About this file

These construction drawings detail the Collin County Courthouse Chilled Water Replacement project, prepared by MD Engineering for a comprehensive mechanical system upgrade. The project scope includes installing lead/lag chilled water building variable speed pumps in the crawl space, replacing existing 3-way control valves with 2-way control valves for five air handling units, and integrating pump and temperature controls with the existing 2006 Honeywell control system. The contractor will also provide a 500-ton air-cooled chiller with generator for temporary service during construction. The project involves extensive demolition and replacement of underground chilled water piping, including 18-inch HDPE piping beneath the loading dock and new butterfly valves in the pump room.

The project documents indicate a comprehensive approach to upgrading the courthouse's mechanical infrastructure, with careful consideration of existing utilities and minimal disruption to courthouse operations. The base bid and alternate #1 are structured to allow phased implementation, with specific demolition and installation requirements. The estimated project cost is approximately $1,000,000, with work to be performed carefully around existing telecommunications infrastructure and maintaining one dock operational throughout construction. The drawings include detailed site plans, demolition plans, and photographic documentation of existing conditions, highlighting the complexity of working within an active government facility while upgrading critical mechanical systems.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

INDEX OF DRAWINGS

B I D D O C U M E N T S

ISSUE DATE:

MARCH 22, 2024

COVER SHEET

PROJECT LOCATION KEY PLAN

TRUE NORTH

COLLIN COUNTY COURTHOUSE

CHILLED WATER REPLACEMENT

MECHANICAL

M0.0 LEGEND AND GENERAL NOTES - MECHANICAL

MD1.0 DEMO SITE PLAN - MECHANICAL

M0.1 TEMP CHILLED WATER CONNECTORS MECHANICAL

M1.0 SITE PLAN - MECHANICAL

M1.1 OVERALL PLAN - MECHANICAL

M2.1 ENLARGED PLAN - MECHANICAL

M3.1 PHOTOS - MECHANICAL

M3.2 PHOTOS - MECHANICAL

PRIME CONSULTANT

PROJECT NUMBER: 231649

Texas Registered Firm No. F-7489 1255 West 15th Street, Suite 300 Plano, TX 75075 469.467.0200 Email: mdengca@md-eng.com Project Number: 221531

AutoCAD SHX Text McKINNEY, TX 75071

AutoCAD SHX Text

2100 BLOOMDALE RD

AutoCAD SHX Text

%%UPROJECT LOCATION MAP

AutoCAD SHX Text

%%UVICINITY MAP

AutoCAD SHX Text

HIGHWAY

AutoCAD SHX Text

AutoCAD SHX Text

BLOOMDALE

AutoCAD SHX Text

ROAD

AutoCAD SHX Text

COMMUNITY

AutoCAD SHX Text

AVE

1. PROVIDE ALL MATERIALS AND EQUIPMENT AND PERFORM ALL

LABOR REQUIRED TO INSTALL COMPLETE AND OPERABLE

MECHANICAL SYSTEM AS INDICATED ON THE DRAWINGS, AS

SPECIFIED AND AS REQUIRED BY ALL NATIONAL, STATE AND

LOCAL CODES.

2. CONTRACT DRAWINGS FOR MECHANICAL WORK ARE

DIAGRAMMATIC AND ARE INTENDED TO CONVEY SCOPE AND

GENERAL ARRANGEMENT ONLY. IT IS THE CONTRACTORS

RESPONSIBILITY FOR INSTALLING ALL MATERIALS PER SMACNA

STANDARDS AND THE MANUFACTURER'S STANDARDS.

3. ALL EXISTING SYSTEM INFORMATION AND/OR LOCATIONS

ARE PROVIDED BY THE OWNER OR BY A 3RD PARTY.

IT IS THE CONTRACTORS RESPONSIBILITY TO VERIFY ALL MEP

SERVICES ARE LOCATED AS DESIGNED BEFORE BIDDING THE

PROJECT. IN OCCURRENCES WHERE EXISTING DOES NOT

MATCH DESIGNED, IT IS THE CONTRACTORS RESPONSIBILITY

TO NOTIFY THE OWNER, ARCHITECT, & ENGINEER

BEFORE PROCEEDING. IF ANY DISCREPANCIES ARE NOT

IDENTIFIED AT BIDDING, THE COST SHALL BE ABSORBED BY

THE CONTRACTOR AND NOT PASSED ONTO THE OWNER OR

ENGINEER OF RECORD.

4. COORDINATE CONSTRUCTION OF ALL MECHANICAL WORK WITH

ARCHITECTURAL, STRUCTURAL, CIVIL, ELECTRICAL WORK, ETC.,

SHOWN ON THE OTHER CONTRACT DRAWINGS.

5. WHEN TWO OR MORE ITEMS OF THE SAME TYPE OF EQUIPMENT

ARE REQUIRED, THE PRODUCT OF ONE MANUFACTURE SHALL BE

USED.

6. ALL MISCELLANEOUS STEEL REQUIRED TO ENSURE PROPER

INSTALLATION AND AS SHOWN IN DETAILS FOR PIPING SHALL BE

FURNISHED AND INSTALLED BY THE MECHANICAL CONTRACTOR.

7. LOCATION AND SIZES OF ALL FLOOR, AND WALL, OPENINGS

SHALL BE COORDINATED WITH ALL OTHER TRADES.

8. ALL DEMOLITION ACTIVITIES SHALL BE PERFORMED SO AS TO

PROVIDE MINIMAL DISRUPTION TO THE NEIGHBORING TENANTS.

9. ALL SAW CUTTING SHALL BE PERFORMED AFTER HOURS SO THAT

OPERATION DOES NOT DISTURB NEIGHBORING TENANTS. THERE

SHALL BE NO GAS POWERED EQUIPMENT IN TENANT AREAS.

GENERAL PROJECT NOTES:

FLOOR CONTROL VALVE

TEE

TEE, UP

TEE, DOWN

SINGLE SWEEP TEE

CROSS

LATERAL

45 DEGREE ELBOW

90 DEGREE ELBOW

90 DEGREE ELBOW UP

CAP

HVAC VALVE

VENT THRU ROOF

BUTTERFLY VALVE

SOLENOID VALVE

EXPANSION JOINT

FLOAT AND THERM. TRAP

BUCKET STEAM TRAP

FLOOR CLEAN OUT

FIRE HOSE CABINET

PRESSURE RELIEF VALVE

CONTROL, 2 WAY VALVE

CONTROL, 3 WAY VALVE

STRAINER & BLOW OFF VALVE

PRESSURE GAUGE & COCK

UNION OR COMPANION FLANGES

PRESSURE & TEMPERATURE TAP (PETES PLUG)

MANUAL AIR VENT

TEMPERATURE SENSOR

PRESSURE SENSOR

THERMOMETER & WELL

HOSE END DRAIN

AUTOMATIC AIR VENT

FLOW METER

T S

F FLOW SWITCH

ANCHOR (PIPE)

HOSE BIBB

B

B

T

H

F

F.H.C.

D.S.

CO

CO

OR

R.D.

V.T.R.

HUMIDISTAT

CLEAN OUT

GATE VALVE

FLOOR DRAIN

HUB DRAIN

DOWN SPOUT

ROOF DRAIN

CHECK VALVE

GLOBE VALVE

BALL VALVE

PLUG VALVE

THERMOMETER

THERMOSTAT

OS & Y VALVE

& FITTINGS SYMBOLS

ALL SYMBOLS ON THIS LIST ARE NOT NECESSARILY USED ON THIS JOB.

BALANCING VALVE (WITH PETE'S PLUG EITHER SIDE)

SINGLE W.F. LATERAL STUB

DOUBLE W.F. LATERAL STUB

DOUBLE W.F. LAT & TRAP

FLOOR DRAIN RISER W/TRAP

SINGLE W.F. LAT. & TRAP

O.D. OVERFLOW ROOF DRAIN

PIPE GUIDE

COMPRESSED AIR TAP

MOTORIZED ISOLATION VALVE (2-POSITION-24v)

MANUALLY CALIBRATED BALANCING VALVE

AUTOMATIC FLOW CONTROL VALVE

PIPE SIZE REDUCER (CONCENTRIC)

90 DEGREE ELBOW DOWN

ANGLE GATE VALVE

ANGLE GLOBE VALVE

PIPE SIZE REDUCER (ECCENTRIC)

MOTORIZED CONTROL VALVE (MODULATING-24v)

EXISTING PIPING

EXISTING PIPING TO BE REMOVED

UNDERFLOOR

CONNECT TO NEW OR EXISTING

CHILLED WATER SUPPLY

CHILLED WATER RETURN

SYMBOL DESCRIPTION

X X X

CHWS

CHWR

ABOVE

ALTERNATING CURRENT

AIR CONDITIONER

ABOVE FINISHED FLOOR

ABOVE GRADE AND GFI

AIR HANDLING UNIT

ALTERNATE

AMPERE

APPROXIMATELY

ARCHITECTURAL

AVERAGE

BOILER

BAROMETRIC RELIEF DAMPER

BRITISH THERMAL UNIT

CUBIC FEET PER MINUTE

CONSTRUCTION DOCUMENTS

CHILLER

CHEMICAL

CHILLED WATER PUMP

CEILING

COMPRESSOR

COOLING TOWER

CONDENSER WATER PUMP

DRY BULB

DETAIL

DIAMETER

DIMENSION

DESIGN DEVELOPMENT

ENTERING DRY BULB

ELECTRICAL

ELEVATION

ENTERING WET BULB

ENTERING WATER TEMPERATURE

EXHAUST

EXISTING

DEGREES FAHRENHEIT

GROUND FAULT INTERRUPTER

GALLONS PER MINUTE

FEET PER MINUTE

FEET PER SECOND

FOOT OR FEET

HEAD

HEAT PUMP UNIT

HOUR(S)

HEIGHT

HEATER

HEAT,VENT AND AIR CONDITIONING

HOT WATER PUMP

HEAT EXCHANGER

FREQUENCY (HERTZ)

INSIDE DIAMETER OR DIMENSION

INCHES

KILOWATT

KILOWATT HOUR

MAXIMUM

LEAVING WATER TEMPERATURE

1000 BTU PER HOUR

MECHANICAL

MANUFACTURER

MINIMUM

NUMBER

NOT APPLICABLE

NOISE CRITERIA

NECK DIMENSION

OPPOSED BLADE DAMPER

OUTSIDE DIAMETER

OUTSIDE AIR

ORIGINAL

PHASE

POWERED MIXING BOX

PLUMBING

PRESSURE

PANEL

REFERENCE

RETURN AIR

RETURN AIR GRILLE

ROOF TOP UNIT

STAND ALONE DIGITAL CONTROLLER

SENSIBLE

SQUARE

SUPPLY AIR

STATIC PRESSURE

SINGLE SPEED MOTOR

START/STOP/STATUS

TEMPERATURE

VOLT

VARIABLE AIR VALVE

VELOCITY

WATT

WITH

WEATHERPROOF

WATER PRESSURE DROP

WEATHERPROOF GFI

TRANSFORMER

ABV.

AC

A/C

AFF

AG

AHU

ALT.

AMP.

APPROX.

ARCH.

AVG.

B

BRD

BTU

CFM

CD

CH.

CHEM.

CHP

CLG.

CMPR.

CT

CWP

DB

DET.

DIA.

DIM.

DD

EDB

ELEC.

ELEV.

EWB

EWT

EXH.

EXIST.

DEG. F

GFI

GPM

FPM

FPS

FT.

HD.

HPU

HR.

HT.

HTR.

HVAC

HWP

HX

HZ.

ID

IN.

KW

KWH

MAX.

LWT

MBH

MECH.

MFR.

MIN.

NO.

N/A

NC

NK

OBD

OD

OA

ORIG.

PH.

PMB

PLBG.

PRESS.

PNL.

RE.

RA

RAG

RTU

SDC

SENS.

SQ.

SA

SP

S/S S/S/S

TEMP.

V

VAV

VEL.

W W/

WP.

WPD

WPG

XFMR.

AFG ABOVE FINISHED GRADE

CKT. CIRCUIT

DEFL. DEFLECTION

MVD MANUAL VOLUME DAMPER

WB WET BULB

MEP ABBREVIATIONS

WITHOUTW/O

UNO UNLESS NOTED OTHERWISE

UH UNIT HEATER

SAG SUPPLY AIR GRILLE

LAT LEAVING AIR TEMPERATURE

HP HORSE POWER

FLR. FLOOR

FAN COIL UNITFCU

EF EXHAUST FAN

CONDENSING UNITCU

RD. RADIUS

HOA HANDS/OFF/AUTO. MOTOR STARTER

HTG. HEATING

EA EXHAUST AIR

F/A FREE AREA OPENING (SQ. FT.)

ABOVE FINISHED CEILINGAFC

NOT IN CONSTRUCTIONNIC

W.G. WATER GUAGE

TOTAL STATIC PRESSURE (IN. W.G.)T.S.P.

MOTOR STARTERSTR.

SEER SEASON ENERGY EFFICIENCY RATIO

AMB. AMBIENT TEMPERATURE (F. DEGREE)

BUILDING MANAGEMENT SYSTEM BMS

CUBIC FEET PER HOURCFH

DISC. DISCONNECT SWITCH

ENERGY MGMT. CONTROL SYSTEM

EXTERNAL STATIC PRESS. (IN. W.G.)E.S.P.

EMCS.

P.D. PRESSURE DROP (FT)

RPM REVOLUTIONS PER MINUTE

FRACTIONAL HORSE POWERFHP

COIL FINS PER INCH.FPI

MCA

MOCP

MINIMUM CURRENT AMPS.

MAX. OVER CURRENT PROTECTION

BELOW GRADEB.G.

AHAP AS HIGH AS POSSIBLE

OWNERS AUTHORIZED REPRESENTATIVEOAR

OWNER FURNISHED CONTRACTOR INSTALLEDOFCI

SECTION

DETAIL SYMBOL

(ALL SYMBOLS MAY NOT APPEAR ON DRAWINGS)

DRAWING SYMBOLS

NOTE BY SYMBOL

AIR DISTRIBUTION DEVICE

SUBTITLE

X

XX

XX

XX

XX

XX XX

NUMBER

DESCRIPTION

SCALE

DETAIL #

DRAWING NO. TO REFER TO

AIR QUANTITY

ARROWS INDICATE

THROW PATTERN

G-R-D

DESIGNATION

DRAWING NUMBER WHERE

SECTION IS LOCATED

SECTION NUMBER

GAS PRESSURE REDUCING VALVE

WATER PRESSURE REDUCING VALVE

ELEVATION/ RISER DIAGRAM SYMBOL

XX

XX

DRAWING NUMBER

POINTS TO ELEVATION/ RISER AREA

ELEVATION/ RISER #

(ALL DESIGNATIONS MAY NOT APPEAR ON DRAWINGS.)

PIPING DESIGNATIONS

DEMO TO THIS POINT

EXISTING CHILLED WATER SUPPLY

EXISTING CHILLED WATER RETURN

CHWS(E)

CHWR(E)

SCOPE OF WORK

THE SCOPE OF WORK FOR THIS PROJECT INCLUDES MECHANICAL AND ELECTRICAL WORK

ASSOCIATED WITH THE ADDITION OF LEAD/LAG CHILLED WATER BUILDING VARIABLE SPEED

PUMPS IN CRAWL SPACE; REPLACEMENT OF EXISTING 3-WAY CONTROL VALVES WITH 2-WAY

CONTROL VALVES FOR ALL FIVE EXISTING AHU'S (#32-#36) IN THE 2ND LEVEL MECHANICAL

ROOM; AND ADDITION/ INTEGRATION OF PUMP AND TEMPERATURE CONTROLS WITH

EXISTING 2006 HONEYWELL CONTROL SYSTEM.

CONTRACTOR TO PROVIDE 500 TON AIR COOLED CHILLER WITH GENERATOR FOR

TEMPORARY SERVICE DURING CONSTRUCTION.

M0.0

LEGEND AND

GENERAL NOTES

- MECHANICAL

Project No.

221531

Sheet No.

Re vi si o ns

B

LO

O M

D A

LE

R D

M cK

IN

N

EY

, T

EX

A S

Te xa s Re g is te re d F irm N o

F

-7

W e st th S tr e e t, S u it e

Pl a no

, T X

.4

.0

Em a il:

m d e ng c a m d

-e ng

.c o m Pr o je c t N um b e r:

C C

C O

U

RT

H O

U

SE

C H

W W

A

TE

R

PI

PI

N

G

AutoCAD SHX Text 03/22/2024

AutoCAD SHX Text

CONSTRUCTION DOCUMENTS

AutoCAD SHX Text

DATE

DESCRIPTION

EXIST. VAULT #5

BLOOMDALE

COURTHOUSE

18" CHWS/R

DEMOLITON BEGINS

HERE FOR ALTERNATE #1.

DEMOLITION CONTINUES

UP TO BUILDING ENTRANCE IN PUMP ROOM

AS SHOWN IN PHOTO

18"

EXIST.

TELECOMMUNICATION

DUCT BANK

TO REMAIN

REFERENCE 2009 SITE SHEET

FOR UTLITIIES IN THIS AREA OF

SITE.

GENERAL DEMO NOTES

1. REFER TO M0.0 FOR GENERAL MECHANICAL NOTES,

ABBREVIATIONS, AND SYMBOLS.

2. PRIOR TO THE DEMOLITION OF WORK BY ANY TRADE PROVIDE A

QUALIFIED MECHANICAL CONTRACTOR TO DISCONNECT ALL

MECHANICAL EQUIPMENT WITHIN THE AREA OF DEMOLITION. THIS

CONTRACTOR SHALL REMAIN ON SITE DURING DEMOLITION, TO

DISCONNECT AND TEST ALL MECHANICAL SYSTEMS THAT BECOMES

ACCESSIBLE DURING THE COURSE OF DEMOLITION.

3. TOUR THE PROJECT SITE WITH THE OWNER'S REPRESENTATIVE TO

IDENTIFY AND MARK THOSE ITEMS SCHEDULED FOR DEMOLITION,

THAT THE OWNER WISHES TO RETAIN. DELIVER THOSE ITEMS SO

MARKED, TO THE OWNER'S STORAGE, WITHIN THE PROJECT SITE

AS DIRECTED.

4. ALL REMAINING DEMOLITION ITEMS SHALL BECOME THE

CONTRACTORS PROPERTY AND SHALL BE REMOVED FROM THE

SITE. HAZARDOUS MATERIALS SHALL BE DISPOSED OF IN

ACCORDANCE WITH FEDERAL REGULATIONS AND THE CONTRACT

DOCUMENTS.

GENERAL DEMO NOTES

1. DEMOLITION BEGINS HERE (SOUTH) FOR BASE BID.

2. DEMOLITION BEGINS HERE FOR ALT. #1.

MD1.0

DEMO SITE PLAN

- MECHANICAL

NORTH

Project No.

221531

Sheet No.

Re vi si o ns

B

LO

O M

D A

LE

R D

M cK

IN

N

EY

, T

EX

A S

Te xa s Re g is te re d F irm N

W e st th S tr e e t, S u it e

Pl a no

, T X

.4

.0

Em e ng c a m d

-e ng

.c o m Pr o je c t N um b e r:

C C

C O

U

RT

H O

U

SE

C H

W W

A

TE

R

PI

PI

N

G

DEMO SITE PLAN - MECHANICAL01 SCALE: 1"=32'-0"

DEMOLITION

BEGINS HERE FOR

ALTERNATE #1

EXIST. VAULT #5

18" CHWS/R

DEMOLITION

BEGINS HERE (SOUTH)

FOR BASE BID.

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text

CB

AutoCAD SHX Text

CC

AutoCAD SHX Text

CD

AutoCAD SHX Text

CE

AutoCAD SHX Text

CF

AutoCAD SHX Text

CG

AutoCAD SHX Text

CH

AutoCAD SHX Text

CJ

AutoCAD SHX Text

CK

AutoCAD SHX Text

CA

AutoCAD SHX Text

CL

AutoCAD SHX Text

CM

AutoCAD SHX Text

CN

AutoCAD SHX Text

CP

AutoCAD SHX Text

CQ

AutoCAD SHX Text

CR

AutoCAD SHX Text

CS

AutoCAD SHX Text

CT

AutoCAD SHX Text

CU

AutoCAD SHX Text

CV

AutoCAD SHX Text C1

AutoCAD SHX Text C2

AutoCAD SHX Text C3

AutoCAD SHX Text C4

AutoCAD SHX Text A

AutoCAD SHX Text B

AutoCAD SHX Text C

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text H

AutoCAD SHX Text J

AutoCAD SHX Text K

AutoCAD SHX Text L

AutoCAD SHX Text F

AutoCAD SHX Text G

AutoCAD SHX Text C

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text H

AutoCAD SHX Text J

AutoCAD SHX Text K

AutoCAD SHX Text E6

AutoCAD SHX Text G4

AutoCAD SHX Text E6

AutoCAD SHX Text G4

AutoCAD SHX Text F

AutoCAD SHX Text G

AutoCAD SHX Text D9

AutoCAD SHX Text D8

AutoCAD SHX Text E5

AutoCAD SHX Text E7

AutoCAD SHX Text F2

AutoCAD SHX Text F3

AutoCAD SHX Text F7

AutoCAD SHX Text F8

AutoCAD SHX Text G3

AutoCAD SHX Text G5

AutoCAD SHX Text H1

AutoCAD SHX Text H2

AutoCAD SHX Text K9

AutoCAD SHX Text 1/32"=1'-0"

AutoCAD SHX Text

GRAPHIC SCALE:

AutoCAD SHX Text

AutoCAD SHX Text 8'

AutoCAD SHX Text 16'

AutoCAD SHX Text 32'

AutoCAD SHX Text 64'

AutoCAD SHX Text 03/22/2024

AutoCAD SHX Text

CONSTRUCTION DOCUMENTS

AutoCAD SHX Text

DATE

18"

18"

EXISTING

12" VALVE

EXIST. 12"

VALVE

LOCATION OF NEW 12"

CHILLED WATER PIPING TEE (8")

FOR TEMP. CHILLER

RETURN CONNECTION.

LOCATION

FOR TEMP.

CHILLER

CHWR

CONNECTION

FREEZE SECTION

OF PIPING FOR

12" PIPING W/

8" TEE INSTALLATION.

EXISTING

12" CHWS

CLOSE EXISTING

12" CHWR VALVE

TO INSTALL

TEMP.

CONNECTION

FOR 8" CHWR

1. INSTALL AND PERFORM CRYOGENTIC PIPE FREEZING SYSTEM

W/ LIQUID NITROGEN (LN2); INSULATED JACKET; AND

STAINLESS STEEL HOSE. TECHNICIAN SHALL BE OSHA 10

CERTIFIED.

2. AREA (FLANGE) TO BE REMOVED FOR SCHEDULE 40 CAP AT

EACH OPEN END 18" PIPE.

NOTES BY SYMBOL " "

1. CONTRACTOR SHALL COORDINATE AVAILABLE 3 DAY

WEEKEND FOR SHUTDOWN OF EXISTING CHILLED WATER

SYSTEM FOR THIS WORK.

2. CLOSE EXIST. 18" VALVES TO MINIMUM FLOW IN THE 18"

CHILLED WATER LINES LOCATED IN VAULT 5 PRIOR TO

FREEZING LINES SHOWN IN PHOTOS BELOW.

3. FULLY OPEN THE EXIST. 18" VALVES IN VAULT 5 AFTER ALL

TEMPORARY CONNECTIONS AND WORK SHOWN HERE IS

COMPLETE.

SCOPE OF WORK FOR FUTURE

TEMPORARY AIR COOLED CHILLER

M0.1

TEMPORARY

CHILLED WATER

CONNECTIONS -

MECHANICAL

Project No.

221531

Sheet No.

Re vi si o ns

B

LO

O M

D A

LE

R D

M cK

IN

N

EY

, T

EX

A S

Te xa s Re g is te re d F irm N

W e st th S tr e e t, S u it e

Pl a no

, T X

.4

.0

Em e ng c a m d

-e ng

.c o m Pr o je c t N um b e r:

C C

C O

U

RT

H O

U

SE

C H

W W

A

TE

R

PI

PI

N

G

PHASE 1- TEMPORARY CHILLED WATER CONNECTIONS01 SCALE: NTS

AutoCAD SHX Text 03/22/2024

AutoCAD SHX Text

CONSTRUCTION DOCUMENTS

AutoCAD SHX Text

DATE

VAULT #5

6" CHWS/R BYPASS

BLOOMDALE

COURTHOUSE

VAULT #5 - 18" CHWS & CHWR

BLOOMDALE

COURTHOUSE

NEW PIPING EXTENDS

BENEATH LOADING DOCK

TO NEW RISERS IN

MECH PUMP ROOM

CONNECT NEW 18" CHWS &

CHWR TO EXIST. 18" CHWS/R

PIPING (ALT. #1)

CHWS

CHWR

CH

W

R

CH

W

S

EXIST. TELECOMMUNICATION

DUCTBANK

CHWS

CHWR

NEW VAULT W/ 18" CHWS/R BUTTERFLY

VALVES FOR FUTURE COURTHOUSE EXPANSION.

1. CONTRACTOR SHALL BORE UNDER ROAD IN THIS APPROXIMATE

LOCATION.

2. CONTRACTOR SHALL FIELD VERIFY EXACT LOCATION AND DEPTH

ON EXISTING CHILLED WATER LINES.

3. CONTRACTOR SHALL FIELD VERIFY EXACT PATH OF THE EXIST.

CHILLED WATER LINES. CONNECT NEW PIPE TO EXISTING. PIPE

SHALL BE SLEEVED WHERE IT COMES OUT OF THE GROUND AND

THEN CONNECTED TO EXISTING PIPE.

4. PROVIDE THRUST BLOCK AS DETAILED.

5. INSTALL CHILLED WATER SUPPLY AND RETURN LINES AS IN SAME

PATH AS PREVIOUS CHILLED WATER PIPING WITHOUT DISRUPTING

EXISTING UTILITIES.

6. ALT #1 ENDS, BASE BID BEGINS WITH NEW VAULT.

GENERAL NOTES

1. REFER TO MP0.0 FOR GENERAL MECHANICAL NOTES,

ABBREVIATIONS AND SYMBOLS.

2. CONTRACTOR SHALL FIELD VERIFY EXACT LOCATION AND

DEPTH OF EXISTING UTILITY LINES AND CHILLED WATER

LINES.

3. ANY PIPE PENETRATIONS THRU EXIST. STRUCTURAL

CONCRETE SHALL BE COORDINATED AND INSTALLED PER

STRUCTURAL ENGINEER'S RECOMMENDATIONS.

4. ALL PIPE SHALL BE DIRECT BURIAL WITH 4' MINIMUM FILL

OVER TOP OF PIPE. COORDINATE WITH OTHER TRADES

BEFORE STARTING ANY WORK.

5. HDPE PIPING SHALL BE INSTALLED PER MANUFACTURER'S

RECOMMENDATION AND INDICATED ON SHOP DRAWINGS.

PREPARED BY PRE-INSULATED PIPE MANUFACTURER.

6. PROVIDE THRUST BLOCKS AT EACH CHANGE OF DIRECTION.

INSTALL PER MANUFACTURERS RECOMMENDATION AND

INDICATE ON SUBMITTALS PREPARE BY THE HDPE PIPE

MANUFACTURER.

7. PROVIDE MARKING TAPE OR COPPER WITH 2' ABOVE PIPE

FOR LOCATING THE FUTURE.

8. CONTRACTOR SHALL HAVE COORDINATION MEETING WITH

OWNER AND UTILITY REPRESENTATIVES PRIOR TO SHOP

DRAWING SUBMITTAL.

NOTES BY SYMBOL " "

NTS

5'-1"

8'-8"

8'-8"

8"

FULL 180° OPEN

(TYPICAL)

SPRING ASSISTED

GALVANIZED DIAMOND

PLATE DOORS

W/LOCKING LATCH

OPTIONAL-NONSLIP DOORS

2-TON LIFT ANCHOR

(4 PLACES IN TOP)

KNOCKOUT

FOR PIPE

PENETRATION

(AS REQ'D)

BASE (No. 776-B)

5'-0" LONG

GALVANIZED

"C" CHANNEL

(2 EACH WALL)

TOP (No. 77-8-T-352P)

12" Dia.

Sump

GALVANIZED

PULL/LIFT IRON

(1 EACH WALL)

1" DIA. GROUND

ROD KNOCKOUT

H1

L1 W1

CONCRETE:

SPECIFICATIONS

OLD CASTLE

MODEL NO.

STANDARD

DUTY

10'-0"

L1 W1 H1

15,000

LBS

APPROX. WEIGHT

WALLS AND BOTTOM

PRECAST CONCRETE

VAULT SECTION WITH

REINFORCEMENT: GRADE 60 REINFORCED. STEEL REBAR CONFORMING

TO ASTM A615 ON REQUIRED CENTERS OR EQUAL.

BAR BENDING & PLACEMENT SHALL CONFORM TO

LATEST ACI STANDARDS FOR PRECAST CONCRETE.

CLASS I/II CONCRETE WITH OF DESIGN STRENGTH

OF 4500 PSI AT 28 DAYS. UNIT IS OF MONOLITHIC

CONSTRUCTION AT FLOOR AND FIRST STAGE OF

WALL WITH SECTIONAL RISER TO REQUIRED DEPTH.

8'-0" 8'-0"

UTILITY

MODEL

VAULT

SCALE:

M1.0

SITE PLAN -

MECHANICAL

NORTH

Project No.

221531

Sheet No.

Re vi si o ns

B

LO

O M

D A

LE

R D

M cK

IN

N

EY

, T

EX

A S

Te xa s Re g is te re d F irm N

W e st th S tr e e t, S u it e

Pl a no

, T X

.4

.0

Em e ng c a m d

-e ng

.c o m Pr o je c t N um b e r:

C C

C O

U

RT

H O

U

SE

C H

W W

A

TE

R

PI

PI

N

G

SITE PLAN - MECHANICAL01 SCALE: 1"=32'-0"

NOT TO SCALE

SECTION A

NOTE:

BEARING SURFACE = A x B IN SQUARE FEET.

A x B > rasp

WHERE R = REACTION IN POUNDS

Sp. = ALLOWABLE SOIL BEARING

PRESSURE IN POUNDS PER

SQUARE FEET.

AA

UNDISTURBED EARTH

6" MIN. CHAT BED

A

NOT TO SCALE

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text

CB

AutoCAD SHX Text

CC

AutoCAD SHX Text

CD

AutoCAD SHX Text

CE

AutoCAD SHX Text

CF

AutoCAD SHX Text

CG

AutoCAD SHX Text

CH

AutoCAD SHX Text

CJ

AutoCAD SHX Text

CK

AutoCAD SHX Text

CA

AutoCAD SHX Text

CL

AutoCAD SHX Text

CM

AutoCAD SHX Text

CN

AutoCAD SHX Text

CP

AutoCAD SHX Text

CQ

AutoCAD SHX Text

CR

AutoCAD SHX Text

CS

AutoCAD SHX Text

CT

AutoCAD SHX Text

CU

AutoCAD SHX Text

CV

AutoCAD SHX Text C1

AutoCAD SHX Text C2

AutoCAD SHX Text C3

AutoCAD SHX Text C4

AutoCAD SHX Text A

AutoCAD SHX Text B

AutoCAD SHX Text C

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text H

AutoCAD SHX Text J

AutoCAD SHX Text K

AutoCAD SHX Text L

AutoCAD SHX Text F

AutoCAD SHX Text G

AutoCAD SHX Text C

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text H

AutoCAD SHX Text J

AutoCAD SHX Text K

AutoCAD SHX Text E6

AutoCAD SHX Text G4

AutoCAD SHX Text E6

AutoCAD SHX Text G4

AutoCAD SHX Text F

AutoCAD SHX Text G

AutoCAD SHX Text D9

AutoCAD SHX Text D8

AutoCAD SHX Text E5

AutoCAD SHX Text E7

AutoCAD SHX Text F2

AutoCAD SHX Text F3

AutoCAD SHX Text F7

AutoCAD SHX Text F8

AutoCAD SHX Text G3

AutoCAD SHX Text G5

AutoCAD SHX Text H1

AutoCAD SHX Text H2

AutoCAD SHX Text K9

AutoCAD SHX Text

VAULT DETAIL

AutoCAD SHX Text

AutoCAD SHX Text

DIMENSIONS

AutoCAD SHX Text 1/32"=1'-0"

AutoCAD SHX Text

GRAPHIC SCALE:

AutoCAD SHX Text

AutoCAD SHX Text 8'

AutoCAD SHX Text 16'

AutoCAD SHX Text 32'

AutoCAD SHX Text 64'

AutoCAD SHX Text 03/22/2024

AutoCAD SHX Text

CONSTRUCTION DOCUMENTS

AutoCAD SHX Text

DATE

AutoCAD SHX Text

DESCRIPTION

AutoCAD SHX Text %%uTRENCH DETAIL

AutoCAD SHX Text

AutoCAD SHX Text %%uTHRUST BLOCK

GENERAL NOTES

1. SEE PLAN SHEET M0.0 FOR NOTES, SYMBOLS, AND

ABBREVIATIONS. REFER TO SPECIFICATIONS FOR

ADDITIONAL PROJECT REQUIREMENTS.

2. CONTRACT DRAWINGS ARE DIAGRAMMATIC.

CONTRACTOR SHALL FIELD VERIFY ALL CONDITIONS IN

THE AREA OF EXISTING AND NEW WORK.

3. COORDINATE WITH ALL TRADES BEFORE INSTALLING

ANY PIPING.

N.I.C.

M2.1

DEMOLITION STOPS

AT 5'-0" AFF.

C H

W S

(E

C H

W R

(E

CONTRACTOR SHALL LEAVE 1-DOCK

OPERATING FOR THE DURATION OF THE

PROJECT.

REFERENCE DEMO SITE PLAN

FOR CONTINUATION

REMOVE &

STORE EXISTING

DOCK LEVELER

18"

M1.1

PARTIAL PLAN -

DEMO & NEW

PIPING

SCHEMATIC -

MECHANICAL

NORTH

Project No.

221531

Sheet No.

Re vi si o ns

B

LO

O M

D A

LE

R D

M cK

IN

N

EY

, T

EX

A S

Te xa s Re g is te re d F irm N

W e st th S tr e e t, S u it e

Pl a no

, T X

.4

.0

Em e ng c a m d

-e ng

.c o m Pr o je c t N um b e r:

C C

C O

U

RT

H O

U

SE

C H

W W

A

TE

R

PI

PI

N

G

DEMOLITION - PARTIAL FLOOR PLAN - MECHANICAL01 SCALE: 3/32"=1'-0"

KEY PLAN

LOWER LEVEL MECH CHILLED WATER PUMP ROOM

LEVEL 1

NEW 18" UNDERGROUND HDPE PIPING

BENEATH THE LOADING DOCK TO ENTRANCE IN PUMP ROOM

COURTHOUSE CHILLED WATER ENTRANCE SCHEMATIC

(LOOKING WEST ON RISER WALL IN PUMP ROOM)

NEW 18" BUTTERFLY VALVE

CONNECT TO EXISTING RISER

NEW 18" BUTTERFLY VALVE

CONNECT TO EXISTING RISER CH

W

R( E)

CH

W

S( E)

BLACK STEEL BEGINS

HERE IN PUMP ROOM

FOR INSTALLATION OF

NEW B.V.

BLACK STEEL BEGINS

HERE IN PUMP ROOM

FOR INSTALLATION OF

NEW B.V.

VAULT 5

ALTERNATE - 1

THIS SECTION OF 18" BLACK

STEEL, CHWS & CHWR PIPING

IS REMOVED & REPLACED

WITH HDPE PIPING.

EXISTING DUCT BANK

IN THIS AREA TO REMAIN.

ALTERNATE - 1 ENDS HERE & BASE BID BEGINS

AT NEW VAULT AS SHOWN ON DOCUMENTS.

AREA OF NEW VAULT. EXISTING DUCT BANK IN

THIS AREA TO REMAIN.

THIS PORTION OF NEW PIPING DISRUPTING

TRAFFIC SHALL BE HELD TO 1 WEEKEND.

PATH OF NEW PIPING. EXISTING DUCT BANK

IN THIS AREA TO REMAIN.

AREA OF NEW PIPING ON

NORTH HALF OF 2 TRUCK

DOCK. SOUTH HALF SHALL

BE OPERATIONAL DURING

CONSTRUCTION.

AutoCAD SHX Text

SUPPORT SERVICES

AutoCAD SHX Text

OPEN OFFICE

AutoCAD SHX Text 00124

AutoCAD SHX Text

STAIR 3

AutoCAD SHX Text 00132

AutoCAD SHX Text

CORRIDOR

AutoCAD SHX Text 00134

AutoCAD SHX Text

SUPR.

AutoCAD SHX Text

STORAGE

AutoCAD SHX Text 00130

AutoCAD SHX Text

ELECTRICAL

AutoCAD SHX Text

ROOM

AutoCAD SHX Text 00148

AutoCAD SHX Text

PUMP

AutoCAD SHX Text

ROOM

AutoCAD SHX Text 00128

AutoCAD SHX Text

DOCK

AutoCAD SHX Text 00120

AutoCAD SHX Text

CORRIDOR

AutoCAD SHX Text 00149

AutoCAD SHX Text K

AutoCAD SHX Text L

AutoCAD SHX Text M

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 11.1

AutoCAD SHX Text K9

AutoCAD SHX Text

AutoCAD SHX Text 5'

AutoCAD SHX Text 10'

AutoCAD SHX Text 3/32"=1'-0"

AutoCAD SHX Text

GRAPHIC SCALE:

AutoCAD SHX Text 20'

AutoCAD SHX Text 03/22/2024

AutoCAD SHX Text

CONSTRUCTION DOCUMENTS

AutoCAD SHX Text

DATE

N.I.C.

CONTRACTOR SHALL LEAVE 1-DOCK

OPERATING FOR THE DURATION OF THE

PROJECT.

C H

W S

C H

W R

NEW 18"

RISER UP TO

6'-0" AFF

REF. PIC. ON M4.1

FOR EXIST. RISERS

NEW 18"

RISER

UP TO 6'-0" AFF

NEW 18" CHWS/R PIPING BENEATH THE

DOCK.

NEW 18" UNDERGROUND

BENEATH DOCK SLAB.

18" CHWS(E)

18" CHWR(E)

NEW 8"

CHWS & CHWR

SERVING

TEMPORARY

CHILLER.

12" CHWR(E)

12"

CHWS(E)

14"

EXISTING CHW PUMPS

AND HT. EXCHANGERS

GENERAL NOTES

1. SEE PLAN SHEET M0.0 FOR NOTES, SYMBOLS, AND

ABBREVIATIONS. REFER TO SPECIFICATIONS FOR

ADDITIONAL PROJECT REQUIREMENTS.

2. CONTRACT DRAWINGS ARE DIAGRAMMATIC.

CONTRACTOR SHALL FIELD VERIFY EXISTING UTILITIES

IN THE AREA OF NEW CHILLED WATER PIPING.

3. COORDINATE WITH ALL TRADES BEFORE INSTALLING

ANY CHILLED WATER PIPING.

NOTES BY SYMBOL " "

1. ROUTE NEW 18" CHWS PIPING UP THROUGH THE

FLOOR AND INSTALL A 18" BUTTERFLY VALVE 3'-0"

AFF.

2. EXISTING DIFFERENTIAL PRESSURE SENSORS TO

REMAIN.

3. ROUTE NEW 18" CHWR PIPING UP THROUGH THE

FLOOR AND INSTALL A 18" BUTTERFLY VALVE 3'-0"

AFF.

4. EXISTING 12" BUTTERFLY VALVES.

5. CONNECT TEMPORARY CHWS TO 8"

CONNECTION PROVIDED IN PHASE 1.

6. CONNECT TEMPORARY CHWR TO 8" TEE

CONNECTION PROVIDED IN PHASE 1.

M2.1

ENLARGED PLAN

- MECHANICAL

NORTH

Project No.

221531

Sheet No.

Re vi si o ns

B

LO

O M

D A

LE

R D

M cK

IN

N

EY

, T

EX

A S

Te xa s Re g is te re d F irm N

W e st th S tr e e t, S u it e

Pl a no

, T X

.4

.0

Em e ng c a m d

-e ng

.c o m Pr o je c t N um b e r:

C C

C O

U

RT

H O

U

SE

C H

W W

A

TE

R

PI

PI

N

G

ENLARGED PLAN - MECHANICAL01 SCALE: 1/8"=1'-0"

KEY PLAN

AutoCAD SHX Text

SUPPORT SERVICES

AutoCAD SHX Text

OPEN OFFICE

AutoCAD SHX Text 00124

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text 00126

AutoCAD SHX Text

STAIR 3

AutoCAD SHX Text 00132

AutoCAD SHX Text

CORRIDOR

AutoCAD SHX Text 00134

AutoCAD SHX Text

BUILDING

AutoCAD SHX Text

STORAGE

AutoCAD SHX Text 00136

AutoCAD SHX Text

STAIR 4

AutoCAD SHX Text 00144

AutoCAD SHX Text

SECURE

AutoCAD SHX Text

CORRIDOR

AutoCAD SHX Text 00198

AutoCAD SHX Text

SUPR.

AutoCAD SHX Text

STORAGE

AutoCAD SHX Text 00130

AutoCAD SHX Text

STORAGE

AutoCAD SHX Text

ROOM

AutoCAD SHX Text 00190

AutoCAD SHX Text

MECHANICAL

AutoCAD SHX Text

ROOM

AutoCAD SHX Text 00140

AutoCAD SHX Text

BOILER

AutoCAD SHX Text

ROOM

AutoCAD SHX Text 00142

AutoCAD SHX Text

SECURE

AutoCAD SHX Text

VESTIBULE

AutoCAD SHX Text 00150

AutoCAD SHX Text

SECURE

AutoCAD SHX Text

VESTIBULE

AutoCAD SHX Text 00152

AutoCAD SHX Text

ELECTRICAL

AutoCAD SHX Text

ROOM

AutoCAD SHX Text 00148

AutoCAD SHX Text

ELECTRICAL

AutoCAD SHX Text

ROOM

AutoCAD SHX Text 00146

AutoCAD SHX Text

PUMP

AutoCAD SHX Text

ROOM

AutoCAD SHX Text 00128

AutoCAD SHX Text

BUILDING

AutoCAD SHX Text

STORAGE

AutoCAD SHX Text 00138

AutoCAD SHX Text

CORRIDOR

AutoCAD SHX Text 00135

AutoCAD SHX Text

ELEV. 10

AutoCAD SHX Text

ELEV. 9

AutoCAD SHX Text

ELEV. 8

AutoCAD SHX Text

ELEV. 7

AutoCAD SHX Text

ELEVATOR

AutoCAD SHX Text

LOBBY

AutoCAD SHX Text 00154

AutoCAD SHX Text

DOCK

AutoCAD SHX Text 00120

AutoCAD SHX Text

CORRIDOR

AutoCAD SHX Text 00149

AutoCAD SHX Text

3 MAN

AutoCAD SHX Text

CELL

AutoCAD SHX Text 00174

AutoCAD SHX Text J

AutoCAD SHX Text K

AutoCAD SHX Text L

AutoCAD SHX Text M

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 11.1

AutoCAD SHX Text K9

AutoCAD SHX Text 1/8"=1'-0"

AutoCAD SHX Text

GRAPHIC SCALE:

AutoCAD SHX Text

AutoCAD SHX Text 2'

AutoCAD SHX Text 4'

AutoCAD SHX Text 8'

AutoCAD SHX Text 16'

AutoCAD SHX Text 03/22/2024

AutoCAD SHX Text

CONSTRUCTION DOCUMENTS

AutoCAD SHX Text

DATE

DEMOLITION INCLUDES

THIS SECTION OF CHWS/R

PIPING FOR NEW 18"

BUTTERFLY VALVES.

NEW 18"

BUTTERFLY

VALVE

(CHWS)

NEW 18"

HDPE

STOPS HERE

NEW 18"

BUTTERFLY

VALVE

(CHWR)

NEW 18"

BLACK

STEEL

PIPING

NEW RISER

NEW RISER

M4.1

PHOTOS -

MECHANICAL

Project No.

221531

Sheet No.

Re vi si o ns

B

LO

O M

D A

LE

R D

M cK

IN

N

EY

, T

EX

A S

Te xa s Re g is te re d F irm N

W e st th S tr e e t, S u it e

Pl a no

, T X

.4

.0

Em e ng c a m d

-e ng

.c o m Pr o je c t N um b e r:

C C

C O

U

RT

H O

U

SE

C H

W W

A

TE

R

PI

PI

N

G

PHOTO - VAULT 5 - 18" CHWS & CHWR01

PHOTO - PUMP ROOM - NEW WORK02

(INCLUDES NEW HDPE PIPING ENTRANCE

UP TO 18" AFF; NEW BLACK STEEL PIPING

W/ 18" B.V.'S

PHOTO - PUMP ROOM - CHILLED WATER ENTRANCE04

AutoCAD SHX Text 03/22/2024

AutoCAD SHX Text

CONSTRUCTION DOCUMENTS

AutoCAD SHX Text

DATE

AREA W/

CONCRETE ELEC.

DUCT BANK W/

PIPING BENEATH.

AREA OF WORK.

DEMOLITION & NEW

HDPE CHILLED WTR. PIPING.

PUMP ROOM

ON OTHER SIDE

OF THIS WALL.

REMOVE DOCK LEVELER

SO AS TO RE-USE.

THIS SIDE OF DOCK

TO REMAIN OPERATIONAL

THROUGHOUT CONSTRUCTION

REMOVE THIS AREA OF

CONCRETE FOR NEW

CHILLED WATER PIPING

INSTALLATION.

M4.2

PHOTOS -

MECHANICAL

Project No.

221531

Sheet No.

Re vi si o ns

B

LO

O M

D A

LE

R D

M cK

IN

N

EY

, T

EX

A S

Te xa s Re g is te re d F irm N

W e st th S tr e e t, S u it e

Pl a no

, T X

.4

.0

Em e ng c a m d

-e ng

.c o m Pr o je c t N um b e r:

C C

C O

U

RT

H O

U

SE

C H

W W

A

TE

R

PI

PI

N

G

PHOTO - PREVIOUS EXCAVATING WHERE CHILLED WATER PIPING IS LOCATED01

PHOTO - WORK AREAS04 PHOTO - DOCK02

PHOTO - PREVIOUS CHILLED WATER LEAK03

AutoCAD SHX Text 03/22/2024

AutoCAD SHX Text

CONSTRUCTION DOCUMENTS

AutoCAD SHX Text

DATE

221531 - COVER
221531 - COVER
221531 - M0.0
221531 - M0.0
221531 - MD1.0
221531 - MD1.0
221531 - M0.1
221531 - M0.1
221531 - M1.0
221531 - M1.0
221531 - M1.1
221531 - M1.1
221531 - M2.1
221531 - M2.1
221531 - M4.1
221531 - M4.1
221531 - M4.2
221531 - M4.2