTHING ROOM
BB12D
ELECTRICAL
BD03A
ENTRY (UTILITIES)
BD03
TEL/DATA
BD03C
TEL/DATA
BD03B
CHUTE (LINEN)
BC04
EXTRASTITIAL (MECH/ELECT)
BC01
MECHANICAL ROOM
BB05
OFFICE (90)
BB03C
EXTRASTITIAL (MECH/ELECT)
BB06
TOILET (WOMEN)
BB07
TOILET (MEN)
BB09
HAC
BB08
OFFICE (04)
BB11A
OFFICE (04)
BB10
CORRIDOR
BB00
OFFICE (PATIENT RECORDS)
BB11B
OFFICE (04)
BB11
MECH. RM.
BB02
MECHANICAL
BD02
MECHANICAL
BB01
VESTIBULE
BD00
OFFICE
BD01B
STORAGE
BD01BB
LIBRARY CENTER
BD01A
MECHANICAL ROOM
BA08
EXTRASTITIAL (MECH/ELECT)
BA09
ELECTRICAL
BA06
TEL/DATA
BA05
PREP (CHEMICAL)
BA07AA
DEMONSTRATIONS (MORGUE)
BA07
MORGUE
BA04D
S T
O R
A G
E
S P
E C
IM
E
N S
B A
A
OFFICE ( )
BA04E OFFICE ( )
BA04F
ENTRY (MORGUE)
BA04
COLD ROOM
BA04DA
HAC
BA04B
TOILET (MEN)
BA04C
OFFICES (136)
BA03
OFFICE (136)
BA03B
OFFICE (136)
BA03A
SHOP (LOCKS & KEYS)
BA02
EXTRASTITIAL (MECH/ELECT)
BA01
OFFICE (90)
BB03D
OFFICE (CAK)
BA11
SHOP
BB13
"H" ELEVATOR LEVEL
BAE1
STAIR LEVEL
BBA
"G" ELEVATOR LEVEL
BCE1
STAIR LEVEL
BCA
STAIR LEVEL
BBB
"C" ELEVATOR LEVEL
BBE2
"D" ELEVATOR LEVEL
BBE1
"F" ELEVATOR LEVEL (FUTURE)
BBE4
"E" ELEVATOR LEVEL (FUTURE)
BBE3
STAIR LEVEL
BAA
TOILET (WOMEN)
BA04A
M A
IL
R
O O
M
B B
STORAGE (PATIENT EFFECTS)
BB12C
DUMBWAITER
BBE5
STORAGE (04 RECORDS)
BB04A
WAITING (CLOTHING ROOM)
BB12
DRESSING (CLOTHING ROOM)
BB12B
DRESSING (CLOTHING ROOM)
BB12A
LOBBY (ELEVATORS)
BC00F
C O
R R
ID
O
R
T O
E
LE
V A
T O
R S
/B .0
1)
B C
E
C O
R R
ID
O
R
B C
DOCK (LOADING/UNLOADING)
BCOOD
S T
O R
A G
E
B C
LOBBY (ELEVATOR)
BC00A
BREAKRM (136)
BA03.16
STORAGE (04 RECORDS)
BB04
.01
DOCK
NON-
FLAMMABLE
STORAGE
EMPTY
CYLINDER
STORAGE
PULMINARY
SVC.
STORAGE
GAS
FLAMMABLE
STORAGE
OFFICE
BB03A
SHOP
BA02A
OFFICE
BB04C
STORAGE (90)
BB03B
FE
FE
FE
FE
OCCUPANCY LEGEND
Calculating...
1514131211109876
54321
A
B
C
D
AREA OF WORK
2' T
R A V
EL
D
IS
TA
N C E
171' TRAVEL DISTANCE
EGRESS PATH
TOTAL SQUARE
FOOTAGE:
46,475 SF
HEALTHCARE - OUTPATIENT
- 240 SF / PERSON
- 194 OCCUPANTS FLOOR
EGRESS INFORMATION
REQUIRED # OF
EXITS
(per IBC 1015.1)
- 2 EXITS REQUIRED
- 4 EXITS PROVIDED (EXISTING)
- 2 MINIMUM ≤ 500 OCCUPANTS
OCCUPANCY:
- 38" CLEAR, 2 DOORS 36" EACH
- 2 STAIRS REQ., 2 STAIRS EXISTING
- STAIR WIDTH 44"
EGRESS
REQUIRED:
1.
2.
EGRESS WIDTH
(per IBC 1005.1) - EXIT DOORS =
36"/(0.20) = 180 PPL
# OF OCCUPANTS - 194
x 0.2 = 38.8" EGRESS WIDTH
EXIT STAIRS = 127 OCCUPANTS FLOOR
0.3 x 127 = 58.2"
EXISTING STAIRS WITH 36" DOORS AND
44" WIDE STAIRS
EXIT ACCESS
TRAVEL
(per IBC TABLE 1016.1)
300'-00" MAXIMUM DISTANCE
FULLY SPRINKLERED
COMMON PATH
OF TRAVEL
(per IBC Chapter 1014.3)
100'-00" MAXIMUM
TRAVEL
DISTANCE
INCREASE
(per NFPA 101-19.2.6.2.1)
150'-0" MAXIMUM DISTANCE, WHEN NOT
WHOLLY IN A SMOKE COMPARTMENT.
DEAD END
CORRIDOR
50'-0" FULLY SPRINKLERED
INCREASE TRAVEL DISTANCE 50FT IF
BUILDING IS SPRINKLED
Revisions: Date
Drawing Title:
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER:
SHEET NOTES:
WALL RATING LEGEND
1 HR - FIRE SEPARATION
2 HR - FIRE SEPARATION
SMOKE RESISTIVE HAZARDOUS AREA
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
RYAN UNG
/9
/2
:4 :1
P
M
GL100
BASEMENT LIFE SAFETY PLAN
6 7TJM EGS/JJG
CHILLED WATER AND HVAC
UPGRADE
VA MEDICAL CENTER - BUILDING 14
500 FOOTHILL DRIVE
SALT LAKE CITY, UT 84148 05/10/2019
100% CONSTRUCTION DOCUMENTS
660-15-10818-247
Scale: 3/32" = 1'-0"
BASEMENT FLOOR LIFE SAFETY PLAN
A. SEE SHEETS AG001 FOR SYMBOLS AND
ABBREVIATIONS.
B. REFER TO PLUMBING DRAWINGS FOR INFORMATION
CONCERNING PLUMBING FIXTURES AND PIPING
SYSTEM(S).
C. REFER TO MECHANICAL DRAWINGS FOR
INFORMATION CONCERNING HVAC SYSTEM(S).
D. REFER TO ELECTRICAL DRAWINGS FOR INFORMATION
CONCERNING POWER, LIGHTING AND
COMMUNICATION SYSTEM(S).
E. REFER TO ELECTRICAL DRAWING FOR FIRE ALARM
NOTIFICATION AND EMERGENCY EGRESS LIGHTING
LOCATIONS.
F. REFER TO PARTITION TYPES FOR FURTHER FIRE
SEPARATION REQUIREMENTS.
G. CONTRACTOR TO PROVIDE ALL ADDITIONAL FRAMING
NECESSARY FOR ALL OPENINGS AND SUPPLEMENTAL
FRAMING ABOVE PARTITIONS.
H. ALL FIRE RATED ASSEMBLIES SHALL BE INSTALLED IN
STRICT ACCORDANCE WITH TESTED ASSEMBLIES
INDICATED.
I. EXTEND FIRE RATED PARTITIONS, BARRIERS, AND
OTHER SEPARATIONS TO BOTTOM OF ROOF/FLOOR
DECK ABOVE (OR AS DIRECTED BY UL ASSEMBLY)
AND TO EXTERIOR WALL. SEAL JOINT BETWEEN
EDGES OF PARTITION WITH FIRE RATED SEALANT
AND/OR INTUMESCENT ASSEMBLY.
J. ALL PENETRATIONS OF FIRE-RATED ASSEMBLIES
SHALL BE FIRE-SEALED IN ACCORDANCE WITH
APPROVED MANUFACTURER'S DETAIL FOR LOCATION,
TYPE OF CONSTRUCTION, PENETRATING ITEM AND
RATING REQUIRED.
K. ALL DUCTWORK, DIFFUSERS AND GRILLES
PENETRATING FIRE-RATED WALLS, CEILINGS AND
FLOORS SHALL HAVE THE APPROPRIATE TYPE OF
FIRE/SMOKE DAMPER IN ACCORDANCE WITH THE
TYPE OF CONSTRUCTION BEING PENETRATED AND
THE FIRE/SMOKE RATING REQUIRED.
L. ALL LIGHT FIXTURES AND ELECTRICAL DEVICES
PENETRATING FIRE-RATED ASSEMBLIES SHALL BE UL-
LISTED FOR INSTALLATION IN THE ASSEMBLY OR
SHALL BE INSTALLED SUCH THAT THE FIRE-RATING IS
NOT COMPROMISED.
