Color_Code.jpeg
JPEG file 3 MB Posted
- Attached to
- Pier Gift Shop Electric Door Installation
- Solicitation number
- Quote- 26 - 341
- Issued by
- Pinellas County, Florida
About this file
The file is a color-coded reference image related to the City of St. Petersburg's electric door installation project at the Pier Gift Shop located at 830 2nd Ave NE, St. Petersburg, Florida. The City is requesting quotes for the removal of existing double doors and the furnishing and installation of a 9330 Hurricane Impact Series Full Break Out left-hand single sliding door system measuring 83.5" x 101", complete with motion and safety sensors, electric lock, and Kynar painted finish. A mandatory pre-proposal meeting is scheduled for October 21, 2026, with quotes due November 3, 2026 at 3:00 p.m. Vendors must demonstrate a minimum of one year of experience in electric door installations and provide three references for similar work. The contractor must ensure fire-code compliance, obtain applicable permits, provide operating and maintenance manuals, and conduct a full functional test with the City Project Coordinator present.
Qualified vendors must be registered with the Florida Department of State Division of Corporations, provide a W-9, and maintain minimum insurance coverage of one million dollars per occurrence in commercial general liability and two million dollars aggregate. A public construction bond equal to the full contract value, executed by a Florida-authorized surety and remaining in effect for at least one year beyond final completion, is required. The cost proposal must be lump-sum and include all labor, materials, tools, equipment, documentation, and replacement parts. Compliance with Florida Statute 448.095 (E-Verify) and Florida Statute 287.135 (scrutinized companies certifications) is mandatory. Subcontractor participation by small, veteran, minority, and women business enterprises is voluntary with no minimum participation requirement, though a Subcontractor Summary Worksheet is mandatory with all bids, and up to 80 percent of contract work may be subcontracted. Questions are due October 27, 2026.
Other files
| File | Type | Posted |
|---|---|---|
| Model_9300_Slide_Installation_Manual_2020_new_(1111_code).pdf | ||
| Color_Code_#2.jpeg | JPEG file | |
| Pier_Gift_Shop_Electric_Door_Installation_(Addendum_#1_Revision).pdf | ||
| Light_Construction_Agreement.pdf | ||
| Pier_Gift_Shop_Electric_Door_Installation.pdf | ||
| Image_of_Doors.pdf | ||
| Agreement.pdf | ||
| Light_Construction_Agreement.docx | DOCX document | |
| Subcontractor_Summary_-_Sheltered_.xlsx | XLSX spreadsheet | |
| Public_Construction_Bond.docx | DOCX document | |
| Subcontractor_Summary_Spreadsheet.xlsx | XLSX spreadsheet | |
| Performance_&_Payment_Bond_.DOCX | DOCX document | |
| Subcontractor_Utilization_Plan.docx | DOCX document |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .