36C25921R0105 0003.pdf
PDF 130 KB Posted
- Solicitation number
- 36C25921R0105
About this file
This solicitation requests proposals for plumbing and HVAC construction services at the George E. Wahlen VA Medical Center in Salt Lake City, Utah. The project magnitude is between $500,000 and $1 million, with a NAICS code of 238220 and small business size standard of $16.5 million. This opportunity is set aside 100% for Service-Disabled Veteran-Owned Small Businesses. Proposals are due by December 7, 2021 at 1:00 PM Mountain Time. Apparent successful offerors must be verified and listed in the Vendor Information Pages database as an eligible SDVOSB prior to contract award. The work will be administered by the Department of Veterans Affairs Network Contracting Office 19 located in Greenwood Village, Colorado.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFI 1 attachment.pdf | ||
| 221100Summ.pdf | ||
| 36C25921R0105 0002.docx | DOCX document | |
| 36C25921R0105 0001.docx | DOCX document | |
| Site Visit Attendance.pdf | ||
| 36C25921R0105_1.docx | DOCX document | |
| Combined Specs.pdf | ||
| Combined Signed Dwgs.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE 7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER 3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO. 1. CONTRACT ID CODE
FACILITY CODE CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office. is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER 16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30 PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243
(Type or print) (Type or print)
(Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code)
(If other than Item 6)
(Specify type of modification and authority)
(such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer)
0003 660-15-108
36C259
Department of Veterans Affairs Network Contracting Office
NCO 19
6162 South Willow Drive, Suite 300 Greenwood Village CO 80111
36C259
Department of Veterans Affairs Network Contracting Office
NCO 19
6162 South Willow Drive, Suite 300 Greenwood Village CO 80111
To all Offerors/Bidders 36C25921R0105
10-26-2021 X
X X
This amendment is created to provide answers and attachments to questions 1 and 3 of RFI #1.
The proposal due date is December 7, 2021 at 1:00 PM MT.
CONTINUATION PAGE
RFI #1
Answers to Questions 1 and 3
660-15-108 Chilled Water & HVAC Upgrade B.14
Question 1. Can the chilled water piping be pro pressed?
The VA hydronic piping specification (23 21 13) version 08-01-017, which is part of the project does not have option to use pro press piping/fittings.
The latest VA hydronic specification (23 21 13) version 02-01-20 also does not have option to use pro press piping/fittings.
So, for mechanical piping VA does not provide option for using pro press piping/fittings.
The latest VA plumbing water piping specs (22 11 00) version 05-01-21 also does not have option for using pro press fitting. Please see attached change summary.
So, per latest editions of VA specifications, for both mechanical and plumbing piping VA does not provide option to use pro press fittings.
Question 3. Where we bring in the chilled water piping into Mech RM BB505 there is not a lot of options for pie routing. Would it be ok to run the new pipes below the existing or see if we could find a less congested route to run them?
There is no work in room BB05, it is a loading dock. The main 8” chilled water pipes are already in the Mechanical room BC04 where the work is to be done. The chilled water for the project will be taped from these existing 8” pipes. The glycol loop will be routed to the roof as shown on the drawings. Please refer drawing MP-100 for the equipment installation and pipe routing in the mechanical room. There is demolition work in the mechanical room BC04, please refer to drawing MD-100. These drawings are base case.
See attached document: 221100Summ.
See attached document: noreply@va.gov_20211129_105640.