COMBINED DLM PLANT HOLLOW TREATMENT FACILITY PROJECT PLANS PART 1 OF 2 (1).pdf
PDF 42 MB Posted
- Solicitation number
- ARFQ 0313 DEP2100000055 2
- Issued by
- Taylor County, West Virginia
About this file
Combined DLM Plant Hollow Treatment Facility Project Plans Summary
This document comprises the project plans for the Plant Hollow Treatment Facility, a state and local infrastructure project under the jurisdiction of the West Virginia Department of Environmental Protection (WVDEP), Division of Land Restoration, Office of Special Reclamation. The project involves the construction and rehabilitation of an acid mine drainage (AMD) treatment facility located in Upshur County, West Virginia, on property associated with DLM Coal Company permits 138-74, 135-78, 58-77, and 23-76. The scope of work includes sediment and erosion control measures, treatment facility construction, pump station installations, pipeline systems, sludge cell development, electrical infrastructure, and site rehabilitation across multiple locations including Plant Hollow, Panther Fork, Cutright, Alton, and various haulroads and ponds. The summary of quantities identifies major components such as 920 linear feet of silt fence, 15 acres of revegetation, one control and pump building, limestone and stone materials totaling 4,500 tons, one clarifier system, one rapid mix tank, three lift station systems, extensive HDPE and PVC piping networks ranging from 2 to 24 inches in diameter, new sludge cells, and ancillary infrastructure including chain link and farm fencing, caustic tanks, and electrical conduit systems. The project plans dated February 2021 provide comprehensive technical specifications, construction details, site profiles, demolition requirements, and installation standards organized across multiple detailed sheets.
The project documents establish detailed technical requirements for construction materials and methods, including specifications for concrete strength (4,000 PSI minimum), reinforcing steel (Grade 60, 60,000 PSI minimum), structural steel conforming to AISC standards, and electrical work performed by licensed West Virginia contractors with minimum five years of experience in water treatment facility installations. All electrical work must comply with the National Electrical Code and be supervised by a Master Electrician. The specifications require coordination among multiple state and federal agencies that may observe construction activities, including the WVDNR, WVSHPO, USFWS, USEPA, USACE, and OSM. The contractor assumes responsibility for site preparation, utility location coordination through WV 811, bench mark maintenance, dimensional verification, and compliance with all local, state, and federal building codes and safety regulations. Sludge removal from existing ponds and cells is included as part of the work, with the contractor required to dewater facilities as construction progresses. The treatment facility will be equipped with comprehensive monitoring and control systems, including pH probes, flow meters, automated lime dosing, lift station level controls, and an emergency diesel generator system (450 KW for the treatment plant; 100 KW for Panther Lift Station), with specific programming requirements for automated operation and manual override capabilities.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT AREA
TAX MAP
TOTAL
SHT. NO.
OFFICE OF SPECIAL RECLAMATION
SCALE: NTS
47 SCHOOL STREET, SUITE 301
PHILIPPI, WV 26416
OFFICE: 1-304-457-3219
FAX: 1-304-457-5613
Division of Land Restoration
Office of Special Reclamation
West Virginia
Department of Environmental Protection
DATE: FEBRUARY 2021
DLM COAL COMPANY
PERMIT # 138-74, 135-78, 58-77, 23-76
PLANT HOLLOW TREATMENT FACILITY
UPSHUR COUNTY, WEST VIRGINIA
SUMMARY OF QUANTITIES QUANTITY UNITS
SILT FENCE 920 LF
TYPE I REVEGETATION 15 AC
CONTROL AND PUMP BUILDING 1 LS
ACCESS ROAD REHABILITATION 1000 TN
NEW ROAD CONSTRUCTION BASE LAYER 270 LF
NEW ROAD CONSTRUCTION FINAL LAYER 270 LF
ROAD MAINTENANCE 1 LS
LIMESTONE INCIDENTAL STONE 4000 TN
NON-CALCAREOUS INCIDENTAL STONE 500 TN
TREATMENT FACILITY GRAVEL PAD 1 LS
LIME SILO SYSTEM 1 LS
CLARIFIER 1 LS
RAPID MIX TANK 1 LS
ELECTRICAL 1 LS
MAIN UNDERGROUND ELECTRICAL AND PULL BOXES 3050 LF
PANTHER FORK UNDERGROUND ELECTRICAL AND PULL BOXES 1110 LF
CUTRIGHT UNDERGROUND ELECTRICAL AND PULL BOXES 1655 LF
PANTHER FORK LIFT STATION SYSTEM 1 LS
CUTRIGHT LIFT STATION SYSTEM 1 LS
PLANT HOLLOW LIFT STATION 1 LS
FLOWMETER MANHOLE 1 EA
SEPTIC SYSTEM 1 EA
4 FOOT CONCRETE MANHOLE 2 EA
6 FOOT CONCRETE MANHOLE 4 EA
NON-POTABLE WATER SYSTEM 1 LS
NEW SLUDGE CELL 1 1 LS
NEW SLUDGE CELL 2 1 LS
SLUDGE VALVE BOX 5 EA
EXISTING SLUDGE CELL REHABILITATION 1 LS
FINAL TREATMENT POND 1 LS
EXISTING SHOP UPGRADE 1 LS
2 INCH HDPE DR-17 NPW FORCE MAIN 1435 LF
3 INCH HDPE DR-17 NPW FORCE MAIN 1180 LF
4 INCH HDPE DR-17 FORCE MAIN 260 LF
6 INCH HDPE DR-17 FORCE MAIN 2000 LF
10 INCH HDPE DR-17 FORCE MAIN 240 LF
8 INCH HDPE DR-17 SLUDGE FORCE MAIN 3300 LF
4 INCH SDR-35 COLLECTION LINE 70 LF
6 INCH SDR-35 COLLECTION LINE 170 LF
8 INCH SDR-35 GRAVITY LINE 1000 LF
8 INCH SDR-35 SEEP COLLECTOR 300 LF
8 INCH SDR-35 COLLECTION LINE 200 LF
12 INCH SDR-35 CLARIFIER DRAIN LINE 410 LF
24 INCH C-900 CONVEYANCE LINE 880 LF
24 INCH DUAL WALL CULVERT 120 LF
DISTRIBUTION TROUGH 1 EA
COLLECTION VAULT 1 EA
CONTROL TEE VAULT 1 EA
CHAIN LINK FENCE AND GATES 1720 LF
FARM FENCE AND GATES 2840 LF
1 INCH SCH 40 PVC RIGID CONDUIT 1000 LF
FIBER OPTIC ARMORED CABLE 6970 LF
HEADWALLS 2 EA
AIR RELIEF VALVE MANHOLE 2 EA
DITCH 1 50 LF
DITCH 2 75 LF
DITCH 3 525 LF
DITCH 4 600 LF
1000 GALLON DUAL WALL CAUSTIC TANK WITH GRAVEL PAD 7 EA
POND 13 CAUSTIC TANK BUILDING 1 LS
ALTON CAUSTIC TANK BUILDING RELOCATION 1 LS
BOLLARDS 51 EA
POND SLUDGE REMOVAL 5000 CY
UTILITIES NON BID ITEM
NOTE:
THE QUANTITIES SHOWN ON THE SUMMARY OF QUANTITIES REPRESENT THE AMOUNTS AS
DIRECTLY MEASURED IN THE PLANS. WHEN BIDDING IN WVOASIS THE COMMODITY LINES MAY BE
DIFFERENT AMOUNTS FROM THE PLANS TO ACCOMMODATE ANY UNFORESEEN CHANGES IN THE
FIELD. THEREFORE, ALWAYS BID ON THE QUANTITIES LISTED IN WVOASIS.
SUMMARY OF QUANTITIES
TOTAL
SHT. NO.
OFFICE OF SPECIAL RECLAMATION
SCALE: NTS
47 SCHOOL STREET, SUITE 301
PHILIPPI, WV 26416
OFFICE: 1-304-457-3219
FAX: 1-304-457-5613
Division of Land Restoration
Office of Special Reclamation
West Virginia
Department of Environmental Protection
DATE: FEBRUARY 2021
DLM COAL COMPANY
PERMIT # 138-74, 135-78, 58-77, 23-76
SEDIMENT AND EROSION CONTROL
THE FIRST ORDER OF WORK FOR THE CONTRACTOR IS TO INSTALL SEDIMENT
CONTROL STRUCTURES TO ESTABLISH EROSION CONTROL AT THE EARLIEST POSSIBLE
DATE. INITIAL CLEARING AND GRUBBING IS TO ONLY BE WHAT IS NECESSARY IN
ORDER TO ACCOMPLISH THESE OPERATIONS.
WVDEP SHALL CONDUCT PERIODIC INSPECTION OF SEDIMENT AND EROSION CONTROL
MEASURES TO INSURE PROPER OPERATION AND COMPLIANCE.
IN THE EVENT THAT THE TEMPORARY EROSION AND POLLUTION CONTROL MEASURES
ARE ORDERED BY THE PROJECT CONTACT DUE TO THE CONTRACTOR'S NEGLIGENCE,
CARELESSNESS, OR FAILURE TO INSTALL PERMANENT CONTROLS AS PART OF THE
WORK AS SCHEDULED, SUCH WORK SHALL BE PERFORMED BY THE CONTRACTOR AT
THE CONTRACTOR'S EXPENSE.
WASTE AND BORROW SITES
WHEN REQUIRED, WASTE AND BORROW SITES SHALL BE DEPICTED ON THE PROJECT
PLANS. DURING THE CONTRACT, IF ADDITIONAL WASTE AND BORROW SITES ARE
REQUIRED, THE CONTRACTOR SHALL CONTACT THE PROJECT CONTACT.
NO WASTE OR BORROW SITES SHALL BE PERMITTED WITHIN ANY FLOODPLAIN,
WETLANDS, OR HIGHLY SENSITIVE CULTURAL RESOURCES.
EXISTING PIPE REMOVAL
ANY EXISTING PIPES THAT ARE REMOVED DURING CONSTRUCTION SHALL BECOME
THE PROPERTY OF THE WVDEP, UNLESS OTHERWISE NOTED. THE COST OF THE
REMOVAL OF EXISTING PIPES SHALL BE INCLUDED IN THE COMMODITY LINE ITEM "SITE
PREPARATION" AND SHALL INCLUDE REMOVAL, DISPOSAL, AND BACKFILL WITH
SUITABLE MATERIAL.
