Color_Code_#2.jpeg

JPEG file 1015 KB Posted

Attached to
Pier Gift Shop Electric Door Installation
Solicitation number
Quote- 26 - 341
Issued by
Pinellas County, Florida

About this file

This file is a color-coded image document related to the City of St. Petersburg's electric door installation project at the Pier Gift Shop in St. Petersburg, Florida. The project involves the removal of existing standard double doors and the installation of a 9330 Hurricane Impact Series Full Break Out left-hand single sliding door system measuring 83.5" x 101", complete with motion and safety sensors, electric lock, and Kynar painted finish at 830 2nd Ave NE. A mandatory pre-proposal meeting is scheduled for October 21, 2026, with quotes due November 3, 2026 at 3:00 p.m. The vendor must demonstrate a minimum of one year of experience in electric door installations and provide three references for similar work. Fire-code compliance, applicable permits, operating and maintenance manuals, and a full functional test with the City Project Coordinator present are required deliverables.

The cost proposal must include all labor, materials, tools, equipment, documentation, and replacement parts on a lump-sum basis. The contractor must furnish a public construction bond equal to the full contract value, executed by a Florida-authorized surety and effective for at least one year beyond final completion. Required qualifications include Florida Department of State Division of Corporations registration, a W-9, commercial general liability insurance with a minimum of one million dollars per occurrence and two million dollars aggregate, and compliance with Florida Statute 448.095 (E-Verify) and Florida Statute 287.135 (scrutinized companies certifications). Up to 80% of contract work may be subcontracted, with a mandatory Subcontractor Summary Worksheet required with all bids. Subcontractor participation by small, veteran, minority, and women business enterprises is encouraged but voluntary with no minimum participation requirement. Questions are due October 27, 2026.

Other files

File Type Posted
Model_9300_Slide_Installation_Manual_2020_new_(1111_code).pdf PDF
Color_Code.jpeg JPEG file
Pier_Gift_Shop_Electric_Door_Installation_(Addendum_#1_Revision).pdf PDF
Light_Construction_Agreement.pdf PDF
Pier_Gift_Shop_Electric_Door_Installation.pdf PDF
Image_of_Doors.pdf PDF
Agreement.pdf PDF
Light_Construction_Agreement.docx DOCX document
Subcontractor_Summary_-_Sheltered_.xlsx XLSX spreadsheet
Public_Construction_Bond.docx DOCX document
Subcontractor_Summary_Spreadsheet.xlsx XLSX spreadsheet
Performance_&_Payment_Bond_.DOCX DOCX document
Subcontractor_Utilization_Plan.docx DOCX document
Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .