221531_-_M0.0.pdf
PDF 221 KB Posted
- Solicitation number
- 2024-419
- Issued by
- Collin County, Texas
About this file
This document is a Mechanical Legend and General Notes sheet (M0.0) for the Collin County Courthouse Chilled Water Piping Replacement project, prepared by MD Engineering. The project scope involves replacing the existing 18-inch underground black steel chilled water piping with 18-inch underground HDPE piping. The base plan includes piping replacement from a new vault to the building entrance, with 18-inch butterfly valves added for building isolation. Alternate 1 extends the replacement scope from Vault 5 to the new vault, which will house two 18-inch isolation valves for a future courthouse expansion.
The project requires significant temporary infrastructure, including providing a 500-ton air-cooled chiller with generator for temporary service during construction. The contractor must perform cryogenic freezing of existing chilled water lines to install valves for risers and temporary piping connections. Additional requirements include minimal disruption to neighboring tenants, performing saw cutting after hours, and coordinating with architectural, structural, civil, and electrical work. The project emphasizes careful verification of existing system information and adherence to SMACNA and manufacturer standards for installation.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Collin_County_Courthouse_Chilled_Water_Lines_Replacement_(Addendum_#5_Revision).pdf | ||
| Clarification_Memo.pdf | ||
| 00_43_13_Bid_Bond.doc | DOC document | |
| Collin_County_Courthouse_Utility_Locates_[for_reference_only].pdf | ||
| Pre-bid_Sign_In_Sheet.pdf | ||
| LEGAL_NOTICE.pdf | ||
| Collin_Co._Courthouse_Chilled_Water_Replacement_-_Construction_Drawings.pdf | ||
| Collin_Co._Courthouse_Chilled_Water_Replacement_-_Specifications.pdf | ||
| 005213_Construction_Agreement.docx | DOCX document | |
| 006111_Performance_Bond.doc | DOC document | |
| 006113_Payment_Bond.doc | DOC document | |
| 006119_Maintenance_Bond.doc | DOC document |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1. PROVIDE ALL MATERIALS AND EQUIPMENT AND PERFORM ALL
LABOR REQUIRED TO INSTALL COMPLETE AND OPERABLE
MECHANICAL SYSTEM AS INDICATED ON THE DRAWINGS, AS
SPECIFIED AND AS REQUIRED BY ALL NATIONAL, STATE AND
LOCAL CODES.
2. CONTRACT DRAWINGS FOR MECHANICAL WORK ARE
DIAGRAMMATIC AND ARE INTENDED TO CONVEY SCOPE AND
GENERAL ARRANGEMENT ONLY. IT IS THE CONTRACTORS
RESPONSIBILITY FOR INSTALLING ALL MATERIALS PER SMACNA
STANDARDS AND THE MANUFACTURER'S STANDARDS.
3. ALL EXISTING SYSTEM INFORMATION AND/OR LOCATIONS
ARE PROVIDED BY THE OWNER OR BY A 3RD PARTY.
IT IS THE CONTRACTORS RESPONSIBILITY TO VERIFY ALL MEP
SERVICES ARE LOCATED AS DESIGNED BEFORE BIDDING THE
PROJECT. IN OCCURRENCES WHERE EXISTING DOES NOT
MATCH DESIGNED, IT IS THE CONTRACTORS RESPONSIBILITY
TO NOTIFY THE OWNER, ARCHITECT, & ENGINEER
BEFORE PROCEEDING. IF ANY DISCREPANCIES ARE NOT
IDENTIFIED AT BIDDING, THE COST SHALL BE ABSORBED BY
THE CONTRACTOR AND NOT PASSED ONTO THE OWNER OR
ENGINEER OF RECORD.
4. COORDINATE CONSTRUCTION OF ALL MECHANICAL WORK WITH
ARCHITECTURAL, STRUCTURAL, CIVIL, ELECTRICAL WORK, ETC.,
SHOWN ON THE OTHER CONTRACT DRAWINGS.
5. WHEN TWO OR MORE ITEMS OF THE SAME TYPE OF EQUIPMENT
ARE REQUIRED, THE PRODUCT OF ONE MANUFACTURE SHALL BE
USED.
6. ALL MISCELLANEOUS STEEL REQUIRED TO ENSURE PROPER
INSTALLATION AND AS SHOWN IN DETAILS FOR PIPING SHALL BE
FURNISHED AND INSTALLED BY THE MECHANICAL CONTRACTOR.
7. LOCATION AND SIZES OF ALL FLOOR, AND WALL, OPENINGS
SHALL BE COORDINATED WITH ALL OTHER TRADES.
8. ALL DEMOLITION ACTIVITIES SHALL BE PERFORMED SO AS TO
PROVIDE MINIMAL DISRUPTION TO THE NEIGHBORING TENANTS.
9. ALL SAW CUTTING SHALL BE PERFORMED AFTER HOURS SO THAT
OPERATION DOES NOT DISTURB NEIGHBORING TENANTS. THERE
SHALL BE NO GAS POWERED EQUIPMENT IN TENANT AREAS.
GENERAL PROJECT NOTES:
FLOOR CONTROL VALVE
TEE
TEE, UP
TEE, DOWN
SINGLE SWEEP TEE
CROSS
LATERAL
45 DEGREE ELBOW
90 DEGREE ELBOW
90 DEGREE ELBOW UP
CAP
HVAC VALVE
VENT THRU ROOF
BUTTERFLY VALVE
SOLENOID VALVE
EXPANSION JOINT
FLOAT AND THERM. TRAP
BUCKET STEAM TRAP
FLOOR CLEAN OUT
FIRE HOSE CABINET
PRESSURE RELIEF VALVE
CONTROL, 2 WAY VALVE
CONTROL, 3 WAY VALVE
STRAINER & BLOW OFF VALVE
PRESSURE GAUGE & COCK
UNION OR COMPANION FLANGES
PRESSURE & TEMPERATURE TAP (PETES PLUG)
MANUAL AIR VENT
TEMPERATURE SENSOR
PRESSURE SENSOR
THERMOMETER & WELL
HOSE END DRAIN
AUTOMATIC AIR VENT
FLOW METER
T S
F FLOW SWITCH
ANCHOR (PIPE)
HOSE BIBB
B
B
T
H
F
F.H.C.
D.S.
CO
CO
OR
R.D.
V.T.R.
HUMIDISTAT
CLEAN OUT
GATE VALVE
FLOOR DRAIN
HUB DRAIN
DOWN SPOUT
ROOF DRAIN
CHECK VALVE
GLOBE VALVE
BALL VALVE
PLUG VALVE
THERMOMETER
THERMOSTAT
OS & Y VALVE
& FITTINGS SYMBOLS
ALL SYMBOLS ON THIS LIST ARE NOT NECESSARILY USED ON THIS JOB.
BALANCING VALVE (WITH PETE'S PLUG EITHER SIDE)
SINGLE W.F. LATERAL STUB
DOUBLE W.F. LATERAL STUB
DOUBLE W.F. LAT & TRAP
FLOOR DRAIN RISER W/TRAP
SINGLE W.F. LAT. & TRAP
O.D. OVERFLOW ROOF DRAIN
PIPE GUIDE
COMPRESSED AIR TAP
MOTORIZED ISOLATION VALVE (2-POSITION-24v)
MANUALLY CALIBRATED BALANCING VALVE
AUTOMATIC FLOW CONTROL VALVE
PIPE SIZE REDUCER (CONCENTRIC)
90 DEGREE ELBOW DOWN
ANGLE GATE VALVE
ANGLE GLOBE VALVE
PIPE SIZE REDUCER (ECCENTRIC)
MOTORIZED CONTROL VALVE (MODULATING-24v)
EXISTING PIPING
EXISTING PIPING TO BE REMOVED
UNDERFLOOR
CONNECT TO NEW OR EXISTING
CHILLED WATER SUPPLY
CHILLED WATER RETURN
SYMBOL DESCRIPTION
X X X
CHWS
CHWR
ABOVE
ALTERNATING CURRENT
AIR CONDITIONER
ABOVE FINISHED FLOOR
ABOVE GRADE AND GFI
AIR HANDLING UNIT
ALTERNATE
AMPERE
APPROXIMATELY
ARCHITECTURAL
AVERAGE
BOILER
BAROMETRIC RELIEF DAMPER
BRITISH THERMAL UNIT
CUBIC FEET PER MINUTE
CONSTRUCTION DOCUMENTS
CHILLER
CHEMICAL
CHILLED WATER PUMP
CEILING
COMPRESSOR
COOLING TOWER
CONDENSER WATER PUMP
DRY BULB
DETAIL
DIAMETER
DIMENSION
DESIGN DEVELOPMENT
ENTERING DRY BULB
ELECTRICAL
ELEVATION
ENTERING WET BULB
ENTERING WATER TEMPERATURE
EXHAUST
EXISTING
DEGREES FAHRENHEIT
GROUND FAULT INTERRUPTER
GALLONS PER MINUTE
FEET PER MINUTE
FEET PER SECOND
FOOT OR FEET
HEAD
HEAT PUMP UNIT
HOUR(S)
HEIGHT
HEATER
HEAT,VENT AND AIR CONDITIONING
HOT WATER PUMP
HEAT EXCHANGER
FREQUENCY (HERTZ)
INSIDE DIAMETER OR DIMENSION
INCHES
KILOWATT
KILOWATT HOUR
MAXIMUM
LEAVING WATER TEMPERATURE
1000 BTU PER HOUR
MECHANICAL
MANUFACTURER
MINIMUM
NUMBER
NOT APPLICABLE
NOISE CRITERIA
NECK DIMENSION
OPPOSED BLADE DAMPER
OUTSIDE DIAMETER
OUTSIDE AIR
ORIGINAL
PHASE
POWERED MIXING BOX
PLUMBING
PRESSURE
PANEL
REFERENCE
RETURN AIR
RETURN AIR GRILLE
ROOF TOP UNIT
STAND ALONE DIGITAL CONTROLLER
SENSIBLE
SQUARE
SUPPLY AIR
STATIC PRESSURE
SINGLE SPEED MOTOR
START/STOP/STATUS
TEMPERATURE
VOLT
VARIABLE AIR VALVE
VELOCITY
WATT
WITH
WEATHERPROOF
WATER PRESSURE DROP
WEATHERPROOF GFI
TRANSFORMER
ABV.
AC
A/C
AFF
AG
AHU
ALT.
AMP.
APPROX.
ARCH.
AVG.
B
BRD
BTU
CFM
CD
CH.
CHEM.
CHP
CLG.
CMPR.
CT
CWP
DB
DET.
DIA.
DIM.
DD
EDB
ELEC.
ELEV.
EWB
EWT
EXH.
EXIST.
DEG. F
GFI
GPM
FPM
FPS
FT.
HD.
HPU
HR.
HT.
HTR.
HVAC
HWP
HX
HZ.
ID
IN.
KW
KWH
MAX.
LWT
MBH
MECH.
MFR.
MIN.
NO.
N/A
NC
NK
OBD
OD
OA
ORIG.
PH.
PMB
PLBG.
PRESS.
PNL.
RE.
RA
RAG
RTU
SDC
SENS.
SQ.
SA
SP
S/S S/S/S
TEMP.
V
VAV
VEL.
W W/
WP.
WPD
WPG
XFMR.
AFG ABOVE FINISHED GRADE
CKT. CIRCUIT
DEFL. DEFLECTION
MVD MANUAL VOLUME DAMPER
WB WET BULB
MEP ABBREVIATIONS
WITHOUTW/O
UNO UNLESS NOTED OTHERWISE
UH UNIT HEATER
SAG SUPPLY AIR GRILLE
LAT LEAVING AIR TEMPERATURE
HP HORSE POWER
FLR. FLOOR
FAN COIL UNITFCU
EF EXHAUST FAN
CONDENSING UNITCU
RD. RADIUS
HOA HANDS/OFF/AUTO. MOTOR STARTER
HTG. HEATING
EA EXHAUST AIR
F/A FREE AREA OPENING (SQ. FT.)
ABOVE FINISHED CEILINGAFC
NOT IN CONSTRUCTIONNIC
W.G. WATER GUAGE
TOTAL STATIC PRESSURE (IN. W.G.)T.S.P.
MOTOR STARTERSTR.
SEER SEASON ENERGY EFFICIENCY RATIO
AMB. AMBIENT TEMPERATURE (F. DEGREE)
BUILDING MANAGEMENT SYSTEM BMS
CUBIC FEET PER HOURCFH
DISC. DISCONNECT SWITCH
ENERGY MGMT. CONTROL SYSTEM
EXTERNAL STATIC PRESS. (IN. W.G.)E.S.P.
EMCS.
P.D. PRESSURE DROP (FT)
RPM REVOLUTIONS PER MINUTE
FRACTIONAL HORSE POWERFHP
COIL FINS PER INCH.FPI
MCA
MOCP
MINIMUM CURRENT AMPS.
MAX. OVER CURRENT PROTECTION
BELOW GRADEB.G.