CONSTRUCTION ENTRANCE AND ROADS
CONSTRUCTION ENTRANCE(S) SHALL BE INSTALLED AT THE LOCATION(S) SHOWN ON
THE PROJECT PLANS.
THE CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTAINING THE ROADS IN A CLEAN
AND DUST FREE CONDITION.
AGGREGATE BASE COURSE SHALL BE APPLIED IMMEDIATELY FOLLOWING ROUGH
GRADING PER PROJECT PLAN DETAILS.
ELECTRICAL
THE CONTRACTOR SHALL FOLLOW ALL LATEST LOCAL, STATE, AND FEDERAL
ELECTRICAL CODES, INCLUDING THE NATIONAL ELECTRICAL CODE (NEC).
ALL ELECTRICAL WORK PERFORMED SHALL BE EITHER COMPLETED BY OR UNDER THE
DIRECT SUPERVISION OF A MASTER ELECTRICIAN.
THE GENERAL CONTRACTOR OR AN ELECTRICAL SUBCONTRACTOR SHALL BE
LICENSED IN THE STATE OF WEST VIRGINIA TO PERFORM ELECTRICAL WORK. THE
COMPANY PERFORMING THE ELECTRICAL WORK SHALL HAVE A MINIMUM OF FIVE (5)
YEARS OF EXPERIENCE IN THE INSTALLATION OF ELECTRICAL SYSTEMS FOR WATER
TREATMENT FACILITIES. THE COMPANY MAY EMPLOY WEST VIRGINIA LICENSED
JOURNEYMAN ELECTRICIANS WORKING UNDER THE SUPERVISION OF THE MASTER
ELECTRICIAN. HOWEVER, NO MORE THAN ONE APPRENTICE PER JOURNEYMAN SHALL
BE PERMITTED.
UTILITIES
THE LOCATIONS OF ALL KNOWN UTILITIES ARE SHOWN ON THE PROJECT PLANS AND
FIELD INFORMATION. THE CONTRACTOR IS RESPONSIBLE TO ASCERTAIN THE STATUS
AND LOCATION OF EACH UTILITY WHEN PERFORMING WORK WHICH MAY AFFECT THE
FACILITIES, INCLUDING CALLING WV 811, PROBING, EXCAVATION, OR ANY OTHER
PRECAUTION REQUIRED TO CONFIRM LOCATION. THE CONTRACTOR WILL BE
RESPONSIBLE FOR ANY DAMAGE OR DISRUPTION TO UTILITY LINES WHICH ARE KNOWN
ACTIVE AND ARE TO REMAIN IN OPERATION.
DRAINAGE
THE CONTRACTOR SHALL MAINTAIN WORKING STORM DRAINAGE SYSTEMS THROUGH THE WORK
AREAS AT ALL TIMES DURING CONSTRUCTION. THE WORKING SYSTEM MAY CONSIST OF THE
EXISTING STORM DRAINAGE SYSTEM, THE PROPOSED STORM DRAINAGE SYSTEM OR COMBINATION
THEREOF.
BENCH MARKS
THE CONTRACTOR SHALL BE RESPONSIBLE FOR HOLDING BENCH MARK LOCATIONS THROUGHOUT
THE LIFE OF THE CONTRACT. IN THE EVENT THAT A BENCH MARK IS DISTURBED, THE
CONTRACTOR, AS DIRECTED BY THE PROJECT CONTACT, WILL RELOCATE OR RE-ESTABLISH THE
BENCH MARK. NO ADDITIONAL PAYMENT OR COMPENSATION WILL BE MADE FOR THIS WORK.
VERIFICATION OF DIMENSIONS
THE CONTRACTOR IS RESPONSIBLE FOR VERIFICATION OF ALL PLAN AND ELEVATION DIMENSIONS
PRIOR TO ORDERING MATERIALS FOR THE CONSTRUCTION OF THE VARIOUS COMMODITY LINE
ITEMS IN THIS CONTRACT.
NOTICE TO CONTRACTORS
REPRESENTATIVES OF THE FOLLOWING STATE AND FEDERAL AGENCIES MAY BE IN THE AREA ON
OCCASION TO OBSERVE, INSPECT AND MONITOR THE CONSTRUCTION ACTIVITIES:
WEST VIRGINIA DEPARTMENT OF ENVIRONMENTAL PROTECTION, (WVDEP)
WEST VIRGINIA DIVISION OF NATURAL RESOURCES, (WVDNR)
WEST VIRGINIA STATE HISTORIC PRESERVATION OFFICE, (WVSHPO)
UNITED STATES FISH AND WILDLIFE SERVICES, (USFWS)
UNITED STATES ENVIRONMENTAL PROTECTION AGENCY, (USEPA)
UNITED STATES ARMY CORPS OF ENGINEERS, (USACE)
UNITED STATES NATURAL RESOURCES CONSERVATION SERVICE,(USNRCS)
ADVISORY COUNCIL OF HISTORIC PRESERVATION, (ACHP)
UNITED STATES DEPARTMENT OF AGRICULTURE, FOREST SERVICE, (USDA, FS)
OFFICE OF SURFACE MINING (OSM)
SHOP DRAWINGS
SHOP DRAWINGS SHALL BE SENT TO THE ATTENTION OF THE PROJECT CONTACT.
GEOTECHNICAL REPORT
WHEN SITE CONDITIONS REQUIRE A GEOTECHNICAL REPORT, REFER TO TECHNICAL SPECIFICATION
SECTION 14-1 GEOTECHNICAL REPORT. ANY INQUIRIES SHALL BE DIRECTED TO THE PROJECT
CONTACT.
ELEVATIONS
ALL ELEVATIONS SHOWN REFER TO THE NORTH AMERICAN VERTICAL DATUM OF 1988. (NAD88)
COORDINATES
THE PROJECT PLAN DATUMS ARE BASED UPON THE NORTH OR SOUTH ZONE OF THE WEST
VIRGINIA STATE PLANE SYSTEM. THE HORIZONTAL DATUM IS BASED ON THE NORTH\
AMERICAN DATUM OF 1983 (NAD 83). GRID FACTORS ARE NOT REQUIRED WHEN MAKING FIELD
MEASUREMENTS.
CROSS-SECTION VIEWS
ALL CROSS SECTIONS ARE TO BE VIEWED IN THE DIRECTION OF THE ARROW.
VIEWING DIRECTION
FOUNDATIONS
1. THE CONTRACTOR SHALL REVIEW THE SUBSURFACE INVESTIGATION
REPORT, IF AVAILABLE, BEFORE THE START OF CONSTRUCTION.
2. THE CONTRACTOR SHALL NOT PLACE ANY FOUNDATION UNTIL THE
SUBGRADE HAS BEEN ACCEPTED BY THE PROJECT CONTACT.
STRUCTURAL STEEL
1. ALL STEEL SHALL CONFORM TO THE AISC "SPECIFICATIONS FOR THE
DESIGN, FABRICATION AND ERECTION OF STRUCTURAL STEEL FOR
BUILDINGS", LATEST EDITION.
2. WELDED CONNECTIONS SHALL CONFORM TO THE LATEST EDITION OF
AMERICAN WELDING SOCIETY, AWS D1.1.
3. ALL EXTERIOR STRUCTURAL STEEL SHALL BE PAINTED IN ACCORDANCE
WITH TECHNICAL SPECIFICATION SECTION 13-15 PAINTING METAL
STRUCTURES.
CAST-IN-PLACE CONCRETE
1. ALL CONCRETE SHALL HAVE A MINIMUM COMPRESSIVE STRENGTH AT
TWETNY-EIGHT (28) DAYS OF FOUR THOUSAND (4,000) PSI UNLESS OTHERWISE
NOTED.
2. ALL CONCRETE WORK SHALL BE CONSTRUCTED IN ACCORDANCE WITH
"BUILDING CODE REQUIREMENTS FOR REINFORCED CONCRETE" ACI 350-01.
3. ALL EMBEDDED ITEMS ARE NOT SHOWN ON THE PROJECT PLANS. THE
CONTRACTOR SHALL REVIEW THE PROJECT PLANS OF THE VARIOUS TRADES
AND COORDINATE PLACEMENT OF EMBEDDED ITEMS.
4. CONSTRUCTION JOINTS ARE SHOWN ON THE PROJECT PLANS. ANY CHANGES
OR ADDITIONS SHALL BE SUBMITTED TO THE PROJECT CONTACT BEFORE
CONCRETE PLACEMENT. USE TWO (2) INCH X FOUR (4) INCH KEY FOR LESS
THAN EIGHTEEN (18) INCH WALL OR SLAB THICKNESS AND TWO (2) INCH X SIX
(6) INCH KEY FOR THICKNESS OF EIGHTEEN (18) INCHES AND GREATER.
5. PROVIDE FORM COVER WITH A MINIMUM OF TWO (2) INCH OF CONCRETE FROM
THE OUTSIDE SURFACE. TIES FOR WALLS SUBJECT TO HYDROSTATIC
PRESSURE SHALL HAVE WATERSTOPS.
6. PROVIDE ROUGH BROOM FINISH FOR EXTERIOR SLABS AND STEEL TROWEL
FINISH FOR INTERIOR SLABS UNLESS NOTED OTHERWISE.
REINFORCING STEEL
1. ASTM, A615, A616, OR A617, GRADE 60, MINIMUM YIELD STRENGTH SIXTY
THOUSAND (60,000) PSI.
2. REINFORCING DETAILS SHALL CONFORM TO ACI "DETAILING MANUAL - 1994"
OR AS SHOWN ON THE PROJECT PLANS.