M. SMOKE RESISTANT CONSTRUCTION SHALL MEET THE
REQUIREMENTS OF ALL APPLICABLE CODES. AREA
SHALL BE SEPARATED FROM THE REMAINDER OF THE
BUILDING BE CONSTRUCTION CAPABLE OF RESISTING
THE PASSAGE OF SMOKE. THE PARTITIONS SHALL
EXTEND FROM THE FLOOR TO THE UNDERSIDE OF
THE FLOOR OR ROOF ASSEMBLY ABOVE. DOORS
SHALL BE SELF OR AUTOMATIC CLOSING. DOORS
SHALL NOT HAVE AIR TRANSFER OPENINGS AND
SHALL NOT BE UNDERCUT IN EXCESS OF CLEARANCE
PERMITTED WITH ACCORDANCE TO NFPA 80.
N. STORAGE OF ANY FLAMMABLE OR COMBUSTIBLE
LIQUIDS IS UNDERSTOOD TO NOT BE WITHIN THE
BUILDING. STORAGE OF ANY MATERIAL IS TO BE IN
COMPLIANCE WITH ALL APPLICABLE CODES AND
AUTHORITIES HAVING JURISDICTION
O. EXISTING SMOKE COMPARTMENT INFORMATION WAS
TAKEN FROM 2011 CONSTRUCTION DOCUMENT
PACKAGE BY NEENAN ARCHITECTURE INSTRUCTION
FOR THE U.S. ARMY CORPS OF ENGINEERS.
0 84 16
NORTH
PLAN
LIFE SAFETY LEGEND
EGRESS INFORMATION
PROPOSED USE:
OWNED BY: PRIVATE
LOCAL GOVERNMENT
CITY/COUNTY
STATE
CODE ENFORCEMENT JURISDICTION: CITY
COUNTY
APPLICABLE CODES:
GENERAL CODE INFORMATION:
CONSTRUCTION TYPE:
PRIMARY OCCUPANCY:
SECONDARY OCCUPANCY:
PROJECT NAME:
PROJECT ADDRESS:
OWNER OR AGENT:
2018 INTERNATIONAL PLUMBING CODE
2019 NFPA 70 NATIONAL ELECTRIC CODE
2018 NFPA 99 HEALTHCARE FACILITY CODE
2018 NFPA 101 LIFE SAFETY CODE
2017 PG 18-13 BARRIER FREE DESIGN
2018 ADAAG GUIDELINES
1B
HEALTHCARE
N/A
2018 INTERNATIONAL BUIDLING CODE
2018 INTERNATIONAL ENERGY CONSERVATION CODE
2018 INTERNATIONAL MECHANICAL CODE
2018 INTERNATIONAL FIRE CODE
2017 NATIONAL ELECTRIC CODE
2018 NFPA LIFE SAFETY CODE
CHILLED WATER AND HVAC UPGRADE
VA MEDICAL CENTER - BUILDING 14
500 FOOTHILL DRIVE
SALT LAKE CITY, UT 84148
VETERANS ADMINISTRATION
2018 NFPA LIFE SAFETY CODE
CODE INFORMATION
N
AREA OF WORK
KEY PLAN
SCALE: NO SCALE
D A
T H
E O
D
ORE JOHN MOW
EN
JRR
EGISTERED
No. 7867
A R C H I T E C
T
A
LA
R
E GI H,NC
S
G O 52644
P E
N
CO
LU IT
E
NG
RG
U O
A
P ,P
R E
G I
S T
E R
E D
A R
C H I T E C T U R
A L
C O
R P
O T
I O
N
N O
R T H C A R O L
I N A
A R
TV
TV
TV
TV
TV TV
TV
TV TV
TOTAL SQUARE
FOOTAGE:
46,475 SF
HEALTHCARE - OUTPATIENT
- 240 SF / PERSON
- 194 OCCUPANTS FLOOR
EGRESS INFORMATION
REQUIRED # OF
EXITS
(per IBC 1015.1)
- 2 EXITS REQUIRED
- 4 EXITS PROVIDED (EXISTING)
- 2 MINIMUM ≤ 500 OCCUPANTS
OCCUPANCY:
- 38" CLEAR, 2 DOORS 36" EACH
- 2 STAIRS REQ., 2 STAIRS EXISTING
- STAIR WIDTH 44"
EGRESS
REQUIRED:
1.
2.
EGRESS WIDTH
(per IBC 1005.1) - EXIT DOORS =
36"/(0.20) = 180 PPL
# OF OCCUPANTS - 194
x 0.2 = 38.8" EGRESS WIDTH
EXIT STAIRS = 127 OCCUPANTS FLOOR
0.3 x 127 = 58.2"
EXISTING STAIRS WITH 36" DOORS AND
44" WIDE STAIRS
EXIT ACCESS
TRAVEL
(per IBC TABLE 1016.1)
300'-00" MAXIMUM DISTANCE
FULLY SPRINKLERED
COMMON PATH
OF TRAVEL
(per IBC Chapter 1014.3)
100'-00" MAXIMUM
TRAVEL
DISTANCE
INCREASE
(per NFPA 101-19.2.6.2.1)
150'-0" MAXIMUM DISTANCE, WHEN NOT
WHOLLY IN A SMOKE COMPARTMENT.
DEAD END
CORRIDOR
50'-0" FULLY SPRINKLERED
INCREASE TRAVEL DISTANCE 50FT IF
BUILDING IS SPRINKLED
EGRESS PATH
151413121110987654321
A
B
C
D
H
F
AREA OF WORK
3C22
OFFICES
3C08
OFFICES
3C10
OFFICE
3C08A
OFFICE
3C12
OFFICE
3C06
HAC
3C04
CLASS RM
3C08B
OFFICE
3C08C
OFFICE
3C08D
OFFICE
3C08E
OFFICE
3C08F
OFFICE
3C08G
OFFICE
3C02
CLASS RM
3CO2A
CLASS RM
3B26
STAFF LOUNGE
3C00
CORRIDOR
3B27
EQUIPMENT RM
3B30
ANESTHESIA
WRK RM
3B00E
CORRIDOR
3B10
CORRIDOR
3B00
CORRIDOR
3B10D
PHARMACY
3B00BAA
MENS LOCKER
ROOM
3B00CAA
WOMENS
LOCKER ROOM
3B00D
CORRIDOR
3B80A
TOILET
3B22F
CRNA NURSES
OFFICE
3B22E
HEAD NURSE'S
OFFICE
3B00
CORRIDOR
3B06
FAMILY
CONFERENCE
OFFICE
3C14
OFFICE
3C22D
OFFICE
3C22D
OFFICES
3C22
COPIER
3C22A
OFFICE
(STAFF)
3C20
OFFICE
3C22B
ELECTRICAL
3B12
OFFICE
3C24
OFFICE
3C26
OFFICE
3C28
OFFICE
(NUTRITION)
3C30
LINEN
(SOILED)
3C18
TRASH
COLLECTION
3C16
TOILET (MEN)
3C32
TOILET
(WOMEN)
3C34
CORRIDOR
3B00G
TANKS
3B42
CORRIDOR
3B00F
UTILITY
(SOILED)
3B38
H.A.C.
3B40
UTILITY
(CLEAN)
3B36
CORRIDOR
3B00E
EQUIPMENT
RM
3B34
CLEAN CORE
3B09A
DUMB WAITER
(SOILED)
3BE6
CLEAN CORE
3B09
PUMP ROOM
3B07A
DUMB WAITER
(CLEAN)
3BE5
SPEC.
PURPOSE O.R.
#6
3B19
SPEC.
PURPOSE O.R.
#5 (UROLOGY)
3B17
SPEC.
PURPOSE O.R.
#4 (ORTHO)
3B15
CORRIDOR
3B00C
IMAGING
3B32
ANEST. BM.
WR.
3B24
LAB
3B10A
2' T
R A V
EL
D
IS
TA
N C E
T
R A
V E
L D
IS
T
A N
C E
83' T
RAVEL D
ISTANCE
149' TRAVEL DISTANCE
## KEY NOTES:
Revisions: Date
Drawing Title:
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER:
SHEET NOTES:
WALL RATING LEGEND
1 HR - FIRE SEPARATION
2 HR - FIRE SEPARATION
SMOKE RESISTIVE HAZARDOUS AREA
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
RYAN UNG
/9
/2
:4 :1
P
M
GL104
THIRD FLOOR LIFE SAFETY PLAN
7 7TJM EGS/JJG
CHILLED WATER AND HVAC
UPGRADE
VA MEDICAL CENTER - BUILDING 14
500 FOOTHILL DRIVE
SALT LAKE CITY, UT 84148 05/10/2019
100% CONSTRUCTION DOCUMENTS
660-15-10818-247
A. SEE SHEETS AG001 FOR SYMBOLS AND
ABBREVIATIONS.
