36C25921R0105 0001.docx

DOCX document 19 KB Posted

Attached to
Z1DA--660-15-108 Chilled Water & HVAC Upgrade B. 14
Solicitation number
36C25921R0105
Issued by

About this file

This document provides details on a federal contract solicitation for chilled water and HVAC upgrade services. The contractor will be required to connect two air handling units on the roof of Building 14 at the Salt Lake City VA Medical Center to the main chilled water feed in the basement, providing all labor, tools, materials, equipment, and supervision. The project value is estimated between $500,000 and $1,000,000. The solicitation number is 36C25921R0105 and is open only to verified Service-Disabled Veteran-Owned Small Businesses. Questions are due by November 11th and proposals by November 30th. The contractor must begin work within 10 days of notice to proceed and complete within 200 days, complying with all applicable regulations including Davis-Bacon wage rates.

View the file

Other files

File Type Posted
RFI 1 attachment.pdf PDF
221100Summ.pdf PDF
36C25921R0105 0003.pdf PDF
36C25921R0105 0002.docx DOCX document
Site Visit Attendance.pdf PDF
36C25921R0105_1.docx DOCX document
Combined Specs.pdf PDF
Combined Signed Dwgs.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE

7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office.

is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer) 1 of 660-15-108 36C259 Department of Veterans Affairs Network Contracting Office

NCO 19

6162 South Willow Drive, Suite 300 Greenwood Village

CO

80111 36C259 Department of Veterans Affairs Network Contracting Office

NCO 19

6162 South Willow Drive, Suite 300 Greenwood Village

CO

80111 To all Offerors/Bidders

36C25921R0105 10-26-2021

X X X

This amendment provides the Site Visit notes and attendance.

CONTINUATION PAGE

Pre-Bid Meeting

FOR

660-15-108 Chilled Water & HVAC Upgrade B.14 The contractor is to provide all labor, tools, materials, equipment, and supervision required to complete the chilled water and HVAC upgrade in Building 14. The project will connect two air handling units located on the roof of Building 14 to the main chilled water feed located in the basement of the same building. at the Salt Lake City VA Medical Center.

All work must be done in compliance with applicable OSHA, EPA and federal/state environmental regulations and policies. Contractor is responsible for proper handling and disposal of debris, waste and excess fuel generated during completion of this work.

Location: Salt Lake City VA Medical Center

AGENDA:

· Introduction of Ilze Karklins-Powers CO and Ryan Ung COR

· The pre-bid meeting/site walk is not mandatory

· QUESTIONS During site visit MUST BE WRITTEN DOWN

· Pertinent Dates:

· Questions are due by COB November 11, 2021. Please submit to ilze.karklins-powers@va.gov

· Proposals due on 11/30/2021 no later than 1:00 PM MT via email to ilze.karklins-powers@va.gov

· Prospective bidders are prohibited from attempting to gain information by inquiring with VA employees about project other than through written questions submitted to Contracting Officer.

· Prospective bidders are prohibited from visiting site other than through formal invitation by Contracting Officer.

· Attendees of walk-through are to stay as a group while walking to various locations and are to leave the future project site once the walk-through is concluded.

· Confirmation of construction range is between $500,000 and $1,000,000.

· Bid Guarantee & Payment/Performance Bonds: are required

· Contractor shall begin performance within 10 days after Notice to Proceed (NTP) and complete within 200 days.

· Please remember to include EMR ratings and past performance ratings from CPARS as applicable.

· Post Award Compliance:

· Compliance with Davis Bacon Wages and Application wage determination shall be expected of the contractor. The contractor can submit their weekly certified payrolls with their monthly invoice.

See attached document: Site Visit Attendance.