3. MINIMUM BAR LAPS
TOP OTHER
#9 BAR 90 INCHES 65 INCHES
#8 BAR 71 INCHES 51 INCHES
#7 BAR 54 INCHES 39 INCHES
#6 BAR 43 INCHES 31 INCHES
#5 BAR 36 INCHES 26 INCHES
#4 BAR 28 INCHES 20 INCHES
4. MINIMUM CLEARANCE
a. CAST AGAINST EARTH - 3"
b. #6 BARS AND LARGER - 2"
c. #5 BARS AND SMALLER - 2"
STRUCTURAL LINTELS
UNLESS SHOWN OTHERWISE, PROVIDE THE FOLLOWING LINTEL ANGLES:
MASONRY OPENING ANGLE & SIZE BEARING
4'-0" TO LESS (2) 3
X 3
X
6"
4'-1" TO 6'-0" (2) 4 X 3
X
LLV 6"
6'-1" TO 7'-0" (2) 5 X 3
X
LLV 6"
7'-1" TO 3'-0" (2) 6 X 3
X
LLV 6"
8'-1" TO 9'-0" (2) 7 X 4 X
LLV 6"
1. ALL LINTELS SHALL BE GALVANIZED.
2. ALL LINTELS SHALL HAVE TWELVE (12) INCHES OF SOLID MASONRY BELOW
BEARING END.
BLOCK CONSTRUCTION
1. MASONRY WORK SHALL CONFORM TO THE LATEST EDITION OF THE "NATIONAL
CONCRETE MASONRY ASSOCIATION."
2. HOLLOW LOAD-BEARING CONCRETE MASONRY UNITS SHALL MEET THE
REQUIREMENTS OF ASTM C90 AND HAVE A TWO (2) HOUR FIRE RATING.
3. MORTAR SHALL BE TYPE S IN ACCORDANCE WITH ASTM C-270 AND HAVE A
MINIMUM COMPRESSIVE STRENGTH OF ONE THOUSAND EIGHT HUNDERED
(1,800) PSI AT TWENTY-EIGHT (28) DAYS, GROUT SHALL HAVE A MINIMUM
COMPRESSIVE STRENGTH OF TWO THOUSAND FIVE HUNDRED (2,500) PSI AT
TWENTY-EIGHT (28) DAYS.
4. REINFORCING STEEL SHALL BE ASTM, A615, A616, OR A617 YIELD GRADE 60.
MINMUM STRENGTH SIXTY THOUSAND (60,000) PSI.
5. REINFORCING STEEL SHALL BE LAPPED AS SPECIFIED ON THIS SHEET. (REF
REINFORCING STEEL, SUB 3)
6. BLOCK MANUFACTURER SHALL PROVIDE A CONTROL JOINT DETAIL TO BE
REVIEWED AND APPROVED BY THE PROJECT CONTACT DURING
CONSTRUCTION.
GENERAL NOTES STRUCTURAL NOTES
GENERAL AND STRUCTURAL NOTES
TOTAL
SHT. NO.
GENERAL STEEL NOTES
1. STEEL FABRICATION AND ERECTION SHALL COMPLY WITH THE LATEST EDITIONS
OF THE FOLLOWING CODES & STANDARDS:
A. AMERICAN INSITUTE OF STEEL CONSTRUCTION (AISC) SPECIFICATION FOR
STRUCTURAL STEEL BUILDINGS.
B. RESEARCH COUNCIL ON STRUCTURAL CONNECTIONS (RCSC) SPECIFICATION
FOR STRUCTURAL STEEL JOINTS USING HIGH-STRENGTH BOLTS.
C. WELDING AS PER AMERICAN WELDING SOCIETY (AWS) D1.1 "STRUCTURAL
WELDING CODE.
D. STATE BUILDING CODE - LATEST EDITION.
E. FEDERAL REGULATIONS OT THE OCCUPATIONAL SAFETY AND HEALTH
ADMINISTRATION (OSHA) OF THE U.S. DEPARTMENT OF LABOR, TITLE 29.
F. ASTM INTERNATIONAL (ASTM) A992 STANDARD SPECIFICATION FOR
STRUCTURAL STEEL SHAPES.
G. ASTM A36 STANDARD SPECIFICATION FOR CARBON STEEL STRUCTURAL
STEEL.
H. PAINTING TO BE IN ACCORDANCE WITH THE SSPC PAINTING MANUAL:
1. VOLUME 1 - GOOD PAINTING PRACTICE
2. VOLUME 2 - SYSTEMS AND SPECIFICATIONS.
2. C SHAPES & ANGLE SHALL BE ASTM A992.
3. ALL OTHER PLATES AND SHAPES SHALL BE ASTM A36.
4. BOLT ASSEMBLY SHALL BE 3/4" ASTM F3125, GRADE A325 BOLTS; ASTM A563 NUTS,
GRADE C PLAIN; ASTM F436 WASHER, PLAIN.
5. THE STRUCTURAL STEEL DETAILER IS RESPONSIBLE FOR THE DESIGN OF ALL
CONNECTIONS, EXCEPT THOSE SPECIFICALLY SHOWN ON THE DESIGN DRAWINGS.
6. ALL BOLTED CONNECTIONS SHALL BE FULLY PRE TENSIONED.
7. ALL BOLTED CONNECTIONS SHALL HAVE A MINIMUM OF TWO (2) BOLTS.
8. FABRICATOR SHALL FURNISH ALL FIELD BOLTS, NUTS AND WASHERS NECESSARY.
9. WHERE FIELD WELD IS SPECIFIED, THE FABRICATOR SHALL FURNISH ALL
NECESSARY CLIPS AND BOLTS.
10. ALL GRATING TO BE MOLDED FIBERGLASS AS MANUFACTURED BY MCNICHOLS OR
EQ.
A. SERIES TYPE TO BE MS-S-150.
B. CONSTRUCTION TYPE TO BE MOLDED
C. GRID SHAPE TO BE SQUARE.
D. PRIMARY MATERIAL TO BE FIBERGLASS
E. RESIN TO BE SGF POLYESTER RESIN (SGF)
F. GRID SIZE TO BE 1 1/2" x 1 1/2" ON CENTER.
G. GRID HEIGHT TO BE 1 1/2".
H. GRID THICKNESS TO BE 1/4".
I. COLOR TO BE YELLOW.
J. GRATING SHALL BE ATTACHED WITH STAINLESS STEEL, TYPE 316 FRICTION
TYPE GRATING CLIPS.
OFFICE OF SPECIAL RECLAMATION
SCALE: NTS
47 SCHOOL STREET, SUITE 301
PHILIPPI, WV 26416
OFFICE: 1-304-457-3219
FAX: 1-304-457-5613
Division of Land Restoration
Office of Special Reclamation
West Virginia
Department of Environmental Protection
DATE: FEBRUARY 2021
DLM COAL COMPANY
PERMIT # 138-74, 135-78, 58-77, 23-76
OUTLET CROSS-SECTION
UP-SLOPE FACE
R3-ROCK
AASHTO #57
6" MIN.
1 MIN.
1 MIN.
FILTER FABRIC OR
STRAW BALES
WOOD POSTS
1 MIN.
HEIGHT OF ROCK FILTER = 5/6
HEIGHT OF FILTER FABRIC FENCE
OR STRAW BALES
3' MIN.
AASHTO #57
S
L
O
P
E
L
1'
3"
F
L
O
W
RUN
R I S
E
9"
3" MIN.
SECTION A-A'
SECTION C-C'
NOTE:
1. SPACING OF PREFABRICATED DITCH CHECKS
SHALL BE THE SAME AS STONE DITCH CHECKS.
2. AASHTO #1 (2-4 INCH) SHALL BE USED, AND MAY
BE REINFORCED WITH 3 TO 6 INCH RIPRAP.
3. THE MINIMUM DITCH DEPTH IS 1.0'.DITCH MAY BE
TRAPEZOIDAL OR V-DITCH.
A
A'
C
C'
L
L= (160/S), WITH A 100' MAX
WHERE,
L= SPACING IN FEET
S= % SLOPE= (RISE/RUN) X 100
9"
3" MIN.
ROCK CHECK DAM
NTS
3"
2"-5"
12"
6"
2.4.
5.
3B.
1.
3A.
CRITICAL POINTS
A. OVERLAPS AND SEAMS
B. PROJECTED WATER LINE
C. CHANNEL BOTTOM/SIDE
SLOPE VERTICES
* HORIZONTAL STAPLE SPACING SHOULD BE ALTERED
IF NECESSARY TO ALLOW STAPLES TO SECURE THE
CRITICAL POINTS ALONG THE CHANNEL SURFACE.
A
A
B
C
B
C
** IN LOOSE SOIL CONDITIONS, THE USE OF STAPLE
OR STAKE LENGTHS GREATER THAN 6" MAY BE
12"
6"
6"
6"
4"-6"
4"
(15 cm)
NOTE:
NECESSARY TO PROPERLY ANCHOR THE BLANKETS.
4"
2"-5"
1.
6.
7.
2.
5.
4.8.
3.
6"
M
I N
4" MIN
FLOW
EMBED FILTER FABRIC
MIN. 6" INTO GROUND
FILTER FABRIC
FILTER FABRIC
THE FENCE POSTS AND EXTEND
IT INTO THE DITCH.
EXTENSION OF FABRIC INTO TRENCH
FENCE POST
THE EXCAVATED SOIL.
48" MIN. FENCE
OF FILTER ABOVE
GROUND SURFACE
30" MIN. HEIGHT
F
L
O
W
F
L
O
W
M
A
X
C
O
2. ATTACH THE FILTER FABRIC TO
A 4" X 4" TRENCH UPSLOPE
ALONG THE LINE OF POSTS.
1. SET POSTS AND EXCAVATE
3. BACKFILL AND COMPACT
POST
48" HIGH (MIN.) FENCE POSTS
NOTE:
SILT FENCE SHALL BE INSTALLED IN THE LOCATIONS SHOWN ON THE PROJECT PLANS AND IN
ACCORDANCE WITH THE DRAWING DETAILS SHOWN:
1. A TRENCH SHALL BE PLOWED OR OTHERWISE EXCAVATED TO THE REQUIRED DEPTH
WITH LITTLE, IF ANY, DISTURBANCE TO THE DOWN SLOPE SIDE OF THE TRENCH. THE
BOTTOM OF THE TRENCH AND THE FENCE TOP SHALL BE PLACED ON A LEVEL GRADE.
WHEN IT IS NECESSARY TO CROSS SMALL DEPRESSIONS, THE TRENCH BOTTOM AND
FENCE TOP MAY DEVIATE SLIGHTLY FROM THE LEVEL GRADE. GRADES IN SUCH
SECTIONS WILL NOT EXCEED 1%, NOR WILL THE DEVIATION EXTEND
FOR MORE THEN TWENTY-FIVE (25) FEET.