B. REFER TO PLUMBING DRAWINGS FOR INFORMATION
CONCERNING PLUMBING FIXTURES AND PIPING
SYSTEM(S).
C. REFER TO MECHANICAL DRAWINGS FOR
INFORMATION CONCERNING HVAC SYSTEM(S).
D. REFER TO ELECTRICAL DRAWINGS FOR INFORMATION
CONCERNING POWER, LIGHTING AND
COMMUNICATION SYSTEM(S).
E. REFER TO ELECTRICAL DRAWING FOR FIRE ALARM
NOTIFICATION AND EMERGENCY EGRESS LIGHTING
LOCATIONS.
F. REFER TO PARTITION TYPES FOR FURTHER FIRE
SEPARATION REQUIREMENTS.
G. CONTRACTOR TO PROVIDE ALL ADDITIONAL FRAMING
NECESSARY FOR ALL OPENINGS AND SUPPLEMENTAL
FRAMING ABOVE PARTITIONS.
H. ALL FIRE RATED ASSEMBLIES SHALL BE INSTALLED IN
STRICT ACCORDANCE WITH TESTED ASSEMBLIES
INDICATED.
I. EXTEND FIRE RATED PARTITIONS, BARRIERS, AND
OTHER SEPARATIONS TO BOTTOM OF ROOF/FLOOR
DECK ABOVE (OR AS DIRECTED BY UL ASSEMBLY)
AND TO EXTERIOR WALL. SEAL JOINT BETWEEN
EDGES OF PARTITION WITH FIRE RATED SEALANT
AND/OR INTUMESCENT ASSEMBLY.
J. ALL PENETRATIONS OF FIRE-RATED ASSEMBLIES
SHALL BE FIRE-SEALED IN ACCORDANCE WITH
APPROVED MANUFACTURER'S DETAIL FOR LOCATION,
TYPE OF CONSTRUCTION, PENETRATING ITEM AND
RATING REQUIRED.
K. ALL DUCTWORK, DIFFUSERS AND GRILLES
PENETRATING FIRE-RATED WALLS, CEILINGS AND
FLOORS SHALL HAVE THE APPROPRIATE TYPE OF
FIRE/SMOKE DAMPER IN ACCORDANCE WITH THE
TYPE OF CONSTRUCTION BEING PENETRATED AND
THE FIRE/SMOKE RATING REQUIRED.
L. ALL LIGHT FIXTURES AND ELECTRICAL DEVICES
PENETRATING FIRE-RATED ASSEMBLIES SHALL BE UL-
LISTED FOR INSTALLATION IN THE ASSEMBLY OR
SHALL BE INSTALLED SUCH THAT THE FIRE-RATING IS
NOT COMPROMISED.
M. SMOKE RESISTANT CONSTRUCTION SHALL MEET THE
REQUIREMENTS OF ALL APPLICABLE CODES. AREA
SHALL BE SEPARATED FROM THE REMAINDER OF THE
BUILDING BE CONSTRUCTION CAPABLE OF RESISTING
THE PASSAGE OF SMOKE. THE PARTITIONS SHALL
EXTEND FROM THE FLOOR TO THE UNDERSIDE OF
THE FLOOR OR ROOF ASSEMBLY ABOVE. DOORS
SHALL BE SELF OR AUTOMATIC CLOSING. DOORS
SHALL NOT HAVE AIR TRANSFER OPENINGS AND
SHALL NOT BE UNDERCUT IN EXCESS OF CLEARANCE
PERMITTED WITH ACCORDANCE TO NFPA 80.
N. STORAGE OF ANY FLAMMABLE OR COMBUSTIBLE
LIQUIDS IS UNDERSTOOD TO NOT BE WITHIN THE
BUILDING. STORAGE OF ANY MATERIAL IS TO BE IN
COMPLIANCE WITH ALL APPLICABLE CODES AND
AUTHORITIES HAVING JURISDICTION
O. EXISTING SMOKE COMPARTMENT INFORMATION WAS
TAKEN FROM 2011 CONSTRUCTION DOCUMENT
PACKAGE BY NEENAN ARCHITECTURE INSTRUCTION
FOR THE U.S. ARMY CORPS OF ENGINEERS.
PROPOSED USE:
OWNED BY: PRIVATE
LOCAL GOVERNMENT
CITY/COUNTY
STATE
CODE ENFORCEMENT JURISDICTION: CITY
COUNTY
APPLICABLE CODES:
GENERAL CODE INFORMATION:
CONSTRUCTION TYPE:
PRIMARY OCCUPANCY:
SECONDARY OCCUPANCY:
PROJECT NAME:
PROJECT ADDRESS:
OWNER OR AGENT:
2018 INTERNATIONAL PLUMBING CODE
2019 NFPA 70 NATIONAL ELECTRIC CODE
2018 NFPA 99 HEALTHCARE FACILITY CODE
2018 NFPA 101 LIFE SAFETY CODE
2017 PG 18-13 BARRIER FREE DESIGN
2018 ADAAG GUIDELINES
1B
HEALTHCARE
N/A
2018 INTERNATIONAL BUIDLING CODE
2018 INTERNATIONAL ENERGY CONSERVATION CODE
2018 INTERNATIONAL MECHANICAL CODE
2018 INTERNATIONAL FIRE CODE
2017 NATIONAL ELECTRIC CODE
2018 NFPA LIFE SAFETY CODE
CHILLED WATER AND HVAC UPGRADE
VA MEDICAL CENTER - BUILDING 14
500 FOOTHILL DRIVE
SALT LAKE CITY, UT 84148
VETERANS ADMINISTRATION
2018 NFPA LIFE SAFETY CODE
CODE INFORMATION
0 84 16
NORTH
PLAN
EGRESS INFORMATION
LIFE SAFETY LEGEND
Scale: 3/32" = 1'-0"
THIRD FLOOR LIFE SAFETY PLAN
N
AREA OF WORK
KEY PLAN
SCALE: NO SCALE
D A
T H
E O
D
ORE JOHN MOW
EN
JRR
EGISTERED
No. 7867
A R C H I T E C
T
A
LA
R
E GI H,NC
S
G O 52644
P E
N
CO
LU IT
E
NG
RG
U O
A
P ,P
R E
G I
S T
E R
E D
A R
C H I T E C T U R
A L
C O
R P
O T
I O
N
N O
R T H C A R O L
I N A
A R
S
TAT E O F N E VA
D A
T H
E O
D
ORE JOHN MOW
EN
JRR
EGISTERED
No. 7867
A R C H I T E C
T
CL
AFF ABOVE FINISHED FLOOR
ACP/APC ACOUSTIC CEILING PANEL/
ACOUSTIC PANEL CEILING
ACT ACOUSTIC(AL) TILE
ADJ ADJUSTABLE
ADT'L ADDITIONAL
AGG AGGREGATE
ALT ALTERNATE
AL ALUMINUM
APPROX APPROXIMATE(LY)
ASPH ASPHALT
AUTO AUTOMATIC
B/O BOTTOM OF
BD BOARD
BLDG BUILDING
BLKG BLOCKING
BOT BOTTOM
BRG BEARING
CENTERLINE
C/C CENTER TO CENTER
CJ CONTROL JOINT
CLL CONTRACT LIMIT LINE
CEM CEMENT(ITIOUS)
CMU CONCRETE MASONRY UNIT
CLG CEILING
CLR CLEAR
COL COLUMN
CONC CONCRETE
CONST CONSTRUCTION
CONT CONTINUOUS
CPT CARPET
CT CERAMIC TILE
CTR CENTER(ED)
DF DRINKING FOUNTAIN
DS DOWNSPOUT
DBL DOUBLE
DEG DEGREE
DEMO DEMOLITION
DET/DTL DETAIL
DIA DIAMETER
DIM DIMENSION
DN DOWN
DWG(S) DRAWING(S)
E EAST
EC ELECTRICAL CONTRACTOR
EHO ELECTRICAL HOLD OPEN
EJ EXPANSION JOINT
EW EACH WAY
EA EACH
EIFS EXTERIOR INSULATION
FINISH SYSTEM
EL ELEVATION
ELEC ELECTRIC(AL)
ELEV ELEVATOR
EMER EMERGENCY
EQ EQUAL
EQUIP EQUIPMENT
EXIST EXISTING
EXT EXTERIOR
EWC ELECTRIC WATER COOLER
FD FLOOR DRAIN
FE FIRE EXTINGUISHER
FF FACTORY FINISH
FFE FINISH FLOOR ELEVATION
FV FIELD VERIFY
FEC FIRE EXTINGUISHER CABINET
FDN FOUNDATION
FIN FINISH
FLSHG FLASHING
FLR FLOOR
FRMG FRAMING
FT FOOT/FEET
FTG FOOTING
GC GENERAL CONTRACTOR
GA GAUGE
GALV GALVANIZED
GEN GENERAL
GYP GYPSUM
HM HOLLOW METAL
HDWR HARDWARE
HOL HOLLOW
HOR HORIZONTAL
HT HEIGHT
HVAC HEATING/VENTILATION/AIR
