Combined_Bid_Sheet.pdf

PDF 415 KB Posted

Attached to
SCOR Stream Restoration and Riparian Area Reclamation Projects
Solicitation number
IFB #25046
Issued by
Greenville County, South Carolina

About this file

This document is a Bid Sheet for two stream restoration and riparian reclamation projects by Greenville County, South Carolina, funded through the South Carolina Office of Resilience (SCOR) ARPA-funded Stormwater Infrastructure Program (ASIP). The bid covers two separate projects: the North Chastain Stream Restoration (5.5 acres) and the Little Creek Stream Improvement (6.5 acres), both located within the Reedy River watershed. Each project includes detailed line items for mobilization, as-builts, erosion control, clearing and grubbing, excavation, stream restoration features (cross vanes, boulder walls, riffles), erosion control matting, vegetation establishment, and plant installations. The projects involve stream restoration, bank grading, instream feature installation, and reforestation efforts on previously acquired floodplain buyout properties.

The bid sheet indicates no specific pricing, as the unit price and total price columns are left blank for bidder completion. Notable cost-saving provisions include no tipping fees for spoil material at Blackberry Valley Residential Waste and Recycling Center and free boulder availability from Twin Chimneys Landfill. The projects are scheduled for November 2024, with a Notice to Proceed contingent on pending permit approvals. The restoration work encompasses various environmental rehabilitation techniques, including soil lifts, coir matting, turf reinforcement matting, boulder walls, and bank toe treatments, with the goal of improving stream ecology and reducing flood risks in the Reedy River watershed.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ITEM # DESCRIPTION QTY UNIT UNIT PRICE TOTAL PRICE

1 MOBILIZATION - LS

2 AS-BUILTS - LS

3 EROSION AND SEDIMENT CONTROL - LS

4 CLEARING AND GRUBBING 1.9 AC

EXCAVATION, FILLING, AND GRADING

(CUT=2250CY, FILL=420CY, NET=1830CY)

1,830 CY

6 CROSS VANE 1 EA

7 SINGLE ARM VANE 2 EA

8 BOULDER WALL 1 EA

9 BOULDER RIFFLE 4 EA

10 BOULDER TOE 510 LF

11 TOE ROCK 980 LF

COIR TURF REINFORCEMENT MATTING

(700G)

4,440 SY

COIR TURF REINFORCEMENT MATTING

(320G)

1,160 SY

14 PERMANENT TRM 150 SY

TURF ERADICATION AND SEEDBED

PREPARATION

4.4 AC

SEEDING, MULCHING AND VEGETATION

ESTABLISHMENT

6.3 AC

17 LIVE STAKES 100 BN

18 BALLED BURLAPPED TREE/SHRUB 7 EA

19 7-GALLON TREE/SHRUB 7 EA

20 3-GALLON TREE/SHRUB 504 EA

21 PLUGS/BARE ROOT STEMS 2,256 EA

22 HEADWALL 1 EA

NORTH CHASTAIN STREAM RESTORATION AND RIPRARIAN RECLAMATION:

BID SHEET

NOV 2024

TOTAL

*NOTE: ALL SPOIL MATERIAL IS TO BE TAKEN TO BLACKBERRY VALLEY RESIDENTIAL WASTE AND RECYCLING

CENTER AT 409 BLACKBERRY VALLEY ROAD, GREENVILLE SC 29617. THERE WILL BE NO TIPPING FEE.

NOTE: BOULDERS ARE AVAILABLE AT NO COST WHEN USED ON THESE PROJECTS AT TWIN CHIMNEYS

LANDFILL. SEE ATTACHMENT FOR MORE INFORMATION.

ITEM # DESCRIPTION QTY UNIT UNIT PRICE TOTAL PRICE

1 MOBILIZATION - LS

2 AS-BUILTS - LS

3 EROSION AND SEDIMENT CONTROL - LS

4 CLEARING AND GRUBBING 2 AC

EXCAVATION, FILLING, AND GRADING

(CUT=2950CY, FILL=530CY, NET=2420CY)

2,950 CY

6 CROSS VANE 1 EA

7 SINGLE ARM VANE 2.0 EA

8 BOULDER TOE 840 LF

9 TOE ROCK 1,350 LF

COIR TURF REINFORCEMENT MATTING

(700G)

3,000 SY

COIR TURF REINFORCEMENT MATTING

(320G)

1,600 SY

12 PERMANENT TRM 1,600 SY

13 VEGETATED CONCRETE BLOCK MATTING 200 SY

TURF ERADICATION AND SEEDBED

PREPARATION

5 AC

SEEDING, MULCHING AND VEGETATION

ESTABLISHMENT

7.0 AC

16 LIVE STAKES 100 BN

17 BALLED BURLAPPED TREE/SHRUB 7 EA

18 7-GALLON TREE/SHRUB 7 EA

19 3-GALLON TREE/SHRUB 560 EA

20 PLUGS/BARE ROOT STEMS 2,506 EA

LITTLE CREEK STREAM RESTORATION AND RIPRARIAN RECLAMATION:

BID SHEET

NOV 2024

TOTAL

PROJECT TOTAL

*NOTE: ALL SPOIL MATERIAL IS TO BE TAKEN TO BLACKBERRY VALLEY RESIDENTIAL WASTE AND RECYCLING CENTER AT 409 BLACKBERRY VALLEY ROAD, GREENVILLE SC 29617. THERE WILL BE NO TIPPING FEE.

NOTE: BOULDERS ARE AVAILABLE AT NO COST WHEN USED ON THESE PROJECTS AT TWIN CHIMNEYS

LANDFILL. SEE ATTACHMENT FOR MORE INFORMATION.

File details come from the government source that posted it. Updated .