2. SUPPORT STAKES WILL BE DRIVEN TO THE REQUIRED DEPTH BELOW THE EXISTING
GROUND SURFACE AT THE SPECIFIED INTERVALS.
3. STRETCH AND FASTEN FABRIC TO THE UP-SLOPE SIDE OF THE SUPPORT STAKES.
4. WHERE THE ENDS OF THE FABRIC COME TOGETHER, THEY BE BE OVERLAPPED,
FOLDED, AND STAPLED TO PREVENT SEDIMENT BYPASS.
5. THE TOE ANCHOR WILL BE BACKFILLED AND COMPACTED TO A DENSITY EQUAL TO THE
SURROUNDING SOILS.
6. FILTER FABRIC IS TO BE FASTENED SECURELY TO POSTS WITH WIRE TIES OR STAPLES.
7. WHEN TWO SECTIONS OF FILTER FABRIC ADJOIN EACH OTHER, THEY SHALL BE
OVERLAPPED BY SIX INCHES AND FOLDED.
8. MAINTENANCE SHALL BE PERFORMED AS NEEDED AND INSPECTED FOR DAMAGE
AFTER RAINS.
9. POSTS SHALL BE CONSTRUCTED OF TWO (2) INCH X TWO (2) INCH HARDWOOD, THREE
(3) FEET LONG.
10. APPROVED PREFABRICATED UNITS INCLUDE "GEOFAB", "ENVIROFENCE", OR APPROVED
EQUAL.
11. REFER TO TECHNICAL SPECIFICATION SECTION 6-2 SEDIMENT CONTROL FOR MORE
DETAILS.
1. PREPARE SOIL BEFORE INSTALLATION BLANKETS, INCLUDING ANY NECESSARY APPLICATION OF LIME, FERTILIZER, AND SEED. WHEN USING
EROSION MATTING.
2. BEGIN AT THE TOP OF THE CHANNEL BY ANCHORING THE BLANKET IN A SIX (6) INCH DEEP X SIX (6) INCH WIDE TRENCH THAT WITH
APPROXIMATELY TWELVE (12) INCHES OF BLANKET EXTENDED BEYOND THE UP-SLOPE PORTION OF THE TRENCH. ANCHOR THE BLANKET
WITH A ROW OF STAPLES/STAKES APPROXIMATELY TWELVE (12) INCHES APART IN THE BOTTOM OF THE TRENCH. BACKFILL AND COMPACT
THE TRENCH AFTER STAPLING. APPLY SEED TO COMPACTED SOIL AND FOLD REMAINING TWELVE (12) INCH PORTION OF BLANKET BACK
OVER SEED AND COMPACTED SOIL. SECURE BLANKET OVER COMPACTED SOIL WITH A ROW OF STAPLES/STAKES SPACED APPROXIMATELY
TWELVE (12) INCHES ACROSS THE WIDTH OF THE BLANKET.
3. ROLL CENTER BLANKET IN DIRECTION OF WATER FLOW IN BOTTOM OF CHANNEL. BLANKETS WILL UNROLL WITH APPROPRIATE SIDE AGAINST
THE SOIL SURFACE. ALL BLANKETS MUST BE SECURELY FASTENED TO THE SOIL SURFACE BY PLACING STAPLES/STAKES IN APPROPRIATE
LOCATIONS AS SHOWN IN THE STAPLE PATTERN GUIDE. WHEN USING THE DOT SYSTEM, STAPLES/STAKES SHOULD BE PLACED THROUGH
EACH OF THE COLORED DOTS CORRESPONDING TO THE APPROPRIATE STAPLE PATTERN.
4. PLACE CONSECUTIVE BLANKETS END OVER END (SHINGLE STYLE) WITH A FOUR (4) INCH TO SIX (6) INCH OVERLAP. USE A DOUBLE ROW OF
STAPLES STAGGERED FOUR (4) INCHES APART AND FOUR (4) INCH ON CENTER TO SECURE BLANKETS.
5. FULL LENGTH EDGE OF BLANKETS AT TOP OF SIDE SLOPES MUST BE ANCHORED WITH A ROW OF STAPLES/STAKES APPROXIMATELY TWELVE
(12) INCHES APART IN A SIX (6) INCH DEEP X SIX (6) INCH WIDE TRENCH. BACKFILL AND COMPACT THE TRENCH AFTER STAPLING.
6. ADJACENT BLANKETS MUST BE OVERLAPPED APPROXIMATELY TWO (2) TO FIVE (5) INCHES (DEPENDING ON BLANKET TYPE) AND STAPLED.
7. IN HIGH FLOW CHANNEL APPLICATIONS, A STAPLE CHECK SLOT IS RECOMMENDED AT THIRTY (30) TO FORTY (40) FOOT INTERVALS. USE A
DOUBLE ROW OF STAPLES STAGGERED FOUR (4) INCHES APART AND FOUR (4) INCH ON CENTER THE ENTIRE WIDTH OF THE CHANNEL.
8. THE TERMINAL END OF THE BLANKETS MUST BE ANCHORED WITH A ROW OF STAPLES/STAKES APPROXIMATELY TWELVE (12) INCHES APART IN
A SIX (6) INCH DEEP X SIX (6) INCH WIDE TRENCH. BACKFILL AND COMPACT THE TRENCH AFTER STAPLING.
1. PREPARE SOIL BEFORE INSTALLATION BLANKETS, INCLUDING ANY NECESSARY APPLICATION OF LIME, FERTILIZER, AND SEED. WHEN USING
EROSION MATTING.
2. BEGIN AT THE TOP OF THE CHANNEL BY ANCHORING THE BLANKET IN A SIX (6) INCH DEEP X SIX (6) INCH WIDE TRENCH THAT WITH
APPROXIMATELY TWELVE (12) INCHES OF BLANKET EXTENDED BEYOND THE UP-SLOPE PORTION OF THE TRENCH. ANCHOR THE BLANKET
WITH A ROW OF STAPLES/STAKES APPROXIMATELY TWELVE (12) INCHES APART IN THE BOTTOM OF THE TRENCH. BACKFILL AND COMPACT
THE TRENCH AFTER STAPLING. APPLY SEED TO COMPACTED SOIL AND FOLD REMAINING TWELVE (12) INCH PORTION OF BLANKET BACK
OVER SEED AND COMPACTED SOIL. SECURE BLANKET OVER COMPACTED SOIL WITH A ROW OF STAPLES/STAKES SPACED APPROXIMATELY
TWELVE (12) INCHES ACROSS THE WIDTH OF THE BLANKET.
3. ROLL CENTER BLANKET IN DIRECTION OF WATER FLOW IN BOTTOM OF CHANNEL. BLANKETS WILL UNROLL WITH APPROPRIATE SIDE AGAINST
THE SOIL SURFACE. ALL BLANKETS MUST BE SECURELY FASTENED TO THE SOIL SURFACE BY PLACING STAPLES/STAKES IN APPROPRIATE
LOCATIONS AS SHOWN IN THE STAPLE PATTERN GUIDE. WHEN USING THE DOT SYSTEM, STAPLES/STAKES SHOULD BE PLACED THROUGH
EACH OF THE COLORED DOTS CORRESPONDING TO THE APPROPRIATE STAPLE PATTERN.
4. THE EDGES OF PARALLEL BLANKETS MUST BE STAPLED WITH APPROXIMATELY TWO (2) INCH TO FIVE (5) INCH OVERLAP DEPENDING ON
BLANKET TYPE.
5. CONSECUTIVE BLANKETS SPLICED DOWN THE SLOPE MUST BE PLACED END OVER END (SHINGLE STYLE) WITH AN APPROXIMATE THREE (3)
INCH OVERLAP. STAPLE THROUGH OVERLAPPED AREA, APPROXIMATELY TWELVE (12) INCHES APART ACROSS THE ENTIRE BLANKET WIDTH.
6. IN LOOSE SOIL CONDITIONS, THE USE OF STAPLE OR STAKE LENGHTS GREATER THAN SIX (6) INCHES MAY BE NECESSARY TO PROPERLY
SECURE THE BLANKETS.
1'
1'
EROSION MATTING
NTS
ROCK FILTER OUTLETS
NTS
SILT FENCE DETAIL
NTS
CONSTRUCTION DETAIL
INSTALLATION DETAIL
SLOPE INSTALLATION
CHANNEL INSTALLATION
STORAGE TANK
COMPACTED
SOIL
COMPACTED
SOIL
10 MIL PLASTIC LINER
EARTHEN BASIN
4 SIDES
LOOSE SAND TO PROTECT
PLASTIC LINER FROM PUNCTURE
BURY "ENDS" OR WEIGHT
TO SECURE LINER (TYP.)
(H) MIN 2'
6'4'
2" SS - NPT
MALE THREAD
2" BANJO BALL VALVE OR
APPROVED EQUIVALENT
SEAL TO LINER BY MEANS
OF MECHANICAL FITTINGS
OR WELDING
SPILL CONTAINMENT DETAIL
NTS
NOTES:
1. SELECTED HEIGHT (H) OF EARTHEN BERM IS TO BE A TWO (2) FOOT MINIMUM OR 110% OF THE CAPACITY
OF THE TANK(S) TOTAL VOLUME WITHIN THE BERM. A SIX (6) INCH FREEBOARD MUST BE INCLUDED.
2. A TWO (2) INCH WATER REMOVAL DRAIN SHALL BE LOCATED AT THE LOWEST POINT IN THE BOTTOM OF
THE CONTAINMENT VOLUME. IT SHALL CONNECT TO A NORMALLY CLOSED VALVE OUTSIDE THE DIKE.
THE VALVE SHALL BE MANUALLY OPERATED AND PROTECTED FROM UNAUTHORIZED OPERATION.
RAINWATER CONTAINED WITHIN THIS DIKE SHALL BE EXAMINED PRIOR TO RELEASE TO ENSURE THAT
HARMFUL QUANTITIES OF FUELS AND LUBRICANTS ARE NOT DISCHARGED. ALTERNATE METHODS OF
WATER REMOVAL WILL BE CONSIDERED FOR APPROVAL.
3. TANKS WITH SECONDARY CONTAINMENT MAY BE USED AS AN ALTERNATIVE.
SECTION A-A'
A
A'
8'
6'
2'
3"
MIN
F l o w
SEDIMENT SUMP DETAIL
NTS
STRAW OR HAY BALE DIKE DETAILS
NTS
NOTES:
1. BALES SHALL BE PLACED IN A ROW WITH ENDS TIGHTLY ABUTTING THE ADJACENT BALES.
2. ALL BALES SHALL BE EMBEDDED IN THE SOIL A MINIMUM OF FOUR (4) INCHES OR BALES COVERED WITH A FILTER MAT, WITH EARTH TAMPED
ON THE UPSTREAM SIDE TO PREVENT PIPING.
3. BALES SHALL BE SECURELY ANCHORED IN PLACE BY STAKES DRIVEN THROUGH THE BALES. THE FIRST STAKE IN EACH BALE SHALL BE
DRIVEN TOWARD PREVIOUSLY LAID BALE TO FORCE BALES TOGETHER.
4. BALES SHALL BE REMOVED AS DIRECTED BY THE ENGINEER.
ANCHORING DETAIL END VIEW
F L O
W
EMBEDDED AS SITE
CONDITIONS DICTATE TO
PREVENT FLOW UNDER
BALES.
SOIL COMPACTED TO
PREVENT PIPING
ANGLE FIRST STAKE TOWARD
PREVIOUSLY LAID BALE
BOUND BALES
PLACED ON CONTOUR
2" X 2" STAKES MINIMUM OF 1 FT. INTO GROUND
SEDIMENT AND EROSION CONTROL
TOTAL
SHT. NO.
OFFICE OF SPECIAL RECLAMATION
SCALE: NTS
47 SCHOOL STREET, SUITE 301
PHILIPPI, WV 26416
OFFICE: 1-304-457-3219
FAX: 1-304-457-5613
Division of Land Restoration
Office of Special Reclamation
West Virginia
Department of Environmental Protection
DATE: FEBRUARY 2021
DLM COAL COMPANY
PERMIT # 138-74, 135-78, 58-77, 23-76
PLANT HOLLOW TREATMENT FACILITY
UPSHUR COUNTY, WEST VIRGINIA
AutoCAD SHX Text 4"
W.E.
2187.8
2163.5
W.E.
BAFFLE CURTAIN
PLANT HOLLOW
PANTHER FORK
CUTRIGHT
ALTON
POND 13
HAULROAD 2
HAULROAD 3
LITTLE WOODY
DLM SHOP
CAUSTIC TANK
CAUSTIC TANK
CAUSTIC TANK
CAUSTIC TANK
CAUSTIC TANK
CAUSTIC TANK
CAUSTIC TANK
CAUSTIC TANK
CAUSTIC TANK
CAUSTIC TANK
CAUSTIC TANK
CAUSTIC TANK
CAUSTIC TANK
CP-1
CP-10
CP-2
CP-3
CP-4
CP-5
CP-6
CP-7
CP-8
CP-9
CP-11
CP-12
CP-13
CP-14
CP-15
POND 2
POND 4
POND 4
SUMP
POND 3
SLUDGE CELL
POND 1
DUGOUT A
DUGOUT B
PERMIT
BOUNDARY
PERMIT
BOUNDARY
PERMIT
BOUNDARY
PERMIT
BOUNDARY
PERMIT
BOUNDARY
PERMIT
BOUNDARY
PERMIT
BOUNDARY
PERMIT
BOUNDARY
PERMIT
BOUNDARY
PERMIT
BOUNDARY
IRON PIPE
PROPERTY LINE
PROPERTY LINE
PROPERTY LINE
PROPERTY LINE
TOTAL
SHT. NO.
OFFICE OF SPECIAL RECLAMATION
SCALE: 1:300
47 SCHOOL STREET, SUITE 301
PHILIPPI, WV 26416
OFFICE: 1-304-457-3219
FAX: 1-304-457-5613
Division of Land Restoration
Office of Special Reclamation
West Virginia
Department of Environmental Protection
DATE: FEBRUARY 2021
DLM COAL COMPANY
PERMIT # 138-74, 135-78, 58-77, 23-76
PLANT HOLLOW TREATMENT FACILITY
UPSHUR COUNTY, WEST VIRGINIA
DLM SITE OVERVIEW
CONTROL POINT COORDINATES
POINT # NORTHING EASTING ELEVATION
CP-1 663299.6086 2195014.6980 1937.1465'
CP-2 662988.2618 2195382.0310 1966.5760'
CP-3 662740.1856 2195792.9270 1982.2454'
CP-4 662495.2782 2195946.6300 1981.7291'
CP-5 662253.8606 2196762.4360 2025.0962'
CP-6 662083.1216 2196963.9360 2054.4221'
CP-7 661812.1757 2196977.8790 20527.7428'
CP-8 661624.2168 2197352.9630 2085.0903'
CP-9 662864.4349 2198624.3430 2008.8503'
CP-10 662761.7425 2198660.1720 2009.1722'
CP-11 664884.6848 2196282.5290 2012.6716'
CP-12 664738.8481 2196399.1360 2012.6796'
CP-13 664533.3412 2196134.8400 2016.8936'
CP-14 660308.1770 2196432.3360 2156.3800'
CP-15 660501.3360 2196471.2170 2162.3300'
IRON PIPE 663124.6747 2195062.6906 1944.0600'
NOTE:
IRON PIPE LOCATED AT PLANT HOLLOW SITE TO BE
REPLACED ONCE CONSTRUCTION IS COMPLETED.
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
WELL
AutoCAD SHX Text
WELL
AutoCAD SHX Text
WELL
AutoCAD SHX Text W.E.
AutoCAD SHX Text W.E.
AutoCAD SHX Text W.E.
AutoCAD SHX Text W.E.
AutoCAD SHX Text W.E.
AutoCAD SHX Text W.E.
AutoCAD SHX Text W.E.
AutoCAD SHX Text W.E.
AutoCAD SHX Text W.E.
AutoCAD SHX Text W.E.
AutoCAD SHX Text 1929.7
AutoCAD SHX Text 2007.2
AutoCAD SHX Text 2009.1
AutoCAD SHX Text 1983.9
AutoCAD SHX Text 2005.8
AutoCAD SHX Text 2028.7
AutoCAD SHX Text 2036.2
AutoCAD SHX Text 2083.6
AutoCAD SHX Text 2077.8
AutoCAD SHX Text 2007.5
AutoCAD SHX Text
WELL
AutoCAD SHX Text
WELL
AutoCAD SHX Text W.E.
AutoCAD SHX Text W.E.
AutoCAD SHX Text 2038.8
AutoCAD SHX Text 2078.9
AutoCAD SHX Text W.E.
AutoCAD SHX Text
WELL
AutoCAD SHX Text 2110.4
AutoCAD SHX Text 2021.3
AutoCAD SHX Text W.E.
AutoCAD SHX Text
WELL
AutoCAD SHX Text 2037.5
AutoCAD SHX Text W.E.
AutoCAD SHX Text 2032.2
AutoCAD SHX Text W.E.
AutoCAD SHX Text 2016.5
AutoCAD SHX Text W.E.
AutoCAD SHX Text 2002.1
AutoCAD SHX Text 1980.5
AutoCAD SHX Text W.E.
AutoCAD SHX Text 2013.3
AutoCAD SHX Text W.E.
AutoCAD SHX Text W.E.
AutoCAD SHX Text 1966.0
AutoCAD SHX Text W.E.
AutoCAD SHX Text 1961.2
AutoCAD SHX Text 1977.7
AutoCAD SHX Text 2006.7
AutoCAD SHX Text W.E.
AutoCAD SHX Text 1982.4
AutoCAD SHX Text W.E.
AutoCAD SHX Text 1978.1
AutoCAD SHX Text 2004.3
AutoCAD SHX Text W.E.
AutoCAD SHX Text W.E.
AutoCAD SHX Text
WELL
AutoCAD SHX Text W.E.
AutoCAD SHX Text 1969.3
AutoCAD SHX Text W.E.
AutoCAD SHX Text
WELL
AutoCAD SHX Text 1944.2
AutoCAD SHX Text W.E.
AutoCAD SHX Text 1935.4
AutoCAD SHX Text W.E.
AutoCAD SHX Text W.E.
AutoCAD SHX Text
WELL
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text
3-4 IPF
AutoCAD SHX Text
COF
AutoCAD SHX Text
NAIL
AutoCAD SHX Text
NAIL
AutoCAD SHX Text
NAIL
AutoCAD SHX Text
TREE CNR
AutoCAD SHX Text
1 PIPE
AutoCAD SHX Text
1-2IPF
AutoCAD SHX Text
1-2IPF
AutoCAD SHX Text
AXEL F
AutoCAD SHX Text
AXEL F
AutoCAD SHX Text
AXEL F
AutoCAD SHX Text
AXEL F
AutoCAD SHX Text
AXEL F
AutoCAD SHX Text
AXEL F
AutoCAD SHX Text
1-2IPF
AutoCAD SHX Text
1-2IPF
AutoCAD SHX Text
ALTON IP-6
AutoCAD SHX Text
ALTON IP-6
AutoCAD SHX Text
ALTON CAUSTIC TANK
AutoCAD SHX Text
ALTON CAUSTIC TANK
AutoCAD SHX Text
ALTON CAUSTIC TANK
AutoCAD SHX Text
ALTON CAUSTIC TANK
AutoCAD SHX Text
WOODY IP-1
AutoCAD SHX Text
WOODY IP-1
AutoCAD SHX Text
WOODY IP-2
AutoCAD SHX Text
WOODY IP-2
AutoCAD SHX Text
WOODY IP-3
AutoCAD SHX Text
WOODY IP-3
AutoCAD SHX Text
HAUL 3 MH
AutoCAD SHX Text
HAUL 3 MH
AutoCAD SHX Text
HAUL 3 MH
AutoCAD SHX Text
HAUL 3 MH
AutoCAD SHX Text
BUILDING CNR
AutoCAD SHX Text
BUILDING CNR
AutoCAD SHX Text
BUILDING CNR
AutoCAD SHX Text
BUILDING CNR
AutoCAD SHX Text
PATHFINDER IP-1
AutoCAD SHX Text
PATHFINDER IP-1
AutoCAD SHX Text
PATHFINDER IP-2
AutoCAD SHX Text
PATHFINDER IP-2
AutoCAD SHX Text
ALTON IP-1
AutoCAD SHX Text
ALTON IP-1
AutoCAD SHX Text
ALTON IP-2
AutoCAD SHX Text
ALTON IP-2
AutoCAD SHX Text
ALTON IP-3
AutoCAD SHX Text
ALTON IP-3
AutoCAD SHX Text
ALTON IP-4
AutoCAD SHX Text
ALTON IP-4
AutoCAD SHX Text
ALTON IP-5
AutoCAD SHX Text
ALTON IP-5
AutoCAD SHX Text
ALTON IP-5
AutoCAD SHX Text
ALTON IP-5
AutoCAD SHX Text
PIPE
AutoCAD SHX Text
PIPE
AutoCAD SHX Text
PIPE
AutoCAD SHX Text
PIPE
AutoCAD SHX Text
PIPE
AutoCAD SHX Text
PIPE
AutoCAD SHX Text
CAUSTIC TANKK
AutoCAD SHX Text
PIPE
AutoCAD SHX Text
CAUSTIC TANK
AutoCAD SHX Text
PIPE
AutoCAD SHX Text
CAUSTIC TANK
AutoCAD SHX Text
PIPE
AutoCAD SHX Text
PIPE
AutoCAD SHX Text
PIPE
AutoCAD SHX Text
PIPE
AutoCAD SHX Text
PIPE
AutoCAD SHX Text
PIPE
AutoCAD SHX Text
PIPE
AutoCAD SHX Text
PIPE
AutoCAD SHX Text
PIPE
AutoCAD SHX Text
CAUSTIC TANK
AutoCAD SHX Text
CAUSTIC TANK
AutoCAD SHX Text
"ALTON IP1"
"ALTON IP2"
CAUSTIC TANK
CAUSTIC TANK
CP-1
CP-2
CP-3
POND 2
POND 3
POND 1
DUGOUT A
DUGOUT B
TOTAL
SHT. NO.
OFFICE OF SPECIAL RECLAMATION
SCALE: 1:40
47 SCHOOL STREET, SUITE 301
PHILIPPI, WV 26416
OFFICE: 1-304-457-3219
FAX: 1-304-457-5613
Division of Land Restoration
Office of Special Reclamation
West Virginia
Department of Environmental Protection
DATE: FEBRUARY 2021
DLM COAL COMPANY
PERMIT # 138-74, 135-78, 58-77, 23-76
PLANT HOLLOW TREATMENT FACILITY
UPSHUR COUNTY, WEST VIRGINIA
EXISTING CONDITIONS-PLANT HOLLOW SECTION 1
AutoCAD SHX Text W.E.
AutoCAD SHX Text W.E.
AutoCAD SHX Text 1929.7
AutoCAD SHX Text 1980.5
AutoCAD SHX Text W.E.
AutoCAD SHX Text 1966.0
AutoCAD SHX Text W.E.
AutoCAD SHX Text 1961.2
AutoCAD SHX Text 1944.2
AutoCAD SHX Text W.E.
AutoCAD SHX Text 1935.4
AutoCAD SHX Text W.E.
AutoCAD SHX Text W.E.
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
PIPE
AutoCAD SHX Text
PIPE
AutoCAD SHX Text
PIPE
AutoCAD SHX Text
PIPE
AutoCAD SHX Text
PIPE
AutoCAD SHX Text
PIPE
PIPE
CP-3
CP-4
CP-5
CP-6
CP-7
POND 4
POND 4
SUMP
POND 3
PROPERTY LINE
EXISTING CONDITIONS-PLANT HOLLOW SECTION 2
TOTAL
SHT. NO.
OFFICE OF SPECIAL RECLAMATION
SCALE: 1:50
47 SCHOOL STREET, SUITE 301
PHILIPPI, WV 26416
OFFICE: 1-304-457-3219
FAX: 1-304-457-5613
Division of Land Restoration
Office of Special Reclamation
West Virginia
Department of Environmental Protection
DATE: FEBRUARY 2021
DLM COAL COMPANY
PERMIT # 138-74, 135-78, 58-77, 23-76
PLANT HOLLOW TREATMENT FACILITY
UPSHUR COUNTY, WEST VIRGINIA
AutoCAD SHX Text W.E.
AutoCAD SHX Text W.E.
AutoCAD SHX Text 2021.3
AutoCAD SHX Text W.E.
AutoCAD SHX Text
WELL
AutoCAD SHX Text 2002.1
AutoCAD SHX Text 1977.7
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text
CAUSTIC TANK
AutoCAD SHX Text
PIPE
CP-5
CP-6
CP-7
CP-8
POND 4
EXISTING CONDITIONS-PLANT HOLLOW SECTION 3
TOTAL
SHT. NO.
OFFICE OF SPECIAL RECLAMATION
SCALE: 1:50
47 SCHOOL STREET, SUITE 301
PHILIPPI, WV 26416
OFFICE: 1-304-457-3219
FAX: 1-304-457-5613
Division of Land Restoration
Office of Special Reclamation
West Virginia
Department of Environmental Protection
DATE: FEBRUARY 2021
DLM COAL COMPANY
PERMIT # 138-74, 135-78, 58-77, 23-76
PLANT HOLLOW TREATMENT FACILITY
UPSHUR COUNTY, WEST VIRGINIA
AutoCAD SHX Text W.E.
AutoCAD SHX Text W.E.
AutoCAD SHX Text W.E.
AutoCAD SHX Text 2028.7
AutoCAD SHX Text 2036.2
AutoCAD SHX Text 2021.3
AutoCAD SHX Text
WELL
AutoCAD SHX Text 2002.1
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
PIPE
CP-10
CP-9
EXISTING CONDITIONS-PANTHER FORK
TOTAL
SHT. NO.
OFFICE OF SPECIAL RECLAMATION
SCALE: 1:30
47 SCHOOL STREET, SUITE 301
PHILIPPI, WV 26416
OFFICE: 1-304-457-3219
FAX: 1-304-457-5613
Division of Land Restoration
Office of Special Reclamation
West Virginia
Department of Environmental Protection
DATE: FEBRUARY 2021
DLM COAL COMPANY
PERMIT # 138-74, 135-78, 58-77, 23-76
PLANT HOLLOW TREATMENT FACILITY
UPSHUR COUNTY, WEST VIRGINIA
AutoCAD SHX Text W.E.
AutoCAD SHX Text 2007.5
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
CP-11
CP-12
CP-13
PERMIT
BOUNDARY
EXISTING CONDITIONS-CUTRIGHT
TOTAL
SHT. NO.
OFFICE OF SPECIAL RECLAMATION
SCALE: 1:40
47 SCHOOL STREET, SUITE 301
PHILIPPI, WV 26416
OFFICE: 1-304-457-3219
FAX: 1-304-457-5613
Division of Land Restoration
Office of Special Reclamation
West Virginia
Department of Environmental Protection
DATE: FEBRUARY 2021
DLM COAL COMPANY
PERMIT # 138-74, 135-78, 58-77, 23-76
PLANT HOLLOW TREATMENT FACILITY
UPSHUR COUNTY, WEST VIRGINIA
AutoCAD SHX Text W.E.
AutoCAD SHX Text W.E.
AutoCAD SHX Text 1983.9
AutoCAD SHX Text 2005.8
AutoCAD SHX Text 2083.6
AutoCAD SHX Text 2013.3
AutoCAD SHX Text W.E.
AutoCAD SHX Text W.E.
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
STATE OF WV
TM/PAR 7-6P/5
PERMIT
BOUNDARY
EXISTING CONDITIONS-ALTON
TOTAL
SHT. NO.
OFFICE OF SPECIAL RECLAMATION
SCALE: 1:60
47 SCHOOL STREET, SUITE 301
PHILIPPI, WV 26416
OFFICE: 1-304-457-3219
FAX: 1-304-457-5613
Division of Land Restoration
Office of Special Reclamation
West Virginia
Department of Environmental Protection
DATE: FEBRUARY 2021
DLM COAL COMPANY
PERMIT # 138-74, 135-78, 58-77, 23-76
PLANT HOLLOW TREATMENT FACILITY
UPSHUR COUNTY, WEST VIRGINIA
AutoCAD SHX Text W.E.
AutoCAD SHX Text 2007.2
AutoCAD SHX Text 2006.7
AutoCAD SHX Text W.E.
AutoCAD SHX Text 1982.4
AutoCAD SHX Text W.E.
AutoCAD SHX Text 1978.1
AutoCAD SHX Text 2004.3
AutoCAD SHX Text W.E.
AutoCAD SHX Text W.E.
AutoCAD SHX Text 1969.3
AutoCAD SHX Text W.E.
AutoCAD SHX Text
WELL
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text
PIPE
AutoCAD SHX Text
PIPE
AutoCAD SHX Text
PIPE
AutoCAD SHX Text
PIPE
AutoCAD SHX Text
PIPE
AutoCAD SHX Text
PIPE
AutoCAD SHX Text
PIPE
AutoCAD SHX Text
PIPE
AutoCAD SHX Text
CAUSTIC TANK
2163.5
CAUSTIC TANK
PERMIT
BOUNDARY
PROPERTY LINE
EXISTING CONDITIONS-HAULROAD 2
TOTAL
SHT. NO.
OFFICE OF SPECIAL RECLAMATION
SCALE: 1:30
47 SCHOOL STREET, SUITE 301
PHILIPPI, WV 26416
OFFICE: 1-304-457-3219
FAX: 1-304-457-5613
Division of Land Restoration
Office of Special Reclamation
West Virginia
Department of Environmental Protection
DATE: FEBRUARY 2021
DLM COAL COMPANY
PERMIT # 138-74, 135-78, 58-77, 23-76
PLANT HOLLOW TREATMENT FACILITY
UPSHUR COUNTY, WEST VIRGINIA
AutoCAD SHX Text
WELL
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AXEL F
AutoCAD SHX Text
AXEL F
AutoCAD SHX Text
NEAL J. AND JOHN J. ZICKEFOOSE
TM/PAR 7-6Q/9.2
2187.8
BAFFLE CURTAIN
CAUSTIC TANK
PERMIT
BOUNDARY
EXISTING CONDITIONS-HAULROAD 3
TOTAL
SHT. NO.