CONDITIONING
ID INSIDE DIAMETER
IN INCH
INCL INCLUDING
INSUL INSULATION
INT INTERIOR
JAN JANITOR
JT JOINT
LAV LAVATORY
LB(S) POUND(S)
L/S LANDSCAPE
LT LIGHT
MO MASONRY OPENING
MAS MASONRY
MAT'L MATERIAL
MAX MAXIMUM
MECH MECHANICAL
MFR MANUFACTURER
MIN MINIMUM
MISC MISCELLANEOUS
MTD MOUNTED
MTL METAL
N NORTH
NIC NOT IN CONTRACT
NTS NOT TO SCALE
NOM NOMINAL
OC ON CENTER
OD OUTSIDE DIAMETER
O TO O OUT TO OUT
OPNG OPENING
OPP OPPOSITE
OVHD OVERHEAD
PEB PRE-ENGINEERED BUILDING
PJF PREFORMED JOINT FILLER
PT PRESSURE TREATED
PERIM PERIMETER
PL PLATE
PLAM PLASTIC LAMINATE
PLBG PLUMBING
PLYWD PLYWOOD
PNT PAINT
PR PAIR
PTD PAINTED
PWR POWER
RB RUBBER BASE
RD ROOF DRAIN
RO ROUGH OPENING
RAD RADIUS
REC RECESSED
REINF REINFORCED
REQ'D REQUIRED
REV REVISED (REVISION)
RM ROOM
S SOUTH
SB SPLASH BLOCK
SF SQUARE FEET
SS STAINLESS STEEL
SIM SIMILAR
SPEC SPECIFICATIONS
SQ SQUARE
STD STANDARD
STL STEEL
STOR STORAGE
STRUCT STRUCTURAL
SUSP SUSPENDED
T&G TONGUE AND GROOVE
T/O TOP OF
TELE TELEPHONE
TRTD TREATED
TS TUBE STEEL
TYP TYPICAL
UNFIN UNFINISHED
UNO UNLESS NOTED OTHERWISE
VCT VINYL COMPOSITION TILE
VIF VERIFY IN FIELD
VERT VERTICAL
W WEST
W/ WITH
W/O WITHOUT
WC WATER CLOSET
WWF WELDED WIRE FABRIC
WD WOOD
WH WATER HEATER
WT WEIGHT
WALL SECTION
SYMBOL
INTERIOR ELEVATION
SYMBOL
COLUMN GRID
ELEVATION SYMBOL
REVISION NOTE
ENLARGED DETAIL CALLOUT
ROOM DESIGNATION
SYMBOL
BREAK LINE
ROOF SLOPE
DIRECTION SYMBOL
TYPICAL GRAPHIC SCALE
DETAIL #
PAGE #
DETAIL #
PAGE #
TRUE NORTH ARROW
PROJECT NORTH ARROW
A8.1
EXTERIOR ELEVATION
SYMBOL
DETAIL #
PAGE #
A8.1
A8.1
A8.1
BUILDING SECTION
SYMBOL
DETAIL #
PAGE #
A8.1
A8.1
DETAIL SECTION
SYMBOL
DETAIL #
PAGE #
A8.1
WALL GRID
(REPRESENTS
FACE OF EXISTING
WALL)
XX.X
XX.X
ELEVATION
0'-0"
ROOM
NAME
101A
NORTH
PLAN
NORTH
TRUE
0 4 8 16
A PARTITION TYPE
GENERAL NOTES
1. INDICATIONS OF PROJECT LIMITS OR LINES OF DEMARCATION ARE SHOWN FOR GENERAL SCOPE DEFINITION AND REFLECT THE UNDERSTANDING OF THE DESIGNER AS TO THE LIMITATIONS OF THE WORK AREA IN AN OCCUPIED AREA. ACTUAL CONTRACT LIMITS ARE TO BE DETERMINED BY AGREEMENT BETWEEN THE COR AND CONTRACTOR
BEFORE THE START OF THE WORK.
2. DRAWINGS ARE PREPARED USING DIMENSIONS AND PRODUCT DRAWINGS ARE PREPARED USING DIMENSIONS AND PRODUCT AND DETAILS FOR SPECIFIC PRODUCTS MAY CHANGE BEFORE THEY ARE AND DETAILS FOR SPECIFIC PRODUCTS MAY CHANGE BEFORE THEY ARE ACTUALLY INCORPORATED INTO THE WORK, AND PRODUCTS BY OTHER MANUFACTURERS ARE ALSO ACCEPTABLE. THEREFORE, ACTUAL INSTALLATION DETAILS AND DIMENSIONS MAY DIFFER FROM THOSE SHOWN. CONTRACTOR SHALL VERIFY INSTALLATION REQUIREMENTS FOR ALL PRODUCTS TO BE INCORPORATED IN THE WORK (INCLUDING THICKNESS FOR RECESSED OR SEMI-RECESSED PRODUCTS) AND IS RESPONSIBLE FOR ACCOMMODATING AND COORDINATING CHANGES TO OTHER MATERIALS OR PRODUCTS THAT ARE NECESSARY BECAUSE OF THESE
DIFFERENCES.
3. THE DRAWINGS AND SPECIFICATIONS ARE SEPARATED INTO DISCIPLINES FOR CONVENIENCE. THE SEPARATIONS USED ARE USED ONLY FOR THE PURPOSES OF CONVENIENCE AND REFERENCE AND IN NO WAY DO THEY DEFINE OR LIMIT THE SCOPE OR INTENT OF ANY PART OF THE DRAWINGS, OR OF THE DRAWINGS AND SPECIFICATIONS AS A WHOLE. THE FACT THAT THE DRAWINGS ARE SEPARATED IN NO WAY SUGGESTS THAT THE WORK IS NOT TO BE CONSTRUCTED AS A COMPLETE, INTEGRATED AND UNIFIED WHOLE.
4. THE DRAWINGS AND SPECIFICATIONS, INCLUDING DRAWINGS PREPARED BY SPECIFIC ENGINEERING DISCIPLINES ARE COMPLEMENTARY; ITEMS SHOWN IN ANY ONE LOCATION IN THE DRAWINGS SHALL BE CONSIDERED TO BE REQUIREMENTS OF THE CONTRACT FOR CONSTRUCTION. IN THE EVENT OF AN INCONSISTENCY BETWEEN THE DRAWINGS AND SPECIFICATIONS, OR WITHIN EITHER DOCUMENT, THE CONTRACTOR SHALL SEEK CLARIFICATION OR INTERPRETATION FROM THE COR PRIOR TO BIDDING.
WHERE INCONSISTENCIES ARE NOT CLARIFIED PRIOR TO BIDDING, AND WHERE THE ACTUAL SOLUTION OR INTENT CANNOT BE REASONABLY INFERRED, THE CONTRACTOR
SHALL PROVIDE THE BETTER QUALITY OR GREATER QUANTITY OF WORK.
5. USE OF THE WORD "VERIFY" POINTS OUT A SITUATION WHICH MUST BE CONFIRMED PRIOR TO PROCEEDING WITH THE WORK, FABRICATION OF EQUIPMENT, OR ORDERING
MATERIAL. NOTIFY THE COR OF ANY DISCREPANCY DISCOVERED.
6. THE CONTRACTOR SHALL NOTIFY THE COR IMMEDIATELY SHOULD DISCREPANCIES BE FOUND IN THE DRAWINGS AND SPECIFICATIONS.
7. THE CONTRACTOR IS RESPONSIBLE FOR CHECKING ALL FIELD CONDITIONS AND DIMENSIONS AS THEY RELATE TO THIS PROJECT. SHOULD DISCREPANCIES EXIST BETWEEN THE WORK INDICATED AND ACTUAL FIELD CONDITIONS NOTIFY THE COR PRIOR TO PROCEEDING WITH THE WORK.
8. DO NOT SCALE THE DRAWINGS. DRAWING SCALES AS INDICATED ARE FOR REFERENCE ONLY AND ARE NOT INTENDED TO ACCURATELY DEPICT ACTUAL OR DESIGNATED
CONDITIONS. WRITTEN DIMENSIONS SHALL GOVERN.
9. COORDINATE WORK OF ALL TRADES PRIOR TO STARTING CONSTRUCTION.
10. THE CONTRACTOR AND SUBCONTRACTORS INVOLVED IN THIS PROJECT SHALL BE RESPONSIBLE FOR DESIGNING AND INSTALLING THEIR RESPECTIVE WORK AND SYSTEMS TO MEET ALL APPLICABLE FEDERAL, STATE, AND LOCAL CODES, LAWS, SAFETY REGULATIONS, HAZARDOUS WASTE LAWS, ETC. THE CONTRACTOR SHALL FURNISH ALL
NECESSARY PERMITS.
11. THE CONTRACTOR SHALL REVIEW THE DRAWINGS AND UNDERSTAND THE SCOPE OF THE DRAWINGS TO BE THE FOLLOWING: THESE CONSTRUCTION DOCUMENTS (DRAWINGS, SPECIFICATIONS, ADDENDA, ETC.) INDICATE THE GENERAL SCOPE OF THE PROJECT IN TERMS OF ARCHITECTURAL DESIGN CONCEPTS, THE DIMENSIONS OF THE BUILDING, THE MAJOR ARCHITECTURAL ELEMENTS, AND THE MAJOR STRUCTURAL, MECHANICAL, ELECTRICAL, AND DATA SYSTEMS. THE DOCUMENTS DO NOT AND ARE NOT INTENDED TO INDICATE OR DESCRIBE IN DETAIL ALL THE NECESSARY WORK REQUIRED FOR FULL PERFORMANCE OF, AND COMPLETION OF THE REQUIREMENTS OF THE CONTRACT. ON THE BASIS OF THE GENERAL SCOPE INDICATED IN THESE DOCUMENTS, THE TRADE CONTRACTORS SHALL FURNISH ALL ITEMS REQUIRED FOR THE PROPER EXECUTION AND COMPLETION OF THEIR WORK. ALL WORK SHALL BE COMPLETE IN EVERY DETAIL AND THE CONTRACTORS SHALL PROVIDE A ONE YEAR WARRANTY FOR THEIR WORK UNLESS A LONGER WARRANTY IS INDICATED IN THE SPECIFICATIONS.
12. CONTRACTORS SHALL FOLLOW AND OBEY ALL FEDERAL, STATE AND LOCAL CODES, LAWS, SAFETY REGULATIONS AND HAZARDOUS WASTE LAWS, ETC.
ABBREVIATIONS
ARCHITECTURAL SYMBOL LEGEND
## KEY NOTES:
Revisions: Date
Drawing Title:
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER:
SHEET NOTES:
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
RYAN UNG
/9
/2
:4 :1
P
M
AG001
ARCHITECTURAL SYMBOLS,
ABBREVIATIONS AND NOTES
1 10TJM JJG/EGS
CHILLED WATER AND HVAC
UPGRADE
VA MEDICAL CENTER - BUILDING 14
500 FOOTHILL DRIVE
SALT LAKE CITY, UT 84148 05/10/2019
100% CONSTRUCTION DOCUMENTS
660-15-10818-247
N
AREA OF WORK
KEY PLAN
SCALE: NO SCALE
A. SALT LAKE CITY IS LOCATED IN A SEISMIC ZONE AREA
PER U.S. DEPARTMENT OF VETERANS AFFAIRS
SEISMIC ZONE MAP. ALL PIPE CONNECTIONS AND
MOUNTINGS BREAKEDS SHALL BE DESIGNED PER
THIS SEISMIC ZONE CLASIFICATION.
D A
T H
E O
D
ORE JOHN MOW
EN
JRR
EG
ISTERED
No. 7867
A R C H I T E C
T
A
LA
R
E GI H,NC
S
G O 52644
P E
N
CO
LU IT
E
NG
RG
U O
A
P ,P
R E
G I
S T
E R
E D
A R
C H I T E C T U R
A L
C O
R P
O T
I O
N
N O
R T H C A R O L
I N A
A R
S
TAT E O F N E VA
D A
T H
E O
D
ORE JOHN MOW
EN
JRR
EG
ISTERED
No. 7867
A R C H I T E C
T
AE201
1514131211109876
A
B
C
AE301
BC04
MECH. RM
BC04A
ELEC. PANEL
RM.
BC04B
GEN. RM.
BC12
TOILET
BC10
REC/DOC
BC18
LINEN
BC16
TRASH
BC06
B.M. STORAGE
BB19
MECH. RM.
BB21
MECH. RM.
BB23
WATER
TREATMENT
BB13
SHOP
BB12E
NEW LINEN
STOR.
BB12C
STORAGE
(PATIENT
EFFECTS)
BB12D
CLOTHING
ROOM
BB04C
OFFICE
BB11B
OFFICE
(PATIENT
RECORDS)BB11
OFFICE (04)
BB11A
OFFICE (04)
BB10
OFFICE (04)
BB09
TOILET (MEN)
BB07
TOILET
(WOMEN)
BB08
HAC
BB04
STORAGE (04
RECORDS)
SHIPPING &
RECIEVING
DOCK
14BC00
CORRIDOR
14BC00A
CORRIDOR
AREA OF WORK
AE501
B
A
Scale: 1/8" = 1'-0"
BASEMENT PLAN 0 4 8 16
NORTH
PLAN
## KEY NOTES:
Revisions: Date
Drawing Title:
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER:
SHEET NOTES:
WALL RATING LEGEND
1 HR - FIRE SEPARATION
2 HR - FIRE SEPARATION
SMOKE RESISTIVE HAZARDOUS AREA
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
RYAN UNG
/9
/2
:4 :0
P
M
AE100
BASEMENT PLAN
2 10TJM JJG/EGS
CHILLED WATER AND HVAC
UPGRADE
VA MEDICAL CENTER - BUILDING 14
500 FOOTHILL DRIVE
SALT LAKE CITY, UT 84148 05/10/2019
100% CONSTRUCTION DOCUMENTS
660-15-10818-247
01 SHAFT AT GRIDLINE 10 TO BE OPENED, REMOVE
SPANDREL ON EXTERIOR SIDE, TO INSTALL NEW
CHILLER LINES FROM BASEMENT MECHANICAL
ROOM TO CHILLER EQUIPMENT ON ROOF.
02 LOCATION OF SCAFFOLDING, FINAL LOCATION AND
SECURING METHOD BY CONTRACTOR WITH C.O.R.
REVIEW AND ACCEPTANCE.
03 PROVIDE TEMPORARY PARTITION BARRIER. REFER
TO INFECTION CONTROL RISK ASSESSMENT ON
SHEET G-003
04 STICKY MAT AT ZIPPER ENTRY CONSTRUCTION
ACCESS POINT
05 PROVIDE NEGATIVE PRESSURE GAUGE ON
CORRIDOR WALL TO MONITOR THE PRESSURE
THROUGHOUT CONSTRUCTION
A. CONTRACTOR SHALL PROVIDE ALL SCAFFOLDING AND
PROTECTING MEASURES AS REQUIRED FOR THE
REMOVAL OF SPANDREL PANELS UP TO ROOF.
B. CONTRACTOR SHALL ENSURE ALL SCAFFOLDING
AND PROTECTIVE MEASURES COMPLY WITH OSHA
REQUIREMENTS.
C. CONTRACTOR SHALL BE RESPONSIBLE FOR THE
DESIGN AND ENGINEERING OF ALL SCAFFOLDING
AND PROTECTION MEASURES.
D. CONTRACTOR SHALL INSPECT SCAFFOLDING DAILY TO
ENSURE THAT IT IS SECURE AND NOT A HAZARD TO
ANYONE.
E. CONTRACTOR RESPONSIBLE TO COORDINATE
CONSTRUCTION DURING OFF HOURS WITH THE C.O.R.
PRIOR TO STARTING WORK.
F. CONTRACTOR TO PERFORM WORK IN CORRIDOR
DURING OFF HOURS IF THE WORK RESTRICTS USE OF
THE CORRIDOR, CORRIDOR 14BC00.
