Combined_Bid_Sheet.pdf
PDF 415 KB Posted
- Solicitation number
- IFB #25046
- Issued by
- Greenville County, South Carolina
About this file
This document is a Bid Sheet for two stream restoration and riparian reclamation projects by Greenville County, South Carolina, funded through the South Carolina Office of Resilience (SCOR) ARPA-funded Stormwater Infrastructure Program (ASIP). The bid covers two separate projects: the North Chastain Stream Restoration (5.5 acres) and the Little Creek Stream Improvement (6.5 acres), both located within the Reedy River watershed. Each project includes detailed line items for mobilization, as-builts, erosion control, clearing and grubbing, excavation, stream restoration features (cross vanes, boulder walls, riffles), erosion control matting, vegetation establishment, and plant installations. The projects involve stream restoration, bank grading, instream feature installation, and reforestation efforts on previously acquired floodplain buyout properties.
The bid sheet indicates no specific pricing, as the unit price and total price columns are left blank for bidder completion. Notable cost-saving provisions include no tipping fees for spoil material at Blackberry Valley Residential Waste and Recycling Center and free boulder availability from Twin Chimneys Landfill. The projects are scheduled for November 2024, with a Notice to Proceed contingent on pending permit approvals. The restoration work encompasses various environmental rehabilitation techniques, including soil lifts, coir matting, turf reinforcement matting, boulder walls, and bank toe treatments, with the goal of improving stream ecology and reducing flood risks in the Reedy River watershed.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ITEM # DESCRIPTION QTY UNIT UNIT PRICE TOTAL PRICE
1 MOBILIZATION - LS
2 AS-BUILTS - LS
3 EROSION AND SEDIMENT CONTROL - LS
4 CLEARING AND GRUBBING 1.9 AC
EXCAVATION, FILLING, AND GRADING
(CUT=2250CY, FILL=420CY, NET=1830CY)
1,830 CY
6 CROSS VANE 1 EA
7 SINGLE ARM VANE 2 EA
8 BOULDER WALL 1 EA
9 BOULDER RIFFLE 4 EA
10 BOULDER TOE 510 LF
11 TOE ROCK 980 LF
COIR TURF REINFORCEMENT MATTING
(700G)
4,440 SY
COIR TURF REINFORCEMENT MATTING
(320G)
1,160 SY
14 PERMANENT TRM 150 SY
TURF ERADICATION AND SEEDBED
PREPARATION
4.4 AC
SEEDING, MULCHING AND VEGETATION
ESTABLISHMENT
6.3 AC
17 LIVE STAKES 100 BN
18 BALLED BURLAPPED TREE/SHRUB 7 EA
19 7-GALLON TREE/SHRUB 7 EA
20 3-GALLON TREE/SHRUB 504 EA
21 PLUGS/BARE ROOT STEMS 2,256 EA
22 HEADWALL 1 EA
NORTH CHASTAIN STREAM RESTORATION AND RIPRARIAN RECLAMATION:
BID SHEET
NOV 2024
TOTAL
*NOTE: ALL SPOIL MATERIAL IS TO BE TAKEN TO BLACKBERRY VALLEY RESIDENTIAL WASTE AND RECYCLING
CENTER AT 409 BLACKBERRY VALLEY ROAD, GREENVILLE SC 29617. THERE WILL BE NO TIPPING FEE.
NOTE: BOULDERS ARE AVAILABLE AT NO COST WHEN USED ON THESE PROJECTS AT TWIN CHIMNEYS
LANDFILL. SEE ATTACHMENT FOR MORE INFORMATION.
ITEM # DESCRIPTION QTY UNIT UNIT PRICE TOTAL PRICE
1 MOBILIZATION - LS
2 AS-BUILTS - LS
3 EROSION AND SEDIMENT CONTROL - LS
4 CLEARING AND GRUBBING 2 AC
EXCAVATION, FILLING, AND GRADING
(CUT=2950CY, FILL=530CY, NET=2420CY)
2,950 CY
6 CROSS VANE 1 EA
7 SINGLE ARM VANE 2.0 EA
8 BOULDER TOE 840 LF
9 TOE ROCK 1,350 LF
COIR TURF REINFORCEMENT MATTING
(700G)
3,000 SY
COIR TURF REINFORCEMENT MATTING
(320G)
1,600 SY
12 PERMANENT TRM 1,600 SY
13 VEGETATED CONCRETE BLOCK MATTING 200 SY
TURF ERADICATION AND SEEDBED
PREPARATION
5 AC
SEEDING, MULCHING AND VEGETATION
ESTABLISHMENT
7.0 AC
16 LIVE STAKES 100 BN
17 BALLED BURLAPPED TREE/SHRUB 7 EA
18 7-GALLON TREE/SHRUB 7 EA
19 3-GALLON TREE/SHRUB 560 EA
20 PLUGS/BARE ROOT STEMS 2,506 EA
LITTLE CREEK STREAM RESTORATION AND RIPRARIAN RECLAMATION:
BID SHEET
NOV 2024
TOTAL
PROJECT TOTAL
*NOTE: ALL SPOIL MATERIAL IS TO BE TAKEN TO BLACKBERRY VALLEY RESIDENTIAL WASTE AND RECYCLING CENTER AT 409 BLACKBERRY VALLEY ROAD, GREENVILLE SC 29617. THERE WILL BE NO TIPPING FEE.
NOTE: BOULDERS ARE AVAILABLE AT NO COST WHEN USED ON THESE PROJECTS AT TWIN CHIMNEYS
LANDFILL. SEE ATTACHMENT FOR MORE INFORMATION.
File details come from the government source that posted it. Updated .