OFFICE OF SPECIAL RECLAMATION
SCALE: 1:20
47 SCHOOL STREET, SUITE 301
PHILIPPI, WV 26416
OFFICE: 1-304-457-3219
FAX: 1-304-457-5613
Division of Land Restoration
Office of Special Reclamation
West Virginia
Department of Environmental Protection
DATE: FEBRUARY 2021
DLM COAL COMPANY
PERMIT # 138-74, 135-78, 58-77, 23-76
PLANT HOLLOW TREATMENT FACILITY
UPSHUR COUNTY, WEST VIRGINIA
AutoCAD SHX Text
BOUNDARY
PROPERTY LINE
EXISTING CONDITIONS-POND 13
TOTAL
SHT. NO.
OFFICE OF SPECIAL RECLAMATION
SCALE: 1:50
47 SCHOOL STREET, SUITE 301
PHILIPPI, WV 26416
OFFICE: 1-304-457-3219
FAX: 1-304-457-5613
Division of Land Restoration
Office of Special Reclamation
West Virginia
Department of Environmental Protection
DATE: FEBRUARY 2021
DLM COAL COMPANY
PERMIT # 138-74, 135-78, 58-77, 23-76
PLANT HOLLOW TREATMENT FACILITY
UPSHUR COUNTY, WEST VIRGINIA
AutoCAD SHX Text
AutoCAD SHX Text 2077.8
AutoCAD SHX Text W.E.
AutoCAD SHX Text 2078.9
AutoCAD SHX Text W.E.
AutoCAD SHX Text
WELL
AutoCAD SHX Text
AutoCAD SHX Text
BOUNDARY
EXISTING CONDITIONS-LITTLE WOODY
TOTAL
SHT. NO.
OFFICE OF SPECIAL RECLAMATION
SCALE: 1:30
47 SCHOOL STREET, SUITE 301
PHILIPPI, WV 26416
OFFICE: 1-304-457-3219
FAX: 1-304-457-5613
Division of Land Restoration
Office of Special Reclamation
West Virginia
Department of Environmental Protection
DATE: FEBRUARY 2021
DLM COAL COMPANY
PERMIT # 138-74, 135-78, 58-77, 23-76
PLANT HOLLOW TREATMENT FACILITY
UPSHUR COUNTY, WEST VIRGINIA
AutoCAD SHX Text 2009.1
AutoCAD SHX Text 2016.5
AutoCAD SHX Text W.E.
AutoCAD SHX Text
WELL
AutoCAD SHX Text W.E.
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
POND 1
DUGOUT B
CONSTRUCTION
LIMITS
SLIT FENCE
PLANT HOLLOW
CONSTRUCTION
LIMITS
SLIT FENCE
CUTRIGHT
SLIT FENCE
CONSTRUCTION LIMITS
PANTHER FORK
TOTAL
SHT. NO.
OFFICE OF SPECIAL RECLAMATION
SCALE: 1:30
47 SCHOOL STREET, SUITE 301
PHILIPPI, WV 26416
OFFICE: 1-304-457-3219
FAX: 1-304-457-5613
Division of Land Restoration
Office of Special Reclamation
West Virginia
Department of Environmental Protection
DATE: FEBRUARY 2021
DLM COAL COMPANY
PERMIT # 138-74, 135-78, 58-77, 23-76
PLANT HOLLOW TREATMENT FACILITY
UPSHUR COUNTY, WEST VIRGINIA
SILT FENCE LAYOUT
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
PIPE
AutoCAD SHX Text
PIPE
AutoCAD SHX Text
CAUSTIC TANK
CONSTRUCTION
LIMITS
DISCHARGE PIPE
POND 2 NOTE:
POND 2 TO BE DEWATERED
BY CONTRACTOR WHILE
INSTALLING EQUALIZATION
BASIN CONVEYANCE LINE.
POND 2
POND 3
POND 1
DUGOUT A
DUGOUT B
DUGOUT A AND B AND POND 1 NOTE:
BOTH DUGOUTS AND POND 1 TO BE
DEWATERED AND SLUDGE REMOVED
BY CONTRACTOR. (FOR SLUDGE
REMOVAL DETAILS SEE TECHNICAL
SPECIFICATION 13-7 MISCELLANEOUS)
ALL TREES TO BE
CLEARED IN
HATCHED AREA
TOTAL
SHT. NO.
OFFICE OF SPECIAL RECLAMATION
SCALE: NTS
47 SCHOOL STREET, SUITE 301
PHILIPPI, WV 26416
OFFICE: 1-304-457-3219
FAX: 1-304-457-5613
Division of Land Restoration
Office of Special Reclamation
West Virginia
Department of Environmental Protection
DATE: FEBRUARY 2021
DLM COAL COMPANY
PERMIT # 138-74, 135-78, 58-77, 23-76
PLANT HOLLOW TREATMENT FACILITY
UPSHUR COUNTY, WEST VIRGINIA
DEMOLITION-PLANT HOLLOW SECTION 1
NOTE: ALL ITEMS IN
RED TO BE REMOVED.
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
PIPE
AutoCAD SHX Text
PIPE
POND 4
POND 4
SUMP
POND 3
DISCHARGE PIPE:
TO BE REMOVED AND
REPLACED WITH 24 INCH
HDPE DUAL WALL CULVERT
DEMOLITION-PLANT HOLLOW SECTION 2
TOTAL
SHT. NO.
OFFICE OF SPECIAL RECLAMATION
SCALE: NTS
47 SCHOOL STREET, SUITE 301
PHILIPPI, WV 26416
OFFICE: 1-304-457-3219
FAX: 1-304-457-5613
Division of Land Restoration
Office of Special Reclamation
West Virginia
Department of Environmental Protection
DATE: FEBRUARY 2021
DLM COAL COMPANY
PERMIT # 138-74, 135-78, 58-77, 23-76
PLANT HOLLOW TREATMENT FACILITY
UPSHUR COUNTY, WEST VIRGINIA
NOTE: ALL ITEMS IN
RED TO BE REMOVED.
AutoCAD SHX Text W.E.
AutoCAD SHX Text W.E.
AutoCAD SHX Text 2021.3
AutoCAD SHX Text W.E.
AutoCAD SHX Text
WELL
AutoCAD SHX Text 2002.1
AutoCAD SHX Text 1977.7
AutoCAD SHX Text
AutoCAD SHX Text
POND 4
DEMOLITION-PLANT HALLOW SECTION 3
TOTAL
SHT. NO.
OFFICE OF SPECIAL RECLAMATION
SCALE: NTS
47 SCHOOL STREET, SUITE 301
PHILIPPI, WV 26416
OFFICE: 1-304-457-3219
FAX: 1-304-457-5613
Division of Land Restoration
Office of Special Reclamation
West Virginia
Department of Environmental Protection
DATE: FEBRUARY 2021
DLM COAL COMPANY
PERMIT # 138-74, 135-78, 58-77, 23-76
PLANT HOLLOW TREATMENT FACILITY
UPSHUR COUNTY, WEST VIRGINIA
NOTE: ALL ITEMS IN
RED TO BE REMOVED.
AutoCAD SHX Text W.E.
AutoCAD SHX Text W.E.
AutoCAD SHX Text W.E.
AutoCAD SHX Text 2028.7
AutoCAD SHX Text 2036.2
AutoCAD SHX Text 2021.3
AutoCAD SHX Text
WELL
AutoCAD SHX Text 2002.1
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
PIPE
CONSTRUCTION
LIMITS
ALL TREES TO BE
CLEARED IN
HATCHED AREA
PANTHER FORK POND NOTE:
POND TO BE DEWATERED BY
CONTRACTOR AS INFLUENT PIPE
FROM PANTHER FORK LIFT
STATION IS INSTALLED.
DEMOLITION-PANTHER FORK
TOTAL
SHT. NO.
OFFICE OF SPECIAL RECLAMATION
SCALE: NTS
47 SCHOOL STREET, SUITE 301
PHILIPPI, WV 26416
OFFICE: 1-304-457-3219
FAX: 1-304-457-5613
Division of Land Restoration
Office of Special Reclamation
West Virginia
Department of Environmental Protection
DATE: FEBRUARY 2021
DLM COAL COMPANY
PERMIT # 138-74, 135-78, 58-77, 23-76
PLANT HOLLOW TREATMENT FACILITY
UPSHUR COUNTY, WEST VIRGINIA
NOTE: ALL ITEMS IN
RED TO BE REMOVED.
AutoCAD SHX Text W.E.
AutoCAD SHX Text 2007.5
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
CONSTRUCTION
LIMITS
PERMIT
BOUNDARY
CUTRIGHT POND NOTE:
POND TO BE DEWATERED BY
CONTRACTOR AS INFLUENT PIPE
FROM CUTRIGHT LIFT STATION IS
INSTALLED.
ALL TREES TO BE
CLEARED IN
HATCHED AREA
DEMOLITION-CUTRIGHT
TOTAL
SHT. NO.
OFFICE OF SPECIAL RECLAMATION
SCALE: NTS
47 SCHOOL STREET, SUITE 301
PHILIPPI, WV 26416
OFFICE: 1-304-457-3219
FAX: 1-304-457-5613
Division of Land Restoration
Office of Special Reclamation
West Virginia
Department of Environmental Protection
DATE: FEBRUARY 2021
DLM COAL COMPANY
PERMIT # 138-74, 135-78, 58-77, 23-76
PLANT HOLLOW TREATMENT FACILITY
UPSHUR COUNTY, WEST VIRGINIA
NOTE: ALL ITEMS IN
RED TO BE REMOVED.
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
BOUNDARY
DEMOLITION-ALTON
TOTAL
SHT. NO.
OFFICE OF SPECIAL RECLAMATION
SCALE: NTS
47 SCHOOL STREET, SUITE 301
PHILIPPI, WV 26416
OFFICE: 1-304-457-3219
FAX: 1-304-457-5613
Division of Land Restoration
Office of Special Reclamation
West Virginia
Department of Environmental Protection
DATE: FEBRUARY 2021
DLM COAL COMPANY
PERMIT # 138-74, 135-78, 58-77, 23-76
PLANT HOLLOW TREATMENT FACILITY
UPSHUR COUNTY, WEST VIRGINIA
NOTE: ALL ITEMS IN
RED TO BE REMOVED.
AutoCAD SHX Text W.E.
AutoCAD SHX Text 2007.2
AutoCAD SHX Text 2006.7
AutoCAD SHX Text W.E.