N
AREA OF WORK
KEY PLAN
SCALE: NO SCALE
D A
T H
E O
D
ORE JOHN MOW
EN
JRR
EGISTERED
No. 7867
A R C H I T E C
T
A
LA
R
E GI H,NC
S
G O 52644
P E
N
CO
LU IT
E
NG
RG
U O
A
P ,P
R E
G I
S T
E R
E D
A R
C H I T E C T U R
A L
C O
R P
O T
I O
N
N O
R T H C A R O L
I N A
A R
S
TAT E O F N E VA
D A
T H
E O
D
ORE JOHN MOW
EN
JRR
EGISTERED
No. 7867
A R C H I T E C
T
AE201
1514131211109876
A
B
C
AE301
3C08G
OFFICE
3C08F
OFFICE
3C08E
OFFICE
3C02
CLASS RM
3CO2A
CLASS RM
3C08D
OFFICE
3C08C
OFFICE
3C04
CLASS RM
3C08B
OFFICE
3C06
HAC
3C08
OFFICES
3C22
OFFICES
3C12
OFFICE
3C08A
OFFICE
3C10
OFFICE
3C00
CORRIDOR
3B26
STAFF LOUNGE
3B27
EQUIPMENT RM
3B30
ANESTHESIA
WRK RM
3B10
CORRIDOR
3B10D
PHARMACY
3B00
CORRIDOR
3B00D
CORRIDOR
3B80A
TOILET
3B00CAA
WOMENS
LOCKER ROOM
3B00BAA
MENS LOCKER
ROOM3B22F
CRNA NURSES
OFFICE
3B22E
HEAD NURSE'S
OFFICE
3B06
FAMILY
CONFERENCE
3B00E
CORRIDOR
AREA OF WORK
AE501
B
## KEY NOTES:
Revisions: Date
Drawing Title:
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER:
SHEET NOTES:
WALL RATING LEGEND
1 HR - FIRE SEPARATION
2 HR - FIRE SEPARATION
SMOKE RESISTIVE HAZARDOUS AREA
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
RYAN UNG
/9
/2
:4 :0
P
M
AE104
THIRD FLOOR PLAN
3 10TJM JJG/EGS
CHILLED WATER AND HVAC
UPGRADE
VA MEDICAL CENTER - BUILDING 14
500 FOOTHILL DRIVE
SALT LAKE CITY, UT 84148 05/10/2019
100% CONSTRUCTION DOCUMENTS
660-15-10818-247
Scale: 1/8" = 1'-0"
THIRD FLOOR PLAN 0 4 8 16
NORTH
PLAN
A. CONTRACTOR SHALL PROVIDE ALL SCAFFOLDING AND
PROTECTING MEASURES AS REQUIRED FOR THE
REMOVAL OF SPANDREL PANELS UP TO ROOF.
B. CONTRACTOR SHALL ENSURE ALL SCAFFOLDING
AND PROTECTIVE MEASURES COMPLY WITH OSHA
REQUIREMENTS.
C. CONTRACTOR SHALL BE RESPONSIBLE FOR THE
DESIGN AND ENGINEERING OF ALL SCAFFOLDING
AND PROTECTION MEASURES.
D. CONTRACTOR SHALL INSPECT SCAFFOLDING DAILY TO
ENSURE THAT IT IS SECURE AND NOT A HAZARD TO
ANYONE.
E. CONTRACTOR RESPONSIBLE TO COORDINATE
CONSTRUCTION DURING OFF HOURS WITH THE C.O.R.
PRIOR TO STARTING WORK.
F. CONTRACTOR TO PERFORM WORK IN CORRIDOR
DURING OFF HOURS IF THE WORK RESTRICTS USE OF
THE CORRIDOR.
01 SHAFT AT GRIDLINE 10 TO BE OPENED, REMOVE
SPANDREL ON EXTERIOR SIDE, TO INSTALL NEW
CHILLER LINES FROM BASEMENT MECHANICAL
ROOM TO CHILLER EQUIPMENT ON ROOF.
02 LOCATION OF SCAFFOLDING, FINAL LOCATION AND
SECURING METHOD BY CONTRACTOR WITH C.O.R.
REVIEW AND ACCEPTANCE.
03 PROVIDE TEMPORARY PARTITION BARRIER. REFER
TO INFECTION CONTROL RISK ASSESSMENT ON
SHEET G-003
04 STICKY MAT AT ZIPPER ENTRY CONSTRUCTION
ACCESS POINT
05 PROVIDE NEGATIVE PRESSURE GAUGE ON
CORRIDOR WALL TO MONITOR THE PRESSURE
THROUGHOUT CONSTRUCTION
N
AREA OF WORK
KEY PLAN
SCALE: NO SCALE
D A
T H
E O
D
ORE JOHN MOW
EN
JRR
EGISTERED
No. 7867
A R C H I T E C
T
A
LA
R
E GI H,NC
S
G O 52644
P E
N
CO
LU IT
E
NG
RG
U O
A
P ,P
R E
G I
S T
E R
E D
A R
C H I T E C T U R
A L
C O
R P
O T
I O
N
N O
R T H C A R O L
I N A
A R
S
TAT E O F N E VA
D A
T H
E O
D
ORE JOHN MOW
EN
JRR
EGISTERED
No. 7867
A R C H I T E C
T
CRICKET/TAPERED INSULATION
INDICATES ROOF SLOPE
SLOPE: 1/4"
AE201
1514131211109876
54321
A
B
C
D
F
AHCL
AHCL01
AREA OF WORK
AREA OF WORK
0 4 8 16
NORTH
PLAN
ROOF LEGEND
01 EXISTING AIR HANDLER UNITS (ACHL) ON A
RAISED STRUCTURAL PLATFORM
02 NEW CHILLER LINES TO BE ATTACHED TO
BOTTOM FRAME OF EXISTING SOLAR PANEL
SUPPORTS
03 USE FRICTION TYPE MOUNTING BRACKETS FOR
PIPE SUPPORTS OVER ROOF SURFACE.
04 PROVIDE PENETRATION FLASHING FOR BOTH
CHILLER LINES WHERE THEY PENETRATING
ROOF.
## KEY NOTES:
Revisions: Date
Drawing Title:
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER:
SHEET NOTES:
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
RYAN UNG
/9
/2
:4 :0
P
M
AE105
ROOF PLAN
4 10TJM JJG/EGS
CHILLED WATER AND HVAC
UPGRADE
VA MEDICAL CENTER - BUILDING 14
500 FOOTHILL DRIVE
SALT LAKE CITY, UT 84148 05/10/2019
100% CONSTRUCTION DOCUMENTS
660-15-10818-247
Scale: 3/32" = 1'-0"
ROOF PLAN
N
AREA OF WORK
KEY PLAN
SCALE: NO SCALE
A. CONSTRUCTOR SHALL BE RESPONSIBLE TO
ENSURE ALL CONNECTIONS TO THE SOLAR
PANEL SUPPORTS, ROOF BRACKETS AND
CONNECTIONS TO THE ROOF TOP EQUIPMENT
COMPLY WITH SEISMIC REQUIREMENTS. SEE
MECHANICAL DRAWINGS FO BRACKET AND
CONNECTION DETAILS.
B. CONTRACTOR SHALL PROTECT ALL AREAS OF
EXPOSED TO WEATHER DURING THE
INSTALLATION OF THE CHILLER PIPING
THROUGH THE ROOFIN AND SUBSTRATE.
D A
T H
E O
D
ORE JOHN MOW
EN
JRR
EGISTERED
No. 7867
A R C H I T E C
T
A
LA
R
E GI H,NC
S
G O 52644
P E
N
CO
LU IT
E
NG
RG
U O
A
P ,P
R E
G I
S T
E R
E D
A R
C H I T E C T U R
A L
C O
R P
O T
I O
N
N O
R T H C A R O L
I N A
A R
S
TAT E O F N E VA
D A
T H
E O
D
ORE JOHN MOW
EN
JRR
EGISTERED
No. 7867
A R C H I T E C
T
FE
FE
AE201
1514131211109876
A
B
C
AE301
BC04
MECH. RM
BC04A
ELEC. PANEL
RM.
BC04B
GEN. RM.
BB05
SHIPPING &
RECIEVING
DOCK
BC10
REC/DOC
14BC00A
CORRIDOR
BC12
TOILET
BC06
B.M. STORAGE
14BC00
CORRIDOR
BB19
MECH. RM.
BB21
MECH. RM.
BB12D
CLOTHING
ROOM
BB23
WATER
TREATMENT
BB13
SHOP
BB12C
STORAGE
(PATIENT
EFFECTS)
BB04C
OFFICE
BB12E
NEW LINEN
STOR.
BB11B
OFFICE
(PATIENT
RECORDS)
BB11
OFFICE (04)
BB11A
OFFICE (04)
BB09
TOILET (MEN)
BB07
TOILET
(WOMEN)
BB04
STORAGE (04
RECORDS)
03 03
AREA OF WORK
AREA OF WORK
## KEY NOTES:
Revisions: Date
Drawing Title:
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER:
SHEET NOTES:
WALL RATING LEGEND
1 HR - FIRE SEPARATION
2 HR - FIRE SEPARATION
SMOKE RESISTIVE HAZARDOUS AREA
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
RYAN UNG
/9
/2
:4 :0
P
M
AE110
BASEMENT REFLECTED CEILING PLAN
5 10TJM JJG/EGS
CHILLED WATER AND HVAC
UPGRADE
VA MEDICAL CENTER - BUILDING 14
500 FOOTHILL DRIVE
SALT LAKE CITY, UT 84148 05/10/2019
100% CONSTRUCTION DOCUMENTS
660-15-10818-247
Scale: 1/8" = 1'-0"
BASEMENT REFLECTED CEILING PLAN 0 4 8 16
NORTH
PLAN
A. CONTRACTOR SHALL ENSURE THAT ALL FIRE
RATED PARTITIONS, WALLS, FLOORS, ROOF, AND
DECKS THAT ARE PENETRATED BY THE CHILLER
PIPING WILL BE PATCHED/FIRE-STOPPED TO THE
SAME FIRE RATING AS ORIGINALLY DESIGNATED.
B. CONTRACTOR SHALL BE RESPONSIBLE TO
ENSURE ALL ICRA MEASURES ARE INSTALLED AND
ACCEPTED BY COR PRIOR TO STARTING WORK.
C. CONTRACTOR RESPONSIBLE FOR COORDINATING
NEW EQUIPMENT LAYOUT WITH EXISTING
EQUIPMENT INSTALLED. PIPE LOCATION SHOWN
ON DRAWINGS ARE FOR REFERENCE ONLY.
01 REMOVE AND SALVAGE ACOUSTICAL CEILING
TILES AS NECESSARY TO INSTALL NEW CHILLER
PIPING.
02 REINSTALL CEILING TILE AND GRID TO THE
ORIGINAL CONDITION AFTER INSTALLATION OF
CHILLER PIPE..
03 DRILL HOLES THROUGH EXISTING WALL TO
INSTALL CHILLER PIPING. FIRE STOP ALL
PENETRATIONS PER SPEC. SECTION 07 84 00,
FIRESTOPPING, WITH MATERIAL THAT MAINTAINS
THE REQUIRED FIRE RATING OF THE EXISTING
WALL. USE "RED" COLOR FIRE STOPPING
MATERIAL IN ALL RATED WALLS.
04 NEW CHILLER PIPING TO BE LOCATED IN
OVERHEAD SPACE OR ABOVE CEILING. SEE
MECHANICAL DRAWINGS FOR PIPE SIZES AND
MOUNTING INFORMATION.
N
AREA OF WORK
KEY PLAN
SCALE: NO SCALE
D A
T H
E O
D
ORE JOHN MOW
EN
JRR
EGISTERED
No. 7867
A R C H I T E C
T
A
LA
R
E GI H,NC
S
G O 52644
P E
N
CO
LU IT
E
NG
RG
U O
A
P ,P
R E
G I
S T
E R
E D
A R
C H I T E C T U R
A L
C O
R P
O T
I O
N
N O
R T H C A R O L
I N A
A R
S
TAT E O F N E VA
D A
T H
E O
D
ORE JOHN MOW
EN
JRR
EGISTERED
No. 7867
A R C H I T E C
T
AE201
1514131211109876
A
B
C
AE301
3C02
CLASS RM
3CO2A
CLASS RM
3C04
CLASS RM
3C08B
OFFICE
3C08C
OFFICE
3C08D
OFFICE
3C08E
OFFICE
3C08F
OFFICE
3C08G
OFFICE
3C22
OFFICES
3C08
OFFICES
3C10
OFFICE
3C08A
OFFICE
3C12
OFFICE
3C06
HAC
3C00
CORRIDOR
3B26
STAFF LOUNGE
3B27
EQUIPMENT RM
3B30
ANESTHESIA
WRK RM
3B00E
CORRIDOR
3B10
CORRIDOR
3B00
CORRIDOR
3B00CAA
WOMENS
LOCKER ROOM
3B00BAA
MENS LOCKER
ROOM
3B10D
PHARMACY
3B06
FAMILY
CONFERENCE
3B22E
HEAD NURSE'S
OFFICE
3B22F
CRNA NURSES
OFFICE
3B00D
CORRIDOR
3B80A
TOILET
AREA OF WORK03
## KEY NOTES:
Revisions: Date
Drawing Title:
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER:
SHEET NOTES:
WALL RATING LEGEND
1 HR - FIRE SEPARATION
2 HR - FIRE SEPARATION
SMOKE RESISTIVE HAZARDOUS AREA
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
RYAN UNG
/9
/2
:4 :0
P
M
AE114
THIRD FLOOR REFLECTED CEILING
PLAN
6 10TJM JJG/EGS
CHILLED WATER AND HVAC
UPGRADE
VA MEDICAL CENTER - BUILDING 14
500 FOOTHILL DRIVE
SALT LAKE CITY, UT 84148 05/10/2019
100% CONSTRUCTION DOCUMENTS
660-15-10818-247
Scale: 1/8" = 1'-0"
THIRD FLOOR REFLECTED CEILING PLAN 0 4 8 16
NORTH
PLAN
01 REMOVE AND SALVAGE ACOUSTICAL CEILING
TILES AS NECESSARY TO INSTALL NEW CHILLER
PIPING AFTER INSTALLATION OF CHILLER PIPE.
02 REINSTALL CEILING TILE AND GRID TO THE
ORIGINAL CONDITION.
03 DRILL HOLES THROUGH EXISTING WALL TO
INSTALL CHILLER PIPING. FIRE STOP ALL
PENETRATIONS PER SPEC. SECTION 07 84 00,
FIRESTOPPING, WITH MATERIAL THAT MAINTAINS
THE REQUIRED FIRE RATING OF THE EXISTING
WALL. USE RED FIRE SAFING MATERIAL ER
FACILITY REQUIREMENTS.
A. CONTRACTOR SHALL ENSURE THAT ALL FIRE RATED
PARTITIONS, WALLS, FLOORS, ROOF, AND DECKS THAT
ARE PENETRATED BY THE CHILLER PIPING WILL BE
PATCHED/FIRE-STOPPED TO THE SAME FIRE RATING
AS ORIGINALLY DESIGNATED.
B. CONTRACTOR SHALL BE RESPONSIBLE TO ENSURE
ALL ICRA MEASURES ARE INSTALLED AND ACCEPTED
BY COR PRIOR TO STARTING WORK.
C. CONTRACTOR RESPONSIBLE FOR COORDINATING
NEW EQUIPMENT LAYOUT WITH EXISTING EQUIPMENT
INSTALLED. PIPE LOCATION SHOWN ON DRAWINGS
ARE FOR REFERENCE ONLY.
N
AREA OF WORK
KEY PLAN
SCALE: NO SCALE
D A
T H
E O
D
ORE JOHN MOW
EN
JRR
EGISTERED
No. 7867
A R C H I T E C
T
A
LA
R
E GI H,NC
S
G O 52644
P E
N
CO
LU IT
E
NG
RG
U O
A
P ,P
R E
G I
S T
E R
E D
A R
C H I T E C T U R
A L
C O
R P
O T
I O
N
N O
R T H C A R O L
I N A
A R
S
TAT E O F N E VA
D A
T H
E O
D
ORE JOHN MOW
EN
JRR
EGISTERED
No. 7867
A R C H I T E C
T
BASEMENT
-12' - 0"
FIRST FLOOR
12' - 0"
SECOND FLOOR
24' - 0"
THIRD FLOOR
36' - 0"
14 13 12 11 10 9 8
ROOF
48' - 0"
GROUND FLOOR
0"
AE301
AREA OF WORK
AREA OF WORK
LINE OF
ROOF BEYOND
05 06
01 06
05 06
05 06
05 06
## KEY NOTES:
Revisions: Date
Drawing Title:
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER:
SHEET NOTES:
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
RYAN UNG
/9
/2
:4 :1
P
M
AE201
EXTERIOR ELEVATIONS
7 10TJM JJG/EGS
CHILLED WATER AND HVAC
UPGRADE
VA MEDICAL CENTER - BUILDING 14
500 FOOTHILL DRIVE
SALT LAKE CITY, UT 84148 05/10/2019
100% CONSTRUCTION DOCUMENTS
660-15-10818-247
Scale: 1/4" = 1'-0"
NORTH ELEVATION 0 2 4 8
01 SPANDREL PANELS ARE TO BE REMOVED AS
NECESSARY FOR INSTALLATION OF CHILLER
PANELS AFTER PIPING INSTALLATION
02 EXISTING PARAPET WHICH IS THE CONTINUARION
OF THE SHAFT WALL UP ABOVE THE ROOF
03 EXISTING ROOF OVER SPRANDREL AND SHAFT
AREA EXTENDING OUT FROM PARAPET. THIS
ROOF IS NOT TO BE PENETRATED WITH ANY
PIPING OR FASTENERS DURING CONSTRUCTION
04 SPANDREL PANEL ARE INDICATED TO BE
PIVOTING TYPE WINDOW UNITS. REMOVE COVER
CAPS AND SEALANT AND PIVOT WINDOW OPEN
TO INSTALL PIPING. IF THE PANEL INDICATED DO
NOT PIVET / OPEN REMOVE THOSE AS
NECESSARY TO INSTALL PIPE
05 SECURE NEW CHILLER PIPING TO CONCRETE
SHAFT WALL. DO NOT SECURE PIPING TO
CURTAIN WALL
06 REINSTALL ALL PANELS TO EXISTING CONDITION
AND REINSTALL COVER CAPS WITH CONTINUOS
BEAD OF SEALANT ALL EDGES. ENSURE THERE
ARE NO LEAKS IN SEALANT
A. CONTRACTOR SHALL PROVIDE ALL SCAFFOLDING AND
PROTECTING MEASURES AS REQUIRED FOR THE
REMOVAL OF SPANDREL PANELS UP TO ROOF.
B. CONTRACTOR SHALL ENSURE ALL SCAFFOLDING
AND PROTECTIVE MEASURES COMPLY WITH OSHA
REQUIREMENTS.
C. CONTRACTOR SHALL BE RESPONSIBLE FOR THE
DESIGN AND ENGINEERING OF ALL SCAFFOLDING
AND PROTECTION MEASURES.
D. CONTRACTOR SHALL INSPECT SCAFFOLDING DAILY TO
ENSURE THAT IT IS SECURE AND NOT A HAZARD TO
ANYONE.
N
AREA OF WORK
KEY PLAN
SCALE: NO SCALE
D A
T H
E O
D
ORE JOHN MOW
EN
JRR
EGISTERED
No. 7867
A R C H I T E C
T
A
LA
R
E GI H,NC
S
G O 52644
P E
N
CO
LU IT
E
NG
RG
U O
A
P ,P
R E
G I
S T
E R
E D
A R
C H I T E C T U R
A L
C O
R P
O T
I O
N
N O
R T H C A R O L
I N A
A R
S
TAT E O F N E VA
D A
T H
E O
D
ORE JOHN MOW
EN
JRR
EGISTERED
No. 7867
A R C H I T E C
T
BASEMENT
-12' - 0"
FIRST FLOOR
12' - 0"
SECOND FLOOR
24' - 0"
THIRD FLOOR
36' - 0"
A
ROOF
48' - 0"
GROUND FLOOR
0"
EXISTING TPO
SINGLE PLY
ROOF SYSTEM
AE502
## KEY NOTES:
Revisions: Date
Drawing Title:
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER:
SHEET NOTES:
WALL RATING LEGEND
1 HR - FIRE SEPARATION
2 HR - FIRE SEPARATION
SMOKE RESISTIVE HAZARDOUS AREA
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
RYAN UNG
/9
/2
:4 :1
P
M
AE301
BUILDING SECTIONS
8 10TJM JJG/EGS
CHILLED WATER AND HVAC
UPGRADE
VA MEDICAL CENTER - BUILDING 14
500 FOOTHILL DRIVE
SALT LAKE CITY, UT 84148 05/10/2019
100% CONSTRUCTION DOCUMENTS
660-15-10818-247
Scale: 1/4" = 1'-0"
SECTION THROUGH
COLUMN LINE 10 SHAFT
0 2 4 8
A. CONTRACTOR SHALL COORDINATE ALL CONCRETE
WALL PENETRATIONS OR ANY WORK GENERATING
EXCESSIVE NOISE WITH THE C.O.R. PRIOR TO
STARTING WORK. ALL WORK GENERATIN EXCESSIVE
NOISE SHALL BE DONE DURING OFF HOURS AND
WEEKEND PERIOD.
B. CONTRACTOR SHALL ENSURE THE SHAFT IS SECURE
AND WEATHER TIGHT DURING PERIODS WHEN WORK
IS NOT BEING PERFORMED IN THE SHAFT.
01 SPANDREL PANELS ARE INDICATED TO BE
PIVOTING TYPE WINDOW UNITS TO PROVIDE
ACCESS TO RATED SHAFT.
02 SPANDREL PANEL ARE TO BE REMOVED AS
NECESSARY FOR INSTALLATION OF CHILLER
PIPING REINSTALL PANELS AFTER PIPING
INSTALLATION.
03 DRILL THRUGH 2-HR. STUD CHASE WALL AND RUN
PIPE FROM MECHANICAL ROOM INTO RATED
SHAFT.
04 ATTACH CHILLER PIPING TO SHAFT UP TO THIRD
FLOOR.
05 DRILL THROUGH CHASE WALL ABOVE THIRD
FLOOR CEILING AND RUN CHILLER PIPE INTO
CEILING AND RUN CHILLER PIPE INTO CEILING
SPACE.
06 DRILL THROUGH ROOF SLAB AND RUN CHILLER
PIPING ONTO ROOF.
07 REMOVE ROOF MEMBRANE AS NECESSARY TO
INSTALL CHILLER PIPING AND FLASHING. PACTH
ROOF AREA TO MATCH EXISTING, PROVIDE WATER
TIGHT ROOF SYSTEM.
08 EXISTING CONCRETE FOUNDATION WALL.
09 EXISTING CONCRETE SHAFT WALL FROM GROUND
FLOOR TO ROOF PARAPET.
10 EXISTING CURTAIN WALL SYSTEM OVER EXTERIOR
OF RATED SHAFT.
11 EXISTING 2-HR. METAL STUD CHASE WALL
RUNNING BETWEEN 8'-0" CONCRETE SHAFT/
FOUNDATION WALLS.
N
AREA OF WORK
KEY PLAN
SCALE: NO SCALE
D A
T H
E O
D
ORE JOHN MOW
EN
JRR
EGISTERED
No. 7867
A R C H I T E C
T
A
LA
R
E GI H,NC
S
G O 52644
P E
N
CO
LU IT
E
NG
RG
U O
A
P ,P
R E
G I
S T
E R
E D
A R
C H I T E C T U R
A L
C O
R P
O T
I O
N
N O
R T H C A R O L
I N A
A R
S
TAT E O F N E VA
D A
T H
E O
D
ORE JOHN MOW
EN
JRR
EGISTERED
No. 7867
A R C H I T E C
T
A
AE301
060506
A
AE301
8'-0"
8" 3'-4" 3'-4" 8"
AE501
AE501
SHAFT
1" INSULATED
GLASS
- TEMPURED
ALUMINUM
WINDOW SASH
ALUMINUM
WINDOW FRAME ALUMINUM
FACE CAP
ALUMINUM
WINDOW FRAME
1" INSULATED GLASS
- TEMPURED
SHEET ALUMINUM
PARTITION
ALUMINUM
FACE CAP
ALUMINUM
WINDOW FRAME
EXISTING CHASE WALL
1" INSULATED GLASS
- TEMPURED
SHEET ALUMINUM
PARTITION
## KEY NOTES:
Revisions: Date
Drawing Title:
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER:
SHEET NOTES:
WALL RATING LEGEND
1 HR - FIRE SEPARATION
2 HR - FIRE SEPARATION
SMOKE RESISTIVE HAZARDOUS AREA
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
RYAN UNG
/9
/2
:4 :1
P
M
AE501
PLAN DETAILS
9 10TJM JJG/EGS
CHILLED WATER AND HVAC
UPGRADE
VA MEDICAL CENTER - BUILDING 14
500 FOOTHILL DRIVE
SALT LAKE CITY, UT 84148 05/10/2019
100% CONSTRUCTION DOCUMENTS
660-15-10818-247
Scale: 1/2" = 1'-0"
SHAFT AT GRIDLINE 10 - BASEMENT
Scale: 1/2" = 1'-0"
SHAFT AT GRIDLINE 10 - THIRD FLOOR
0 1 2 4
NORTH
PLAN
0 1 2 4
NORTH
PLAN
Scale: 3" = 1'-0"
MULLION DETAIL 0 4"2" 8"
NORTH
PLAN
01 REMOVE SEALANT HOLDING FACE CAP ON
MULLION. THEN REMOVE FACE CAP. SALVAGE ALL
FACE CAPS FOR REINSTALLATIONAFTER
INSTALLATION OF CHILLER PIPING.
02 CONTINUOUS 2-HR. RATED CHASE RUNNING
LENGTH OF BASEMENT WITH ACCESS TO ALL
VERTICLE SHAFTS ABOVE. CHASE CAN BE
ACCESSED FROM CORRIDORS ON EACH END.
03 LOCATION 2-HR. RATED SHAFT ABOVE CHASE AT
GRIDLINES, TYPICAL.
04 VERTICLE 2-HR. RATED SHAFT ON EXTERIOR OF
BUILDING FROM GROUND FLOOR UP TO TOP OF
3RDFLOOR.
05 2-HR. RATED CONCRETE WALL 16" THICK WITH
ONE LAYER OF GYPSUM BOARD.
06 2-HR. RATED STUD WALL WITH TWO LAYERS OF
GYPSUM BOARD ON EACH SIDE, EXISTING.
07 EXISTING CURTAIN WALL PANEL, PIVITING TYPE,
FOR ACCESS TO SHAFT.
Scale: 3" = 1'-0"
MULLION DETAIL AT SHAFT WALL 0 1 2 4
NORTH
PLAN
N
AREA OF WORK
KEY PLAN
SCALE: NO SCALE
A. CONTRACTOR TO VERIFY CONDITION OF CURTAIN
WALL PRIOR TO STARTING WORK. NOTIFY C.O.R. OF
ANY DAMAGE OR CONDITION THAT COULD CAUSE
PERMANENT DAMAGE TO THE…
This is the start of the file's text. The full file is on GovTribe.