AHAP AS HIGH AS POSSIBLE
OWNERS AUTHORIZED REPRESENTATIVEOAR
OWNER FURNISHED CONTRACTOR INSTALLEDOFCI
SECTION
DETAIL SYMBOL
(ALL SYMBOLS MAY NOT APPEAR ON DRAWINGS)
DRAWING SYMBOLS
NOTE BY SYMBOL
AIR DISTRIBUTION DEVICE
SUBTITLE
X
XX
XX
XX
XX
XX XX
NUMBER
DESCRIPTION
SCALE
DETAIL #
DRAWING NO. TO REFER TO
AIR QUANTITY
ARROWS INDICATE
THROW PATTERN
G-R-D
DESIGNATION
DRAWING NUMBER WHERE
SECTION IS LOCATED
SECTION NUMBER
GAS PRESSURE REDUCING VALVE
WATER PRESSURE REDUCING VALVE
ELEVATION/ RISER DIAGRAM SYMBOL
XX
XX
DRAWING NUMBER
POINTS TO ELEVATION/ RISER AREA
ELEVATION/ RISER #
(ALL DESIGNATIONS MAY NOT APPEAR ON DRAWINGS.)
PIPING DESIGNATIONS
DEMO TO THIS POINT
EXISTING CHILLED WATER SUPPLY
EXISTING CHILLED WATER RETURN
CHWS(E)
CHWR(E)
SCOPE OF WORK
THE EXISTING 18-INCH BLACK STEEL UNDERGROUND CHILLED WATER PIPING WILL BE
REPLACED WITH 18-INCH UNDERGROUND HDPE CHILLED WATER PIPING IN SAME LOCATION.
BASE PLAN INCLUDES THE PIPING BEGINNING AT THE NEW VAULT AND EXTENDING TO THE
UNDERSIDE OF THE BUILDING ENTRANCE. BLACK STEEL WILL CONNECT AT THE BUIILDING
ENTRANCE WHERE THE 18-INCH CHILLED WATER SUPPLY AND RETURN RISERS WILL HAVE
18-INCH BUTTERFLY VALVES ADDED FOR THE BUILDING ISOLATION. ALTERNATE 1 WILL
INCLUDE ADDITIONAL DISTANCE FOR THE CHILLED WATER REPLACEMENT SCOPE OF WORK.
THIS WORK INCLUDES THE UNDERGROUND PIPING FROM THE EXISTING VAULT 5 TO THE
NEW VAULT.
THE NEW VAULT WILL HOUSE TWO 18-INCH ISOLATION VALVES TO SERVE THE FUTURE
COURT HOUSE EXPANSION.
THE COURTHOUSE BUILDING WILL REQUIRE TEMPORARY COOLING FOR THE DURATION OF
THE CHILLED WATER REPLACEMENT PROJECT. THE BUILDING WILL REQUIRE STAGING
WORK FOR THE CONNECTION TO THE TEMPORARY CHILLER. WORK INCLUDES SETTING UP
CHILLED WATER PIPING CONNECTIONS FOR A TEMPORARY CHILLER. INSTALLATION OF
VALVES WILL REQUIRE CRYOGENIC FREEZING OF EXISTING CHILLED WATER LINES FOR THE
INSTALLATION OF VALVES FOR BOTH THE RISERS AND ALSO THE TEMPORARY PIPING
CONNECTIONS TO THE TEMPORARY CHILLER EXPANSION.
CONTRACTOR TO PROVIDE 500 TON AIR COOLED CHILLER WITH GENERATOR FOR
TEMPORARY SERVICE DURING CONSTRUCTION.
M0.0
LEGEND AND
GENERAL NOTES
- MECHANICAL
Project No.
221531
Sheet No.
Re vi si o ns
B
LO
O M
D A
LE
R D
M cK
IN
N
EY
, T
EX
A S
Te xa s Re g is te re d F irm N o
F
-7
W e st th S tr e e t, S u it e
Pl a no
, T X
.4
.0
Em a il:
m d e ng c a m d
-e ng
.c o m Pr o je c t N um b e r:
C C
C O
U
RT
H O
U
SE
C H
W W
A
TE
R
PI
PI
N
G
AutoCAD SHX Text 03/22/2024
AutoCAD SHX Text
CONSTRUCTION DOCUMENTS
AutoCAD SHX Text
DATE
AutoCAD SHX Text
DESCRIPTION
| Sheets and Views |
| 221531 - M0.0 |
File details come from the government source that posted it. Updated .