AutoCAD SHX Text 1982.4
AutoCAD SHX Text W.E.
AutoCAD SHX Text 1978.1
AutoCAD SHX Text 2004.3
AutoCAD SHX Text W.E.
AutoCAD SHX Text W.E.
AutoCAD SHX Text 1969.3
AutoCAD SHX Text W.E.
AutoCAD SHX Text
WELL
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
2163.5
CAUSTIC TANK
PERMIT
BOUNDARY
DEMOLITION-HAULROAD 2
TOTAL
SHT. NO.
OFFICE OF SPECIAL RECLAMATION
SCALE: NTS
47 SCHOOL STREET, SUITE 301
PHILIPPI, WV 26416
OFFICE: 1-304-457-3219
FAX: 1-304-457-5613
Division of Land Restoration
Office of Special Reclamation
West Virginia
Department of Environmental Protection
DATE: FEBRUARY 2021
DLM COAL COMPANY
PERMIT # 138-74, 135-78, 58-77, 23-76
PLANT HOLLOW TREATMENT FACILITY
UPSHUR COUNTY, WEST VIRGINIA
NOTE: ALL ITEMS IN
RED TO BE REMOVED.
AutoCAD SHX Text
WELL
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
BAFFLE CURTAIN
PERMIT BOUNDARY
EXISTING METAL BUILDING TO BE
RELOCATED TO ALTON SITE (SEE
SHEET 95 FOR LOCATION)
DEMOLITION-HAULROAD 3
TOTAL
SHT. NO.
OFFICE OF SPECIAL RECLAMATION
SCALE: NTS
47 SCHOOL STREET, SUITE 301
PHILIPPI, WV 26416
OFFICE: 1-304-457-3219
FAX: 1-304-457-5613
Division of Land Restoration
Office of Special Reclamation
West Virginia
Department of Environmental Protection
DATE: FEBRUARY 2021
DLM COAL COMPANY
PERMIT # 138-74, 135-78, 58-77, 23-76
PLANT HOLLOW TREATMENT FACILITY
UPSHUR COUNTY, WEST VIRGINIA
NOTE: ALL ITEMS IN
RED TO BE REMOVED.
BOUNDARY
DEMOLITION-POND 13
TOTAL
SHT. NO.
OFFICE OF SPECIAL RECLAMATION
SCALE: NTS
47 SCHOOL STREET, SUITE 301
PHILIPPI, WV 26416
OFFICE: 1-304-457-3219
FAX: 1-304-457-5613
Division of Land Restoration
Office of Special Reclamation
West Virginia
Department of Environmental Protection
DATE: FEBRUARY 2021
DLM COAL COMPANY
PERMIT # 138-74, 135-78, 58-77, 23-76
PLANT HOLLOW TREATMENT FACILITY
UPSHUR COUNTY, WEST VIRGINIA
NOTE: ALL ITEMS IN
RED TO BE REMOVED.
AutoCAD SHX Text 2077.8
AutoCAD SHX Text W.E.
AutoCAD SHX Text 2078.9
AutoCAD SHX Text W.E.
AutoCAD SHX Text
WELL
AutoCAD SHX Text
AutoCAD SHX Text
BOUNDARY
DEMOLITION-LITTLE WOODY
TOTAL
SHT. NO.
OFFICE OF SPECIAL RECLAMATION
SCALE: NTS
47 SCHOOL STREET, SUITE 301
PHILIPPI, WV 26416
OFFICE: 1-304-457-3219
FAX: 1-304-457-5613
Division of Land Restoration
Office of Special Reclamation
West Virginia
Department of Environmental Protection
DATE: FEBRUARY 2021
DLM COAL COMPANY
PERMIT # 138-74, 135-78, 58-77, 23-76
PLANT HOLLOW TREATMENT FACILITY
UPSHUR COUNTY, WEST VIRGINIA
NOTE: ALL ITEMS IN
RED TO BE REMOVED.
AutoCAD SHX Text 2009.1
AutoCAD SHX Text 2016.5
AutoCAD SHX Text W.E.
AutoCAD SHX Text
WELL
AutoCAD SHX Text W.E.
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
RAPID MIX
TANK
pH PROBES
24" PALMER
BOWLUS
FLOW METER
AVAILABLE POWER:
THREE PHASE, 480 V, 200 AMP
MONITOR:
1. RAW FLOW
2. RAPID MIX TANK pH
3. CLARIFIER FINAL pH
4. SLUDGE LEVEL
5. SLUDGE PUMP #1 SPEED & TEMP.
6. SLUDGE PUMP #2 SPEED & TEMP.
7. RECIRCULATION PUMP SPEED & TEMP.
8. LIME SLURRY PUMP #1
9. LIME SLURRY PUMP #2
10. LIME SLURRY PUMP #3
11. PLANT HOLLOW LIFT STATION
12. CUTRIGHT LIFT STATION
13. PANTHER LIFT STATION
14. POLYMER PUMP #1
15. POLYMER PUMP #2
16. NON-POTABLE WATER PUMP #1
17. NON-POTABLE WATER PUMP #2
18. SILO
19. MEASURE AMP DRAWS
A. SLUDGE PUMP(S)
B. FLOCCULATOR
C. LIFT STATION
D. RAPID MIX
E. SLURRY PUMP
F. POLYMER FEED
G. NON-POTABLE WATER STATION
H. SILO
11. ON-OFF FOR ALL MOTORIZED EQUIPMENT
12. FLOCCULATOR MIXER SPEED
13. CLARIFIER SLUDGE LEVEL
ALARMS:
1. HIGH FLOW
2. pH- HIGH OR LOW
3. LOW POTABLE PRESSURE
4. POWER LOSS (COMMERCIAL)
5. HIGH AMPERAGE ON ANY ELECTRIC
MOTOR
6. LOW/HIGH LEVEL LIME
PHONE:
1. CELL SERVICE
SYSTEM EMERGENCY POWER
1. GENERATOR FOR TREATMENT PLANT
- FUEL DIESEL
- 450 KW
2. GENERATOR FOR PANTHER LIFT STATION
- FUEL DIESEL
- 100 KW
CONTROLS:
1. FLOCCULATOR: H-O-A
- AUTO- ADJUST RPM THROUGH
PLC CONTROL SYSTEM
RPM RANGE (2-20)
- MOTOR SHALL BE STARTED & CONTROLLED BY VFD THROUGH PLC.
MONITOR & CONTROL
- DISPLAY THE POWER STATUS OF EACH FLOCCULATOR.
- DISPLAY & CONTROL FLOCCULATOR RMPS.
- H-O-A
2. POLYMER FEED: H-O-A
- AUTOMATIC MODE, THE POLYMER FEED IS FLOW PACED BASED ON FLOW METER
READING, AND SET POINT mg/L.
- THE PLC SHALL BE PROGRAMMED WITH A MULTIPLIER INPUT TO CONTROL THE
RELATIONSHIP BETWEEN FLOW AND POLYMER FEED RATE.
- MOTOR SHALL BE STARTED & CONTROLLED BY VFD THROUGH PLC.
- HAVE ABILITY TO CHANGE FEED RATE IN mg/L.
- THE POLYMER FEED SYSTEM PUMPS WILL BE CAPABLE OF RECEIVING A 4-20ma SIGNAL.
- THE POLYMER FEED SHALL BE FLOW PACED BASED ON THE FLOW &
OPERATOR-SELECTED CONCENTRATION.
- THE ANTICIPATED POLYMER FEED RATE RANGE IS 0-30 mg/L.
- MORE THAN ONE POLYMER FEED PUMP MAY BE REQUIRED TO OPERATE DURING
HIGH FLOW EVENTS.
MONITOR & CONTROL
- DISPLAY THE POWER STATUS OF EACH PUMP.
- DISPLAY & CONTROL POLYMER FEED CONCENTRATION
- H-O-A
RAPID MIX TANK: ON/OFF
- AUTO - ADJUST RPM THOUGH
PLC CONTROL SYSTEM
- MOTOR SHALL BE STARTED & CONTROLLED BY VFD THROUGH PLC.
MONITOR & CONTROL
- DISPLAY THE POWER STATUS OF THE TANK.
- ON/OFF
EQUIPMENT MOTORS
MOTOR HP
QTY
RAPID MIX TANK 1.5 HP 3-PH AC 1
CLARIFIER
FLOCCULATOR
3 HP 3-PH AC 2
CLARIFIER
DRIVES
1.5 HP 3-PH AC 1
LIME SLURRY
MIX TANK
1.5 HP 3-PH AC 1
LIME SLURRY
PUMP
2 HP 3-PH AC 1
LIME SLURRY
PUMP
2 HP 3-PH AC 1
LIME SLURRY
PUMP
2 HP 3-PH AC 1
SLUDGE PUMPS 50 HP 3-PH AC 2
RECIRCULATION
PUMP
20 HP 3-PH AC 1
PLANT HOLLOW
LIFT STATION
7.5 HP 3-PH AC 2
CUTRIGHT LIFT
STATION
15 HP 3-PH AC 2
POLYMER
PUMPS
0.5 HP 3-PH AC 2
NON-POTABLE
WATER
TRANSFER
PUMPS
7.5 HP 3-PH AC 2
DESIGN PARAMETERS
PARAMETER RAW EFFLUENT RISE RATE
TOTAL, Fe
MG/L
0.0 0.95
TOTAL, Al
MG/L
0.0 0.43
FLOW, MIN
GPM
200 200 0.07
FLOW, AVG
GPM
1275 1275 0.30
FLOW, PEAK
GPM
3000 3000 0.70
GALLONS - 3,830
Gt - 45,000/S
DT - 1.28 MINS
80 'CLARIFIER
SLUDGE LEVEL
INDICATOR
CONTROL AND
SLUDGE PUMP
BUILDING
100 TON LIME
SLURRY SILO
PLANT HOLLOW
LIFT STATION
FINAL
DISCHARGE
BYPASS LINE
R
E
C
I
R
C
U
L
A
T
I
O
N
L
I
N
E
4. SLUDGE PUMPS: H-O-A, A₂
- IN A
MODE PUMP RUNS CONTINUOUSLY AND ON
AND OFF BY SLUDGE LEVELS.
- IN A₂ MODE ON AND OFF TIMER SELECTIONS SHALL BE MADE:
- TIMER…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .